1) Caltrans is pursuing accelerated bridge construction (ABC) to reduce impacts on travelers by speeding up project delivery and improving safety. ABC aims to minimize construction time and impacts through prefabricated elements and innovative techniques.
2) Caltrans' ABC strategic plan includes documenting lessons learned from past ABC projects in California, developing selection criteria to identify suitable projects, engaging industry stakeholders, conducting research, and implementing a pilot program.
3) A proposed ABC pilot project is replacing the connector between highways I-605 and I-10 in Los Angeles County using precast segmental balanced cantilever construction to minimize traffic impacts during the accelerated construction period.
Deskripsi Asli:
-
Judul Asli
Guidelines for Accelerated Bridge Construction Using PrecastPrestressed Concrete Components
1) Caltrans is pursuing accelerated bridge construction (ABC) to reduce impacts on travelers by speeding up project delivery and improving safety. ABC aims to minimize construction time and impacts through prefabricated elements and innovative techniques.
2) Caltrans' ABC strategic plan includes documenting lessons learned from past ABC projects in California, developing selection criteria to identify suitable projects, engaging industry stakeholders, conducting research, and implementing a pilot program.
3) A proposed ABC pilot project is replacing the connector between highways I-605 and I-10 in Los Angeles County using precast segmental balanced cantilever construction to minimize traffic impacts during the accelerated construction period.
1) Caltrans is pursuing accelerated bridge construction (ABC) to reduce impacts on travelers by speeding up project delivery and improving safety. ABC aims to minimize construction time and impacts through prefabricated elements and innovative techniques.
2) Caltrans' ABC strategic plan includes documenting lessons learned from past ABC projects in California, developing selection criteria to identify suitable projects, engaging industry stakeholders, conducting research, and implementing a pilot program.
3) A proposed ABC pilot project is replacing the connector between highways I-605 and I-10 in Los Angeles County using precast segmental balanced cantilever construction to minimize traffic impacts during the accelerated construction period.
Raymond W. Wolfe, PhD, PE Jason Q. Fang, PhD, PE ABC- Advisory Council California Department of Transportation Caltrans Caltrans Accelerated Bridge Construction Accelerated Bridge Construction (ABC) (ABC) Initiative Initiative One Mission One Vision Enhance Mobility across California Need for Accelerated Project Delivery ABC works towards reducing roadway delay impacts on the traveling public ABC deliver project early, provide speedy capital investments Minimize construction and reduce safety- related issues, environmental impacts Improve constructability, product quality and performance. The Bigger Picture- Caltrans Strategic Plan ABC is an element of Accelerated Project Delivery (APD) APD encompasses all aspects of project delivery, including ABC Benefits of APD: lead to expedited capital improvement (commerce, regional business & services, traveling public)= expeditiously Stimulate & Improve the states economy Accelerated Project Delivery NCHRP 20-73 Accelerating Transportation Project and Program Delivery: Conception to Completion Charlie Fielder, District 1 Director representing the Department Ongoing coordination, discussions, and efforts with HQ and Districts develop and implement accelerated project delivery National Spotlight 2006 ABC Workshop, Reno, NV Guidelines for Accelerated Bridge Construction using Precast/Prestressed Concrete Components, PCI Northeast Bridge Technical Committee (2006) Seismic ABC Meeting at 2007 TRB Annual Meeting 2007 SABC meeting in San Diego 2008 FHWA ABC Conference in Baltimore, MD 2008 TRB SABC Collaboration Meetings UDOT ABC Standards Workshop report (anticipated April 2008) FHWA/WashDOT ABC Workshop (September 2008) FHWA Connections Manual (2008) ABC XYZ? Technical Prefabricating Bridge Elements and Systems (PBES) and erecting on-site Precast concrete super- and sub-structure- Majority of PBES in California Steel superstructure Steel & FRP superstructure Segmental construction methods (could be C.I.P.) Launch or Roll-in (SPMT) girders/superstructures Contract and Construction Double shifts Discentiveand Incentives California Issues Costs of ABC use Construction and material costs Projects programmed before ABC tools considered Industry reluctance- CIP the preferred method (typically not a speedy operation) Seismic risk mitigation Performance objectives risk California ABC Strategic Plan Engineering Services: ABC- Advisory Council Pursues further widespread ABC practice for future standard bridge projects 1. Lessons Learned Report and Survey 2. ABC Selection Criteria 3. Industry Engagement 4. Construction Specifications Development 5. Technical Research and Development 6. Project Implementation- Pilot Program Document Lessons Learned ABC Projects in California in last three years- (completed in less than ~5 months) Identify project goals Define ABC techniques employed Quantify successes/challenges Determine effectiveness Establish ABC Techniques Selection Guides Recommend improvements for future projects and research needs Living document Rte99/120 Separation PC/PS Box Beams, Post-Tensioned w/ Inter Cap Reduce construction time for abutments to allow quicker girder placements Total 12 bridges completed in 3 months I-40 Marble Wash Bridge Replace Replace w/ Precast Girders Marble Wash completed in 28 days ABC Selection Criteria- Reference- FHWA: PBES Framework for Decision Making http://www.fhwa.dot.gov/bridge/prefab/framework.cfm Utah DOT Quantify Costs/Benefits Impact on air quality due to increased vehicle emissions, quality of life due to personal time delays, Untimely business service for workforce, supplier, and customers Incur significant costs to traveling public and region businesses ~tens of thousands of dollars per weekday ABC Selection Criteria- Benefits- Reduces traffic delays, hazards, and provides infrastructure improvement at a fast pace. Generate cost model for impact time duration (CIT)- $/day 1. Facility: Local street, Major Artery/Highway, Landmark Bridges oPercentage of traffic effected 2. Type of Impact: Environmental, Traffic Delay, and/or Capacity Improve/Restore 3. Time Duration of Impact: #of days (week or weekend) Estimate CTI ($/day) for Conventional Construction (CC) Estimate CTI ($/day) for ABC Calculate Economic Savings- ECS= CTI (CC) CTI (ABC) ABC Selection Criteria- Balance Risks/Benefits State pays construction premium in advance, cost savings from ABC apply directly to traveling public & regional economy. Economical benefits offset construction costs ABC Selection for Projects Partner with project stakeholders, traffic officials, local agencies Identify needs, benefits, costs, and risks associated with ABC Work with contractors, engineers - consider whether available ABC techniques appropriate Industry Engagement Caltrans to sponsor workshop with consulting engineers, fabricators, erectors, trucking, and general contractors a. Constructability shapes, geometry, curvature, tolerances b. Picking and transporting limits c. New precast component & details solutions d. New material applications Work with Industry to improve construction cost competitiveness Contract Development Reflect Delay/Time Costs in Bid Process Develop use of Incentive/Disincentive contract clause A+B contract practice Technical Development Seismic Issues- future research NCHRP- TRB, MCEER Research Caltrans STR & others A number of research problem topics prioritized Precast bent cap to column connections Precast girder to bent cap connections Precast Segmental Columns Hybrid Connections Other Industries Grouted splice sleeve couplers Technical Development Seismic Research- past Spliced Girder Research- UCSD Testing Fully reversed horizontal displacement cycles until target ductilities reached. Technical Development Seismic Research- past Spliced Girder Research Superstructure Performance Bent cap withstands plastic moment induced by column Girders remain Essentially Elastic with small cracks Post-tensioned bent cap clamps girders together Technical Development Seismic Research- current (a.) Bridge Elevation (c.) Section of cap between girders Precast Bent Connection Tests- U. Washington NCHRP 12-74 (UCSD) studying jointed construction Accelerated Column Construction Tests- U. Washington MCEER ABC research UCSD-Iowa State Inverted-Tee Bent Cap (b.) Typical Section Technical Development Design & Construction Specifications Design Specifications & Details- findings from research Areas of LRFD Bridge Design Specifications needs ABC related modifications Review FHWA Connection Manual- Develop seismic standards Fast cure and setting concrete pour, SCC Assess long-term connection durability & maintainability- install monitoring devices Develop inspection practices non-destructive evaluation methods & tools Investigate potential corrosion issues including unbonded tendon inspection and replacement Project Implementation- Pilot Program Establish a pool of candidate projects for ABC- Select projects based on ABC Selection Criteria- partner with local and traffic officials and stakeholders Up-to-date technical research and developments- application and implementation Engage w/ Contractor during design- Bridge Forum Partner w/ Construction and Contracts Office (OE)- Develop contracts and construction specifications ABC Project Candidate Identify candidate at PSR and APS stage I605/I10 Interchange Viaduct- Advanced Planning Alternative Southbound I-605 to East I-10 connector, in Baldwin Park, Los Angeles County Replace existing on-grade connector Existing traffic safety concern- frequent accidents Proposed bridge crosses I-605 & I-10- curved alignment 30 feet above I-605 & 75 feet above I-10 Total bridge length= 3300 ft Bridge width= 27 ft (single lane) ABC Project Candidate I605/I10 Interchange Viaduct I-605 & I-10 heavily used daily- heavy traffic congestion during commute hours Current HOV Widen on I-10- construction complete in 2011 ABC proposed Minimize construction impact to existing traffic Accelerate traffic safety improvement Structure Type- ABC Alternative Precast Segmental Balanced Cantilever construction- Single-Cell Box Girder ABC Project Candidate I605/I10 Interchange Viaduct 16-spans, span lengths = 210- 270 ft ABC Project Candidate I605/I10 Viaduct- proposed construction stage ABC On-Line ABC On-Line http://www.dot.ca.gov/hq/esc/Structure_Design/accel_bridge_construction/ ABC On-Line ABC On-Line FHWA Seismic ABC Workshop Report Caltrans ABC Strategic Plan ABC Lessons Learned Report- CA Applications Concluding Remarks ABC critical to meet AASHTO SCOBS Grand Challenge #3: Accelerating Bridge Construction Planning essential to proper application National and regional coordination essential and exists Successful implementation requires innovation Engage partners to succeed!