Five justifications for alarm management
Does the financial ROI combined with the overall operational benefits
justify the expense of implementing an alarm management solution? This
article finds that the most effective way is to perform an alarm
assessment.
Jul 17, 2005
Page 1 of 2 Prev 1 | 2 Next View on one page
By Jeff Gould
THE MOST OFTEN asked question by anyone considering an alarm management project is probably,
How do I justify alarm management? There are plenty of articles written on how an alarm system
should perform but how can a company justify and validate the necessity to do alarm management?
Justification is not just financial ROI; rather, it is the combined benefits and needs associated with solving a problem.
The question that needs to be answered is this: does the financial ROI combined with the overall operational benefits
justify the expense of implementing an alarm management solution?
The most effective way to justify alarm management is to perform an alarm assessment. This is the first step in the six
phases of any successful alarm management project:
1. Benchmark & Assessment
2. Alarm management philosophy
3. Alarm analysis / rationalization.
4. Implementation and execution
5. Continuous improvement
6. Maintenance
This article will examine the first phase, Benchmark & Assessment, as it relates to justifying alarm management
projects. For more information about the other Alarm Management Project phases, please refer to Senior Applications
29/6/2014 Five justifications for alarm management
http://www.controlglobal.com/articles/2005/426/ 2/6
Engineer, Michael Marvins whitepaper, Five Steps: Integrating Alarm Management to Boost Production.
The Alarm Management Assessment
Alarm management assessment is comprised of three sub-sets:
1. Technical Benchmark & Assessment
2. Business Justification
3. Project Plan
The Technical Benchmark & Assessment
Technical Assessment addresses measurable and philosophical information associated with the current alarm system.
Quantifiable metrics are based on static alarm configurations (static alarms are the alarms that are configured on an
analog or digital input, or control block on a control system) and real-time, or dynamic alarms (alarms that ring in and
appear on the operators console). Assessing the static alarms reveals whether too many alarms are configured, thus
generating too many real-time alarms for the operators to handle. Similarly, by analyzing real-time alarms, operators can
determine whether there are too many alarms (irrelevant or nuisance alarms) in normal load conditions and during
upset situations.
For the sake of simplicity, the target alarm counts for each metric are summed up in the following two figures.
NOTE: A common misperception is that the target average must be 144 alarms per day. If the plant is operating normally
24 hours a day and 7 days a week then 144 is the correct objective. If, however, upsets occur as is the case with the
majority of facilities, then a more typical average number will likely be around 200 alarms per day.
A common pitfall when benchmarking and assessing an alarm system is the tendency to not collect event information.
29/6/2014 Five justifications for alarm management
http://www.controlglobal.com/articles/2005/426/ 3/6
The top 100 operator actions that are archived into an alarm and event historian, as well as the incidents that are logged
into the incident database, will provide significant information to apply to the creation of an accurate business case for
alarm management.
The last component of Benchmark and Assessment is a review of the alarm philosophy, assuming one exists, to
determine whether it sufficiently outlines management of change procedures (who is changing parameters, when it
happens and why it is being done) and whether philosophy objectives are met. Finally, interviews and reviews should be
completed to assess the operators perception and experience with the current alarm system.
Only after this information has been collected, can the next subset, Business Justification, be completed effectively and
easily.
The Business Justification
Alarms are designed to help the operators mitigate safety, environmental and financial loses. Incident investigations
repeatedly show a very real financial loss associated with any safety and environmental incident, therefore, any properly
configured alarm that is missed by an operator has a financial loss associated with it. All too often, it is the dramatic
events that are scrutinized and brought to attention, yet it is the small, lower priority alarms that create a significant
compounding financial effect. To accurately define the priority of alarms, all alarms must have an Impact Category
assigned to them to determine both the level and area of concern.
Once the consequence of not responding to an alarm is understood, the time that an operator has to respond to the
alarm must be considered. The alarm priority is set taking both of these elements into effect.
29/6/2014 Five justifications for alarm management
http://www.controlglobal.com/articles/2005/426/ 4/6
Since every alarm should alleviate loses, improper alarm configurations end up continually costing the plant profitability
and opportunity. Based on this understanding of what an alarm is and the significance of each alarm, a successful
business plan can be created and a justification can now be made regarding the size and scope of an alarm
management solution. An effective guideline to follow is that each successful justification must address one or all of the
following three key concerns:
1. Environment, health, and safety issues
2. Insurance costs
3. Plant and operational reliability
Justification #1: Regulatory Requirements
Page 1 of 2 Prev 1 | 2 Next View on one page
What are your comments?
You cannot post comments until you have logged in. Login Here.
Comments
No one has commented on this page yet.
RSS feed for comments on this page | RSS feed for all comments
Member Login
Become a Member
ControlGlobal.com is exclusively dedicated to the global process automation market. We report on developing industry
trends, illustrate successful industry applications, and update the basic skills and knowledge base that provide the
profession's foundation.
Most Popular
Check out the most popular content on , as determined by our visitors.
1. #1Beginner's Guide to Differential Pressure Level Transmitters
2. #2Controllers: Direct vs. Reverse-Acting Control
3. #3ABB Automation & Power World 2012 - Live Coverage
4. #4Rockwell Automation Sharing Its Journey to the Connected Enterprise
5. #5RSTechED 2014 Live Coverage
29/6/2014 Five justifications for alarm management
http://www.controlglobal.com/articles/2005/426/ 5/6
29/6/2014 Five justifications for alarm management
http://www.controlglobal.com/articles/2005/426/ 6/6
OPC UA: 5 Things Everyone Needs To Know
What is it, how does it help me, and where can I get it? This white paper sums it all up.
Featured Sponsors
Ask the Experts. Do you have a problem? Let our experts help you.
Subscribe to E-Newsletters
Subscribe to the Magazine
Get the Article RSS Feed
Contact Us | Advertise | Privacy Policy | Legal Disclaimers, Terms & Conditions
Copyright 2004 - 2014 Control Global. All rights reserved.
P: 630-467-1300 | 1501 E. Woodfield Road, Suite 400N, Schaumburg, IL 60173
Chemical Processing | Control Design | Food Processing | Industrial Networking | Pharmaceutical Manufacturing |
Pharma QBD | Plant Services | Sustainable Plant | Wellness Foods

Anda mungkin juga menyukai