Section-3 Schedule 3-17
Schedule for 11 KV Feeder Separation Programme of NameJhabua, Alirajpur, Ujjain, Dewas & Shajapur! Di"trict#
Schedule
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
1 Supply of all related materials including survey, erection of
11KV additional .a& and in"tallation / commi""ioning of
0acuum circuit .rea1er VC2! 3ith all acce""orie" in
e4i"ting 33511 KV "u."tation &ard. Bus bar structure on
11KV side is to be erected by double welded RS joist, and
concreted using te concrete mi!ture 1"#"$. %i!ing of &'
cross arm on all te tree sides. &rawing of bus bar using
strain ardware, disc insulator, pin insulator, (S pin and
)'SR conductor *++ s,.mm, -anter. -rovision of 11 KV .)
is to be done. /ne no. 11 KV V'B wit '0s, ratio *++11++12
amp., and control panel is to be erected and commissioned.
'oncrete mi!ture 1"#"$ is to be used for V'B foundation.
-reparation of cable trenc, laying of control cable for control
panel. 3&rg.4o. &5S'/6178119.
5nstallation and commissioning of 11 :V combined '01-0
unit *++11++12 amps, ;0 trivector meter 311+V 1< 2)mps9 in
te substation.
4ote" 6aterials of te above wor: sall be as per scedule 1<
).
4o. =$ *2 1+> ?* *1 *2 2@ >>
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-18
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
* Supply of all related materials, survey and erection of 11 KV
3 pha"e line on PCC pole 1(6 Kg ,#6 7 long## %i!ing of 11
KV galvaniAed V<cross arm, top clamp, 11 KV pin insulators
wit (S pins and providing galvanised stay sets 1$ mm
complete wit turn buc:le, stay insulator and ancor plate
etc. along wit stay wire of >1#.12 mm duly providing stone
bloc: 1 R'' base plate of siAe =2+B=2+B>2 mm. .aying and
stringing of 11 KV # pase line wit overead ))) conductor
22 s,. mm Rabbit. %i!ing of 11 KV danger board, anti
climbing devices. -ole numbering is to be done. Carting of
eac pole wit (5 coil eart. 3&rg. 4o. &5S'/61781?9.
4ote" 319 6aterial of 11:V # pase line is as per scedule *<
).
Km. 2=? *?$ 1*+ #*> *#2 #*2 2@> =@>
# Supply of all related materials, survey and erection of 11KV
3pha"e DP "tructure ( ft centre on PCC pole 1=+ Kg @.+ 6
long for every 1.$ K6 of 11 KV line by using galvaniAed &'
cross arm = ft centre, 11 KV disc insulators wit strain
ardware, 11 KV pin insulators wit (S pins. (alvaniAed stay
set 1$ mm are to be provided as re,uired and using >1#.12
mm. stay wire. 'oncreting of stay set D +.# cmt. per stay,
concreting of pole D +.2 per pole and base padding D+.+2
per pole by using concrete mi!ture 1"#"$. )nti climbing
device, enameled 11 KV danger board is to be provided on
eac &-. -ole numbering is to be done. Carting of eac &-
is to be done wit (5 earting coil. 3&rg.4o.&5S'/617811?9
4ote" 319 6aterials of 11KV &- structure is as per scedule
#<).
4o. #=# 1@2 >2 *+= 1=> *+# #$> #+=
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-19
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
= Supply of all related materials including survey & erection of
11 KV 3 pha"e DP ( ft centre for tapping the line .&
erecting one PCC Pole 1(6 Kg ,#6 7 long on main 11 KV
feeder. %i!ing of galvaniAed &' cross arms = ft centre, 11 KV
V<cross arm, top clamp, disc insulators, strain ard wares,
pin insulators wit (S pins. -roviding galvaniAed stay set
1$mm complete wit >1#.12 mm. stay wire. 'oncreting of
stay set D +.# cmt. per stay, concreting of pole D +.2 cmt.
per pole and base padding D+.+2 cmt. per pole by using
concrete mi!ture 1"#"$. -roviding of 11 KV danger board,
anti<climbing devices. Carting is to be done using eart coil.
))) conductor 22 s,.mm Rabbit is to be used for jumpering.
3&rg. 4o. &5S'/617811?9.
4ote" 319 6aterials of te above wor: sall be as per
scedule =<).
Km. 2=? *?$ 1*+ #*> *#2 #*2 2@> =@>
2 Supply of all related materials, survey and erection for
rai"ing the height of e4i"ting 11 KV line for proper
0ertical clearance. 0e eigt of 11 KV line will be raised by
fi!ing e!tension piece of RS joist 31.2 6 long 12+!>2 mm
siAe9 on e!isting -'' pole 1=+ Kg @.+ 6 long. 'arpet
guarding will be provided.
3&rg.4o.&5S'/617811>9.

4ote " 319 6aterials of road crossing wor: sall be as per
scedule 2<).
4o. 2=? *?$ 1*+ #*> *#2 #*2 2@> =@>
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-0
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
$ Supply of all related materials, survey including installation
and commissioning of ') KV89 1156#( KV 8luminum 3ound
con0entional t&pe outdoor 3 pha"e di"tri.ution
tran"former wit all fitting and accessories and first filling of
transformer oil. &- structure @ft centre, complete in all
respect erected on -'' pole 1=+ Kg @.+ 6 long. %i!ing of 11
KV .)s, 11 KV &/ set wit appropriate fuse 3&rg.no.
&5S'/61781*9. -roviding earting on eac substation as
per drawing no. &5S'/61781*@. %or .V side protection bo!
wic can accommodate # no. single pole 6''B =+ amps.
rating and all accessories & wiring as per 0S.
Ese of -V' cable insulated #F core unarmoured *2s,.mm
for connecting .0 trivector meter
4ote< 6aterials for *2 KV), 111+.= KV substation and &-
structure is as per scedule $<).
4o. 1?$# 1#@1 11*? ?>2 $>* ??= 1*22 @*+
> Sectionali:ing the line .& in"tallation of 11 KV 82
S3itche" on e4i"ting Location#
$ote;1! 7aterial" for pro0i"ion of 11 KV 82 S3itch "hall
.e a" per "chedule +<8
4o. #@ *+ 11$ >@ #@ *+ 2+ $$
@ Supply of all related materials, survey and including
replacement of e4i"ting 888C58CS= conductor .& 888
conductor )) "># mm# =a..it on e4i"ting 11KV line#
Straigtening of leaning poles, bac: filling wit boulders and
ramming along wit pole numbering is to be done.
Replacement of bro:en disc insulator from e!isting &-.
4ote" 319 6aterials for replacement of conductor and oter
sall be as per scedule @<).
Km.
3'ircuit9
=$ *2 1+> ?* *1 *2 2@ >>
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-1
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
? Supply of all related materials, survey and erection of L? line
3 pha"e ( 3ire o0er<head on PCC pole 1(6 Kg ,#6 7 long
3ma!imum span 2+ 6! u"ing 82 ca.le )6 "># mm# wit all
accessories and ardware fittings. -roviding galvaniAed stay
set 1$ mm & stay wire complete.
4ote" 6aterial of te .0 line sall be as per scedule ?<).
Km. ?+ $# >? 2# 22 =$ 2@ #@
1+ Supply of all related materials, survey and erection of L?
line 3 pha"e ( 3ire o0er<head on PCC pole 1(6 Kg ,#6 7
long ma4imum "pan )6 7! u"ing 82 ca.le ') "># mm#
wit all accessories and ardware fittings. -roviding
galvaniAed stay set 1$ mm & stay wire complete.
4ote" 319 6aterial of te .0 line sall be as per scedule 1+<
).
:m. ? $ 1+ 2 $ 2 $ =
11 Supply of all related materials, survey and replacement of
88858CS= conductor .& 82 ca.le )6 "># mm# of L? line
three pha"e four 3ire on e4i"ting -'' pole 1=+ Kg @.+ 6
long. -roviding of galvaniAed stay set 1$ mm complete wit
turn buc:le, ancor plate etc and stay wire >1#.12 mm. as
and were re,uired. .eaning poles are to be straigtened
bac: filling wit boulders and ramming. )nti<climbing devices,
.0 &anger board are to be provided on eac pole. -ole
numbering is to be done.
4ote" 319 6aterials of above replacement wor: is as per
scedule 11<).
Km.
3'ircuit
#$$ *=$ =#2 *+* #=> *#@ *>+ *#*
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
1* Supply of all related materials, survey and replacement of
88858CS= conductor .& 82 ca.le ') "># mm# of L? line
three pha"e four 3ire on e4i"ting PCC pole 1(6 Kg ,#6 7
long# -roviding of galvaniAed stay set 1$ mm complete wit
turn buc:le, ancor plate etc and stay wire >1#.12 mm. as
and were re,uired. .eaning poles are to be straigtened
bac: filling wit boulders and ramming. )nti<climbing devices,
.0 &anger board are to be provided on eac pole. -ole
numbering is to be done.
4ote" 319 6aterials of above replacement wor: is as
per scedule 1*<).
Km.
3'ircuit
=?= ##* 2@> *># =$? #*1 #$= #1=
1# Supply of all related materials, survey and replacement of
88858CS= conductor .& 82 ca.le 1* "># mm# of L? line
three pha"e four 3ire on e4i"ting PCC pole 1(6 Kg ,#6 7
long# -roviding of galvaniAed stay set 1$ mm complete wit
turn buc:le, ancor plate etc and stay wire >1#.12 mm. as
and were re,uired. .eaning poles are to be straigtened
bac: filling wit boulders and ramming. )nti<climbing devices,
.0 &anger board are to be provided on eac pole. -ole
numbering is to be done.
4ote" 319 6aterials of above replacement wor: is as per
scedule1#<).
Km.
3'ircuit9
22 #> $2 #+ 2* #$ =+ #2
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-3
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
1= Supply of all related materials, survey and replacement of
88858CS= conductor .& 82 ca.le 1* "># mm# of L? line
"ingle pha"e three 3ire on e4i"ting PCC pole 1(6 Kg ,#6
7 long. -roviding of galvaniAed stay set 1$ mm complete
wit turn buc:le, ancor plate etc and stay wire >1#.12 mm.
as and were re,uired. .eaning poles are to be straigtened
bac: filling wit boulders and ramming. )nti<climbing devices,
.0 &anger board are to be provided on eac pole. -ole
numbering is to be done.
4ote" 319 6aterials of above replacement wor: is as per
scedule1=<).
Km.
3'ircuit9
*> 1@ ## 12 *$ 1@ *+ 1>
12 Shifting of e4i"ting 1156#(33 KV9 3 pha"e di"tri.ution
tran"former "u."tation to ne3 location for "eparation of
agricultural pump con"umer" from other categorie" of
con"umer"#
$ote; 1! 7aterial" of a.o0e replacement 3or1 i" a" per
"chedule1)<8#
4o. ?@ $? 2$ =? #= 2+ $# =1
1$ =eno0ation of damaged "ingle pha"e "er0ice line 3ith
ne3 "er0ice line and fi!ing of meter at call bell location,
were ever re,uired.
4ote" 319 6aterials of above replacement wor: is as per
scedule1$<).
4o. #>>1 #=?1 *2@> **$1 1$+? 1*2+ *=?# 1?@?
1> @n"tallation of "ingle pha"e meter in unmetered
connection9 other than 2elo3 Po0ert& Line con"umer"#
$ote; 1! 7aterial" of a.o0e replacement 3or1 i" a" per
"chedule1+<8#
4o. #>>1 #=?1 *2@> **$1 1$+? 1*2+ *=?# 1?@?
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-!
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
1@ Aor1 for reno0ation of e4i"ting 11 KV .a& in e4i"ting
33511 KV "u."tation in rural area including "uppl& of
material"9 "ur0e&9 erection9 / commi""ioning# /ne no. 11
KV V'B wit '0s, ratio 1++12+12 amp., and control panel is
to be erected and commissioned. 'oncrete mi!ture 1"#"$ is
to be used for V'B foundation. -reparation of cable trenc,
laying of control cable for control panel. 3&rg.4o.
&5S'/6178119.
5nstallation and commissioning of 11 :V combined '01-0
unit 1++12+12 amps, ;0 trivector meter 311+V 1< 2)mps9 in
te substation.
4ote" 6aterials of te above wor: sall be as per scedule
1@<).
4o. 2 # 11 ? * # $ @
1? =eplacement of 88858CS= conductor .& PVC ca.le9
t3in core9 unarmoured * "># mm# of e4iting L? line#
$ote; 1! 7aterial" of a.o0e replacement 3or1 i" a" per
"chedule1-<8#
Km. + + + + + + + +
*+ Scedule for installation and commissioning of energy meter
on e!isting distribution transformer substation in abadi area
under separation programme of 3/&69 &n. 3name9 of 3name
district9
4ote" 6aterials of te above wor: sall be as per scedule
*+<)
4o. 1?$ 1#@ 11# ?@ $> ?? 1*$ @*
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-"
S#
$#
Particular" Unit %uantit&
Lot
1'
Lot
13
Lot
1(
Lot
1)
Lot
1*
Lot
1+
Lot
1,
Lot 1-
*1 Scedule of wor: for supply of materials survey and erection
of ;V&S System 3'onversion of e!isting .0 to ;0 line9 on
1=+Kg. @mtr long -'' -ole, -roviding of galvaniAed stay set
1$ mm complete wit turn buc:le, ancor plate etc and stay
wire >1#.12 mm. as and were re,uired. .eaning poles are to
be straigtened bac: filling wit boulders and ramming. )nti<
climbing devices, .0 &anger board are to be provided on
eac pole. -ole numbering is to be done.
4ote" 6aterials of te above wor: sall be as per scedule
*1<)
Km. ### *1@ $># #2+ =@+ *>2 #=# #=?
** Supply of all related material, survey & commissioning of
single pase new service line & fi!ing of meter at outside wall
of te premises of te consumer at call bell location for te
ouses aving no legal electric connection.
4ote" 6aterials of te above wor: sall be as per scedule
**<)
4os.
#+1>* *>?*> *+$?= 1@+?1 1*@>+ 1+++# 1??=+ 12?1+
*# Supply of related material, survey including 5nstallation &
'ommissioning of 11 :V, # -ase, four pole @ft centre
structure outside ##111 :V S1s for new 11 :V feeder werever
erection of addl. Bay is not possible.
4ote" 6aterials of te above wor: sall be as per scedule
*#<)
4os. 1? 1+ 2@ #? 1? 1+ *2 ##
*= -roviding tree pase new connection as per scedule<*=3)9 4os. #+1 *>? *+> 1@1 1*? 1++ 1?? 12?
*2 Replacement of single pase 1#pase stop 1defective meter
as per scedule<*23)9
4os. #+1> *>?# *+$? 1@+? 1*@> 1+++ 1??= 12?1
-lace" D#te$ Si%n#tu&e o' Bidde&
CMD/MPPK/PROJ/FS/03/10-11 VOL IIMPPKVVCL/FSP/
F-03 SBD Vol II
Section-3 Schedule 3-(
MATERIAL & ERECTION SCHEDULE 1 - A
Extension of 11 KV Bay in Existin !!"11 KV s#$ station
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of 11 KV addtona bay n exstng 33/11 KV sub
staton n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
Bus bar structure for addtona bay on 11 KV sde doube weded RS |ost 175x85 mm 8.0 M ong (328 Kg) No 2
2 R.S. |ost 175x85 8 Mtr ong for Meterng DP No 2
3
DC cross arm gavanzed channe 100x50x6mm 4.8 M centre (99.84 Kg) for bus bar. (Drg.No.DISCOM/EZ/1 ) Set 6
4
DC cross arm gavanzed channe 100x50x6mm 8 feet centre 2.8 Mtr 56.3 Kg Set 1
5
DC cross arm gavanzed channe 100x50x6mm 8 feet centre 2.8 Mtr 56.3 Kg for ME mountng Set 1
6 11 KV dsc nsuator No 21
7
11 KV stran hardware sutabe for ACSR conductor 200 sq. mm. Panther. No 21
8 11 KV pn nsuator No 3
9 11 KV LA, No 3
10 11KV soator (600 amp) Set 1
11
Termna camps for soator sutabe for ACSR conductor 200 sq.mm, Panther. No 6
12 Cement for concretng of structure (concrete mxture 1:3:6) cmt 1.90
13 ACSR conductor 200 sq. mm. Panther Km 0.10
14
Termna camps for |umperng of ACSR conductor 200 sq. mm Panther. No 12
15 11KV feeder contro VCB wth CTs 200 / 100 / 5 Amp No 1
16 11KV Contro pane. No 1
17 11KV combned CT/PT unt 200/100/5 amp. No 1
18 HT tr vector meter (110V/ -5 amp) No 1
19 Cement for VCB foundaton (concrete mxture 1:3:6) cmt 3.50
20 Copper Contro cabe 2 core 2.5 sq. mm (unarmoured) Mtr 50
21 Copper Contro cabe 4 core 2.5 sq. mm (unarmoured) Mtr 80
22 Copper Contro cabe 8 core 2.5 sq. mm (unarmoured) Mtr 50
23 Copper Contro cabe 12 core 2.5 sq. mm (unarmoured) Mtr 120
24 Gavanzed Nuts & bots wth washer. Kg 20
25 Pantng of structure & bay ndcaton board LS 1
26
Cabe trench for ayng contro cabe aongwth cover for cabe trench of pre-cast concrete. Mtr 50

Note: HT Tr-vector energy meter s to be nstaed n the Contro room.

MATERIAL & ERECTION SCHEDULE % - A
11 KV Lines on 1&' K ( Mt) *on +CC ,o*e
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-7
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of new 11 KV 3 phase ne on PCC poe 140 Kg 8 Mtr
ong (maxmum span 83 mtrs) n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong (Drg.No.DISCOM/EZ/9) No 12
2 Backng of PCC poe wth bouders and rammng. |ob 12
3
11 KV V-cross arm gavanzed ange 65x65x6 mm (11.6 Kg) (Drg. no. DISCOM/EZ/55)
Set 12
4
Back camp gavanzed MS Fat 50x6 (1.1Kg) (Drg. no. DISCOM/EZ/55)
No 12
5
11KV Top camp gavanzed ange 65x65x6mm (3 Kg) (Drg. no. DISCOM/EZ/55)
No 12
6 11 KV Pn nsuator No 36
7 AAA conductor 55 sq. mm. Rabbt wth 3% sag. Km 3.10
8 |ontng seeves sutabe for AAA conductor 55sq. mm Rabbt. No 6
9 Earthng set (co earth) (Drg.no.DISCOM/EZ/46) No 12
10
Stay set 16mm Gavansed compete wth turn bucke, stay nsuator and anchor pate . (Drg. no. DISCOM/EZ/29)
Set 4
11 Stay camp gavanzed at 50x6mm (1.35 Kg) Set 4
12 Stay wre 7/3.15 mm. (5.5 Kg) per stay set. Kg 22.0
13
Stone bock /RCC base pate sze 450X450X75 mm ( 3 no per stay & 1 no per poe for base paddng as per drawng no
.DISCOM/EZ/47 & 48) No 24
14 Ant-cmbng devces No 12
15 11KV danger board (Drg. No. DISCOM/EZ/39) No 12
16 Numberng on poes No 12
17 Bndng wre and tape Kg 3
18 Gavanzed nuts & bots wth washer (assorted sze) Kg 14
MATERIAL & ERECTION SCHEDULE ! - A -
11 KV D+ St)#.t#)e on 1&' K ( Mt) *on +CC ,o*e
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of new 11 KV DP Structure 4 feet centre on PCC poe
140 Kg 8 Mtr ong at every 1.6 Km of new 11 KV 3 Phase ne n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name
) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong No 2
2
DC cross arm 4 feet centre gavanzed channe 100x50x6 mm 2.2 M (53.4 kg) (Drg. No. DISCOM/EZ/20)
Set 1
3 11KV dsc nsuator No 6
4 11KV stran hardware No 6
5 11KV pn nsuator No 2
6
Horzonta and cross bracng set 4 feet centre wth 4 back camps made out of horzonta and cross bracng gavanzed
ange 50x50x6 mm (45 Kg) (Drg. No. DISCOM/EZ/20) Set 1
7
Stay set 16 mm Gavanzedcompete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 6
8
Stay camp for PCC poe 140 Kg 8.0 M ong gavanzed at 50x6mm (1.35 Kg)
Set 6
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-8
9 Stay wre 7/3.15 mm. (5.5 kg per stay) Kg 33.0
10
Cement concretng for poe and base paddng @ 0.5 & 0.05 cmt per poe respectvey (Concrete mxture 1:3:6).
cmt 1.10
11
Cement for concretng of stay @ 0.3 cmt. per stay (Concrete mxture 1:3:6).
cmt 1.80
12 Earthng set (co earth) (Drg. no. DISCOM/EZ/46) No 2
13 Ant-cmbng devces No 2
14 11KV danger board (Drg. no. DISCOM/EZ/39) No 1
15 Gavanzed nuts & bots wth washer. (assorted sze) Kg 6
16 Numberng on DP No 1
17
PG camp, Aumnum grade T-1F as per IS 8309
No 6
MATERIAL & ERECTION SCHEDULE & - A -
11 KV D+ fo) Ta,,in ,oint on /ain 11 KV *ine on 1&' K ( Mt) *on +CC ,o*e
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of snge PCC poe 140 Kg 8 Mtr ong n between 11
KV 3 Phase man feeder for erecton of 11 KV DP for tap ne n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name )
Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong No 1
2
11KV V-cross arm gavanzed ange 65x65x6mm (11.6 Kg) (Drg. no. DISCOM/EZ/55)
No 1
3
11KV top camp gavanzed ange 65x65x6mm (3 Kg) (Drg. no. DISCOM/EZ/55)
No 1
4 Back camp gavanzed ange Fat 50x6 mm (1.1 Kg) No 1
5
11KV DC Cross Arm 4 ft centre, gavanzed channe 100x50x6mm 2.2M (53.4Kg)
Set 1
6 11KV pn nsuator No 6
7
Horzonta and cross bracng set 4 feet centre wth 4 back camps made out of horzonta and cross bracng gavanzed
ange 50x50x6 mm (45 Kg) (Drg. No. DISCOM/EZ/20) Set 1
8 11KV dsc nsuator No 3
9 11KV stran hardware No 3
10
Stay set 16 mm Gavanzedcompete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 2
11 Stay camp gavanzed at 50x6mm (1.35 Kg) Set 2
12 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 11.0
13 11KV danger Board (Drg. No. DISCOM/EZ/39) No 1
14 Ant-cmbng devce No 2
15 Gavanzed nuts & bots wth washer Kg 5
16 Earthng set (co earth) (Drg. no. DISCOM/EZ/46) Set 1
17
Cement concretng for poe and base paddng @ 0.5 & 0.05 cmt per poe respectvey (Concrete mxture 1:3:6).
cmt 0.55
18
Cement for concretng of stay @ 0.3 cmt per stay (Concrete mxture 1:3:6)
cmt 0.60
19 AAA conductor 55 sq.mm Rabbt for |umperng. Mtr 6
20 Numberng on poe No 1
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-9
21
PG camp, Aumnum grade T-1F as per IS 8309
No 3

Note: (1) Locaton of tappng DP w be decded as per actua survey.

(2) Arrangement of tappng ocaton s ndcated n drg no. DISCOM/EZ/21.
MATERIAL & ERECTION SCHEDULE 0 - A -
Raisin t1e 1ei1t fo) 2e)ti.a* .*ea)an.e of 11 KV *ine
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng for rasng the heght of 11 KV ne on PCC poe 140 Kg
8 Mtr ong for proper vertca cearance of ne n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct
........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
Extenson cross arm made up of RS |ost 1.5 M ong 150x75 mm sze (23Kg) wth dred hoes for top camp and V-
cross arm ttng (f ground cearances s not sumcent; Drg. no. DISCOM/EZ/17).
No 2.0
2
Guardng cross arm made up of Gavanzed ange 65x65x6 mm 2.25 M ong (13.2 Kg)
No 2.0
3
Back ceats/camp for tghtenng the guardng cross arm made up of Gavanzed ange 50x50x6 - 200 mm ong wth
dred hoes or camp made up of Gavanzed at 50x6 mm No 2.0
4
I-bot of Gavanzed round bar 16 mm da. rod fuy threaded 380 mm ong wth gavanzed nuts 2 Nos. n each bot
No 8.0
5 GI wre 8 SWG for guardng (one span of 67 M ong) Kg 17.0
6 GI wre 10 SWG for acng 1 M apart throughout the span. Kg 16.0
7
Stay set 16 mm Gavanzed compete wth turn bucke, stay nsuator, anchor pate and I bot. (Drg. no. DISCOM/EZ/29)
Set 2.0
8 Stay wre 7/3.15 mm. (5 .5 kg per stay) Kg 11.0
9 Stay camp Gavanzed at 50x6 mm 1.35 Kg) Set 2.0
10 GI wre for acng bndng 24 SWG Kg 1.5
11
Cement concretng of stay @ 0.3 cmt per stay havng concrete rato 1:3:6
cmt 0.60
12 Gavanzed nuts and bots wth washer ( assorted sze) Kg 5.0
13 Aumnum bndng wre & tape Kg 1.0
14 Ant-cmbng devces. No 2.0
15
Ppe earthng for road crossng etc on ether sde as per Drawng DISCOM/EZ/51
No 2.0

Note: Locaton of road crossng where extenson of heght s requred w be decded after actua survey.
MATERIAL & ERECTION SCHEDULE 3 - A -
%0 KVA 11"'-&!! KV 4 ! ,1ase Dist)i$#tion T)ansfo)/e) s#$ station
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng 25 KVA 11/0.433 KV Aumnum wound 3 phase
dstrbuton transformer sub staton on PCC poe 140 Kg 8 Mtr ong n rura area under 11 KV Feeder Separaton Programme of O&M Dvson
( Name ) Dstrct ........
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-30
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
25 KVA 11/0.4 KV Aumnum wound conventona type outdoor 3 phase dstrbuton transformer wth accessores.
No 1
2 PCC poe 140 Kg 8.0 M ong No 2
3
DC cross arm 8ft centre gavansed channe 100x50x6 mm 2.8 M (56.3 Kg)
Set 1
4 11KV dsc nsuator No 3
5 11KV stran hardware No 3
6
11KV DO fuse mountng DC cross arm gavanzed channe 75x40x6 mm 2.8 M and bracng ange 35x35x5 mm wth back
camp for supportng DO (28Kg) Set 1
7 11KV DO fuse unt No 3
8 11KV DO fuse wre 1.5 Amp No 3
9
Transformer campng set gavanzed ange 50x50x6 mm 1.4 M (6.5 Kg)
Set 1
10
Stay set 16 mm Gavanzed compete wth turn bucke and anchor pate (Drg. no. DISCOM/EZ/29)
Set 4
11
Stay camp PCC poe 140 Kg 8 M ong gavanzed at 50x6 mm (1.35Kg )
Set 4
12 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 22.0
13
Concretng of poe and base paddng @ 0.5 & 0.05 cmt per poe respectvey (Concrete mxture 1:3:6)
cmt 1.10
14
Cement for concretng of stay set @ 0.3cmt per stay (concrete mxture 1:3:6)
cmt 1.20
15
Transformer betng gavanzed ange wth 2 cross xng gavanzed ange 50x50x6mm and back camp (35.25 Kg)
Set 1
16
Transformer mountng 8ft centre gavanzed channe 100x50x6mm 2.8M (53.6Kg)
Set 1
17 11KV danger board (Drg. No. DISCOM/EZ/39) No 1
18
Earthng for transformer substaton (Drg. no. DISCOM/EZ/ 28 & 49)
Set 1
19 Ant cmbng devces. No 1
20 11KV LA No 3
21 Gavanzed nut & bots wth washer Kg 14
22
Protecton box (as per TS) contanng 3nos. snge poe MCCB 40amps ratng, a accessores and wrng. (Drg. No.
DISCOM/EZ/50) No 1
23 AB cabe 25 sq mm for connectng 2 nos. LT feeder Mtr 20
24
PVC Aumnum cabe armoured, 25 sq. mm. snge core connectng LT bushng to energy meter and meter to MCCB.
Mtr 3
25
LT Three Phase 4 wre 3x240 vots 40-200 Amp Statc (Eectronc) Tr-Vector energy meter of cass 1.0 accuracy wth GSM
Modem (GPRS enabed) No 1

Note: Arrangement of DP structure for dstrbuton transformer s ndcated n Drg. No. DISCOM/EZ/2.
MATERIAL & ERECTION SCHEDULE 5 - A -
Insta**ation of 11 KV AB S6it.1 on 11 KV *ine
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-31
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of 11 KV AB Swtch for sectonazng 11 KV n rura
area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
11 KV AB swtch compete wth square rod, ppe and hande (Drg. no. DISCOM/EZ/5)
Set 1
2
Gavanzed Ange 50x50x6 mm, 450 mm (2Kg) for tghtenng AB swtch
No 3
3 Gavanzed ange 50x50x6 mm, 600 mm (2.7 Kg) for mdde support No 3
4
Gavanzed channe 75x40x6 mm 600 mm (4.5 Kg) for hande support.
No 2
5 Gavanzed ange 50x50x6 mm, 250 mm (1.125 Kg) for back support No 2
6 Gavanzed nuts & bots wth washer (assorted sze) Kg 8
7 T-camp for |umper No 6
8 AAA conductor 55 sq. mm. Rabbt. Mtr 8
Note7 Locaton for nstaaton of 11KV AB swtch w be decded after actua survey.
MATERIAL & ERECTION SCHEDULE ( - A -
Re,*a.e/ent of existin AAAC"ACSR .on8#.to) $y AAA .on8#.to) 00 s9-// Ra$$it on existin 11KV
*ine
Schedue of works for suppy of materas , survey & repacement of exstng AAAC/ACSR conductor by AAA 55 sq.mm rabbt conductor on
exstng 11 KV ne n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 Remova of exstng AAAC/ACSR conductor from 11KV ne.
Km
Ckt
1.00
2
Straghtenng of exstng eanng poes and ts back ng by bouders and rammng.
No 4.00
3
Stay set 16 mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate.
Set 2.00
4 Stay wre 7/3.15 sq. mm. (5.5 Kg per stay) Kg 11.00
5 Stay camp gavanzed at 50x6mm (1.35 Kg) Set 2.00
6
Stone bock /RCC base pate sze 450X450X75 mm ( 3 no per stay for base paddng as per drawng no.DISCOM/EZ/ 47
No 6.00
7
Strngng of AAA conductor 55 sq. mm Rabbt on exstng 11KV poes wth 3% sage.
Km
Ckt
3.10
8 |ontng seeves sutabe for AAA conductor 55sq.mm Rabbt. No 6.00
9 Bndng wre and tape. Kg 3.00
MATERIAL & ERECTION SCHEDULE : - A -
LT *ine ! ,1ase 0 6i)e o2e) 1ea8 #sin AB .a$*e ;L+E 0' s9-// on +CC ,o*e 1&' K ( Mt) *on
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-3
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of LT ne 3 phase 5 wre over head on PCC poe 140
Kg 8 Mtr ong (maxmum span 50 Mtr) usng AB Cabe XLPE 50 sq.mm n rura area under 11 KV Feeder Separaton Programme of O&M
Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong. No 20
2 Back ng of poe wth boder and rammng. |ob 20
3 Suspenson camp as per drawng no. DISCOM/EZ/34 No 15
4 Dead end camp as per drawng no. DISCOM/EZ/35 No 5
5
Earth connector sutabe for AB Cabe wth 6 sqmm PVC wre for extendng neutra from neutra / messenger wre to
dstrbuton box as per drawng no. DISCOM/EZ/32. No 10
6
Percng connector Type -I sutabe for AB cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no. DISCOM/EZ/ 40 No 4
7
Percng connector Type -II sutabe for AB Cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no.DISCOM/EZ/ 40 No 16
8
1100 Vots Grade AB XLPE cabe 3x50 sq. mm. + 1x16 sq.mm +1x 35 sq mm ncudng 3% sag
Km 1.03
9
Stay set 16mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 9
10 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 49.5
11 Stay camp gavanzed at 50x6 mm (1.35Kg) Set 9
12
Stone bock / RCC base pate sze 450x450x75 mm ( 2 no per stay and 1 no for poe ), drg. No. DISCOM/EZ/ 47 & 48
No 38
13 Earthng set (co earth) (Drg.no.DISCOM/EZ/ 46) Set 5
14 Gavanzed nut & bots wth washer (assorted sze) Kg 30
15 Numberng on PCC poe No 20
16 LT danger board (Drg. no. DISCOM/EZ/ 38 ) No 20
17
Dstrbuton Box three phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg. No. Dscom/EZ/
44) aongwth earthng wth aongwth usng earth co. No 2
18
Dstrbuton Box snge phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg no Dscom/EZ/
43 aongwth earthng usng earth co. No 8
19 AB Cabe |ontng kt of sutabe sze Set 1
20 AB Cabe end cap sutabe sze Set 5
21 Ant-cmbng devces @ 3.5 Kg per poe. No 20
22
Transfer of exstng connectons by way of dsconnecton and reconnecton usng servce materas aready n use.
No 20

Note: (1) Every fourth poe s to be earthed.
(2) Arrangement of xtures on the poe w be as gven n Drg. No. DISCOM/EZ/25.
MATERIAL & ERECTION SCHEDULE 1' - A -
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-33
LT *ine ! ,1ase 0 6i)e o2e) 1ea8 #sin AB .a$*e ;L+E %0 s9-// on +CC ,o*e 1&' K ( Mt) *on
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of LT ne 3 phase 5 wre over head on PCC poe 140
Kg 8 Mtr ong (maxmum span 50 Mtr) usng AB Cabe XLPE 25 sq.mm n rura area under 11 KV Feeder Separaton Programme of O&M
Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong. No 20
2 Back ng of poe wth boder and rammng. |ob 20
3 Suspenson camp as per drawng no. DISCOM/EZ/34 No 15
4 Dead end camp as per drawng no. DISCOM/EZ/35 No 5
5
Earth connector sutabe for AB Cabe wth 6 sqmm PVC wre for extendng neutra from neutra / messenger wre to
dstrbuton box as per drawng no. DISCOM/EZ/32. No 10
6
Percng connector Type -I sutabe for AB cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no. DISCOM/EZ/ 40 No 4
7
Percng connector Type -II sutabe for AB Cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no.DISCOM/EZ/ 40 No 16
8
1100 Vots Grade AB XLPE cabe 3x25 sq. mm. + 1x16 sq.mm +1x 25 sq mm ncudng 3% sag
Km 1.03
9
Stay set 16mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 9
10 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 49.5
11 Stay camp gavanzed at 50x6 mm (1.35Kg) Set 9
12
Stone bock / RCC base pate sze 450x450x75 mm ( 2 no per stay and 1 no for poe ), drg. No. DISCOM/EZ/ 47 & 48
No 38
13 Earthng set (co earth) (Drg.no.DISCOM/EZ/ 46) Set 5
14 Gavanzed nut & bots wth washer (assorted sze) Kg 30
15 Numberng on PCC poe No 20
16 LT danger board (Drg. no. DISCOM/EZ/ 38 ) No 20
17
Dstrbuton Box three phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg. No. Dscom/EZ/
44) aongwth earthng usng earth co. No 2
18
Dstrbuton Box snge phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg no Dscom/EZ/
43 aongwth earthng usng earth co. No 8
19 AB Cabe |ontng kt of sutabe sze Set 1
20 AB Cabe end cap sutabe sze Set 5
21 Ant-cmbng devces @ 3.5 Kg per poe. No 20
22
Transfer of exstng connectons by way of dsconnecton and reconnecton usng servce materas aready n use.
No 20

Note: (1) Every fourth poe s to be earthed.
(2) Arrangement of xtures on the poe w be as gven n Drg. No. DISCOM/EZ/25.

CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-3!
MATERIAL & ERECTION SCHEDULE 11 - A -
Re,*a.e/ent of AAAC"ACSR .on8#.to) $y AB .a$*e ;L+E 0' s9-// on Existin t1)ee ,1ase LT *ine
Schedue of works for suppy of materas , survey & Repacement of exstng AAAC/ACSR conductor by usng AB Cabe XLPE 50 sq.mm on
exstng exstng 3 phase LT ne(maxmum span 50 Mtr) n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name )
Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong. No 5
2 Back ng of poe wth boder and rammng. |ob 5
3
Remova of exstng AAAC/ACSR conductor from LT ne Km
Ckt
1.0
4
Straghtenng of exstng Leanng poes & ts back ng by bouder & rammng
No 6
5 Suspenson camp as per drawng no. DISCOM/EZ/34 No 15
6 Dead end camp as per drawng no. DISCOM/EZ/35 No 5
7
Earth connector sutabe for AB Cabe wth 6 sqmm PVC wre for extendng neutra from neutra / messenger wre to
dstrbuton box as per drawng no. DISCOM/EZ/32. No 10
8
Percng connector Type -I sutabe for AB cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no. DISCOM/EZ/ 40 No 4
9
Percng connector Type -II sutabe for AB Cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no.DISCOM/EZ/ 41 No 16
10
1100 Vots Grade AB XLPE cabe 3x50 sq. mm. + 1x16 sq.mm +1x 35 sq mm ncudng 3% sag Km
Ckt
1.03
11
Stay set 16mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 5
12 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 27.5
13 Stay camp gavanzed at 50x6 mm (1.35Kg) Set 5
14
Stone bock / RCC base pate sze 450x450x75 mm ( 2 no per stay and 1 no for poe ), drg. No. DISCOM/EZ/ 47 & 48
No 15
15 Earthng set (co earth) (Drg.no.DISCOM/EZ/ 46) Set 5
16 Gavanzed nut & bots wth washer (assorted sze) Kg 10
17 Numberng on PCC poe No 20
18 LT danger board (Drg. no. DISCOM/EZ/ 38 ) No 20
20
Dstrbuton Box three phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg. No. Dscom/EZ/
44) aongwth earthng usng earth co. No 2
21
Dstrbuton Box snge phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg no Dscom/EZ/
43 aongwth earthng usng earth co. No 8
22 AB Cabe |ontng kt of sutabe sze Set 1
23 AB Cabe end cap sutabe sze Set 5
24 Ant-cmbng devces @ 3.5 Kg per poe. No 20
25
Transfer of exstng connectons by way of dsconnecton and reconnecton usng servce materas aready n use.
No 20
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-3"

4ote " < 3a9 Cvery fourt pole of .0 line to be earted . 3b9 &amaged stays are to be replaced by new one as & were re,uire . GcH Balance .0 conductor , old
.0 cross arm 1 E clamps are to be return to concern area store of te employer . 3d9 &amage 1 brea:age to te e!tent of *I of te total ,uantity of poles sall
be allowed . &amage 1 brea:age beyond *I of te total ,uantity sall be to te contractors account .
MATERIAL & ERECTION SCHEDULE 1% - A -
Re,*a.e/ent of AAAC"ACSR .on8#.to) $y AB .a$*e ;L+E %0 s9-// on Existin t1)ee ,1ase LT *ine
Schedue of works for suppy of materas , survey & Repacement of exstng AAAC/ACSR conductor by usng AB Cabe XLPE 25 sq.mm on
exstng 3 phase LT ne (maxmum span 50 Mtr) n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct
........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong. No 5
2 Back ng of poe wth boder and rammng. |ob 5
3
Remova of exstng AAAC/ACSR conductor from LT ne Km
Ckt
1
4
Straghtenng of exstng Leanng poes & ts back ng by bouder & rammng
No 6
5 Suspenson camp as per drawng no. DISCOM/EZ/34 No 15
6 Dead end camp as per drawng no. DISCOM/EZ/35 No 5
7
Earth connector sutabe for AB Cabe wth 6 sqmm PVC wre for extendng neutra from neutra / messenger wre to
dstrbuton box as per drawng no. DISCOM/EZ/32. No 10
8
Percng connector Type -I sutabe for AB cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no. DISCOM/EZ/ 40 No 4
9
Percng connector Type -II sutabe for AB Cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no.DISCOM/EZ/ 41 No 16
10
1100 Vots Grade AB XLPE cabe 3x25 sq. mm. + 1x16 sq.mm +1x 25 sq mm ncudng 3% sag Km
Ckt
1.03
11
Stay set 16mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 5
12 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 27.5
13 Stay camp gavanzed at 50x6 mm (1.35Kg) Set 5
14
Stone bock / RCC base pate sze 450x450x75 mm ( 2 no per stay and 1 no for poe ), drg. No. DISCOM/EZ/ 47 & 48
No 15
15 Earthng set (co earth) (Drg.no.DISCOM/EZ/ 46) Set 5
16 Gavanzed nut & bots wth washer (assorted sze) Kg 10
17 Numberng on PCC poe No 20
18 LT danger board (Drg. no. DISCOM/EZ/ 38 ) No 20
20
Dstrbuton Box three phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg. No. Dscom/EZ/
44) aongwth earthng wth earth co as per drawng. No 2
21
Dstrbuton Box snge phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg no Dscom/EZ/
43 aongwth earthng wth earth co as per drawng. No 8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-3(
22 AB Cabe |ontng kt of sutabe sze Set 1
23 AB Cabe end cap sutabe sze Set 5
24 Ant-cmbng devces @ 3.5 Kg per poe. No 20
25
Transfer of exstng connectons by way of dsconnecton and reconnecton usng servce materas aready n use.
No 20

4ote " < 3a9 Cvery fourt pole of .0 line to be earted . 3b9 &amaged stays are to be replaced by new one as & were re,uire . GcH Balance .0 conductor , old
.0 cross arm 1 E clamps are to be return to concern area store of te employer . 3d9 &amage 1 brea:age to te e!tent of *I of te total ,uantity of poles sall
be allowed . &amage 1 brea:age beyond *I of te total ,uantity sall be to te contractors account .
MATERIAL & ERECTION SCHEDULE 1! - A -
Re,*a.e/ent of AAAC"ACSR .on8#.to) $y AB .a$*e ;L+E 13 s9-// on Existin t1)ee ,1ase LT *ine
Schedue of works for suppy of materas , survey & Repacement of exstng AAAC/ACSR conductor by usng AB Cabe XLPE 16 sq.mm on
exstng 3 phase LT ne (maxmum span 50 Mtr) n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct
........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong. No 5
2 Back ng of poe wth boder and rammng. |ob 5
3
Remova of exstng AAAC/ACSR conductor from LT ne Km
Ckt
1
4
Straghtenng of exstng Leanng poes & ts back ng by bouder & rammng
No 6
5 Suspenson camp as per drawng no. DISCOM/EZ/34 No 15
6 Dead end camp as per drawng no. DISCOM/EZ/35 No 5
7
Earth connector sutabe for AB Cabe wth 6 sqmm PVC wre for extendng neutra from neutra / messenger wre to
dstrbuton box as per drawng no. DISCOM/EZ/32. No 10
8
Percng connector Type -I sutabe for AB cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no. DISCOM/EZ/ 40 No 4
9
Percng connector Type -II sutabe for AB Cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no.DISCOM/EZ/ 41 No 16
10
1100 Vots Grade AB XLPE cabe 3x16 sq. mm. + 1x16 sq.mm +1x 25 sq mm ncudng 3% sag Km
Ckt
1.03
11
Stay set 16mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 5
12 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 27.5
13 Stay camp gavanzed at 50x6 mm (1.35Kg) Set 5
14
Stone bock / RCC base pate sze 450x450x75 mm ( 2 no per stay and 1 no for poe ), drg. No. DISCOM/EZ/ 47 & 48
No 15
15 Earthng set (co earth) (Drg.no.DISCOM/EZ/ 46) Set 5
16 Gavanzed nut & bots wth washer (assorted sze) Kg 10
17 Numberng on PCC poe No 20
18 LT danger board (Drg. no. DISCOM/EZ/ 38 ) No 20
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-37
20
Dstrbuton Box three phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg. No. Dscom/EZ/
44) aongwth earthng usng earth co. No 2
21
Dstrbuton Box snge phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg no Dscom/EZ/
43 aongwth earthng usng earth co. No 8
22 AB Cabe |ontng kt of sutabe sze Set 1
23 AB Cabe end cap sutabe sze Set 5
24 Ant-cmbng devces @ 3.5 Kg per poe. No 20
25
Transfer of exstng connectons by way of dsconnecton and reconnecton usng servce materas aready n use.
No 20

4ote " < 3a9 Cvery fourt pole of .0 line to be earted . 3b9 &amaged stays are to be replaced by new one as & were re,uire . GcH Balance .0 conductor , old
.0 cross arm 1 E clamps are to be return to concern area store of te employer . 3d9 &amage 1 brea:age to te e!tent of *I of te total ,uantity of poles sall
be allowed . &amage 1 brea:age beyond *I of te total ,uantity sall be to te contractors account .
MATERIAL & ERECTION SCHEDULE 1& - A -
Re,*a.e/ent of AAAC"ACSR .on8#.to) $y AB .a$*e ;L+E 13 s9-// on Existin Sin*e ,1ase LT *ine
Schedue of works for suppy of materas , survey & Repacement of exstng AAAC/ACSR conductor by usng AB Cabe XLPE 16 sq.mm on
exstng Snge phase three wre LT ne (maxmum span 50 Mtr) n rura area under 11 KV Feeder Separaton Programme of O&M Dvson
( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 PCC poe 140 Kg 8.0 M ong. No 5
2 Back ng of poe wth boder and rammng. |ob 5
3
Remova of exstng AAAC/ACSR conductor from LT ne Km
Ckt
1
4
Straghtenng of exstng Leanng poes & ts back ng by bouder & rammng
No 6
5 Suspenson camp as per drawng no. DISCOM/EZ/34 No 15
6 Dead end camp as per drawng no. DISCOM/EZ/35 No 5
7
Earth connector sutabe for AB Cabe wth 6 sqmm PVC wre for extendng neutra from neutra / messenger wre to
dstrbuton box as per drawng no. DISCOM/EZ/32. No 8
8
Percng connector Type -I sutabe for AB cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no. DISCOM/EZ/ 40 No 4
9
Percng connector Type -II sutabe for AB Cabe wth 6 sq. mm. PVC wre for extendng phase suppy from IPC to
dstrbuton box as per drawng no.DISCOM/EZ/ 41 No 8
10
1100 Vots Grade AB XLPE cabe 3x16 sq. mm. +1x 25 sq mm ncudng 3% sag Km
Ckt
1.03
11
Stay set 16mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 5
12 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 27.5
13 Stay camp gavanzed at 50x6 mm (1.35Kg) Set 5
14
Stone bock / RCC base pate sze 450x450x75 mm ( 2 no per stay and 1 no for poe ), drg. No. DISCOM/EZ/ 47 & 49
No 15
15 Earthng set (co earth) (Drg.no.DISCOM/EZ/ 46) Set 5
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-38
16 Gavanzed nut & bots wth washer (assorted sze) Kg 10
17 Numberng on PCC poe No 20
18 LT danger board (Drg. no. DISCOM/EZ/ 38 ) No 20
19
Dstrbuton Box snge phase ncudng accessores for xng wth poe sutabe for AB XLPE cabe. ( Drg no Dscom/EZ/
43 aongwth earthng usng earth co. No 8
20 AB Cabe |ontng kt of sutabe sze Set 1
21 AB Cabe end cap sutabe sze Set 5
22 Ant-cmbng devces @ 3.5 Kg per poe. No 20
23
Transfer of exstng connectons by way of dsconnecton and reconnecton usng servce materas aready n use.
No 20
4ote " < 3a9 Cvery fourt pole of .0 line to be earted . 3b9 &amaged stays are to be replaced by new one as & were re,uire . GcH Balance .0 conductor , old
.0 cross arm 1 E clamps are to be return to concern area store of te employer . 3d9 &amage 1 brea:age to te e!tent of *I of te total ,uantity of poles sall
be allowed . &amage 1 brea:age beyond *I of te total ,uantity sall be to te contractors account .
MATERIAL & ERECTION SCHEDULE 10 - A -
S1iftin of existin 11"'-&!! KV t1)ee ,1ase 8ist)i$#tion t)ansfo)/e) s#$ station to ne6 *o.ation
fo) se,a)ation of a)i.#*t#)a* ,#/, .ons#/e)s f)o/ ot1e) .ateo)ies of .ons#/e)
Schedue of works for suppy of materas , survey, shftng, renstaaton & commssonng of exstng 11/0.433 KV 3 phase dstrbuton
transformer sub staton on PCC poe 140 Kg 8 Mtr ong n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name )
Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1*
Shftng of 11/0.433 KV outdoor type, 3 phase dstrbuton transformer wth accessores. ( Erecton ony)
No 1
2 PCC poe 140 Kg 8.0 M ong No 2
3
DC cross arm 8ft centre gavansed channe 100x50x6 mm 2.8 M (56.3 Kg)
Set 1
4 11KV dsc nsuator. No 3
5 11KV stran hardware No 3
6*
11KV DO fuse mountng DC cross arm gavanzed channe 75x40x6 mm 2.8 M and bracng ange 35x35x5 mm wth back
camp for supportng DO (28Kg) ( Erecton ony) Set 1
7* 11KV DO fuse unt ( Erecton ony) No 1
8 11KV DO fuse wre 1.5 Amp No 3
9*
Transformer campng set gavanzed ange 50x50x6 mm 1.4 M (6.5 Kg) ( Erecton ony)
Set 1
10
Stay set 16mm Gavanzed compete wth turn bucke, stay nsuator and anchor pate. (Drg. no. DISCOM/EZ/29)
Set 4
11
Stay camp PCC poe 140 Kg 8 M ong gavanzed at 50x6 mm (1.35Kg )
Set 4
12 Stay wre 7/3.15 mm. (5.5 Kg per stay) Kg 22
13
Concretng for PCC poe & base paddng @ 0.5 & 0.05 cmt per poe respectvey (Concrete mxture 1:3:6)
cmt 1.10
14
Cement for concretng of stay set @ 0.3cmt per stay (concrete mxture 1:3:6)
cmt 1.2
15
*
Transformer betng gavanzed ange wth 2 cross xng gavanzed ange 50x50x6mm and back camp (35.25 Kg) (Drg.
no. DISCOM/EZ/4) ( Erecton ony) Set 1
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-39
16
*
Transformer mountng 8ft centre gavanzed channe 100x50x6mm 2.8M (53.6Kg) ( Erecton ony)
Set 1
17
*
11KV danger board. ( Erecton ony)
Set 1
18
Earthng for transformer substaton (Drg. no. DISCOM/ EZ/ 28 7 49)
Set 1
19 Ant cmbng devces. No 1
20
*
11KV LA ( Erecton ony)
No 1
21 Gavanzed nut & bots wth washer Kg 10
22
*
Shftng of od dstrbuton box /Protecton box / DTR meter ( Erecton ony)
No 1
23
AB cabe 25 sq mm for connectng 2 nos. LT feeder
Mtr 20
319 5f any material as listed above in column * is missing, worn out or damaged at te e!isting location, ten only cost of suc material sall be allowed on te
basis of rates indicated in scedule $ J). Ho3e0er thi" ha" to .e .rought out clearl& in the "ur0e& report#

3*9 /n account of sifting of distribution transformer, all old1damaged materials are to be returned to te area stores of te Cmployer.
MATERIAL & ERECTION SCHEDULE 13 - A -
Reno2ation of 8a/ae8 sin*e ,1ase se)2i.e *ine 6it1 ne6 se)2i.e *ine & <xin of ene)y /ete) 61e)e-e2e) )e9#i)e8 at .a** $e**
" assessa$*e *o.ation
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of snge phase servce (damaged) ne aongwth
energy meter where-ever requred n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
Repacement of damaged od servce ne wth new servce ne of 2.5 sq mm. twn core aumnum conductor,
armoured, PVC cabe, 25 meter ength. No 1
2
Interna wrng for snge phase suppy wth PVC cabe, unarmoured, stranded copper conductor , snge core 2.5 sq mm.,
ength mted to maxmum of 5 meter per connecton. No 1
3 Shacke nsuator 65x50mm No 2
4 PVC Bushes No 2
5 GI wre 10 SWG for support of servce ne , ppe & earthng Kg 3
6
Meter Board madeup of Fbergass Renforced Poyster (FRP) based sheet moudng compound (SMC) conformng to
IS:13410 (1992). Mnmum thckness 2.5 mm Sze of meter board 300x400x20 mm. for xng of meters aong wth
earthng GS nuts and bots and 2 washers. and 4 anchor bots 6 mm No 1
7 Kt kat 16 Amps. No 1
8 Earthng connector No 1
9 G.I. Ppe 20mm for servce ne ISI mark "B" grade Mtr 3
10 G.I. Socket wth band 20mm No 2
11 Wa camp / hooks for ppe No 2
12
LT energy meters, 1 phase, 30 amps Max. wth poy carbonate cover.
No 1
13 Sunderes ( for cement, tap, cps etc.) LS 1
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!0
(1) Meter s to be nstaed at ca be/assessabe ocaton.

(2) Length of the servce ne and for nterna wrng ndcated above s average. The Contractor w be pad for the servce ength and the
nterna wrng as ndcated above rrespectve of the actua ength of wre used.

(3) A od materas e servce wre, nterna wrng matera, energy meter etc are to be returned to the area stores of the Empoyer.
MATERIAL & ERECTION SCHEDULE 15 - A -
+)o2i8in sin*e ,1ase /ete) to #n/ete)e8 .onne.tions
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of Snge phase meter to unmetered connecton n
rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
Meter Board madeup of Fbergass Renforced Poyster (FRP) based sheet moudng compound (SMC) conformng to
IS:13410 (1992). Mnmum thckness 2.5 mm Sze of meter board 300x400x28 mm. for xng of meters aong wth
earthng GS nuts and bots and 2 washers. and 4 anchor bots 6 mm
No 1
2 Kt kat 16 Amps. No 1
3
LT energy meters, 1 phase, 30 amps Max. wth poy carbonate cover.
No 1

Note: TOTAL O=
COL- 11

(1) Meter s to be nstaed at ca be/assessabe ocaton. Pac
e :

(2) Length of the servce ne ndcated above s average. The Contractor w be pad for the servce ength as ndcated
above rrespectve of the actua ength of wre used. Dat
e :

MATERIAL & ERECTION SCHEDULE 1( - A -
Reno2ation of existin 11 KV Bay in !!"11 KV s#$ station
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng for renovaton of 11 KV Exstng bay n 33/11 KV sub
staton n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 11KV feeder contro VCB wth CTs 100 / 50 / 5 Amp No 1
2 11KV combned CT/PT unt 100/50/5 amp. No 1
3 HT trvector meter (110V/ -5 amp) No 1
4 Cement for VCB foundaton (concrete mxture 1:3:6) cmt 3.5
5 Copper Contro cabe 2 core 2.5 sq. mm (unarmoured) Mtr 50
6 Copper Contro cabe 4 core 2.5 sq. mm (unarmoured) Mtr 80
Copper Contro cabe 8 core 2.5 sq. mm (unarmoured) Mtr 50
Copper Contro cabe 12 core 2.5 sq. mm (unarmoured) Mtr 120
7 Gavanzed Nuts & bots wth washer. Kg 2
9
Termna camps for |umperng of AAA conductor 85 sq. mm Racoon.
No 6
10 AAA conductor Racoon 85 sq. mm. Mtr 40
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!1

Note: (1) Lay put & arrangement w be as per drg. no. DISCOM/ EZ/ 1. TOTAL O=
COL- 11
(2)Tr-vector energy meter s to be nstaed n the Contro room.
(3) If any exstng matera s damaged/ worn out and requre repacement, then such materas may be ncuded but t
shoud be based on the actua survey and got approved by the Pro|ect Manager. Rates for such materas sha be as
gven n schedue 1 -A.
MATERIAL & ERECTION SCHEDULE 1: - A -
Re,*a.e/ent of existin AAAC"ACSR .on8#.to) $y +VC .a$*e a)/o#)e8 4 t6in .o)e 3-' s9-// on
existin LT *ine
Schedue of works for suppy of materas , survey & repacement of exstng AAAC/ACSR conductor by PVC cabe unarmoured , twn core 6.0
sq.mm on exstng LT ne ( maxmum span 50 Meter )n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name )
Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
Remova of exstng AAAC/ACSR conductor aongwth accessores from LT ne. km
ckt
1
2
Straghtenng of exstng eanng poes and ts back ng by bouders and rammng.
No 1
3 PVC cabe, 1100 Vots grade twn core, armoured, 6 sq. mm. wth 3% sag. km 1.03
4 GI wre 8 SWG Kg 75.0

Note: (1) Exstng LT shacke nsuators & U camps are to be used for xng of PVC cabe. TOTAL O=
COL- 11
(2) Baance LT conductor, od LT cross arms / U camps are to be returned to concerned Area Stores of the Empoyer.
(3) T1is a))ane/ent is to $e 8one in .ases 61e)e n#/$e) of .ons#/e)s to $e se)2e8 a)e not /o)e t1an %-

MATERIAL & ERECTION SCHEDULE %' - A -
Reno2ation of existin T)ansfo)/e) an8 Insta**ation an8 .o//issionin of ene)y /ete) on existin
8ist)i$#tion t)ansfo)/e) -
Schedue of works for suppy of materas , survey & nstaaton & commssonng of energy meter and renovaton of exstng dstrbuton
transformer substaton n abad area n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1 XLPE nsuated snge core 50 sq mm cabe Mtr 20
2
LT Three phase 4 wre 3x240 vots 40-200 Amp Statc ( Eectronc ) Tr-Vector energy meter of cass 1.0 accuracy wth
GSM Modem ( GPRS enabed ) No 1
3 Dstrbuton Box sutabe for 100KVA Transformer No 1
4
Pantng of Dstrbuton Transformer Body. Exstng surface of the equpments sheets sha be de-rusted by means of
emery paper / wre brush and then ceaned. Thereafter two or more coats of red oxde znc chromate prmer pant, usng
pantng brush, t smooth na surface appears, sha be provded. The surface s thereafter panted wth two or more
coats of synthetc ename pant by spray pantng. The na shade of surface shoud be same as of orgna transformer.
No 1
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!
4ote " )rrangement of &- structure for distribution transformer is indicated in &rawing 4o. &5S'/61C81*
MATERIAL & ERECTION SCHEDULE %1 - A -
+)o2i8in ne6 Sin*e ,1ase .onen.tion
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of snge phase new connecton wth meter n rura
area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
New servce connecton wth servce ne of 2.5 sq mm. two core aumnum conductor, armoured, PVC cabe, 25 meter
ength.
No 1
3 Shacke nsuator 65x50mm No 2
4 PVC Bushes No 2
5 GI wre 10 SWG for support of servce ne , ppe & earthng Kg 3
6
Meter Board madeup of Fbergass Renforced Poyster (FRP) based sheet moudng compound (SMC) conformng to
IS:13410 (1992). Mnmum thckness 2.5 mm Sze of meter board 300x400x28 mm. for xng of meters aong wth
earthng GS nuts and bots and 2 washers. and 4 anchor bots 6 mm
No 1
7 Kt kat 16 Amps. No 1
8 Earthng connector No 1
9 G.I. Ppe 20mm for servce ne ISI mark "B" grade Mtr 3
10 G.I. Socket wth band 40mm No 2
11 Wa camp / hooks for ppe No 2
12
LT energy meters, snge (phase) 30 amps Max. wth poy carbonate cover.
No 1
13 Sunderes ( for cement, tap, cps etc.) LS 1
Note:
(1) Meter s to be nstaed at ca be/assessabe ocaton.

(2) Length of the servce ne ndcated above s average. The Contractor w be pad for the servce ength as ndcated above
rrespectve of the actua ength of wre used.
MATERIAL & ERECTION SCHEDULE %% - A -
+)o2i8in ne6 t1)ee ,1ase .onen.tion
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of three phase new connecton wth meter n rura area
under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
New servce connecton wth servce ne of 4.0 sq mm. four core aumnum conductor, armoured, PVC cabe, 25 meter
ength.
No 1
3 Shacke nsuator 65x50mm No 2
4 PVC Bushes No 2
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!3
5 GI wre 10 SWG for support of servce ne , ppe & earthng Kg 3
6
Meter Board madeup of Fbergass Renforced Poyster (FRP) based sheet moudng compound (SMC) conformng to
IS:13410 (1992). Mnmum thckness 2.5 mm Sze of meter board 400x400x28 mm. for xng of meters aong wth
earthng GS nuts and bots and 2 washers. and 4 anchor bots 6 mm

No 1
7 Kt kat 32 Amps. No 3
8 Earthng connector No 1
9 G.I. Ppe 40mm for servce ne ISI mark "B" grade Mtr 3
10 G.I. Socket wth band 40mm No 2
11 Wa camp / hooks for ppe No 2
12
LT energy meters, 3 (phase) 4 wre ,10-40 amps Max. wth poy carbonate cover.
No 1
13 Sunderes ( for cement, tap, cps etc.) LS 1
Note:
(1) Meter s to be nstaed at ca be/assessabe ocaton.

(2) Length of the servce ne ndcated above s average. The Contractor w be pad for the servce ength as ndcated above
rrespectve of the actua ength of wre used.
MATERIAL & ERECTION SCHEDULE %! - A -
Re,*a.e/ent of Sto, " Defe.ti2e t1)ee ,1ase /ete)
Schedue of works for suppy of materas , survey, erecton, nstaaton & commssonng of new Three phase meter aganst stop / defectve
meters n rura area under 11 KV Feeder Separaton Programme of O&M Dvson ( Name ) Dstrct ........
S.
N.
Partcuars Unt
Ouant
ty
1 % ! &
1
Meter Board madeup of Fbergass Renforced Poyster (FRP) based sheet moudng compound (SMC) conformng to
IS:13410 (1992). Mnmum thckness 2.5 mm Sze of meter board 400x400x28 mm. for xng of meters aong wth
earthng GS nuts and bots and 2 washers. and 4 anchor bots 6 mm

No 1
2 Kt kat 32 Amps. No 3
3
LT energy meters, 3 (phase) 4 wre ,10-40 amps Max. wth poy carbonate cover.
No 1
4
Interna wrng for three phase suppy wth PVC cabe, unarmoured stranded copper conductor, four core 6.0 sq.mm.
ength mted to maxmum of 5 meter per connecton. No 1
5 GI wre 10 SWG kg 3.0
Note:
(1) Meter s to be nstaed at ca be/assessabe ocaton.

(2) Length of the servce ne and for nterna wrng ndcated above s average. The Contractor w be pad for the servce ength and the
nterna wrng as ndcated above rrespectve of the actua ength of wre used.

(3) A od materas e servce wre, nterna wrng matera, energy meter etc are to be returned to the area stores of the Empoyer.
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!!
MATERIAL & ERECTION SCHEDULE 1 - A
Extension o 11 !V "#$ in Existin% &&'11 !V su( st#tion
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' 11 KV #ddition#l 2#- in e3i+tin% 33/11 KV +u2 +t#tion in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict
77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 Bu+ 2#& +t&uctu&e 'o& #ddition#l 2#- on 11 KV +ide dou2le )elded ;S <oi+t 17"38" .. 880 M lon% 438 K%6 5o
;8S8 <oi+t 17"38" 8 Mt& lon% 'o& Mete&in% DP 5o
3 DC c&o++ #&. %#l0#ni=ed ch#nnel 1003"03(.. !88 M cent&e 49988! K%6 'o& 2u+ 2#&8 4D&%85o8DISCOM/>?/1 6 Set (
! DC c&o++ #&. %#l0#ni=ed ch#nnel 1003"03(.. 8 'eet cent&e 88 Mt& "(83 K% Set 1
" DC c&o++ #&. %#l0#ni=ed ch#nnel 1003"03(.. 8 'eet cent&e 88 Mt& "(83 K% 'o& M@ .ountin% Set 1
( 11 KV di+c in+ul#to& 5o 1
7 11 KV +t&#in h#&d)#&e +uit#2le 'o& ACS; conducto& 00 +B8 ..8 P#nthe&8 5o 1
8 11 KV ,in in+ul#to& 5o 3
9 11 KV LA/ 5o 3
10 11KV i+ol#to& 4(00 #.,6 Set 1
11 Ce&.in#l cl#.,+ 'o& i+ol#to& +uit#2le 'o& ACS; conducto& 00 +B8../ P#nthe&8 5o (
1 Ce.ent 'o& conc&etin% o' +t&uctu&e 4conc&ete .i3tu&e 1$3$(6 c.t 189
13 ACS; conducto& 00 +B8 ..8 P#nthe& K. 081
1! Ce&.in#l cl#.,+ 'o& Du.,e&in% o' ACS; conducto& 00 +B8 .. P#nthe&8 5o 1
1" 11KV 'eede& cont&ol VCB 5o 1
1( 11KV Cont&ol ,#nel8 5o 1
17 11KV co.2ined CC/PC unit 00/100/" #.,8 5o 1
18 EC t&i 0ecto& .ete& 4110V/ -" #.,6 5o
19 Ce.ent 'o& VCB 'ound#tion 4conc&ete .i3tu&e 1$3$(6 c.t 38"
0 Co,,e& Cont&ol c#2le co&e 8" +B8 .. 4un#&.ou&ed6 Mt& "0
1 Co,,e& Cont&ol c#2le ! co&e 8" +B8 .. 4un#&.ou&ed6 Mt& 80
Co,,e& Cont&ol c#2le 8 co&e 8" +B8 .. 4un#&.ou&ed6 Mt& "0
3 Co,,e& Cont&ol c#2le 1 co&e 8" +B8 .. 4un#&.ou&ed6 Mt& 10
! F#l0#ni=ed 5ut+ 1 2olt+ )ith )#+he&8 K% 0
" P#intin% o' +t&uctu&e 1 2#- indic#tion 2o#&d LS LS
( C#2le t&ench 'o& l#-in% cont&ol c#2le #lon%)ith co0e& 'o& c#2le t&ench o' ,&e-c#+t conc&ete8 Mt& "0
5ote$ EC C&i-0ecto& ene&%- .ete& i+ to 2e in+t#lled in the Cont&ol &oo.8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!"
MATERIAL & ERECTION SCHEDULE ) - A
11 !V Lines on 1*+ !% , Mt- lon% .CC /ole
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' ne) 11 KV 3 ,h#+e line on PCC ,ole 1!0 K% 8 Mt& lon% 4.#3i.u. +,#n 83 .t&+6 in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M
Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon% 4D&%85o8DISCOM/>?/96 5o 1
B#c*'illin% o' PCC ,ole )ith 2oulde&+ #nd &#..in%8 Set 1
3 11 KV V-c&o++ #&. %#l0#ni=ed #n%le ("3("3( .. 411 K%6 4D&%8 no8 DISCOM/>?/""6 Set 1
! B#c* cl#., %#l0#ni=ed MS Fl#t "03( 418 K%6 4D&%8 no8 DISCOM/>?/""6 5o 1
" 11KV Co, cl#., %#l0#ni=ed #n%le ("3("3(.. 43 K%6 4D&%8 no8 DISCOM/>?/""6 5o 1
( 11 KV Pin in+ul#to& 5o 3(
7 AAA conducto& "" +B8 ..8 ;#22it )ith 3G +#%8 K. 381
8 <ointin% +lee0e+ +uit#2le 'o& AAA conducto& ""+B8 .. ;#22it8 c.t (
9 @#&thin% +et 4coil e#&th6 4D&%8no8DISCOM/>?/!(6 5o 1
10 F#l0#ni+ed +t#- +et 1(.. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te 8 4D&%8 no8 DISCOM/>?/96 Set !
11 St#- cl#., %#l0#ni=ed 'l#t "03(.. 4183" K%6 Set !
1 St#- )i&e 7/381" ..8 4"8" K%6 ,e& +t#- +et8 K%
13 Stone 2loc* /;CC 2#+e ,l#te +i=e !"0H!"0H7" .. 4 3 no ,e& +t#- 1 1 no ,e& ,ole 'o& 2#+e ,#ddin% #+ ,e& d&#)in% no 8DISCOM/>?/!7 1 !86 5o !
1! Anti-cli.2in% de0ice+ 5o 1
1" 11KV d#n%e& 2o#&d 4D&%8 5o8 DISCOM/>?/396 5o 1
1( 5u.2e&in% on ,ole+ 5o 1
17 Bindin% )i&e #nd t#,e K% 3
18 F#l0#ni=ed nut+ 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 1!
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!(
MATERIAL & ERECTION SCHEDULE & - A
11 !V D. St-u0tu-e on 1*+ !% , Mt- lon% .CC /ole
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' ne) 11 KV DP St&uctu&e ! 'eet cent&e on PCC ,ole 1!0 K% 8 Mt& lon% #t e0e&- 18( K. o' ne) 11 KV 3 Ph#+e line in &u&#l #&e# unde& 11 KV Feede&
Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon% 5o
DC c&o++ #&. ! 'eet cent&e %#l0#ni=ed ch#nnel 1003"03( .. 8 M 4"38! *%6 4D&%8 5o8 DISCOM/>?/06 Set 1
3 11KV di+c in+ul#to& 5o (
! 11KV +t&#in h#&d)#&e 5o (
" 11KV ,in in+ul#to& 5o
( Eo&i=ont#l #nd c&o++ 2&#cin% +et ! 'eet cent&e )ith ! 2#c* cl#.,+ .#de out o' ho&i=ont#l #nd c&o++ 2&#cin% %#l0#ni=ed #n%le "03"03( .. 4!" K%6 4D&%8 5o8 DISCOM/>?/06 Set 1
7 F#l0#ni=ed +t#- +et 1( .. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set (
8 St#- cl#., 'o& PCC ,ole 1!0 K% 880 M lon% %#l0#ni=ed 'l#t "03(.. 4183" K%6 Set (
9 St#- )i&e 7/381" ..8 4"8" *% ,e& +t#-6 K% 33
10 Ce.ent conc&etin% 'o& ,ole #nd 2#+e ,#ddin% I 08" 1 080" c.t ,e& ,ole &e+,ecti0el- 4Conc&ete .i3tu&e 1$3$(68 c.t 181
11 Ce.ent 'o& conc&etin% o' +t#- I 083 c.t8 ,e& +t#- 4Conc&ete .i3tu&e 1$3$(68 c.t 188
1 @#&thin% +et 4coil e#&th6 4D&%8 no8 DISCOM/>?/!(6 5o
13 Anti-cli.2in% de0ice+ 5o
1! 11KV d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/396 5o 1
1" F#l0#ni=ed nut+ 1 2olt+ )ith )#+he&8 4#++o&ted +i=e6 K% (
1( 5u.2e&in% on DP 5o 1
17 PF cl#.,/ Alu.iniu. %&#de C-1F #+ ,e& IS 8309 5o (
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!7
MATERIAL & ERECTION SCHEDULE * - A
11 !V D. o- T#//in% /oint on m#in 11 !V line on 1*+ !% , Mt- lon% .CC /ole
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' +in%le PCC ,ole 1!0 K% 8 Mt& lon% in 2et)een 11 KV 3 Ph#+e .#in 'eede& 'o& e&ection o' 11 KV DP 'o& t#, line in &u&#l #&e# unde& 11 KV Feede&
Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon% 5o 1
11KV V-c&o++ #&. %#l0#ni=ed #n%le ("3("3(.. 411 K%6 4D&%8 no8 DISCOM/>?/""6 5o 1
3 11KV to, cl#., %#l0#ni=ed #n%le ("3("3(.. 43 K%6 4D&%8 no8 DISCOM/>?/""6 5o 1
! B#c* cl#., %#l0#ni=ed Fl#t "03( .. 418 K%6 5o 1
" 11KV DC C&o++ A&. ! 't cent&e/ %#l0#ni=ed ch#nnel 1003"03(.. 8M 4"38!K%6 Set 1
( 11KV ,in in+ul#to& 5o (
7 Eo&i=ont#l #nd c&o++ 2&#cin% +et ! 'eet cent&e )ith ! 2#c* cl#.,+ .#de out o' ho&i=ont#l #nd c&o++ 2&#cin% %#l0#ni=ed #n%le "03"03( .. 4!" K%6 4D&%8 5o8 DISCOM/>?/06 Set 1
8 11KV di+c in+ul#to& 5o 3
9 11KV +t&#in h#&d)#&e 5o 3
10 F#l0#ni=ed +t#- +et 1( .. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set
11 St#- cl#., %#l0#ni=ed 'l#t "03(.. 4183" K%6 Set
1 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K% 11
13 11KV d#n%e& Bo#&d 4D&%8 5o8 DISCOM/>?/396 5o 1
1! Anti-cli.2in% de0ice 5o
1" F#l0#ni=ed nut+ 1 2olt+ )ith )#+he& K% "
1( @#&thin% +et 4coil e#&th6 4D&%8 no8 DISCOM/>?/!(6 Set 1
17 Ce.ent conc&etin% 'o& ,ole #nd 2#+e ,#ddin% I 08" 1 080" c.t ,e& ,ole &e+,ecti0el- 4Conc&ete .i3tu&e 1$3$(68 c.t 08(
18 Ce.ent 'o& conc&etin% o' +t#- I 083 c.t ,e& +t#- 4Conc&ete .i3tu&e 1$3$(6 c.t 08(
19 AAA conducto& "" +B8.. ;#22it 'o& Du.,e&in%8 Mt& (
0 5u.2e&in% on ,ole 5o 1
1 PF cl#.,/ Alu.iniu. %&#de C-1F #+ ,e& IS 8309 5o 3
5ote$ 416 Loc#tion o' t#,,in% DP )ill 2e decided #+ ,e& #ctu#l +u&0e-8
46 A&&#n%e.ent o' t#,,in% loc#tion i+ indic#ted in d&%8 no8 DISCOM/>?/1
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!8
MATERIAL & ERECTION SCHEDULE 1 - A
R#isin% t2e 2ei%2t o- 3e-ti0#l 0le#-#n0e o 11 !V line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% 'o& &#i+in% the hei%ht o' 11 KV line on PCC ,ole 1!0 K% 8 Mt& lon% 'o& ,&o,e& 0e&tic#l cle#&#nce o' line in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion
P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 @3ten+ion c&o++ #&. .#de u, o' ;S Doi+t 18" M lon% 1"037" .. +i=e 43K%6 )ith d&illed hole+ 'o& to, cl#., #nd V-c&o++ #&. 'ittin% 4i' %&ound cle#&#nce+ i+ not +u''icientJ D&%8 no8
DISCOM/>?/1768
5o
Fu#&din% c&o++ #&. .#de u, o' F#l0#ni=ed #n%le ("3("3( .. 8" M lon% 4138 K%6 5o
3 B#c* cle#t+/cl#., 'o& ti%htenin% the %u#&din% c&o++ #&. .#de u, o' F#l0#ni=ed #n%le "03"03( - 00 .. lon% )ith d&illed hole+ o& cl#., .#de u, o' F#l0#ni=ed 'l#t "03( .. 5o
! I-2olt o' F#l0#ni=ed &ound 2#& 1( .. di#8 &od 'ull- th&e#ded 380 .. lon% )ith %#l0#ni=ed nut+ 5o+8 in e#ch 2olt 5o 8
" FI )i&e 8 S>F 'o& %u#&din% 4one +,#n o' (7 M lon%6 K% 17
( FI )i&e 381" ..8 'o& l#cin% 1 M #,#&t th&ou%hout the +,#n8 K% 1(
7 F#l0#ni=ed St#- +et 1( .. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to&/ #ncho& ,l#te #nd I 2olt8 4D&%8 no8 DISCOM/>?/96 Set
8 St#- )i&e 7/381" ..8 4" 8" *% ,e& +t#-6 K% 11
9 St#- cl#., F#l0#ni=ed 'l#t "03( .. 183" K%6 Set
10 FI )i&e 'o& l#cin% 2indin% ! S>F K% 18"
11 Ce.ent conc&etin% o' +t#- I 083 c.t ,e& +t#- h#0in% conc&ete &#tio 1$3$( c.t 08(
1 F#l0#ni=ed nut+ #nd 2olt+ )ith )#+he& 4 #++o&ted +i=e6 K% "
13 Alu.inu. 2indin% )i&e 1 t#,e K% 1
1! Anti-cli.2in% de0ice+8 5o
1" Pi,e e#&thin% 'o& &o#d c&o++in% etc on eithe& +ide #+ ,e& D&#)in% DISCOM/>?/"1 5o
5ote$ Loc#tion o' &o#d c&o++in% )he&e e3ten+ion o' hei%ht i+ &eBui&ed )ill 2e decided #'te& #ctu#l +u&0e-8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-!9
MATERIAL & ERECTION SCHEDULE 4 - A
)1 !VA11'+5*&& !V 6 & /2#se Dist-i(ution T-#nso-me- su( st#tion
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% " KVA11/08!33 KV Alu.iniu. )ound 3 ,h#+e di+t&i2ution t&#n+'o&.e& +u2 +t#tion on PCC ,ole 1!0 K% 8 Mt& lon% in &u&#l #&e# unde& 11 KV Feede&
Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 " KVA11/08! KV Alu.iniu. )ound con0ention#l t-,e outdoo& 3 ,h#+e di+t&i2ution t&#n+'o&.e& )ith #cce++o&ie+8 5o 1
PCC ,ole 1!0 K% 880 M lon% 5o
3 DC c&o++ #&. 8't cent&e %#l0#ni+ed ch#nnel 1003"03( .. 88 M 4"(83 K%6 Set 1
! 11KV di+c in+ul#to&8 5o 3
" 11KV +t&#in h#&d)#&e 5o 3
( 11KV DO 'u+e .ountin% DC c&o++ #&. %#l0#ni=ed ch#nnel 7"3!03( .. 88 M #nd 2&#cin% #n%le 3"33"3" .. )ith 2#c* cl#., 'o& +u,,o&tin% DO 48K%6 Set 1
7 11KV DO 'u+e unit 5o 3
8 11KV DO 'u+e )i&e 18" A., 5o 3
9 C&#n+'o&.e& cl#.,in% +et %#l0#ni=ed #n%le "03"03( .. 18! M 4(8" K%6 Set 1
10 F#l0#ni=ed +t#- +et 1( .. co.,lete )ith tu&n 2uc*le #nd #ncho& ,l#te 4D&%8 no8 DISCOM/>?/96 Set !
11 St#- cl#., PCC ,ole 1!0 K% 8 M lon% %#l0#ni=ed 'l#t "03( .. 4183"K% 6 Set !
1 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K%
13 Conc&etin% o' ,ole #nd 2#+e ,#ddin% I 08" 1 080" c.t ,e& ,ole &e+,ecti0el- 4Conc&ete .i3tu&e 1$3$(6 c.t 181
1! Ce.ent 'o& conc&etin% o' +t#- +et I 083c.t ,e& +t#- 4conc&ete .i3tu&e 1$3$(6 c.t 18
1" C&#n+'o&.e& 2eltin% %#l0#ni=ed #n%le )ith c&o++ 'i3in% %#l0#ni=ed #n%le "03"03(.. #nd 2#c* cl#., 43"8" K%6 Set 1
1( C&#n+'o&.e& .ountin% 8't cent&e %#l0#ni=ed ch#nnel 1003"03(.. 88M 4"38(K%6 Set 1
17 11KV d#n%e& 2o#&d 4D&%8 5o8 DISCOM/>?/396 5o 1
18 @#&thin% 'o& t&#n+'o&.e& +u2+t#tion 4D&%8 no8 DISCOM/>?/ 8 1 !96 Set 1
19 Anti cli.2in% de0ice+8 5o 1
0 11KV LA 5o 3
1 F#l0#ni=ed nut 1 2olt+ )ith )#+he& K% 1!
P&otection 2o3 4#+ ,e& CS6 cont#nin% 3no+8 +in%le ,ole MCCB !0#.,+ &#tin%/ #ll #cce++o&ie+ #nd )i&in%8 4D&%8 5o8 DISCOM/>?/"06 5o 1
3 AB c#2le " +B .. 'o& connectin% no+8 LC 'eede& Mt& 0
! PVC Alu.iniu. c#2le #&.ou&ed/ " +B8 ..8 ! co&e connectin% LC 2u+hin% to ene&%- .ete& #nd .ete& to MCCB8 Mt& 3
" LC Ch&ee Ph#+e ! )i&e 33!0 0olt+ !0-00 A., St#tic 4@lect&onic6 C&i-Vecto& ene&%- .ete& o' cl#++ 180 #ccu&#c- )ith FSM Mode. 4FP;S en#2led6 5o 1
5ote$ A&&#n%e.ent o' DP +t&uctu&e 'o& di+t&i2ution t&#n+'o&.e& i+ indic#ted in D&%8 5o8 DISCOM/>?/8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"0
MATERIAL & ERECTION SCHEDULE 7 - A
Inst#ll#tion o 11 !V A" S8it02 on 11 !V line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' 11 KV AB S)itch 'o& +ection#li=in% 11 KV in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 11 KV AB +)itch co.,lete )ith +Bu#&e &od/ ,i,e #nd h#ndle 4D&%8 no8 DISCOM/>?/"6 Set 1
F#l0#ni=ed An%le "03"03( ../ !"0 .. 4K%6 'o& ti%htenin% AB +)itch 5o 3
3 F#l0#ni=ed #n%le "03"03( ../ (00 .. 487 K%6 'o& .iddle +u,,o&t 5o 3
! F#l0#ni=ed ch#nnel 7"3!03( .. (00 .. 4!8" K%6 'o& h#ndle +u,,o&t8 5o
" F#l0#ni=ed #n%le "03"03( ../ "0 .. 4181" K%6 'o& 2#c* +u,,o&t 5o
( F#l0#ni=ed nut+ 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 8
7 C-cl#., 'o& Du.,e& 5o (
8 AAA conducto& "" +B8 ..8 ;#22it8 Mt& 8
Note9 Loc#tion 'o& in+t#ll#tion o' 11KV AB +)itch )ill 2e decided #'te& #ctu#l +u&0e-8
MATERIAL & ERECTION SCHEDULE , A
Re/l#0ement o existin% AAAC'ACSR 0on:u0to- ($ AAA 0on:u0to- 11 s;5mm R#((it on existin% 11!V line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e- 1 &e,l#ce.ent o' e3i+tin% AAAC/ACS; conducto& 2- AAA "" +B8.. &#22it conducto& on e3i+tin% 11 KV line in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6
Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 ;e.o0#l o' e3i+tin% AAAC/ACS; conducto& '&o. 11KV line8 K.
C*t
1
St&#i%htenin% o' e3i+tin% le#nin% ,ole+ #nd it+ 2#c* 'illin% 2- 2oulde&+ #nd &#..in%8 5o !
3 F#l0#ni=ed +t#- +et 1( .. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 Set
! St#- )i&e 7/381" +B8 ..8 4"8" K% ,e& +t#-6 K% 11
" St#- cl#., %#l0#ni=ed 'l#t "03(.. 4183" K%6 Set
( Stone 2loc* /;CC 2#+e ,l#te +i=e !"0H!"0H7" .. 4 3 no ,e& +t#- 'o& 2#+e ,#ddin% #+ ,e& d&#)in% no8DISCOM/>?/ !7 5o (
7 St&in%in% o' AAA conducto& "" +B8 .. ;#22it on e3i+tin% 11KV ,ole+ )ith 3G +#%e8 K. 381
8 <ointin% +lee0e+ +uit#2le 'o& AAA conducto& ""+B8.. ;#22it8 5o (
9 Bindin% )i&e #nd t#,e8 K% 3
Note9 416 ;e,l#ce.ent o' conducto& i+ to 2e done 'o& identi'ied .#in line e3cludin% t#, line+ )he&e the +i=e o' e3i+tin% conducto& i+ le++ th#n "" +B8 ..8
46 Old &e,l#ced conducto& i+ to 2e &etu&ned to conce&ned A&e# Sto&e+ o' the e.,lo-e&8
436 D#.#%e/2&e#*#%e to the e3tent o' G o' tot#l Bu#ntit- o' ,ole+ +h#ll 2e #llo)ed8 D#.#%e / 2&e#*#%e 2e-ond G o' the tot#l Bu#ntit- +h#ll 2e to the cont&#cto&K+ #ccount
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"1
MATERIAL & ERECTION SCHEDULE < - A
LT line & /2#se 1 8i-e o3e- 2e#: usin% A" 0#(le =L.E 1+ s;5mm on .CC /ole 1*+ !% , Mt- lon%
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' LC line 3 ,h#+e " )i&e o0e& he#d on PCC ,ole 1!0 K% 8 Mt& lon% 4.#3i.u. +,#n "0 Mt&6 u+in% AB C#2le HLP@ "0 +B8.. in &u&#l #&e# unde& 11 KV
Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon%8 5o 0
B#c* 'illin% o' ,ole )ith 2olde& #nd &#..in%8 5o 0
3 Su+,en+ion cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3! 5o 1"
! De#d end cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3" 5o "
" @#&th connecto& +uit#2le 'o& AB C#2le )ith ( +B8.. PVC )i&e 'o& e3tendin% neut&#l '&o. neut&#l / .e++en%e& )i&e to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/38 5o 10
( Pie&cin% connecto& C-,e LI +uit#2le 'o& AB c#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/ !0 5o !
7 Pie&cin% connecto& C-,e LII +uit#2le 'o& AB C#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8DISCOM/>?/ !0 5o 1(
8 1100 Volt+ F&#de AB HLP@ c#2le 33"0 +B8 ..8 M 131( +B8.. M13 3" +B .. includin% 3G +#% K. 1803
9 F#l0#ni=ed +t#- +et 1(.. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set 9
10 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K% !98"
11 St#- cl#., %#l0#ni=ed 'l#t "03( .. 4183"K%6 Set 9
1 Stone 2loc* / ;CC 2#+e ,l#te +i=e !"03!"037" .. 4 no ,e& +t#- #nd 1 no 'o& ,ole 6/ d&%8 5o8 DISCOM/>?/ !7 1 !8 5o 38
13 @#&thin% +et 4coil e#&th6 4D&%8no8DISCOM/>?/ !(6 Set "
1! F#l0#ni=ed nut 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 30
1" 5u.2e&in% on PCC ,ole 5o 0
1( LC d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/ 38 6 5o 0
17 Di+t&i2ution Bo3 th&ee ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&%8 5o8 Di+co./>?/ !!6 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o
18 Di+t&i2ution Bo3 +in%le ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&% no Di+co./>?/ !3 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o 8
19 AB C#2le Dointin% *it o' +uit#2le +i=e Set 1
0 AB C#2le end c#, +uit#2le +i=e Set "
1 Anti-cli.2in% de0ice+ I 38" K% ,e& ,ole8 5o 0
C&#n+'e& o' e3i+tin% connection+ 2- )#- o' di+connection #nd &econnection u+in% +e&0ice .#te&i#l+ #l&e#d- in u+e8 5o 0
5ote$ 416 @0e&- 'ou&th ,ole i+ to 2e e#&thed8
46 A&&#n%e.ent o' 'i3tu&e+ on the ,ole )ill 2e #+ %i0en in D&%8 5o8 DISCOM/>?/"8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"
MATERIAL & ERECTION SCHEDULE 1+ - A
LT line & /2#se 1 8i-e o3e- 2e#: usin% A" 0#(le =L.E )1 s;5mm on .CC /ole 1*+ !% , Mt- lon%
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' LC line 3 ,h#+e " )i&e o0e& he#d on PCC ,ole 1!0 K% 8 Mt& lon% 4.#3i.u. +,#n "0 Mt&6 u+in% AB C#2le HLP@ " +B8.. in &u&#l #&e# unde& 11 KV
Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon%8 5o 0
B#c* 'illin% o' ,ole )ith 2olde& #nd &#..in%8 5o 0
3 Su+,en+ion cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3! 5o 1"
! De#d end cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3" 5o "
" @#&th connecto& +uit#2le 'o& AB C#2le )ith ( +B.. PVC )i&e 'o& e3tendin% neut&#l '&o. neut&#l / .e++en%e& )i&e to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/38 5o 10
( Pie&cin% connecto& C-,e LI +uit#2le 'o& AB c#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/ !0 5o !
7 Pie&cin% connecto& C-,e LII +uit#2le 'o& AB C#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8DISCOM/>?/ !0 5o 1(
8 1100 Volt+ F&#de AB HLP@ c#2le 33" +B8 ..8 M 131( +B8.. M13 " +B .. includin% 3G +#% K. 1803
9 F#l0#ni=ed +t#- +et 1(.. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set 9
10 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K% !98"
11 St#- cl#., %#l0#ni=ed 'l#t "03( .. 4183"K%6 Set 9
1 Stone 2loc* / ;CC 2#+e ,l#te +i=e !"03!"037" .. 4 no ,e& +t#- #nd 1 no 'o& ,ole 6/ d&%8 5o8 DISCOM/>?/ !7 1 !8 5o 38
13 @#&thin% +et 4coil e#&th6 4D&%8no8DISCOM/>?/ !(6 Set "
1! F#l0#ni=ed nut 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 30
1" 5u.2e&in% on PCC ,ole 5o 0
1( LC d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/ 38 6 5o 0
17 Di+t&i2ution Bo3 th&ee ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&%8 5o8 Di+co./>?/ !!6 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o
18 Di+t&i2ution Bo3 +in%le ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&% no Di+co./>?/ !3 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o 8
19 AB C#2le Dointin% *it o' +uit#2le +i=e Set 1
0 AB C#2le end c#, +uit#2le +i=e Set "
1 Anti-cli.2in% de0ice+ I 38" K% ,e& ,ole8 5o 0
C&#n+'e& o' e3i+tin% connection+ 2- )#- o' di+connection #nd &econnection u+in% +e&0ice .#te&i#l+ #l&e#d- in u+e8 5o 0
5ote$ 416 @0e&- 'ou&th ,ole i+ to 2e e#&thed8
46 A&&#n%e.ent o' 'i3tu&e+ on the ,ole )ill 2e #+ %i0en in D&%8 5o8 DISCOM/>?/"8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"3
MATERIAL & ERECTION SCHEDULE 11 - A
Re/l#0ement o AAAC'ACSR 0on:u0to- ($ A" 0#(le =L.E 1+ s;5mm on Existin% t2-ee /2#se LT line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e- 1 ;e,l#ce.ent o' e3i+tin% AAAC/ACS; conducto& 2- u+in% AB C#2le HLP@ "0 +B8.. on e3i+tin% e3i+tin% 3 ,h#+e LC line4.#3i.u. +,#n "0 Mt&6 in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion
P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon%8 5o "
B#c* 'illin% o' ,ole )ith 2olde& #nd &#..in%8 5o "
3 ;e.o0#l o' e3i+tin% AAAC/ACS; conducto& '&o. LC line K. C*t 1
! St&#i%htenin% o' e3i+tin% Le#nin% ,ole+ 1 it+ 2#c* 'illin% 2- 2oulde& 1 &#..in% 5o (
" Su+,en+ion cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3! 5o 1"
( De#d end cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3" 5o "
7 @#&th connecto& +uit#2le 'o& AB C#2le )ith ( +B.. PVC )i&e 'o& e3tendin% neut&#l '&o. neut&#l / .e++en%e& )i&e to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/38 5o 10
8 Pie&cin% connecto& C-,e LI +uit#2le 'o& AB c#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/ !0 5o !
9 Pie&cin% connecto& C-,e LII +uit#2le 'o& AB C#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8DISCOM/>?/ !1 5o 1(
10 1100 Volt+ F&#de AB HLP@ c#2le 33"0 +B8 ..8 M 131( +B8.. M13 3" +B .. includin% 3G +#% K. 1803
11 F#l0#ni=ed +t#- +et 1(.. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set "
1 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K% 78"
13 St#- cl#., %#l0#ni=ed 'l#t "03( .. 4183"K%6 Set "
1! Stone 2loc* / ;CC 2#+e ,l#te +i=e !"03!"037" .. 4 no ,e& +t#- #nd 1 no 'o& ,ole 6/ d&%8 5o8 DISCOM/>?/ !7 1 !8 5o 1"
1" @#&thin% +et 4coil e#&th6 4D&%8no8DISCOM/>?/ !(6 Set "
1( F#l0#ni=ed nut 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 10
17 5u.2e&in% on PCC ,ole 5o 0
18 LC d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/ 38 6 5o 0
0 Di+t&i2ution Bo3 th&ee ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&%8 5o8 Di+co./>?/ !!6 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o
1 Di+t&i2ution Bo3 +in%le ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&% no Di+co./>?/ !3 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o 8
AB C#2le Dointin% *it o' +uit#2le +i=e Set 1
3 AB C#2le end c#, +uit#2le +i=e Set "
! Anti-cli.2in% de0ice+ I 38" K% ,e& ,ole8 5o 0
" C&#n+'e& o' e3i+tin% connection+ 2- )#- o' di+connection #nd &econnection u+in% +e&0ice .#te&i#l+ #l&e#d- in u+e8 5o 0
5ote $ - 4#6 @0e&- 'ou&th ,ole o' LC line to 2e e#&thed 8 426 D#.#%ed +t#-+ #&e to 2e &e,l#ced 2- ne) one #+ 1 )he&e &eBui&e 8 NcO B#l#nce LC conducto& / old LC c&o++ #&. / 9 cl#.,+ #&e to 2e &etu&n to conce&n #&e# +to&e o' the e.,lo-e& 8 4d6
D#.#%e / 2&e#*#%e to the e3tent o' G o' the tot#l Bu#ntit- o' ,ole+ +h#ll 2e #llo)ed 8 D#.#%e / 2&e#*#%e 2e-ond G o' the tot#l Bu#ntit- +h#ll 2e to the cont&#cto&+ #ccount
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"!
MATERIAL & ERECTION SCHEDULE 1) - A
Re/l#0ement o AAAC'ACSR 0on:u0to- ($ A" 0#(le =L.E )1 s;5mm on Existin% t2-ee /2#se LT line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e- 1 ;e,l#ce.ent o' e3i+tin% AAAC/ACS; conducto& 2- u+in% AB C#2le HLP@ " +B8.. on e3i+tin% 3 ,h#+e LC line 4.#3i.u. +,#n "0 Mt&6 in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e
o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon%8 5o "
B#c* 'illin% o' ,ole )ith 2olde& #nd &#..in%8 5o "
3 ;e.o0#l o' e3i+tin% AAAC/ACS; conducto& '&o. LC line K. C*t 1
! St&#i%htenin% o' e3i+tin% Le#nin% ,ole+ 1 it+ 2#c* 'illin% 2- 2oulde& 1 &#..in% 5o (
" Su+,en+ion cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3! 5o 1"
( De#d end cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3" 5o "
7 @#&th connecto& +uit#2le 'o& AB C#2le )ith ( +B.. PVC )i&e 'o& e3tendin% neut&#l '&o. neut&#l / .e++en%e& )i&e to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/38 5o 10
8 Pie&cin% connecto& C-,e LI +uit#2le 'o& AB c#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/ !0 5o !
9 Pie&cin% connecto& C-,e LII +uit#2le 'o& AB C#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8DISCOM/>?/ !1 5o 1(
10 1100 Volt+ F&#de AB HLP@ c#2le 33" +B8 ..8 M 131( +B8.. M13 " +B .. includin% 3G +#% K. 1803
11 F#l0#ni=ed +t#- +et 1(.. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set "
1 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K% 78"
13 St#- cl#., %#l0#ni=ed 'l#t "03( .. 4183"K%6 Set "
1! Stone 2loc* / ;CC 2#+e ,l#te +i=e !"03!"037" .. 4 no ,e& +t#- #nd 1 no 'o& ,ole 6/ d&%8 5o8 DISCOM/>?/ !7 1 !8 5o 1"
1" @#&thin% +et 4coil e#&th6 4D&%8no8DISCOM/>?/ !(6 Set "
1( F#l0#ni=ed nut 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 10
17 5u.2e&in% on PCC ,ole 5o 0
18 LC d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/ 38 6 5o 0
0 Di+t&i2ution Bo3 th&ee ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&%8 5o8 Di+co./>?/ !!6 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o
1 Di+t&i2ution Bo3 +in%le ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&% no Di+co./>?/ !3 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o 8
AB C#2le Dointin% *it o' +uit#2le +i=e Set 1
3 AB C#2le end c#, +uit#2le +i=e Set "
! Anti-cli.2in% de0ice+ I 38" K% ,e& ,ole8 5o 0
" C&#n+'e& o' e3i+tin% connection+ 2- )#- o' di+connection #nd &econnection u+in% +e&0ice .#te&i#l+ #l&e#d- in u+e8 5o 0
5ote $ - 4#6 @0e&- 'ou&th ,ole o' LC line to 2e e#&thed 8 426 D#.#%ed +t#-+ #&e to 2e &e,l#ced 2- ne) one #+ 1 )he&e &eBui&e 8 NcO B#l#nce LC conducto& / old LC c&o++ #&. / 9 cl#.,+ #&e to 2e &etu&n to conce&n #&e# +to&e o' the e.,lo-e& 8 4d6
D#.#%e / 2&e#*#%e to the e3tent o' G o' the tot#l Bu#ntit- o' ,ole+ +h#ll 2e #llo)ed 8 D#.#%e / 2&e#*#%e 2e-ond G o' the tot#l Bu#ntit- +h#ll 2e to the cont&#cto&+ #ccount 8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-""
MATERIAL & ERECTION SCHEDULE 1& - A
Re/l#0ement o AAAC'ACSR 0on:u0to- ($ A" 0#(le =L.E 14 s;5mm on Existin% t2-ee /2#se LT line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e- 1 ;e,l#ce.ent o' e3i+tin% AAAC/ACS; conducto& 2- u+in% AB C#2le HLP@ 1( +B8.. on e3i+tin% 3 ,h#+e LC line 4.#3i.u. +,#n "0 Mt&6 in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e
o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon%8 5o "
B#c* 'illin% o' ,ole )ith 2olde& #nd &#..in%8 5o "
3 ;e.o0#l o' e3i+tin% AAAC/ACS; conducto& '&o. LC line K. C*t 1
! St&#i%htenin% o' e3i+tin% Le#nin% ,ole+ 1 it+ 2#c* 'illin% 2- 2oulde& 1 &#..in% 5o (
" Su+,en+ion cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3! 5o 1"
( De#d end cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3" 5o "
7 @#&th connecto& +uit#2le 'o& AB C#2le )ith ( +B.. PVC )i&e 'o& e3tendin% neut&#l '&o. neut&#l / .e++en%e& )i&e to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/38 5o 10
8 Pie&cin% connecto& C-,e LI +uit#2le 'o& AB c#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/ !0 5o !
9 Pie&cin% connecto& C-,e LII +uit#2le 'o& AB C#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8DISCOM/>?/ !1 5o 1(
10 1100 Volt+ F&#de AB HLP@ c#2le 331( +B8 ..8 M 131( +B8.. M13 " +B .. includin% 3G +#% K. 1803
11 F#l0#ni=ed +t#- +et 1(.. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set "
1 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K% 78"
13 St#- cl#., %#l0#ni=ed 'l#t "03( .. 4183"K%6 Set "
1! Stone 2loc* / ;CC 2#+e ,l#te +i=e !"03!"037" .. 4 no ,e& +t#- #nd 1 no 'o& ,ole 6/ d&%8 5o8 DISCOM/>?/ !7 1 !8 5o 1"
1" @#&thin% +et 4coil e#&th6 4D&%8no8DISCOM/>?/ !(6 Set "
1( F#l0#ni=ed nut 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 10
17 5u.2e&in% on PCC ,ole 5o 0
18 LC d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/ 38 6 5o 0
0 Di+t&i2ution Bo3 th&ee ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&%8 5o8 Di+co./>?/ !!6 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o
1 Di+t&i2ution Bo3 +in%le ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&% no Di+co./>?/ !3 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o 8
AB C#2le Dointin% *it o' +uit#2le +i=e Set 1
3 AB C#2le end c#, +uit#2le +i=e Set "
! Anti-cli.2in% de0ice+ I 38" K% ,e& ,ole8 5o 0
" C&#n+'e& o' e3i+tin% connection+ 2- )#- o' di+connection #nd &econnection u+in% +e&0ice .#te&i#l+ #l&e#d- in u+e8 5o 0
5ote $ - 4#6 @0e&- 'ou&th ,ole o' LC line to 2e e#&thed 8 426 D#.#%ed +t#-+ #&e to 2e &e,l#ced 2- ne) one #+ 1 )he&e &eBui&e 8 NcO B#l#nce LC conducto& / old LC c&o++ #&. / 9 cl#.,+ #&e to 2e &etu&n to conce&n #&e# +to&e o' the e.,lo-e& 8 4d6
D#.#%e / 2&e#*#%e to the e3tent o' G o' the tot#l Bu#ntit- o' ,ole+ +h#ll 2e #llo)ed 8 D#.#%e / 2&e#*#%e 2e-ond G o' the tot#l Bu#ntit- +h#ll 2e to the cont&#cto&+ #ccount 8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"(
MATERIAL & ERECTION SCHEDULE 1* - A
Re/l#0ement o AAAC'ACSR 0on:u0to- ($ A" 0#(le =L.E 14 s;5mm on Existin% Sin%le /2#se LT line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e- 1 ;e,l#ce.ent o' e3i+tin% AAAC/ACS; conducto& 2- u+in% AB C#2le HLP@ 1( +B8.. on e3i+tin% Sin%le ,h#+e th&ee )i&e LC line 4.#3i.u. +,#n "0 Mt&6 in &u&#l #&e# unde& 11 KV Feede&
Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon%8 5o "
B#c* 'illin% o' ,ole )ith 2olde& #nd &#..in%8 5o "
3 ;e.o0#l o' e3i+tin% AAAC/ACS; conducto& '&o. LC line K. C*t 1
! St&#i%htenin% o' e3i+tin% Le#nin% ,ole+ 1 it+ 2#c* 'illin% 2- 2oulde& 1 &#..in% 5o (
" Su+,en+ion cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3! 5o 1"
( De#d end cl#., #+ ,e& d&#)in% no8 DISCOM/>?/3" 5o "
7 @#&th connecto& +uit#2le 'o& AB C#2le )ith ( +B.. PVC )i&e 'o& e3tendin% neut&#l '&o. neut&#l / .e++en%e& )i&e to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/38 5o 8
8 Pie&cin% connecto& C-,e LI +uit#2le 'o& AB c#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8 DISCOM/>?/ !0 5o !
9 Pie&cin% connecto& C-,e LII +uit#2le 'o& AB C#2le )ith ( +B8 ..8 PVC )i&e 'o& e3tendin% ,h#+e +u,,l- '&o. IPC to di+t&i2ution 2o3 #+ ,e& d&#)in% no8DISCOM/>?/ !1 5o 8
10 1100 Volt+ F&#de AB HLP@ c#2le 331( +B8 ..8 M13 " +B .. includin% 3G +#% K. 1803
11 F#l0#ni=ed +t#- +et 1(.. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set "
1 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K% 78"
13 St#- cl#., %#l0#ni=ed 'l#t "03( .. 4183"K%6 Set "
1! Stone 2loc* / ;CC 2#+e ,l#te +i=e !"03!"037" .. 4 no ,e& +t#- #nd 1 no 'o& ,ole 6/ d&%8 5o8 DISCOM/>?/ !7 1 !9 5o 1"
1" @#&thin% +et 4coil e#&th6 4D&%8no8DISCOM/>?/ !(6 Set "
1( F#l0#ni=ed nut 1 2olt+ )ith )#+he& 4#++o&ted +i=e6 K% 10
17 5u.2e&in% on PCC ,ole 5o 0
18 LC d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/ 38 6 5o 0
19 Di+t&i2ution Bo3 +in%le ,h#+e includin% #cce++o&ie+ 'o& 'i3in% )ith ,ole +uit#2le 'o& AB HLP@ c#2le8 4 D&% no Di+co./>?/ !3 #lon%)ith e#&thin% )ith e#&th coil #+ ,e& d&#)in%8 5o 8
0 AB C#2le Dointin% *it o' +uit#2le +i=e Set 1
1 AB C#2le end c#, +uit#2le +i=e Set "
Anti-cli.2in% de0ice+ I 38" K% ,e& ,ole8 5o 0
3 C&#n+'e& o' e3i+tin% connection+ 2- )#- o' di+connection #nd &econnection u+in% +e&0ice .#te&i#l+ #l&e#d- in u+e8 5o 0
5ote $ - 4#6 @0e&- 'ou&th ,ole o' LC line to 2e e#&thed 8 426 D#.#%ed +t#-+ #&e to 2e &e,l#ced 2- ne) one #+ 1 )he&e &eBui&e 8 NcO B#l#nce LC conducto& / old LC c&o++ #&. / 9 cl#.,+ #&e to 2e &etu&n to conce&n #&e# +to&e o' the e.,lo-e& 8
4d6 D#.#%e / 2&e#*#%e to the e3tent o' G o' the tot#l Bu#ntit- o' ,ole+ +h#ll 2e #llo)ed 8 D#.#%e / 2&e#*#%e 2e-ond G o' the tot#l Bu#ntit- +h#ll 2e to the cont&#cto&+ #ccount 8
MATERIAL & ERECTION SCHEDULE 11 - A
S2itin% o existin% 11'+5*&& !V t2-ee /2#se :ist-i(ution t-#nso-me- su( st#tion to ne8 lo0#tion o- se/#-#tion o #%-i0ultu-#l /um/ 0onsume-s -om ot2e- 0#te%o-ies o 0onsume-
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"7
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ +hi'tin%/ &ein+t#ll#tion 1 co..i++ionin% o' e3i+tin% 11/08!33 KV 3 ,h#+e di+t&i2ution t&#n+'o&.e& +u2 +t#tion on PCC ,ole 1!0 K% 8 Mt& lon% in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e
o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8 58 P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1P Shi'tin% o' 11/08!33 KV outdoo& t-,e/ 3 ,h#+e di+t&i2ution t&#n+'o&.e& )ith #cce++o&ie+8 5o 1
PCC ,ole 1!0 K% 880 M lon% 5o
3 DC c&o++ #&. 8't cent&e %#l0#ni+ed ch#nnel 1003"03( .. 88 M 4"(83 K%6 Set 1
! 11KV di+c in+ul#to&8 5o 3
" 11KV +t&#in h#&d)#&e 5o 3
(P 11KV DO 'u+e .ountin% DC c&o++ #&. %#l0#ni=ed ch#nnel 7"3!03( .. 88 M #nd 2&#cin% #n%le 3"33"3" .. )ith 2#c* cl#., 'o& +u,,o&tin% DO 48K%6 Set 1
7P 11KV DO 'u+e unit 5o
8 11KV DO 'u+e )i&e 18" A., 5o 3
9P C&#n+'o&.e& cl#.,in% +et %#l0#ni=ed #n%le "03"03( .. 18! M 4(8" K%6 Set 1
10 F#l0#ni=ed +t#- +et 1( .. co.,lete )ith tu&n 2uc*le #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/ 96 Set !
11 St#- cl#., PCC ,ole 1!0 K% 8 M lon% %#l0#ni=ed 'l#t "03( .. 4183"K% 6 Set !
1 St#- )i&e 7/381" ..8 4"8" K% ,e& +t#-6 K%
13 Conc&etin% 'o& PCC ,ole 1 2#+e ,#ddin% I 08" 1 080" c.t ,e& ,ole &e+,ecti0el- 4Conc&ete .i3tu&e 1$3$(6 c.t 181
1! Ce.ent 'o& conc&etin% o' +t#- +et I 083c.t ,e& +t#- 4conc&ete .i3tu&e 1$3$(6 c.t 18
1"P C&#n+'o&.e& 2eltin% %#l0#ni=ed #n%le )ith c&o++ 'i3in% %#l0#ni=ed #n%le "03"03(.. #nd 2#c* cl#., 43"8" K%6 4D&%8 no8 DISCOM/>?/!6 Set 1
1(P C&#n+'o&.e& .ountin% 8't cent&e %#l0#ni=ed ch#nnel 1003"03(.. 88M 4"38(K%6 Set 1
17P 11KV d#n%e& 2o#&d8 Set 1
18 @#&thin% 'o& t&#n+'o&.e& +u2+t#tion 4D&%8 no8 DISCOM/ >?/ 8 7 !96 Set 1
19 Anti cli.2in% de0ice+8 5o 1
0P 11KV LA 5o 1
1 F#l0#ni=ed nut 1 2olt+ )ith )#+he& 5o 10
P Shi'tin% o' old di+t&i2ution 2o3 /P&otection 2o3 / DC; .ete& K% 1
3 AB c#2le " +B .. 'o& connectin% no+8 LC 'eede& 5o 0
5ote$
>1? ;#te+ #&e to 2e Buoted 'o& e&ection co+t includin% &e.o0#l #nd +hi'tin% onl- 'o& the ite.+ 82i02 #-e m#-@e: 8it2 #ste-is@ >A? in 0olumn no515 >e intent to u+e e3i3tin% .#te&i#l to ne) loc#tion the&e'o&e
.#te&i#l co+t i+ not to 2e Buoted 8
>)? Fo& othe& ite.+/ &#te+ 2oth 'o& .#te&i#l co+t #nd e&ection co+t #&e to 2e Buoted8
>&? I' #n- .#te&i#l #+ li+ted #2o0e in colu.n i+ .i++in%/ )o&n out o& d#.#%ed #t the e3i+tin% loc#tion/ then onl- co+t o' +uch .#te&i#l +h#ll 2e #llo)ed on the 2#+i+ o' &#te+ indic#ted in +chedule ( LA8 Ho8e3e-
t2is 2#s to (e (-ou%2t out 0le#-l$ in t2e su-3e$ -e/o-t5
>*? On #ccount o' +hi'tin% o' di+t&i2ution t&#n+'o&.e&/ #ll old/d#.#%ed .#te&i#l+ #&e to 2e &etu&ned to the #&e# +to&e+ o' the @.,lo-e&8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"8
MATERIAL & ERECTION SCHEDULE 14 - A
;eno0#tion o' d#.#%ed +in%le ,h#+e +e&0ice line )ith ne) +e&0ice line 1 'i3in% o' ene&%- .ete& )he&e-e0e& &eBui&ed #t c#ll 2ell / #++e++#2le
loc#tion
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' +in%le ,h#+e +e&0ice 4d#.#%ed6 line #lon%)ith ene&%- .ete& )he&e-e0e& &eBui&ed in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion
4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 ;e,l#ce.ent o' d#.#%ed old +e&0ice line )ith ne) +e&0ice line o' 8" +B ..8 t)in co&e #lu.inu. conducto&/ #&.ou&ed/ PVC c#2le/ " .ete& len%th8 5o 1
Inte&n#l )i&in% 'o& +in%le ,h#+e +u,,l- )ith PVC c#2le/ un#&.ou&ed/ +t&#nded co,,e& conducto& / +in%le co&e 8" +B ..8/ len%th li.ited to .#3i.u. o' " .ete& ,e& connection8 5o 1
3 Sh#c*le in+ul#to& ("3"0.. 5o
! PVC Bu+he+ 5o
" FI )i&e 10 S>F 'o& +u,,o&t o' +e&0ice line / ,i,e 1 e#&thin% K% 3
( Mete& Bo#&d .#deu, o' Fi2e&%l#++ ;ein'o&ced Pol-+te& 4F;P6 2#+ed +heet .ouldin% co.,ound 4SMC6 con'o&.in% to IS$13!10 419968 Mini.u. thc*ne++ 8" .. Si=e o' .ete& 2o#&d
3003!0038 ..8 'o& 'i3in% o' .ete&+ #lon% )ith e#&thin% FS nut+ #nd 2olt+ #nd )#+he&+8 #nd ! #ncho& 2olt+ ( ..
5o 1
7 Kit *#t 1( A.,+8 5o 1
8 @#&thin% connecto& 5o 1
9 F8I8 Pi,e 0.. 'o& +e&0ice line ISI .#&* QBQ %&#de Mt& 3
10 F8I8 Soc*et )ith 2#nd 0.. 5o
11 >#ll cl#., / hoo*+ 'o& ,i,e 5o
1 LC ene&%- .ete&+/ 1R ,h#+e/ 30 #.,+ M#38 )ith ,ol- c#&2on#te co0e&8
13 Sunde&ie+ 4 'o& ce.ent/ t#,/ cli,+ etc86 LS 1
5ote$
416 Mete& i+ to 2e in+t#lled #t c#ll 2ell/#++e++#2le loc#tion8
46 Len%th o' the +e&0ice line #nd 'o& inte&n#l )i&in% indic#ted #2o0e i+ #0e&#%e8 Che Cont&#cto& )ill 2e ,#id 'o& the +e&0ice len%th #nd the inte&n#l )i&in% #+ indic#ted #2o0e i&&e+,ecti0e o' the #ctu#l len%th o' )i&e u+ed8
436 All old .#te&i#l+ ie +e&0ice )i&e/ inte&n#l )i&in% .#te&i#l/ ene&%- .ete& etc #&e to 2e &etu&ned to the #&e# +to&e+ o' the @.,lo-e&8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-"9
MATERIAL & ERECTION SCHEDULE 17 - A
.-o3i:in% sin%le /2#se mete- to unmete-e: 0onne0tions
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' Sin%le ,h#+e .ete& to un.ete&ed connection in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict
77777778
S8
58
P#&ticul#&+
9nit :u#ntit-
1 ) & *
1 Mete& Bo#&d .#deu, o' Fi2e&%l#++ ;ein'o&ced Pol-+te& 4F;P6 2#+ed +heet .ouldin% co.,ound 4SMC6 con'o&.in% to IS$13!10 419968 Mini.u. thc*ne++ 8" .. Si=e o' .ete& 2o#&d 3003!0038 ..8
'o& 'i3in% o' .ete&+ #lon% )ith e#&thin% FS nut+ #nd 2olt+ #nd )#+he&+8 #nd ! #ncho& 2olt+ ( ..
5o 1
Kit *#t 1( A.,+8 5o 1
3 LC ene&%- .ete&+/ 1R ,h#+e/ 30 #.,+ M#38 )ith ,ol- c#&2on#te co0e&8 5o 1
5ote$
416 Mete& i+ to 2e in+t#lled #t c#ll 2ell/#++e++#2le loc#tion
46 Len%th o' the +e&0ice line indic#ted #2o0e i+ #0e&#%e8 Che Cont&#cto& )ill 2e ,#id 'o& the +e&0ice len%th #+ indic#ted #2o0e i&&e+,ecti0e o' the #ctu#l len%th o' )i&e u+ed8
MATERIAL & ERECTION SCHEDULE 1, - A
Reno3#tion o existin% 11 !V "#$ in &&'11 !V su( st#tion
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% 'o& &eno0#tion o' 11 KV @3i+tin% 2#- in 33/11 KV +u2 +t#tion in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict
77777778
S8
58
P#&ticul#&+
9nit :u#ntit-
1 ) & *
1 11KV 'eede& cont&ol VCB 5o 1
11KV co.2ined CC/PC unit 100/"0/" #.,8 5o 1
3 EC t&i0ecto& .ete& 4110V/ -" #.,6 5o 1
! Ce.ent 'o& VCB 'ound#tion 4conc&ete .i3tu&e 1$3$(6 c.t 38"
" Co,,e& Cont&ol c#2le co&e 8" +B8 .. 4un#&.ou&ed6 Mt& "0
( Co,,e& Cont&ol c#2le ! co&e 8" +B8 .. 4un#&.ou&ed6 Mt& 80
Co,,e& Cont&ol c#2le 8 co&e 8" +B8 .. 4un#&.ou&ed6 Mt& "0
Co,,e& Cont&ol c#2le 1 co&e 8" +B8 .. 4un#&.ou&ed6 Mt& 10
7 F#l0#ni=ed 5ut+ 1 2olt+ )ith )#+he&8 5o
9 Ce&.in#l cl#.,+ 'o& Du.,e&in% o' AAA conducto& 8"+B.. ;#coon8 5o (
10 AAA conducto& ;#coon 8" +B8 ..8 Mt& !0
5ote$
416 L#- ,ut 1 #&&#n%e.ent )ill 2e #+ ,e& d&%8 no8 DISCOM/ >?/ 18
46 C&i-0ecto& ene&%- .ete& i+ to 2e in+t#lled in the Cont&ol &oo.8
436 I' #n- e3i+tin% .#te&i#l i+ d#.#%ed/ )o&n out #nd &eBui&e &e,l#ce.ent/ then +uch .#te&i#l+ .#- 2e included 2ut it +hould 2e 2#+ed on the #ctu#l +u&0e- #nd %ot #,,&o0ed 2- the P&oDect M#n#%e&8 ;#te+ 'o& +uch .#te&i#l+ +h#ll 2e #+
%i0en in +chedule 1 LA8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-(0
MATERIAL & ERECTION SCHEDULE 1< - A
Re/l#0ement o existin% AAAC'ACSR 0on:u0to- ($ .VC 0#(le un#-mou-e: 6 t8in 0o-e 45+ s;5mm on existin% LT line
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e- 1 &e,l#ce.ent o' e3i+tin% AAAC/ACS; conducto& 2- PVC c#2le un#&.ou&ed / t)in co&e (80 +B8.. on e3i+tin% LC line 4 .#3i.u. +,#n "0 Mete& 6in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion
P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 ;e.o0#l o' e3i+tin% AAAC/ACS; conducto& #lon%)ith #cce++o&ie+ '&o. LC line8 *. c*t 1
St&#i%htenin% o' e3i+tin% le#nin% ,ole+ #nd it+ 2#c* 'illin% 2- 2oulde&+ #nd &#..in%8 5o 1
3 PVC c#2le/ 1100 Volt+ %&#de t)in co&e/ un#&.ou&ed/ ( +B8 ..8 )ith 3G +#%8 *. 1803
! FI )i&e 8 S>F K% 7"
5ote$
416 @3i+tin% LC +h#c*le in+ul#to&+ 1 9 cl#.,+ #&e to 2e u+ed 'o& 'i3in% o' PVC c#2le8
46 B#l#nce LC conducto&/ old LC c&o++ #&.+ / 9 cl#.,+ #&e to 2e &etu&ned to conce&ned A&e# Sto&e+ o' the @.,lo-e&8
>&? T2is #--#n%ement is to (e :one in 0#ses 82e-e num(e- o 0onsume-s to (e se-3e: #-e not mo-e t2#n )5
MATERIAL & ERECTION SCHEDULE )+ - A
Reno3#tion o existin% T-#nso-me- #n: Inst#ll#tion #n: 0ommissionin% o ene-%$ mete- on existin% :ist-i(ution t-#nso-me- 5
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e- 1 in+t#ll#tion 1 co..i++ionin% o' ene&%- .ete& #nd &eno0#tion o' e3i+tin% di+t&i2ution t&#n+'o&.e& +u2+t#tion in #2#di #&e# in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M
Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+ 9nit :u#ntit-
1 ) & *
1 HLP@ in+ul#ted +in%le co&e "0 +B .. c#2le Mt& 0
LC Ch&ee ,h#+e ! )i&e 33!0 0olt+ !0-00 A., St#tic 4 @lect&onic 6 C&i-Vecto& ene&%- .ete& o' cl#++ 180 #ccu&#c- )ith FSM Mode. 4 FP;S en#2led 6 5o 1
3 Di+t&i2ution Bo3 +uit#2le 'o& 100KVAC&#n+'o&.e& 5o 1
! P#intin% o' Di+t&i2ution C&#n+'o&.e& Bod-8 @3i+tin% +u&'#ce o' the eBui,.ent+ +heet+ +h#ll 2e de-&u+ted 2- .e#n+ o' e.e&- ,#,e& / )i&e 2&u+h #nd then cle#ned8 Che&e#'te& t)o o& .o&e co#t+ o' &ed
o3ide =inc ch&o.#te ,&i.e& ,#int/ u+in% ,#intin% 2&u+h/ till +.ooth 'in#l +u&'#ce #,,e#&+/ +h#ll 2e ,&o0ided8 Che +u&'#ce i+ the&e#'te& ,#inted )ith t)o o& .o&e co#t+ o' +-nthetic en#.el ,#int 2-
+,&#- ,#intin%8 Che 'in#l +h#de o' +u&'#ce +hould 2e +#.e #+ o' o&i%in#l t&#n+'o&.e&8
5o 1
5ote $ A&&#n%e.ent o' DP +t&uctu&e 'o& di+t&i2ution t&#n+'o&.e& i+ indic#ted in D&#)in% 5o8 DISCOM/>?/
MATERIAL & ERECTION SCHEDULE )1 - A
HVDS S$stem>Con3e-sion o existin% LT to HT line? on 1*+!%5 ,mt- lon% .CC .ole
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-(1
Schedule o' )o&* 'o& +u,,l- o' .#te&i#l+ +u&0e- #nd e&ection o' EVDS S-+te.4Con0e&+ion o' e3i+tin% LC to EC line6 on 1!0K%8 8.t& lon% PCC
Pole in &u&#l #&e#unde& 11*V 'eede& +e,#&#tion ,&o%&#..e o' 4O1M6 Dn8 45#.e6 o' 45#.e6 Di+t&ict8
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 11 KV V-C&o++ A&. %#l0#ni=ed #n%le ("3("3(.. 4183K%86 D&%8 5o8Di+co./>?/1! 5o+ 1(
B#c* cl#., %#l0#ni=ed #n%le "03"03(.. 48(7"K%86 5o+ 1(
3 11 KV Co,-Cl#., %#l0#ni=ed #n%le ("3("3(.. 43K%86 D&%8 5o8Di+co./>?/13 5o+ 1(
! 11 KV St&#in+et )ith E#&d)#&e 5o+ (
" 11 KV F-I Pin )ith in+ul#to& 5o+ !8
( F#l0#ni=ed St#- S#t 1( .. Co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 5o8 Di+co./>?/9 Set !
7 St#- Cl#., F#l0#ni=ed 'l#t "03(.. 4183"K%86 5o+ !
8 St#- )i&e 7/381".. 4"8"K%86 Pe& +t#- K%
9 F#l0#ni=ed 5ut 1 Bolt )ith)#+he& 4#++o&ted +i=e6 K% 18
10 AAAC Conducto& &#2it )ith 3G +#% *. 18"!"
11 PCC Pole 1!0K% 8 .t&8 lon% D&%8 5o8Di+co./>?/9 4D#.#%edM.id +,#nMdeto&i#ted6 5o+ "
1 B#*'illin% o' PCC ,ole )ith 2oulde&+ #nd &#..in%8 5o+ "
13 Conc&etin% I 08 C.t8/+t#- #nd 80" c.t B#+e ,#ddin% ,e& ,cc ,ole C.t 180"
1! Stone 2loc* / ;CC 2#+e ,l#te +i=e!"03!"037".. 43 5o8 ,e& +t#- 1 1 no8 ,e& ,ole 'o& 2#+e ,#ddin% #+ ,e& d&#)in% no8 Di+co./>?/!7 1 !86
1" 11KV d#n%e& 2o#&d 4D&%8 5o8 Di+co./>?/39 5o+ 1(
1( Bindin% )i&e 1 C#,e K% "
17 Alu.inu. ,#int Lt& 1
18 ;ed o3ide ,#int Lt& 1
19 Anti Cli.2in% de0ice+ 5o+ 1(
0 @#&thin% +et 4Coil @#&th6 4D&%8 5o8Di+co./>?/!( 5o+ 1(
1 5u.2e&in% o' ,ole+ 5o+ 1(
Di+.entlin% #nd ;e-+t&in%in% o' 0 +B../ 30 +B.. >e#+el Conducto& '&o. e3i+tin% LC line 'o& EVDS )o&* *. 38009
5ote $ LT to HT 0on3e-sion 9- 1+B o ol: 0on:u0to- o existin% LT line 8ill (e -e-use: o- 0on3e-tin% -om LTto HT line in 3ill#%es5

MATERIAL & ERECTION SCHEDULE )) - A
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-(
.-o3i:in% ne8 Sin%le /2#se 0onne0tion
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' +in%le ,h#+e ne) connection )ith .ete& in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 5e) +e&0ice connection )ith +e&0ice line o' 8" +B ..8 t)o co&e #lu.inu. conducto&/ #&.ou&ed/ PVC c#2le/ " .ete& len%th8 5o 1
3 Sh#c*le in+ul#to& ("3"0.. 5o
! PVC Bu+he+ 5o
" FI )i&e 10 S>F 'o& +u,,o&t o' +e&0ice line / ,i,e 1 e#&thin% K% 3
( Mete& Bo#&d .#deu, o' Fi2e&%l#++ ;ein'o&ced Pol-+te& 4F;P6 2#+ed +heet .ouldin% co.,ound 4SMC6 con'o&.in% to IS$13!10 419968 Mini.u. thc*ne++ 8" .. Si=e o' .ete& 2o#&d 3003!0038 ..8
'o& 'i3in% o' .ete&+ #lon% )ith e#&thin% FS nut+ #nd 2olt+ #nd )#+he&+8 #nd ! #ncho& 2olt+ ( ..
5o 1
7 Kit *#t 1( A.,+8 5o 1
8 @#&thin% connecto& 5o 1
9 F8I8 Pi,e 0.. 'o& +e&0ice line ISI .#&* QBQ %&#de Mt& 3
10 F8I8 Soc*et )ith 2#nd !0.. 5o
11 >#ll cl#., / hoo*+ 'o& ,i,e 5o
1 LC ene&%- .ete&+/ +in%le 4,h#+e6 30 #.,+ M#38 )ith ,ol- c#&2on#te co0e&8 5o 1
13 Sunde&ie+ 4 'o& ce.ent/ t#,/ cli,+ etc86 LS 1
5ote$
416 Mete& i+ to 2e in+t#lled #t c#ll 2ell/#++e++#2le loc#tion8
46 Len%th o' the +e&0ice line indic#ted #2o0e i+ #0e&#%e8 Che Cont&#cto& )ill 2e ,#id 'o& the +e&0ice len%th #+ indic#ted #2o0e i&&e+,ecti0e o' the #ctu#l len%th o' )i&e u+ed8
MATERIAL & ERECTION SCHEDULE )& - A
11 !V Cou- .ole St-u0tu-e on .CC .ole5
Schedule o' )o&* 'o& Su,,l- o' &el#ted .#te&i#l/ +u&0e- includin% In+t#ll#tion 1 Co..i++ionin% o' 11 *V/ 3 Ph#+e/ 'ou& ,ole 8't cent&e +t&uctu&e
out+ide 33/11 *V S/+ 'o& ne) 11 *V 'eede& )he&e0e& e&ection o' #ddl8 B#- i+ not ,o++i2le in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-(3
o' O1M Dn8 4n#.e6 o' 4n#.e6 Di+t&ict
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
1 ) & *
1 PCC ,ole 1!0 K% 880 M lon% 5o+ !
DC c&o++ #&. 8 'eet cent&e %#l0#ni=ed ch#nnel 1003"03( .. 8 M 4"38! *%6 4D&%8 5o8 DISCOM/>?/06 Set 8
3 11KV di+c in+ul#to& 5o+ 1
! 11KV +t&#in h#&d)#&e 5o+ 1
" 11KV ,in in+ul#to& 5o+ 1
( 11KV FS Pin 5o+ 1
7 Eo&i=ont#l #nd c&o++ 2&#cin% +et ! 'eet cent&e )ith ! 2#c* cl#.,+ .#de out o' ho&i=ont#l #nd c&o++ 2&#cin% %#l0#ni=ed #n%le "03"03( .. 4!" K%6 4D&%8 5o8 DISCOM/>?/06 Set !
8 F#l0#ni=ed +t#- +et 1( .. co.,lete )ith tu&n 2uc*le/ +t#- in+ul#to& #nd #ncho& ,l#te8 4D&%8 no8 DISCOM/>?/96 Set 8
9 St#- cl#., 'o& PCC ,ole 1!0 K% 880 M lon% %#l0#ni=ed 'l#t "03(.. 4183" K%6 5o+ 8
10 St#- )i&e 7/381" ..8 4"8" *% ,e& +t#-6 K% !!
11 Ce.ent conc&etin% 'o& ,ole #nd 2#+e ,#ddin% I 08" 1 080" c.t ,e& ,ole &e+,ecti0el- 4Conc&ete .i3tu&e 1$3$(68 C.t 8(
1 Ce.ent 'o& conc&etin% o' +t#- I 083 c.t8 ,e& +t#- 4Conc&ete .i3tu&e 1$3$(68 C.t 8!
13 @#&thin% +et 4coil e#&th6 4D&%8 no8 DISCOM/>?/!(6 5o+ !
1! Anti-cli.2in% de0ice+ 5o+ !
1" 11KV d#n%e& 2o#&d 4D&%8 no8 DISCOM/>?/396 5o+ 1
1( F#l0#ni=ed nut+ 1 2olt+ )ith )#+he&8 4#++o&ted +i=e6 K% 10
17 5u.2e&in% o' ! Pole +t&uctu&e 5o+ 1
18 PF cl#.,/ Alu.iniu. %&#de C-1F #+ ,e& IS 8309 5o+ 1
5ote $ Loc#tion o' ! Pole +t&uctu&e )ill 2e decided #'te& #ctu#l +u&0e-8

MATERIAL & ERECTION SCHEDULE )* - A
.-o3i:in% ne8 t2-ee /2#se 0onne0tion
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' th&ee ,h#+e ne) connection )ith .ete& in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6 Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-(!
1 ) & *
1 5e) +e&0ice connection )ith +e&0ice line o' !80 +B ..8 'ou& co&e #lu.inu. conducto&/ #&.ou&ed/ PVC c#2le/ " .ete& len%th8 5o 1
3 Sh#c*le in+ul#to& ("3"0.. 5o
! PVC Bu+he+ 5o
" FI )i&e 10 S>F 'o& +u,,o&t o' +e&0ice line / ,i,e 1 e#&thin% K% 3
( Mete& Bo#&d .#deu, o' Fi2e&%l#++ ;ein'o&ced Pol-+te& 4F;P6 2#+ed +heet .ouldin% co.,ound 4SMC6 con'o&.in% to IS$13!10 419968 Mini.u. thc*ne++ 8" .. Si=e o' .ete& 2o#&d !003!0038
..8 'o& 'i3in% o' .ete&+ #lon% )ith e#&thin% FS nut+ #nd 2olt+ #nd )#+he&+8 #nd ! #ncho& 2olt+ ( ..
5o 1
7 Kit *#t 3 A.,+8 5o 3
8 @#&thin% connecto& 5o 1
9 F8I8 Pi,e !0.. 'o& +e&0ice line ISI .#&* QBQ %&#de Mt& 3
10 F8I8 Soc*et )ith 2#nd !0.. 5o
11 >#ll cl#., / hoo*+ 'o& ,i,e 5o
1 LC ene&%- .ete&+/ 3R 4,h#+e6 ! )i&e /10-!0 #.,+ M#38 )ith ,ol- c#&2on#te co0e&8 5o 1
13 Sunde&ie+ 4 'o& ce.ent/ t#,/ cli,+ etc86 LS 1
5ote$
416 Mete& i+ to 2e in+t#lled #t c#ll 2ell/#++e++#2le loc#tion8
46 Len%th o' the +e&0ice line indic#ted #2o0e i+ #0e&#%e8 Che Cont&#cto& )ill 2e ,#id 'o& the +e&0ice len%th #+ indic#ted #2o0e i&&e+,ecti0e o' the #ctu#l len%th o' )i&e u+ed8
MATERIAL & ERECTION SCHEDULE )1 - A
Re/l#0ement o Sto/ ' Dee0ti3e sin%le /2#se' t2-ee /2#se mete-
Schedule o' )o&*+ 'o& +u,,l- o' .#te&i#l+ / +u&0e-/ e&ection/ in+t#ll#tion 1 co..i++ionin% o' ne) Sin%le ,h#+e/ Ch&ee ,h#+e .ete& #%#in+t +to, / de'ecti0e .ete&+ in &u&#l #&e# unde& 11 KV Feede& Se,#&#tion P&o%&#..e o' O1M Di0i+ion 4 5#.e 6
Di+t&ict 77777778
S8
58
P#&ticul#&+
9
n
i
t
:
u
#
n
t
i
t
-
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II
Section-3 Schedule 3-("
1 ) & *
1 Mete& Bo#&d .#deu, o' Fi2e&%l#++ ;ein'o&ced Pol-+te& 4F;P6 2#+ed +heet .ouldin% co.,ound 4SMC6 con'o&.in% to IS$13!10 419968 Mini.u. thc*ne++ 8" .. Si=e o' .ete& 2o#&d !003!0038 ..8
'o& 'i3in% o' .ete&+ #lon% )ith e#&thin% FS nut+ #nd 2olt+ #nd )#+he&+8 #nd ! #ncho& 2olt+ ( ..
5o 1
Kit *#t 3 A.,+8 5o 3
3 LC ene&%- .ete&+/ 3R 4,h#+e6 ! )i&e /10-!0 #.,+ M#38 )ith ,ol- c#&2on#te co0e&8 5o 1
! LC ene&%- .ete&+/ 1R ,h#+e/ 30 #.,+ M#38 )ith ,ol- c#&2on#te co0e&8 5o 1
" Inte&n#l )i&in% 'o& th&ee ,h#+e +u,,l- )ith PVC c#2le/ un#&.ou&ed +t&#nded co,,e& conducto&/ 'ou& co&e (80 +B8..8 len%th li.ited to .#3i.u. o' " .ete& ,e& connection8 5o 1
( FI )i&e 10 S>F *% 3
5ote$
416 416 Mete& i+ to 2e in+t#lled #t c#ll 2ell/#++e++#2le loc#tion8
46 Len%th o' the +e&0ice line #nd 'o& inte&n#l )i&in% indic#ted #2o0e i+ #0e&#%e8 Che Cont&#cto& )ill 2e ,#id 'o& the +e&0ice len%th #nd the inte&n#l )i&in% #+ indic#ted #2o0e i&&e+,ecti0e o' the #ctu#l len%th o' )i&e u+ed8
436 All old .#te&i#l+ ie +e&0ice )i&e/ inte&n#l )i&in% .#te&i#l/ ene&%- .ete& etc #&e to 2e &etu&ned to the #&e# +to&e+ o' the @.,lo-e&8
CMD/MPPK/PROJ/FS/03/10-11 VOL
IIMPPKVVCL/FSP/ F-03 SBD Vol II

Anda mungkin juga menyukai