10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers

http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 1/9
H o me Disclaimer Project HSE Plan Construction Method Statements
Method Statement Template Inspection Checklists Request A Method Statement
Project Execution Plan Customer Support Download Method Statements Privacy Policy
Download Project Quality Plan

ar.regus.qa/Qatar-Setup-Company
! . 6 50 :
Method Statement Downloads
RSS
You are here: Home Method Statements Construction Method Statements HVAC Method Statements Method
Statements Construction Method Statements HVAC Method Statements Piping Works Method of Statement For
Installation of Compressed Air Piping System for Chillers
Method of Statement For Installation of Compressed Air Piping System for
Chillers
Tweet
December 5, 2012 | webmaster
SPECIAL RECENT POSTS
Method Statement For Installation Of
Noise and Vibration Control
Equipment
August 20th, 2014
1. PURPOSE This method statement covers
on site installation of noise and vibration
equipment ass[...]
Wall Panels Fabrication and
Installation Method Statement
August 15th, 2014
1.0 PURPOSE The purpose of this procedure
is to define how the Wall Panels Fabrication
and Instal[...]
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 2/9
Tweet
1. PURPOSE
This method of statement covers the on site
installation of the compressed air piping system for
the operation of the chillers. This will include:
Power Plant Compressed Air Systems
Factory assembled packaged air compressor
complete with
- Rotary screw air compressor
- Receiver
- Filtration facilities
- Instrumentation & Control Panel
Refrigerated air dryers.
2. PRE REQUIREMENTS GALVANIZED PIPEWORK
All materials and documentation relevant to a particular section of works will be checked by the
Construction Department prior to the commence of work ensuring that these are of the correct
type as reviewed by the client.
Prior to the commencement of any construction activity, areas and access will be inspected to
confirm that they are in a suitable condition for construction works to commence.
Before commencement any construction activity, pre-inspections will be carried out on all
Method Statement For Coring &
Cutting
August 13th, 2014
EQUIPMENTS & TOOLS REQUIRED Cutting
Machine LP32/TS20 Coring Machine DD
200/DD 350 H[...]
Installation Method Statement For
Sliding Aluminum Doors
August 13th, 2014
EQUIPMENT & TOOLS REQUIRED: Concrete
Drill Machine Rechargeable Tighter
machine Small cu[...]
Installation Procedure For Closed
Control Units
August 12th, 2014
Tools Required: Pipe cutting & threading
machines Standard mechanical Tool Box
Mobile sc[...]
METHOD STATEMENT FOR TESTING &
COMMISSIONING OF WATER BOOSTER
PUMPS SET
August 12th, 2014
Download Method Statement For TESTING &
COMMISSIONING OF BOOSTER PUMPS Now
you can Download M[...]
TESTING & COMMISSIONING OF FIRE
ALARM SYSTEM
August 12th, 2014
Download Method Statement For TESTING &
COMMISSIONING OF FIRE ALARM SYSTEM
Now you can Downlo[...]
Method Statement For Formwork
August 7th, 2014
TABLE OF CONTENT 1.0 PURPOSE 2.0
SCOPE 3.0 REFERENCES 4.0 DEFINITIONS
AN[...]
Testing & Commissioning Of Foam
System
August 7th, 2014
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 3/9
material prior to them leaving the storage area.

3. INSTALLATION METHOD STATEMENT
Ensure that horizontal and vertical pipe runs are correctly aligned and supported as indicated in the
table below for galvanized pipework.
NOMINAL BORE
OF PIPE
INTERVAL FOR
HORIZONTAL RUNS
INTERVALS FOR
VERTICAL RUNS
mm m m
Instruments & Tools Requirement: Valve
operating keys. Digital multimeter Work
Sequence[...]
Download Method Statement For PVC
& GI Conduits & Accessories
Installation
July 19th, 2014
Download Method Statement For
INSTALLATION OF PVC & GI CONDUITS &
ACCESSORIES Now you can [...]
CATEGORIES
BMS
Cement & Clinker Testing
Civil Engineering
Civil Method Statements
Concrete Testing
Construction Method Statements
Drainage Pipes Installation
Duct Works
Electrical
Electrical Method Statements
Fire Suppression System
Health & Safety
HVAC Checklists
HVAC Maintenance
HVAC Method Statements
ISO 9001
Method Statement Template
Method Statements
Piping Method Statements
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 4/9
15 0.75 1.5
22 to 28 1 1.8
28 to 35 1 2
42 1.2 2.4
54 1.4 3.5
Pipework will be installed with falls not less than 1 in 80 in the direction of flow.
Drainage points will be installed at intervals not exceeding 30m.
Drain sets will be piped to the nearest suitable floor waste.
3.1 JOINTING PROCEDURE FOR GALVANIZED TUBE
Screwed pipe work and joints up to and including 50 mm mild steel pipe.
Pipe ends will be threaded by the use of an appropriate threading machine.
The machine die head will be suitable to cut tapered type threads.
Threads will be cut to the correct thread length.
After the suitable thread has been cut, burrs, surplus oil and swarf will be removed prior to the
selected fitting being screwed in place.
Threads shall be applied with thread joint compound of the approved type.
By means of an appropriate pipe wrench, the selected fitting will be screwed onto the pipe
thread to the correct tightness required without causing any damage to the pipe/fitting.
When pipe and fitting is fully tightened, clean of any excess jointing compound, and paint
exposed threads with approved cold galvanizing compound.
4. FINAL CONNECTION
Piping Works
Plumbing Method Statements
Pressure Testing
Project HSE Plan
Pump Installation
Quality Assurance
Quality Management
Risk
Risk Assessment
Risk Management
Sample Forms & Formats
Templates
Testing & Commissioning
Water Supply Piping
Welding Risk
What Is Hazard?
What Is Risk?
Working At Height
TAGS
& Access Control System AC Ducting Method Statement
ac duct installation AC Maintenance blank
performa blank proforma bms system BMS
Testing Procedure Building Management
System Building Management System BMS
control measures Electrical Method
Statement FA System for hazard hvac HVAC
Method Statements installation
Installation Method Statement Installation of
GI Conduits & Accessories method
Method Of Statement
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 5/9
Final connections to compressor will be full line size flexible connections of type shown on the
construction drawing located as close as possible to the compressor. Ensuring pipework is adequately
supported independently to the flexible connectors.
5. PRESSURE TESTING PIPEWORK
Prior to the start of pneumatic testing all other works on the system will cease and personnel
adjacent to the area will be informed of the intention to test.
Pressurization equipment will be connected to the system with a pressure gauge to register line
pressure, isolated from the equipment. Test will include safety release valve.
The test pressure will be 1.5 times the system working pressure held constant for 30 minutes. This will
be attained by raising the pressure equally in three stages.
During any of the three periods if a leakage is apparent in the system it will be identified and
logged, but no remedial work undertaken.
All remedial work will be carried out after the system has been bleed to atmospheric pressure.
Upon completion of any remedial work the system will be re-pressurized as before.
When the system is charged to its test pressure the air temperature in the system must be allowed
to stabilize and the pressurization equipment disconnected.
6. EQUIPMENT INSTALLATION METHOD
All documentation and certification relevant to the Packaged Air compressor will be checked by
the Construction Department prior to the commence of installation, ensuring that they are of the
correct type as review by the client.
All lifting and handling procedures will conform to the manufacturers instructions ensuring at all
times that Packaged Air Compressor is not subjected to undue flexure and stress.
Compressor and associated equipment will be carefully plumbed and aligned, then bolted and
securely anchored to Housekeeping pad.
After alignment is completed supervisor in charge is to ensure that vibration isolators are of the
correct deflection. Final adjustments will be made at pre-commissioning stage.
It will be ensured that all completed installations look neat and tidy, and that there is adequate
Method Statement
method statement for Installation
Method Statement Template MST MST
For BMS of pipe flushing pressure pumps risk
Risk Assessment safe work method
sample check list sample checksheet
Sample Format Electrical statement
swms template test Testing &
Commissioning Testing & Commissioning
Method Statement water
DOWNLOAD METHOD STATEMENTS
Download BMS Installation Method Statement
Download Chilled Water Pipes Installation &
Testing Method Statement
Download Method Statement For INSTALLATION
HYDRO TESTING & FLUSHING OF FIRE FIGHTING
PIPING SYSTEM INCLUDING SPRINKLERS
Download Method Statement For CENTRAL
BATTERY SYSTEM INSTALLATION
Download Method Statement For Fire Alarm
System
Download Method Statement For Flushing Of
Chilled Water Piping
Download Method Statement For Installation Of
Packaged Units
Download Method Statement For Installation Of
Split Units & Risk Assessment
Download Method Statement For Installation Of
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 6/9
spacing between pipe lines and other services allowing access for operation and ease of
maintenance.
The supervisor and the QC officer will continuously monitor the activities to ensure that all
components indicated on the approved construction drawings have been installed and that the
installation is in accordance with the contract requirements and manufacturers
recommendations.
All completed installation work will be protected to avoid damage.
7. SAFETY AND ENVIRONMENTAL CONSIDERATION
In ordered to ensure that all compressed air system works to takes place in a safe manner, tthe
company will consider suitability of the following:
Work on height
Tools
Welding
Pressure test
Work on height
Stand or erect towers on firm base or level ground
Brakes on castors are always using
Secure the tower scaffold to the structure if necessary by ties
Unsound ladders shall never be used
Lean sideways from ladders is forbidden
Ties to be fitted all the time with right length
Regular inspections will be done for ladders & scaffolds by competent persons
Use Of Suitable Tools
Always right type of tools for the job will be used
Correct size of hand tools will be used for the size of the job
Transformers
Download Project HSE Plan With All Forms
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 7/9
Defected tools will be rejected immediately
Only earthed tools shall be allowed to use
Damaged tools are not allow to use before repairing
All electric stuff must be in good shape
The power tools will be inspected regularly by competent persons
Welding
The welders to be trained and certified for the job, must be in good health and trained for safe
work.
Correct face shield or goggles must be used in accordance with the type of welding
Leather gauntlet gloves be worn during the welding
Welding curtains to be used to protect neighboring workers at all the time
All Oxygen cylinders to be black, out let threaded is right hand, Acetylene cylinders are brown,
out let threaded is left hand, and propane cylinders are blue, out let threaded is left hand.
Regulators must be always fitted in good condition
Hoses to be in good condition and in standard color code: Red for fuel gasses and Blue for
oxygen
Non return valve will be fitted all the time and flash- back arrestors if available
Non defective torch will be using
Fire extinguishers in the welding area are required all the time
Avoid welding near flammable materials
Torch should not be left unattended
Welding area will be checked before leaving to make sure there are no source of fire or heat
Monitor the welding area for gasses using online gas monitor
Pressure test
Testing area will be secured from passing workers/neighbors
DANGER HIGH PRESSURE warning signs to be displayed
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 8/9
Installation method of statement for Axial, Centrifugal and Propeller Exhaust Fans
Method Statement For Hydrostatic Pressure Testing of Chilled Water Pipework
Communication system will be used if required in noisy area
Only authorized personnel to be present in the pressure testing area
8. RECORDS & REFERENCES
Equipment Factory Test Certificate
Compressed Air System Check List
Pipework Pressure Test Certificate
Approved Construction Drawing
Manufacturer Instructions for Package Air Compressors

LIKE US ON FACEBOOK
Filed under HVAC Method Statements, Piping Works | Tags: Chillers Compressed Air System, HVAC System Method
Statements, Installation of Compressed Air Piping System, method, Method Of Statement
10/7/2014 Method of Statement For Installation of Compressed Air Piping System for Chillers
http://www.methodstatementhq.com/method-of-statement-for-installation-of-compressed-air-piping-system-for-chillers.html 9/9
Comments are closed.