Anda di halaman 1dari 8

Ica-Ciudad Ica-Alejados Ica-Ciudad Ica-Alejados

AP-001 Inspeccin de Alumbrado Pblico Punto de luz S/. 0.76 S/. 1.39 S/. 0.80 S/. 1.46
AP-002 Inspeccin nocturna de Alumbrado Pblico Punto de luz S/. 0.70 S/. 1.28 S/. 0.74 S/. 1.34
AP-003 Medicin completa del nivel de iluminacin del A.P Vanos S/. 25.00 S/. 46.00 S/. 26.25 S/. 48.30
AP-004 Cambio de Lmpara Lmpara S/. 20.83 S/. 38.34 S/. 21.87 S/. 40.26
AP-005 Cambio y/o Instalacin de Pastorales c/luminaria Cjto S/. 38.01 S/. 69.94 S/. 39.91 S/. 73.44
AP-006 Retiro de pastoral y/o luminaria Cjto S/. 36.43 S/. 67.04 S/. 38.25 S/. 70.39
AP-007 Cambio y/o Instalacin de luminaria Cjto S/. 32.00 S/. 57.57 S/. 33.60 S/. 60.45
AP-008 Rehabilitacn de Luminarias Lum S/. 29.03 S/. 53.42 S/. 30.48 S/. 56.09
AP-009 Cambio y/o limpieza de difusor Lum S/. 20.83 S/. 38.34 S/. 21.87 S/. 40.26
AP-010 Mantenimiento y/o adecuacion de Pastorales - DT2 Pastoral S/. 21.61 S/. 39.76 S/. 22.69 S/. 41.75
AP-011 Confeccin de Pastorales F G Pastoral S/. 16.67 S/. 30.67 S/. 17.50 S/. 32.20
AP-012 Instalacin de equipo de Alumbrado Pblico (abrazaderas, pastoral, conductor, cuas, luminaria, lmpara). Kit S/. 45.00 S/. 69.94 S/. 47.25 S/. 73.44
AP-013 Mantenimiento de equipos de Control de AP Cjto S/. 38.01 S/. 69.94 S/. 39.91 S/. 73.44
AP-014 Cambio y/o instalacin de equipos de control de AP Cjto S/. 35.17 S/. 64.70 S/. 36.93 S/. 67.94
AP-015 Reprogramacin de Relojes Reloj S/. 24.97 S/. 45.95 S/. 26.22 S/. 48.25
AP-016 reubicacion y/o reistalacion de conductor areo y accesorios m S/. 2.43 S/. 4.46 S/. 2.55 S/. 4.68
PU S/. CON INCREMENTO 5%
ALUMBRADO PBLICO
CDIGO ACTIVIDADES UNIDAD
PU S/.
Ica-Ciudad Ica-Alejados Ica-Ciudad
MT-001 Inspeccin Ligera de redes MT (Emergencias) Km S/. 33.33 S/. 61.33 S/. 35.00
MT-002 Inspeccin Minuciosa de redes MT Km S/. 70.00 S/. 128.80 S/. 73.50
MT-003 Inspeccin Termografica de Redes Areas Est S/. 50.00 S/. 92.00 S/. 52.50
MT-004 Limpieza de franja de servidumbre Poda y/o Tala de rboles Arbol S/. 98.33 S/. 180.93 S/. 103.25
MT-005 Cambiar/Instalar Retenida completa MT Cjto S/. 96.67 S/. 177.87 S/. 101.50
MT-006 Mantenimiento de Retenida MT Cjto S/. 54.00 S/. 99.36 S/. 56.70
MT-007 Cambiar/Instalar Canaleta de Retenida MT Unid. S/. 16.67 S/. 30.67 S/. 17.50
MT-008 Mantenimiento (Limpieza a Trapo) de Armado MT Cjto S/. 25.00 S/. 46.00 S/. 26.25
MT-009 Cambiar/Instalar Aislador PIN Unid. S/. 16.50 S/. 30.37 S/. 17.33
MT-010 Cambiar/Instalar aislador Suspensin (Polimerico o Cadena) Cjto S/. 16.50 S/. 30.37 S/. 17.33
MT-011 Cambiar/Instalar conductor de bajada a tierra Cjto S/. 20.42 S/. 37.57 S/. 21.44
MT-012 Cambiar/Instalar Espiga para aislador PIN Unid. S/. 20.67 S/. 38.03 S/. 21.70
MT-013 Cambiar/Instalar Mnsula o Cruceta de Concreto con accesorios Cjto S/. 149.33 S/. 274.77 S/. 156.80
MT-014 Cambiar/Instalar Mens. Cruc. Soporte-Madera o Fierro Cjto S/. 49.33 S/. 90.77 S/. 51.80
MT-015 Cambiar/Instalar riostra de poste MT Unid. S/. 20.50 S/. 37.73 S/. 21.53
MT-016 Cambiar amarres y/o preformados en redes MT Unid. S/. 20.50 S/. 37.73 S/. 21.53
MT-017 Rotura y reparacin de vereda m2 S/. 65.00 S/. 119.60 S/. 68.25
MT-018 Rotura y Reparacin de Pista Asfalto M2 S/. 91.67 S/. 168.67 S/. 96.25
MT-019 Rotura y Reparacin de Pista Concreto M2 S/. 80.83 S/. 148.74 S/. 84.87
MT-020 Mantenimiento (Limpieza a Trapo) de SAM Estuctura S/. 45.83 S/. 84.34 S/. 48.12
MT-021 Mantenimiento (Limpieza a Trapo) de SAB Estuctura S/. 60.00 S/. 110.40 S/. 63.00
MT-022 Cambiar Poste de Concreto MT (Incluye traslado, excavacion, agregados, etc.) Unid. S/. 425.00 S/. 736.00 S/. 446.25
MT-023 Cambiar Poste de Concreto MT (sin grua) - (Incluye traslado, excavacion, agregados, etc.) Unid. S/. 425.00 S/. 766.67 S/. 446.25
MT-024 Cambiar Poste de madera MT (Incluye traslado, excavacion, agregados, etc.) Unid. S/. 366.67 S/. 674.67 S/. 385.00
MT-025 Cambiar Poste de madera MT (sin grua) - (Incluye traslado, excavacion, agregados, etc.) Unid. S/. 400.00 S/. 736.00 S/. 420.00
MT-026 Instalar/Retirar poste de concreto MT Unid. S/. 125.00 S/. 230.00 S/. 131.25
MT-027 Instalar/Retirar poste de madera MT Unid. S/. 116.67 S/. 214.67 S/. 122.50
MT-028 Reubicar Poste CAC MT Unid. S/. 425.00 S/. 736.00 S/. 446.25
MT-029 Reubicar Poste madera MT Unid. S/. 416.67 S/. 766.67 S/. 437.50
MT-030 Verticalizacin de Poste MT Unid. S/. 158.33 S/. 291.33 S/. 166.25
MT-031 Cambiar Estructura SAB Cjto S/. 1,400.00 S/. 2,576.00 S/. 1,470.00
MT-032 Cambiar Estructura SAM Cjto S/. 680.00 S/. 1,251.00 S/. 714.00
MT-033 Instalar bloque Protecc. Contra Impacto Unid. S/. 100.83 S/. 185.54 S/. 105.87
MT-034 Traslado de Poste M.T. y accesorios M.T., hasta entre 70 - 120Km. Evento S/. 1,000.00
MT-035 Traslado de Poste M.T., y accesorios M.T. hasta entre 120 - 200Km. Evento S/. 2,000.00
MT-036 Traslado de Poste M.T., y accesorios M.T. mayor a 200Km. Evento S/. 2,500.00
MT-037 Sealizar Estructura MT Cjto S/. 13.00 S/. 23.92 S/. 13.65
MT-038 Apertura y cierre de zanja MT m S/. 26.67 S/. 49.07 S/. 28.00
MT-039 Cambiar/Instalar Cable Energia Subt. M.T. hasta 70 mm2. m/terna S/. 15.00 S/. 27.60 S/. 15.75
MT-040 Cambiar/Instalar Cable Energia Subt. M.T. mayor a 70 mm m/terna S/. 16.67 S/. 30.67 S/. 17.50
MT-041 Cambiar conductor en M.T. m/terna S/. 4.17 S/. 7.66 S/. 4.38
MT-042 Cambiar/instalar Terminacin y/o Empalmes de cables de energa M.T kit S/. 541.67 S/. 996.67 S/. 568.75
MT-043 Cambiar/Reparar Cuello Muerto de MT Unid. S/. 31.50 S/. 57.97 S/. 33.08
MT-044 Rev/Ajte/Limp/Aislar Conectores.Termin. MT Unid. S/. 20.83 S/. 38.34 S/. 21.87
MT-045 Instalacin/Reposicin de Lineas Areas en M.T. m/terna S/. 4.17 S/. 7.66 S/. 4.38
MT-046 Medicion de Aislamiento de cables subterraneos MT Cjto S/. 62.50 S/. 115.01 S/. 65.63
MT-047 Cambiar/Instalar conector de MT.-Cualq. Tipo Unid. S/. 20.83 S/. 38.34 S/. 21.87
MT-048 Retemplado de conductores M.T. m/Terna S/. 2.91 S/. 5.36 S/. 3.06
MT-049 Cambiar/Instalar Pararrayos Unid. S/. 29.00 S/. 53.36 S/. 30.45
MT-050 Cambiar/Instalar Seccionador Tipo cut out Unid. S/. 29.00 S/. 53.36 S/. 30.45
MT-051
Limpieza y ajuste en Sistema de Proteccin y/o Maniobra (Recloser, Sec. Bajo carga,
condensadores)
Cjto S/. 45.83 S/. 84.34 S/. 48.12
MT-052 Cambiar/instalar Seccionador tripolar/Recloser Cjto S/. 208.33 S/. 383.33 S/. 218.75
MT-053 Cambiar/instalar Banco de Condensadores Cjto S/. 208.33 S/. 383.33 S/. 218.75
MT-054 Localizacion de falla subterranea MT Falla S/. 150.00 S/. 276.00 S/. 157.50
MT-055 Cambio de Fusibles cualquier tipo Cjto S/. 30.00 S/. 55.20 S/. 31.50
MT-056 Apertura y Cierre de Seccionadores Cjto S/. 60.00 S/. 110.40 S/. 63.00
MT-057 Conexin y desconexin de cuellos Cjto/Est. S/. 50.00 S/. 92.00 S/. 52.50
MT-058 Medicin de Tensiones y Corrientes en Redes MT Cjto S/. 75.00 S/. 107.00 S/. 78.75
MT-059 Mantenimiento de Puesta a Tierra con Varilla. (Incluye mediciones antes y depues) Cjto S/. 140.00 S/. 222.34 S/. 147.00
MT-060 Mantenimiento de componentes de P.A. T. Unid S/. 60.34 S/. 111.02 S/. 63.36
MT-061 Instalacin de Nueva Puesta a Tierra. (Incluye mediciones de Puesta a tierra) Cjto S/. 140.00 S/. 222.34 S/. 147.00
MT-062 Servicio de mano de obra por dia Unid. S/. 75.00 S/. 138.00 S/. 78.75
MT-063 Instalacin de mangas y/o cubiertas( cobertores) m S/. 17.60 S/. 32.38 S/. 18.48
CODIGO ACTIVIDAD Unid.
PU S/.
MANTENIMIENTO DE REDES DE MEDIA TENSIN
PU S/. CON INCREMENTO 5%
Ica-Ciudad Ica-Alejados
SED-001 Actualizacin del inventario de SED SED S/. 19.91 S/. 36.64
SED-002 Inspeccin termografica en SED SED S/. 50.00 S/. 92.00
SED-003 Registro de Carga y Tensin puntuales en SED's. SED S/. 25.00 S/. 46.00
SED-004 Medicin de resistencia de la puesta a tierra PUESTA A TIERRA S/. 29.69 S/. 54.62
SED-005 Mant. Exterior de Transformadores (limpieza, ajustes, pintado y otros) TRAFO S/. 95.83 S/. 176.34
SED-006 Regulacin de Taps TRAFO S/. 25.00 S/. 46.00
SED-007 Cambio/Instalacin de Transformador TRAFO S/. 345.83 S/. 636.34
SED-008 Rotacin de transformadores CJTO S/. 415.00 S/. 763.60
SED-009 Instalacin/Cambio de tableros de distribucion TABLERO S/. 180.00 S/. 331.20
SED-010 Cambio y/o instalacin de llaves termomagneticas, bases porta fusibles u otros similares. CJTO S/. 28.00 S/. 51.52
SED-011 Limpieza, pintado y sealizacin exterior de tablero de Distribucin TABLERO S/. 51.67 S/. 95.07
SED-012 Reparacin de tablero de distribucin (puertas, bisagras, etc.) TABLERO S/. 51.67 S/. 95.07
SED-013 Instalacin/Cambio de cables de comunicacin en SED SED S/. 107.25 S/. 197.34
SED-014 Limpieza de Locales de SS.EE. Caseta SED S/. 108.33 S/. 199.33
SED-015 Pintado interior en SS.EE. Caseta SED S/. 187.00 S/. 344.08
SED-016 Pintar las Fachadas de las SS.EE. Caseta SED S/. 90.00 S/. 165.60
SED-017 Mant. Integral de SS.EE. Caseta SED S/. 155.83 S/. 286.74
SED-018 Mantenimiento de Puesta a Tierra SED (incluye medicion antes y despues de intervencion) SED S/. 140.00 S/. 222.34
SED-019 Instalacin de nuevas puestas a tierra SED. Incluye medicion de la puesta a tierra. PAT S/. 140.00 S/. 222.34
SED-020 Cambio/Instalacin de caja de registro PT PAT S/. 20.83 S/. 38.34
SED-021 Sealizacin y codificacin en SED SED S/. 13.00 S/. 23.92
SED-022 Cambio de fusibles en SED (seccionamiento o en tablero de distribucin) SED S/. 30.00 S/. 55.20
SED-023 Apertura y/o cierre de interruptor termomagntico en tablero de distribucin SED S/. 11.91 S/. 21.92
RELACIN DE ACTIVIDADES - SUBESTACIONES DE DISTRIBUCIN
CODIGO TAREA UNIDAD
PU S/.
Ica-Ciudad Ica-Alejados
BT-001 Inspeccin Minuciosa de redes BT Km S/. 98.43 S/. 181.10
BT-002 Inspeccin Ligera de redes BT por SED SED S/. 98.43 S/. 181.10
BT-003 Limpieza de Franja de Servidumbre Retoos, arbustos, espinos, eucalipts, etc) Km S/. 122.13 S/. 224.72
BT-004 Mantenimiento de Retenida Cjto S/. 35.00 S/. 56.00
BT-005 Cambio o instalacin de Varilla Anclaje y Bloque de Concreto Cjto S/. 33.33 S/. 61.33
BT-006 Retiro de Retenida Cjto S/. 28.70 S/. 52.82
BT-007 Instalacin y/o cambio total Retenida Cjto S/. 83.90 S/. 154.38
BT-008 Mantenimiento de Puesta a Tierra con Varilla. (Incluye mediciones antes y depues) Cjto S/. 140.00 S/. 224.00
BT-009 Mantenimiento de componentes de P.A. T. Unid S/. 60.34 S/. 111.02
BT-010 Cambio o instalacion de Conductor bajada a tierra Cjto S/. 36.23 S/. 66.66
BT-011 Instalacin de Nueva Puesta a Tierra. (Incluye mediciones de Puesta a tierra) Cjto S/. 140.00 S/. 224.00
BT-012 Cambio de Aislador de BT -cualquier tipo Unid S/. 11.44 S/. 21.06
BT-013 Cambio de Portalnea BT-cualquier tipo Unid S/. 18.54 S/. 34.11
BT-014 Cambio de Ferretera en Poste de Alineamiento, Autoport. Cjto S/. 20.30 S/. 37.36
BT-015 Cambio de Ferretera en Poste de Fin de Lnea, Autoport Cjto S/. 29.06 S/. 53.47
BT-016 Instalacin de extensores de FG por DMS Cjto S/. 29.06 S/. 53.47
BT-017 Mantenimiento de Poste Cjto S/. 46.56 S/. 85.66
BT-018 Cambio de poste de concreto y accesorios Unid S/. 280.00 S/. 460.00
BT-019 Cambio de poste de madera y accesorios Unid S/. 250.00 S/. 460.00
BT-020 Verticalizacin de Poste Unid S/. 100.00 S/. 184.00
BT-021 Proteccin de estructura (cono) en Poste de CAC Unid S/. 94.97 S/. 174.75
BT-022 Reubicacin de Poste y accesorios Unid S/. 250.00 S/. 460.00
BT-023 Instalacin de poste CAC y accesorios Unid S/. 250.00 S/. 460.00
BT-024 Retiro de Poste y accesorios Unid S/. 116.67 S/. 214.67
BT-025 Reinstalacion de poste de BT Unid S/. 250.00 S/. 460.00
BT-026 Sealizacin en Poste Poste S/. 23.70 S/. 43.62
BT-027 Cambio de Conductor Autoportante m S/. 1.92 S/. 3.54
BT-028 Reflechado de Conductor convencional CPI m S/. 1.13 S/. 2.08
BT-029 Cambio de Conductor Convencional (CPI o similar) m S/. 1.68 S/. 3.09
BT-030 Cambio o instalacion de Cable NYY m S/. 3.33 S/. 6.13
BT-031 Instalacin de conductor autoportante m S/. 1.92 S/. 3.54
BT-032 Instalacin de conductor convencional CPI m S/. 1.68 S/. 3.09
BT-033 reubicacion y/o reistalacion de conductor areo y accesorios m S/. 2.43 S/. 4.46
BT-034 Mantenimiento de Empalmes Areos y Derivaciones Cjto S/. 12.37 S/. 22.75
BT-035 Apertura y Cierre de cuellos de B.T. Cjto S/. 19.69 S/. 36.22
BT-036 Empalme de conductor aereo Unid S/. 12.77 S/. 23.49
BT-037 Emplame de conductor NYY Unid S/. 13.27 S/. 24.42
BT-038 Cambiar/Ejecutar punta o manga muerta B.T. Cjto S/. 24.72 S/. 45.49
BT-039 Medicion de Resistencia de la Puesta a Tierra Unid S/. 16.23 S/. 29.87
BT-040 Balance de cargas en circuitos BT SED S/. 17.04 S/. 31.36
BT-041 Medicin y deteccin de puntos calientes Terna S/. 33.69 S/. 61.98
BT-042 Medicin de parmetros puntuales en red BT Terna S/. 12.77 S/. 23.49
BT-043 Mantenimiento de cajas de distribucin de acometidas Unid S/. 20.83 S/. 38.32
BT-044 Transporte de Cuadrillas hasta entre 70 - 120 km Evento S/. 0.00 S/. 300.00
BT-045 Transporte de Cuadrillas hasta entre 120 - 200 Km. Evento S/. 0.00 S/. 400.00
BT-046 Transporte de Cuadrillas a ms de 200 Km. Evento S/. 0.00 S/. 500.00
BT-047 Instalacin de ductos de cruzada en BT Unid S/. 22.01 S/. 40.50
BT-048 Apertura y Cierre de zanja m S/. 26.67 S/. 49.07
BT-049 Rotura y Reparacin de Vereda m2 S/. 65.00 S/. 119.60
BT-050 Rotura y repacion de pista azfalto m2 S/. 91.67 S/. 168.67
BT-051 Rotura y repacion de pista concreto m2 S/. 80.83 S/. 148.74
BT-052 Servicio de mano de obra por dia UNIDAD S/. 60.00 S/. 99.66
MANTENIMIENTO DE REDES DE BAJA TENSIN
CDIGO TAREA UNIDAD
PU S/.
Ica-Ciudad Ica-Alejados
CAMBIO DE POTENCIA
SUM-001 Retiro y Conexin monofsica area Unid. S/. 40.00 S/. 64.40
SUM-002 Retiro y Conexin trifsica area Unid. S/. 50.00 S/. 80.50
SUM-003 Retiro y Conexin monofsica subterrnea Unid. S/. 69.20 S/. 111.41
SUM-004 Retiro y Conexin trifsica subterrnea Unid. S/. 73.71 S/. 118.66
SUM-005 Inspeccin de factibilidad para cambio de potencia (factibilidad, Presupuesto. y Carta) Unid. S/. 15.02 S/. 24.18
SUM-006 Entrega de cartas por cambio de potencia Unid. S/. 10.20 S/. 14.28
SUM-007 Procesamiento de data al sistema informatico Unid. S/. 0.50 S/. 0.70
CORTES y RECONEXIONES 80% NO APLICA
SUM-008 Corte en Fusible o Interruptor (Tapa sin ranura) Unid. S/. 3.00 S/. 0.00
SUM-009 Corte en interruptor (tapa con ranura) Unid. S/. 3.82 S/. 0.00
SUM-010 Corte Caja de Medicin (aislamiento acometida) Unid. S/. 4.19 S/. 0.00
SUM-011 Corte Lnea Area (empalme) Unid. S/. 10.34 S/. 0.00
SUM-012 Corte Caja Medicin (aislamiento acometida) Unid. S/. 19.19 S/. 0.00
SUM-013 Reconexin en interruptor (tapa sin ranura) Unid. S/. 3.59 S/. 0.00
SUM-014 Reconexin en interruptor (tapa con ranura) Unid. S/. 4.10
SUM-015 Reconexin Caja de Medicin (aislamiento de acometida) Unid. S/. 4.70
SUM-016 Reconexin Lnea Area (empalme) Unid. S/. 12.96
SUM-017 RECONEXIN EN CAJA DE MEDICIN (Aislamiento de acometida bloqueada conexin subterrnea) Unid. S/. 17.36
SUM-018 Retiro de la Conexin Area Unid. S/. 29.98
SUM-019 Retiro de la Conexin Subterrnea (Sin retiro de cable) Unid. S/. 28.61
SUM-020 Retiro de la Conexin Mltiple Unid. S/. 28.61
SUM-021 Reinstalacin de la Conexin Area Unid. S/. 48.86
SUM-022 Reinstalacin de la Conexin Subterrnea (Sin retiro de Cable) Unid. S/. 35.46
SUM-023 Reinstalacin de la Conexin Mltiple Unid. S/. 35.46
SUM-024 Retiro de la Conexin Subterrnea (empalme y cable de acometida) Unid. S/. 109.04
SUM-025 Retiro de la Conexin Mixta (empalme y cable de acometida) Unid. S/. 109.04
SUM-026 Reinstalacin de la Conexin Subterrnea (empalme y cable de acometida) Unid. S/. 181.17
SUM-027 Reinstalacin de la Conexin Mixta (empalme y cable de acometida) Unid. S/. 181.17
SUM-028 Corte en fusible o interruptor (tapa sin ranura) Unid. S/. 3.32
SUM-029 Corte en interruptor (tapa con ranura) Unid. S/. 5.50
SUM-030 Corte en Caja de Medicin (aislamiento acometida) Unid. S/. 5.88
SUM-031 Corte en Lnea Area (empalme) Unid. S/. 13.94
SUM-032 Corte en Caja Medicin (Aislamiento de acometida bloqueada conexin subterranea) Unid. S/. 4.37
SUM-033 Reconexin en fusible o interruptor (tapa sin ranura) Unid. S/. 6.07
SUM-034 Reconexin en interruptor (tapa con ranura) Unid. S/. 6.95
SUM-035 Reconexin en Caja de Medicin (Aislamiento de Acometida) Unid. S/. 19.25
SUM-036 Reconexin en Lnea Area (empalme) Unid. S/. 17.08
SUM-037 Reconexin en Caja Medicin (Aislamiento de acometida bloqueada conexin subterranea) Unid. S/. 17.42
SUM-038 Retiro de la Conexin Area Unid. S/. 33.75
SUM-039 Retiro de la Conexin Subterrnea (Sin retiro de Cable) Unid. S/. 33.53
SUM-040 Retiro de la Conexin Mltiple Unid. S/. 33.53
SUM-041 Reinstalacin de la Conexin Area Unid. S/. 57.17
SUM-042 Reinstalacin de la Conexin Subterrnea (Sin retiro de cable) Unid. S/. 39.64
SUM-043 Reinstalacin de la Conexin Mltiple Unid. S/. 39.64
SUM-044 Retiro de la Conexin Subterrnea (empalme y cable de acometida) Unid. S/. 117.43
SUM-045 Retiro de la Conexin Mixta (empalme y cable de acometida) Unid. S/. 117.43
SUM-046 Reinstalacin de la Conexin Subterrnea (empalme y cable de acometida) Unid. S/. 232.75
SUM-047 Reinstalacin de la Conexin Mixta (empalme y cable de acometida) Unid. S/. 232.75
SUM-048 Procesamiento de data al sistema informatico Unid. S/. 0.50 S/. 0.70
MANTENIMIENTO DE CONEXIONES
SUM-049
Reubicacin Conexiones monofsicas trifsicas a fachada con acometida subterrnea
Unid. S/. 77.49 S/. 124.75
SUM-050
Reubicacin Conexiones monofsicas trifsica a fachada con acometida area
Unid. S/. 54.48 S/. 87.71
ITEM DESCRIPCION Unidad
ACTIVIDADES EN SUMINISTROS
PU S/.
Ica-Ciudad Ica-Alejados
ITEM DESCRIPCION Unidad
PU S/.
SUM-051
Cambio / instalacin tubo PVC-SAP subterrneo
Unid. S/. 14.92 S/. 24.01
SUM-052
Cambio / instalacin tubo PVC-SAP areo
Unid. S/. 12.00 S/. 19.32
SUM-053
Cambio caja porta medidor monofsica / trifsica
Unid. S/. 20.00 S/. 32.20
SUM-054
Cambio / reposicin asegurar tapa / chapa de caja porta medidor
Unid. S/. 7.00 S/. 11.27
SUM-055
Pintado caja porta medidor con rotulacin de suministro
Unid. S/. 5.50 S/. 8.86
SUM-056
Sellado de tapa caja porta medidor
Unid. S/. 8.50 S/. 13.69
SUM-057
Cambio / readecuacin acometida area monofsica
Unid. S/. 33.70 S/. 54.26
SUM-058
Cambio / readecuacin acometida area trifsica
Unid. S/. 39.70 S/. 63.92
SUM-059
Cambio / readecuacin acometida subterrnea monofsica
Unid. S/. 46.87 S/. 75.46
SUM-060
Cambio / readecuacin acometida subterrnea trifsica
Unid. S/. 48.70 S/. 78.41
SUM-061 Conexin monofsica / trifsica en banco de medidores Unid. S/. 43.50 S/. 70.04
SUM-062 Construccin de murete de ladrillo para caja porta medidor Unid. S/. 145.00 S/. 203.00
SUM-063 Reparacin de falla en acometida subterrnea Unid. S/. 43.61 S/. 70.21
SUM-064 Rotura y reparacin de vereda MT. S/. 65.00 S/. 104.65
SUM-065 Apertura y cierre de zanja BT MT. S/. 24.00 S/. 38.64
SUM-066 Cambio cable de acometida conexin BT areo Unid. S/. 25.50 S/. 41.06
SUM-067 Cambio cable de acometida conexin BT subterrneo Unid. S/. 36.50 S/. 58.77
SUM-068 Reposicin de sistema de proteccin Unid. S/. 7.50 S/. 12.08
SUM-069 Mantenimiento y/o reparacin de caja de derivacin en poste Unid. S/. 20.00 S/. 32.20
SUM-070 Cambio de caja de derivacin en poste Unid. S/. 20.00 S/. 32.20
SUM-071
Cambio y/o instalacin de conectores tipo cua
Unid S/. 8.00 S/. 12.88
SUM-072
Inversin de fases de la conexin
Unid. S/. 12.50 S/. 20.13
SUM-073
Cambio de equipo de medicin monofsico
Unid. S/. 14.03 S/. 22.60
SUM-074
Cambio de equipo de medicin trifsico
Unid. S/. 16.50 S/. 26.57
SUM-075
Relevamiento de suministros y actualizacin en sistema informtico
Unid. S/. 1.70 S/. 2.74
SUM-076
Instalacin de barra de derivacin
Kit. S/. 13.33 S/. 21.46
SUM-077
Balanceo de carga en suministros
Acometida S/. 2.50 S/. 4.03
SUM-078
Reparacin falla en caja porta medidor
Unid. S/. 12.50 S/. 21.00
SUM-079
Reparacin falla en acometida area
Unid. S/. 17.50 S/. 29.40
SUM-080
Reparacin falla en acometida subterrnea
Unid. S/. 43.61 S/. 73.26
SUM-081
Verificacin de fallas internas
Unid. S/. 13.50 S/. 22.68
SUM-082 Inspeccin tcnica de suministros por reclamo u otros Unid. S/. 11.70 S/. 18.84
SUM-083 Procesamiento de data al sistema informatico Unid. S/. 0.50 S/. 0.70
NORMALIZACIN CON CARGO A TERCEROS
SUM-084
Reubicacin Conexiones monofsicas trifsicas a fachada con acometida subterrnea
Unid. S/. 77.48 S/. 124.75
SUM-085
Reubicacin Conexiones monofsicas trifsica a fachada con acometida area
Unid. S/. 54.48 S/. 87.71
SUM-086
Cambio caja porta medidor monofsica / trifsica
Unid. S/. 20.00 S/. 32.20
SUM-087
Cambio / readecuacin acometida area monofsica
Unid. S/. 33.70 S/. 54.26
SUM-088
Cambio / readecuacin acometida area trifsica
Unid. S/. 39.70 S/. 63.92
SUM-089
Cambio / readecuacin acometida subterrnea monofsica
Unid. S/. 46.87 S/. 75.46
SUM-090
Cambio / readecuacin acometida subterrnea trifsica
Unid. S/. 48.70 S/. 78.41
SUM-091 Construccin de murete de ladrillo para caja porta medidor Unid. S/. 145.00 S/. 203.00
SUM-092 Apertura y cierre de zanja BT MT. S/. 24.00 S/. 38.64
SUM-093 Retiro o anulacin de suministro en BT areo Unid. S/. 26.75 S/. 43.06
SUM-094 Procesamiento de data al sistema informatico Unid. S/. 0.50 S/. 0.70
NUEVAS CONEXIONES
SUM-095 Conexin monofsica area Unid. S/. 40.00 S/. 67.20
SUM-096 Conexin trifsica area Unid. S/. 50.00 S/. 84.00
SUM-097 Conexin monofsica subterrnea Unid. S/. 69.20 S/. 116.26
SUM-098 Conexin trifsica subterrnea Unid. S/. 73.71 S/. 123.83
SUM-099 Conexin trifsica con caja de conexin en banco de medidores Unid. S/. 43.50 S/. 73.08
SUM-100 Conexin monofsica trifsica en banco de medidores Unid. S/. 43.50 S/. 73.08
SUM-101 Construccin de murete de ladrillo para caja porta medidor (incluye cemento y agregados) Unid. S/. 145.00 S/. 203.00
SUM-102 Rotura y reparacin de vereda Unid. S/. 65.00 S/. 109.20
SUM-103 Apertura y cierre de zanja BT Unid. S/. 24.00 S/. 40.32
SUM-104 Instalacin de caja de derivacin en poste Unid. S/. 15.00 S/. 25.20
Ica-Ciudad Ica-Alejados
ITEM DESCRIPCION Unidad
PU S/.
SUM-105
Elaboracin documentos y expediente de nuevo suministro (factibilidad, Presupuesto y Carta)
Unid. S/. 35.00 S/. 49.00
SUM-106 Inspeccin y/o Verificacin para Nueva Conexin (instalaciones internas) Und S/. 16.38 S/. 25.23
SUM-107 Entrega de cartas para nuevas conexiones Unid. S/. 10.20 S/. 14.28
SUM-108 Ordenamiento y foliado de expedidntes Unid. S/. 1.50 S/. 2.10
SUM-109 Procesamiento de data al sistema informatico Unid. S/. 0.50 S/. 0.70
P.U. S/. PU S/. CON INCREMENTO 5%
1 Lectura de Suministros Und. S/. 0.25 S/. 0.26
2 Reparto de recibos, boletines y otros. Und. S/. 0.15 S/. 0.16
P.U. S/.
PU S/. CON INCREMENTO 5%
1
Lectura de Suministro y reparto de recibos
S/.
S/. 1,782.90 S/. 1,872.05
2
Reparto de recibos, boletines y otros.
S/.
S/. 1,782.90 S/. 1,872.05
3 Cortes y Reconexiones S/. S/. 1,500.00 S/. 1,575.00
4 Cobranzas de recibos. S/. S/. 2,614.89 S/. 2,745.63
ITEM DESCRIPCION Unidad
ZONA B
COSTO FIJO - ZONAS ALEJADAS
LECTURA DE SUMINISTROS, REPARTO DE RECIBOS, BOLETINES Y COBRANZAS
ITEM DESCRIPCION Unidad
PRECIOS UNITARIOS CIUDAD
ZONA A

Anda mungkin juga menyukai