Anda di halaman 1dari 39

ASME Boiler and Pressure Vessel Code

SECTION XI

INTERPRETATIONS
Volume 46
The Interpretations to the Code will be issued twice a year (July and December) up to the
publication of the 2001 Edition of the Code. The Interpretations for each individual Section are
published separately and are part of the update service to that Section; Interpretations of Section
III, Divisions 1 and 2, are part of the update service to Section III, Subsection NCA.

Interpretations Volumes 36 through 41 were included with the update service to the 1995 Edition
of the Code; Volume 42 is the first Interpretations volume to be included with the update service
to the 1998 Edition.

Section

Vol. 42

Vol. 43

Vol. 44

Vol. 45

Vol. 46

I
II-A
II-B
II-C
II-D
III-NCA
III-3
IV
V
VI
VII
VIII-1
VIII-2
VIII-3
IX
X
XI

7 /98
7 /98
...
...
...
7 /98
...
7 /98
7 /98
...
...
7 /98
7 /98
...
7 /98
...
7 /98

12 /98
...
...
...
...
12 /98
...
12 /98
12 /98
...
...
12 /98
12 /98
12 /98
12 /98
...
12 /98

7 /99
7 /99
...
...
...
7 /99
...
7 /99
7 /99
...
...
7 /99
7 /99
...
7 /99
...
7 /99

12 /99
12 /99
...
...
...
12 /99
...
12 /99
...
...
...
12 /99
12 /99
...
12 /99
...
12 /99

...
7 /00
7 /00
...
...
7 /00
...
7 /00
7 /00
...
...
7 /00
7 /00
...
7 /00
...
7 /00

SEC11I1RVC 06-05-00 07:44:40

Job #38930

ASME

Vol. 47

Interpretations 46

INTERPRETATIONS
NO. 46 SECTION XI
Replies to Technical Inquiries
July 1, 1999 through December 31, 1999

FOREWORD
General Information
This publication includes all written interpretations issued between the indicated dates by the ASME
Staff on behalf of the ASME Boiler and Pressure Vessel Committee in response to inquiries concerning
interpretations of the ASME Boiler and Pressure Vessel Code. A contents is also included that lists
subjects specific to the interpretations covered in the individual volume.
These interpretations are taken verbatim from the original letters, except for a few typographical
and editorial corrections made for the purpose of improved clarity. In some instances, a review of the
interpretation revealed a need for corrections of a technical nature. In these cases, a revised interpretation
is presented bearing the original Interpretation Number with the suffix R and the original file number
with an asterisk. Following these revised interpretations, new interpretations and revisions to them
issued during the indicated dates are assigned Interpretation Numbers in chronological order. Interpretations
applying to more than one Code Section appear with the interpretations for each affected Section.
ASME procedures provide for reconsideration of these interpretations when or if additional information
is available that the inquirer believes might affect the interpretation. Further, persons aggrieved by an
interpretation may appeal to the cognizant ASME committee or subcommittee. As stated in the Statement
of Policy in the Code documents, ASME does not approve, certify, rate, or endorse any item,
construction, proprietary device, or activity.
Each interpretation applies to the Edition and Addenda stated in the interpretation, or if none is
stated, to the Edition and Addenda in effect on the date of issuance of the interpretation. Subsequent
revisions to the Code may supersede the interpretation.
For detailed instructions on preparation of technical inquiries to the ASME Boiler and Pressure
Vessel Committee, refer to Appendix V in Division 1, Appendix III in Division 2, and Appendix VI
in Division 3.
Subject and Numerical Indexes
Subject and numerical indexes have been prepared to assist the user in locating interpretations by
subject matter or by location in the Code. They cover interpretations issued from Volume 12 up to
and including the present volume, and will be updated with each volume.

401

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

SECTION XI
Subject
Code Case N-416-1, Alternative Pressure Test Requirement for Welded Repairs or
Installation of Replacement Items by Welding Class 1, 2, and 3 . . . . . . . . . . . . . . . . .
Code Case N-416-1, Timing of NDE Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Code Cases N-498, N-498-1, and N-498-2, Alternative Requirements for 10 Year
Hydrostatic Testing for Class 1, 2, and 3 Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Code Case N-522, Pressure Testing of Containment Piping, Section XI,
Division 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWA-4000, -7000, Definition of Repair Organization (Repair/Replacement
Organization) (1977 Edition With the Summer 1978 Addenda Through the
1998 Edition with the 2000 Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWA-4000, -7000, Subassembly Installation (1977 Edition With the Summer 1978
Addenda up to and Including the 1995 Edition With the 1999 Addenda) and
Code Case N-416-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWA-4180, IWA-4220, Report of Reconciliation (1995 Edition With the 1995 Addenda
Through the 1998 Edition With the 1999 Addenda; IWA-4410 in the 1995 and 1996
Addenda); IWA-4421 (1995 Edition With the 1997 Addenda through the 1998
Edition With the 1999 Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWA-4300, Welding and Welder Qualifications for Repairs (1980 Edition Through
the 1986 Edition With the 1987 Addenda); IWA-7320, Welding and Welder
Qualifications for Replacements (1980 Edition Through the 1989 Edition With the
1990 Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWA-4540(c), Pressure Testing of Class 1, 2, and 3 Items (1995 Addenda Through
the 1998 Edition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWA-4700, Pressure Tests; IWA-5120, System Pressure Tests for Repair/Replacement
Activities (1992 Edition With the 1992 Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWA-5214, Repair and Replacements (1980 Edition With the Winter 1980 Addenda
Through the 1989 Edition With the 1990 Addenda); and IWA-4710(c), Pressure
Tests (1989 Edition With the 1991 Addenda Through 1992 Edition With the 1994 Addenda)
IWA-7330, Procurement of Material (Summer 1978 Addenda Through 1990 Addenda);
IWA-4920 (1991 Addenda Through the 1995 Edition); IWA-4143 (1995
Addenda Through the 1999 Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWB-3516.1(a), Allowable Planar Flaws (1989 Edition Through the 1992 Addenda) . . .
IWB-3522, IWC-3516, IWD-3000, Leakage at Class 2 and 3 Mechanical Connections
(1986 Edition and Later Addenda Through the 1997 Addenda) . . . . . . . . . . . . . . . . . . .
IWE-1220(d), Components Exempted From Examination (1992 Edition and 1992 Addenda)
IWF-1300(e), Table IWD-2500-1, VT-3 Insulation Removal (1983 Edition With
Addenda Through Winter 1983 and 1989 Edition, No Addenda) . . . . . . . . . . . . . . . . .
IWF-2500, Examination of Component Supports; Code Case N-491, -2500, Use of
Code Cases (1989 Edition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWF-2500(a), Boundary Interface (1977 Edition With the Summer 1978 Addenda
Through the 1998 Edition With the 1999 Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . .
IWL-4000, Installation Concrete Anchors (1992 Edition With the 1992 Addenda
Through the 1998 Edition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Mandatory Appendix IV, IV-3110-(f), Eddy Current Instrument Channel Application
(1989 Edition With the 1990 Addenda up to and Including the 1992 Edition
With the 1992 Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table IWB-2500-1, Examination Category B-J (1983 Edition and Later Editions and
Addenda) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table IWC-2500-1, Examination Requirements for Nozzle-to-Nozzle Extension Welds
(1986 Edition, No Addenda, Through the 1996 Addenda) . . . . . . . . . . . . . . . . . . . . . . .
Table IWE-2500-1, Examination Category E-A, Accessible Surface Areas (1992
Edition With the 1992 Addenda Through the 1998 Edition With the 1999 Addenda)

Interpretation

File No.

XI-1-98-48R
XI-1-98-64

IN99-004*
IN99-026

XI-1-98-68

IN97-004

XI-1-98-65

IN99-027

XI-1-98-62

IN99-024

XI-1-98-61

IN99-010

XI-1-98-66

IN99-031

XI-1-98-54

IN98-024

XI-1-98-51R

IN99-011*

XI-1-98-52R

IN99-013*

XI-1-95-48R

IN95-007A*

XI-1-98-57
XI-1-98-69

IN99-018
IN98-002B

XI-1-98-55
XI-1-98-56

IN98-006
IN99-014

XI-1-98-60

IN98-014B

XI-1-98-58

IN99-022

XI-1-92-29R

IN92-006A*

XI-1-98-59

IN99-002

XI-1-98-63

IN99-025B

XI-1-98-70

IN98-009

XI-1-98-67

IN96-015

XI-1-98-71

IN99-001

403

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

Section XI Interpretations No. 46

XI-1-92-29R, XI-1-98-48R

Interpretation: XI-1-92-29R
Subject:

IWF-2500(a), Boundary Interface (1977 Edition With the Summer 1978 Addenda
Through the 1998 Edition With the 1999 Addenda)

Date Issued:

March 8, 2000

File:

IN92-006A*

Question: Is it the intent of IWF-2500(a), for a pipe-clamp-type support, that the mechanical
connections to the pressure retaining components requiring examination include the bolting or pins
and their interface to the clamp, but exclude the component-to-clamp interface?
Reply: Yes.

Interpretation: XI-1-98-48R
Subject:

Code Case N-416-1, Alternative Pressure Test Requirement for Welded Repairs or
Installation of Replacement Items by Welding, Class 1, 2, and 3

Date Issued:

September 1, 1999

File:

IN99-004*

Question (1): When using Code Case N-416-1, is it a requirement of Section XI that a reconciliation
concerning NDE requirements and acceptance criteria between two Codes (e.g., B31.7-1969 and ASME
Section III, 1992 Edition, 1992 Addenda) be performed by a Level III for the applicable examination
method?
Reply (1): No.
Question (2): When using Code Case N-416-1, is it a requirement of Section XI that the
reconciliation of an NDE procedure between two Codes (e.g., B31.7-1969 to ASME Section III, 1992
Edition, 1992 Addenda) for requirements and acceptance criteria be performed by a Level III for the
applicable examination method?
Reply (2): No.

405

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

XI-1-98-51R, XI-1-98-52R

Section XI Interpretations No. 46

Interpretation: XI-1-98-51R
Subject:

IWA-4540(c), Pressure Testing of Class 1, 2, and 3 Items (1995 Addenda Through


the 1998 Edition)

Date Issued:

September 1, 1999

File:

IN99-011*

Question: Does IWA-4540(c) require a pressure test when installation of the item(s) does not
involve any replacement pressure-retaining items?
Reply: No.

Interpretation: XI-1-98-52R
Subject:

IWA-4700, Pressure Tests; IWA-5120, System Pressure Tests for Repair/Replacement


Activities (1992 Edition With the 1992 Addenda)

Date Issued:

September 1, 1999

File:

IN99-013*

Question: Is it a requirement of IWA-4700 and IWA-5120 that the entire system be subjected to
a VT-2 examination when the area of a repair/replacement activity that is required to be pressure
tested is not isolable within a portion of a system?
Reply: No.

406

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

Section XI Interpretations No. 46

XI-1-95-48R

Interpretation: XI-1-95-48R
Subject:

IWA-5214, Repair and Replacement (1980 Edition With the Winter 1980 Addenda
Through the 1989 Edition With the 1990 Addenda); and IWA-4710(c), Pressure Tests
(1989 Edition With the 1991 Addenda Through the 1992 Edition With the 1994
Addenda)

Date Issued:

November 11, 1996

File:

IN95-007A*
Question (1): When replacing a valve disc, do the requirements of IWA-5214(e) apply?
Reply (1): No.

Question (2): When replacing any pressure retaining part of a valve that is internal to the valve
body/bonnet, do the requirements of IWA-5214(e) apply?
Reply (2): No.
Question (3): When replacing a valve disc, do the requirements of IWA-4710(c) apply?
Reply (3): No.
Question (4): When replacing a valve bonnet and/or body that requires installation by mechanical
joints, do the requirements of IWA-4710(c) apply?
Reply (4): Yes.
Question (5): When replacing any pressure retaining part of a valve that is internal to the valves
body/bonnet, do the requirements of IWA-4710(c) apply?
Reply (5): No.

407

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

XI-1-98-54, XI-1-98-55

Section XI Interpretations No. 46

Interpretation: XI-1-98-54
Subject:

IWA-4300, Welding and Welder Qualifications for Repairs (1980 Edition Through
the 1986 Edition With the 1987 Addenda); IWA-7320, Welding and Welder Qualifications for Replacements (1980 Edition Through the 1989 Edition With the 1990
Addenda)

Date Issued:

July 22, 1999

File:

IN98-024

Question (1): Is it the intent of IWA-4300 for repair welding to components and their supports,
which were originally constructed to welding requirements other than Section IX (e.g., AWS D1.1),
to be performed with welders and welding procedure specifications qualified in accordance with Section
IX and the additional requirements of Section III and XI?
Reply (1): No, the welding requirements from the original construction code may be used.
Question (2): Is it the intent of IWA-7320 for replacement welding to components and their
supports, which were originally constructed to welding requirements other than Section IX (e.g., AWS
D1.1), to be performed with welders and welding procedure specifications qualified in accordance with
Section IX and the additional heat treating and impact tests required by IWB-4000?
Reply (2): No, the welding requirements from the original construction code may be used.

Interpretation: XI-1-98-55
Subject:

IWB-3522, IWC-3516, IWD-3000, Leakage at Class 2 and 3 Mechanical Connections


(1986 Edition and Later Addenda Through the 1997 Addenda)

Date Issued:

September 1, 1999

File:

IN98-006

Question (1): Is it a requirement of IWC-3516 and IWD-3000 to apply IWB-3522 to Class 2 and
3 components?
Reply (1): No.
Question (2): Is leakage at a threaded connection of Class 2 or 3 components considered a relevant
condition per IWC-3516 and IWD-3000?
Reply (2): IWC-3516 and IWD-3000 do not address leakage.

408

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

Section XI Interpretations No. 46

XI-1-98-56, XI-1-98-57

Interpretation: XI-1-98-56
Subject:

IWE-1220(d), Components Exempted From Examination (1992 Edition With 1992


Addenda)

Date Issued:

September 1, 1999

File:

IN99-014

Question: Does IWE-1220(d) require that portion of piping that penetrates the containment vessel
to be classified as Class 1 or 2?
Reply: No. It is up to the Owner to classify components.

Interpretation: XI-1-98-57
Subject:

IWA-7330, Procurement of Material (Summer 1978 Addenda Through 1990 Addenda);


IWA-4920 (1991 Addenda Through the 1995 Edition); IWA-4143 (1995 Addenda
Through the 1999 Addenda)

Date Issued:

September 1, 1999

File:

IN99-018

Question (1): When using the original Construction Code (Section III), is it a requirement of
IWA-4143(a) that Repair/Replacement Organizations (including the Owner, when the Owner acts as
the Repair/Replacement Organization) that fabricate parts, appurtenances, piping subassemblies and
supports for use by the Owner, at the Owners facility, be an N-Type Certificate Holder or Quality
System Certificate Holder in order to procure, store, handle, and use the material from which such
items are fabricated?
Reply (1): No. However, if the Construction Code invokes NA-3700 or NCA-3800, a Repair/
Replacement Organization that is not accredited by ASME must procure materials from an accredited
Materials Organization or Certificate Holder. (Applicability: 1997 Addenda and Later)
Question (2): When using the original Construction Code (Section III), is it a requirement of
IWA-4143(b) (IWA-7330 for Editions and Addenda Through the 1990 Addenda, and IWA-7330 From
the 1991 Addenda Through the 1995 Edition) that Repair/Replacement Organizations (including the
Owner, when the Owner acts as the Repair/Replacement Organization) that install items at the Owners
facility be an N-Type Certificate Holder or Quality System Certificate Holder in order to procure,
store, handle, and use the material used in the installation?
Reply (2): No. However, if the Construction Code invokes NA-3700 or NCA-3800, a Repair/
Replacement Organization that is not accredited by ASME must procure materials from an accredited
Materials Organization or Certificate Holder. (Applicability: Summer 1978 Addenda Through 1999
Addenda)

409

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

XI-1-98-58, XI-1-98-59

Section XI Interpretations No. 46

Interpretation: XI-1-98-58
Subject:

IWF-2500, Examination of Component Supports; Code Case N-491, -2500, (1989


Edition)

Date Issued:

September 1, 1999

File:

IN99-022

Question (1): Do IWF-2500 and Code Case N-491, -2500, require the examination of clearances
only when examining guides and stops, and the examination of settings only when examining spring
and constant load supports?
Reply (1): Yes.
Question (2): Is it a requirement that VT-3 examinations of components supports performed in
accordance with IWF-2500 or Code Case N-491, -2500, include the verification by measurement of
as-built dimensions such as fillet weld leg sizes, base-plate anchor-to-wall gap tolerances, and other
installation tolerances?
Reply (2): No.

Interpretation: XI-1-98-59
Subject:

IWL-4000 Installation Concrete Anchors (1992 Edition With the 1992 Addenda
Through the 1998 Edition)

Date Issued:

December 11, 1999

File:

IN99-002

Question: Is it the intent of IWL-4000 that the installation of concrete anchors be exempt from
the rules of IWL-4000 provided the installation affects only the cover concrete external to the outermost
layer of structural reinforcing steel or the post-tensioning system?
Reply: Yes.

410

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

Section XI Interpretations No. 46

XI-1-98-60, XI-1-98-61, XI-1-98-62

Interpretation: XI-1-98-60
Subject:

IWF-1300(e), Table IWD-2500-1, VT-3 Insulation Removal (1983 Edition With


the Winter 1983 Addenda Through the 1989 Edition, No Addenda)

Date Issued:

December 15, 1999

File:

IN98-014B

Question: Is it a requirement of IWF-1300(e) to require insulation removal to perform the VT-3


examination at the mechanical connection to the pressure boundary for nonintegral supports other than
supports carrying the weight of the component or serving as a structural restraint in compression?
Reply: Yes.

Interpretation: XI-1-98-61
Subject:

IWA-4000, -7000, Subassembly Installation (1997 Edition With the Summer 1978
Addenda up to and Including the 1995 Edition With the 1996 Addenda) and Code
Case N-416-1

Date Issued:

December 15, 1999

File:

IN99-010

Question: Does the Section XI term installation allow the joining of items, by the Owner or
Repair/Replacement Organization, into a piping subassembly at a location other than its final location
in the piping system?
Reply: Yes.

Interpretation: XI-1-98-62
Subject:

IWA-4000, -7000, Definition of Repair Organization (Repair/Replacement Organization)


(1977 Edition With the Summer 1978 Addenda Through the 1998 Edition With the
2000 Addenda)

Date Issued:

December 15, 1999

File:

IN99-024

Question: Does IWA-4000 (or IWA-7000, as applicable) permit an Owner to contract repair/
replacement activities to be controlled in accordance with the Owner-approved Quality Assurance
Program of the contractor (Repair/Replacement Organization), with ANII services to be subcontracted
by the Repair/Replacement Organization and a Data Report to be prepared and certified by the Repair/
Replacement Organization and the subcontracted ANII certifying that the applicable requirements of
Section XI have been met?
Reply: Yes.
411

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

XI-1-98-63, XI-1-98-64, XI-1-98-65

Section XI Interpretations No. 46

Interpretation: XI-1-98-63
Subject:

Mandatory Appendix IV, IV-3110(f), Eddy Current Instrument Channel Application


(1989 Edition With the 1990 Addenda up to and Including the 1992 Edition With
the 1992 Addenda)

Date Issued:

December 15, 1999

File:

IN99-025B

Question: Does Mandatory Appendix IV, IV-3110(f) require amplification for all channels of the
eddy current instrument to be within 5% of the mean value, at all sensitivity settings, at any single
frequency?
Reply: Yes.

Interpretation: XI-1-98-64
Subject:

Code Case N-416-1, Timing of NDE Requirements

Date Issued:

December 15, 1999

File:

IN99-026

Question: When performing a system leakage test in lieu of a Section XI hydrostatic test in
accordance with Code Case N-416-1 following installation of a NPT-stamped Class 1 replacement part
by welding, may the NDE specified in NB-5410 be performed prior to the system leakage test?
Reply: Yes.

Interpretation: XI-1-98-65
Subject:

Code Case N-522, Pressure Testing of Containment Piping, Section XI, Division 1

Date Issued:

December 15, 1999

File:

IN99-027

Question: Is it a requirement of Code Case N-522 that the pressure test following repairs or the
installation of replacements by welding in containment penetration piping that is otherwise outside the
scope of Section XI, be performed in accordance with 10 CFR 50, Appendix J?
Reply: No. The scope of N-522 only applies to the periodic pressure tests of Table IWC-25001, Category C-H.

412

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

Section XI Interpretations No. 46

XI-1-98-66, XI-1-98-67

Interpretation: XI-1-98-66
Subject:

IWA-4180, IWA-4220, Report of Reconciliation (1995 Edition With the 1995 Addenda
Through the 1998 Edition With the 1999 Addenda; IWA-4410 in the 1995 and 1996
Addenda); IWA-4421 (1995 Edition With the 1997 Addenda Through the 1998 Edition
With the 1999 Addenda)

Date Issued:

December 15, 1999

File:

IN99-031

Question: Is it a requirement of IWA-4180, IWA-4220, (IWA-4410 in the 1995 and 1996 Addenda)
and IWA-4421 that the Report of Reconciliation be a separate and unique document?
Reply: No. Any documents that satisfy the evaluation requirements contained in IWA-4220 may
be used to record reconciliation activities.

Interpretation: XI-1-98-67
Subject:

Table IWC-2500-1, Examination Requirements for Nozzle-to-Nozzle Extension Welds


(1986 Edition, No Addenda, Through the 1996 Addenda)

Date Issued:

March 6, 2000

File:

IN96-015

Question (1): Is it the intent of Table IWC-2500-1, Examination Category C-H, that nozzle-tonozzle vessel welds (i.e., nozzle extension) be visual, VT-2-examined in accordance with the frequency
specified for Examination Category C-H?
Reply (1): Yes.
Question (2): Is it the intent of Table IWC-2500-1 that full penetration nozzle-to-nozzle vessel
welds be included in Examination Category C-B?
Reply (2): Yes.

413

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

XI-1-98-68, XI-1-98-69

Section XI Interpretations No. 46

Interpretation: XI-1-98-68
Subject:

Code Cases N-498, N-498-1, and N-498-2, Alternative Requirements for 10 Year
Hydrostatic Testing For Class 1, 2, and 3 Systems

Date Issued:

March 6, 2000

File:

IN97-004

Question: When conducting a Class 1 system leakage test under the provisions of Code Case N498, including N-498-1 and N-498-2, is it the intent of para. (a)(2) to pressurize all Class 1 piping
(including portions isolated during normal operation), to the reactor coolant system nominal operating
pressure?
Reply: Yes.

Interpretation: XI-1-98-69
Subject:

IWB-3516.1(a), Allowable Planar Flaws (1989 Edition Through the 1992 Addenda)

Date Issued:

March 6, 2000

File:

IN98-002B

Question: Is it the intent of IWB-3516.1(a) that referenced Figs. IWB-2500-14 and IWB-2500-15
have the same examination boundary location sequence A-B-C-D as Fig. IWB-2500-13?
Reply: Yes.

414

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

Section XI Interpretations No. 46

IX-1-98-70, XI-1-98-71

Interpretation: IX-1-98-70
Subject:

Table IWB-2500-1, Examination Category B-J (1983 Edition and Later Editions and
Addenda)

Date Issued:

March 6, 2000

File:

IN98-009

Question (1): Does Table IWB-2500-1, Examination Category B-J, Footnote (1) require 25% of
the total nonexempt weld population of each item number listed (i.e., B9.11, B9.21, B9.31, B9.32, or
B9.40) be selected for examination during an Inspection Interval?
Reply (1): No.
Question (2): Does Table IWB-2500-1, Examination Category B-J, Footnote (1) require 25% of
the total nonexempt weld population of Examination Category B-J be selected for examination during
an Inspection Interval?
Reply (2): Yes.
Question (3): Is it the intent of Table IWB-2500-1, Examination Category B-J, Footnote (2) to
require the reexamination of B-J welds initially selected during the previous inspection interval only
to the extent practical?
Reply (3): Yes. This was clarified in a code change in the 1993 addenda.

Interpretation: XI-1-98-71
Subject:

Table IWE 2500-1, Examination Category E-A, Accessible Surface Areas (1992 Edition
With the 1992 Addenda Through the 1998 Edition With the 1999 Addenda)

Date Issued:

March 8, 2000

File:

IN99-001

Question: Is it the intent of Table IWE-2500-1, Category E-A, Accessible Surface Areas, that
surface areas may be considered inaccessible if visual access by line of sight with adequate lighting
from permanent vantage points is obstructed by permanent plant structures, equipment, or components,
provided these surface areas do not require examination in accordance with the inspection plan for
IWE-1240?
Reply: Yes.

415

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

SEC11ITEXT 06-05-00 08:23:03

Job #38930

ASME

Interpretations 46

NUMERICAL INDEX
Location
Subsection IMA
IMA-5200
IMA-5210

Interpretation

File
No.

Page
No.

XI-3-89-02
XI-3-89-02

IN86-024B
IN86-024B

211
211

IMB-5000
IMB-5100

XI-3-89-01
XI-1-98-21
XI-3-89-01
XI-3-86-01

IN86-024C
IN97-026
IN86-024C
IN86-024A

169
375
169
153

Subsection IMC
IMC-2500

XI-3-89-01

IN86-024C

169

Subsection IMF
IMF-1500
IMF-2500

XI-3-83-01
XI-3-83-01

BC81-330
BC81-330

11
11

XI-1-86-07
XI-1-98-03
XI-1-83-78
XI-1-83-44
XI-1-83-77
XI-1-83-78
XI-1-95-56
XI-1-89-64
XI-1-89-64R
XI-1-92-02
XI-1-98-04
XI-1-83-71
XI-1-83-71R
XI-1-86-22
XI-1-98-25
XI-1-83-48
XI-1-86-64
XI-1-98-05
XI-1-83-79
XI-1-89-02
XI-1-98-06
XI-1-98-24
XI-1-98-06
XI-1-95-27
XI-1-83-69
XI-1-83-64
XI-1-83-29
XI-1-83-31
XI-1-83-84
XI-1-86-71
XI-1-86-72

BC85-481
IN96-025
BC84-682
BC83-448
BC84-603
BC84-682
IN96-022
IN89-017B
IN89-017B*
IN91-012
IN97-029
BC80-583
BC80-583*
IN86-010
IN98-003
BC84-177
IN87-028A
IN97-027
BC84-684
IN88-001
IN97-034
IN97-032
IN97-034
IN94-006A
BC84-616
BC84-562
BC82-050
BC82-630
BC83-654
IN87-005A
IN87-005B

Subsection IMB
Table IMB-2500-1

Subsection IWA
IWA-1200
IWA-1310
IWA-1320

IWA-1400

IWA-2000
IWA-2100
IWA-2120

IWA-2130
IWA-2200
IWA-2210
IWA-2212
IWA-2213
IWA-2214
IWA-2222
IWA-2232

94
362
76
50
76
76
346
231
241
242
363
71
90
108
377
52
147
363
77
165
364
377
364
314
69
60
32
33
80
156
156

Location

IWA-2240
IWA-2300

IWA-2300(a)
IWA-2300(a)(1)
IWA-2300(c)
IWA-2300(d)
IWA-2300(e)
IWA-2310
IWA-2312
IWA-2321
IWA-2324
IWA-2325
IWA-2330
IWA-2400
IWA-2410
IWA-2430(d)
IWA-2600
IWA-3100

Interpretation
XI-1-89-09
XI-1-89-13
XI-1-89-49
XI-1-86-28
XI-1-83-16
XI-1-83-18
XI-1-83-23
XI-1-83-24
XI-1-83-29
XI-1-83-40
XI-1-83-40R
XI-1-83-45
XI-1-83-63
XI-1-83-82
XI-1-86-40
XI-1-86-56
XI-1-86-66
XI-1-89-06
XI-1-89-26
XI-1-92-39
XI-1-92-42
XI-1-92-70
XI-1-95-38
XI-1-95-68
XI-1-95-58
XI-1-95-67
XI-1-98-24
XI-1-86-16
XI-1-86-19
XI-1-86-73
XI-1-92-28
XI-1-86-19
XI-1-83-01
XI-1-83-36
XI-1-95-61
XI-1-98-23
XI-1-95-61
XI-1-98-07
XI-1-98-37
XI-1-92-54
XI-1-92-54
XI-1-92-70
XI-1-95-61
XI-1-86-54
XI-1-89-58
XI-1-83-41
XI-1-92-57
XI-1-92-06
XI-1-95-05
XI-1-89-16

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 1

File
No.

Page
No.

IN87-019
IN89-005
IN90-013
IN86-008
BC82-775
BC83-060
BC83-056
BC83-178
BC82-050
BC84-043
BC84-043*
BC83-535
BC84-310
BC83-176
BC85-571
IN86-028
IN87-015
IN88-006
BC80-231*
IN92-032
IN92-030
IN93-022
IN95-019
IN95-024
IN96-027
IN96-013
IN97-032
BC85-142
BC85-071
IN87-029
IN92-019
BC85-071
BC80-582
BC83-585
IN95-022
IN97-030
IN95-022
IN97-031
IN98-029
IN93-015
IN93-015
IN93-022
IN95-022
IN87-001
IN90-025
BC84-064
IN93-002
IN91-019
IN93-035
IN89-001B

168
176
217
111
20
21
29
29
32
42
67
50
60
78
123
137
153
167
194
267
268
293
330
351
347
351
377
105
106
157
257
106
5
40
348
376
348
364
388
276
276
293
348
136
228
43
282
244
301
178

(a)

Location

Interpretation

File
No.

Page
No.

Subsection IWA (Contd)


IWA-3200
IWA-3300
IWA-3350
Fig. IWA-3350-1
IWA-3360
Fig. IWA-3360-1
IWA-3400
IWA-3410
IWA-4000

IWA-4100

IWA-4120

IWA-4130
IWA-4143
IWA-4150
IWA-4170

(b)

XI-1-89-45
XI-1-92-38
XI-1-98-11
XI-1-98-11
XI-1-98-11
XI-1-98-11
XI-1-98-11
XI-1-86-52
XI-1-86-52R
XI-1-83-17
XI-1-83-10
XI-1-83-13
XI-1-83-28
XI-1-83-28R
XI-1-83-50
XI-1-83-50R
XI-1-83-65
XI-1-83-66
XI-1-86-13R
XI-1-86-36
XI-1-86-41
XI-1-86-44
XI-1-86-47
XI-1-86-44R
XI-1-86-59
XI-1-86-55
XI-1-86-55R
XI-1-89-28
XI-1-89-30
XI-1-89-40
XI-1-89-56
XI-1-89-64
XI-1-89-64R
XI-1-92-21
XI-1-92-31
XI-1-92-68
XI-1-95-09
XI-1-95-14
XI-1-98-20
XI-1-98-20R
XI-1-98-27
XI-1-98-43
XI-1-98-44
XI-1-98-61
XI-1-98-62
XI-81-11R
XI-1-83-26
XI-1-83-26R
XI-1-98-08
XI-1-98-29
XI-1-98-29R
XI-1-83-40
XI-1-83-40R
XI-1-83-57
XI-1-86-38
XI-1-92-32
XI-1-92-60
XI-1-83-57
XI-1-92-06
XI-1-98-57
XI-1-95-01
XI-1-95-29

IN90-006
IN92-031
IN97-001
IN97-001
IN97-001
IN97-001
IN97-001
BC85-524
BC85-524*
BC82-597
BC82-277
BC82-407
BC83-344
BC83-344*
BC84-175
BC84-175*
BC84-647
BC84-652
BC85-111*
IN86-021
IN86-005
IN86-015
IN86-025B
IN86-015*
BC85-550
IN87-002
IN87-002*
IN89-021
IN89-011
IN89-017A
IN90-022
IN89-017B
IN89-017B*
IN92-009B
IN91-018
IN94-005
IN94-014
IN93-029
IN97-025
IN97-025*
IN97-035
IN98-018
IN98-020
IN99-010
IN99-024
BC81-369*
BC83-244
BC83-244*
IN97-021
IN97-021A
IN97-021A*
BC84-043
BC84-043*
BC84-392
BC85-141
IN91-031
IN93-024
BC84-392
IN91-019
IN99-018
IN93-003
IN95-001B

209
266
366
366
366
366
366
135
187
20
17
18
31
185
54
68
61
61
225
121
124
126
127
144
145
137
153
195
202
207
227
231
241
254
263
292
302
304
375
375
378
395
395
411
411
87
30
87
365
378
379
42
67
57
122
263
283
57
244
409
299
315

Location

Interpretation

IWA-4180
IWA-4200

XI-1-98-66
XI-1-83-57
XI-1-92-35
XI-1-92-35R
XI-1-89-01
XI-1-95-57
XI-1-95-57R
XI-1-98-66
XI-1-95-57
XI-1-95-57R
XI-1-83-43
XI-1-83-55
XI-1-83-81
XI-1-89-01
XI-1-92-08
XI-1-92-59
XI-1-95-29
XI-1-98-54
XI-1-83-83
XI-1-89-35
XI-1-83-05
XI-1-83-28
XI-1-83-34
XI-1-83-35
XI-1-83-37
XI-1-83-37R2
XI-1-83-54R
XI-1-83-58
XI-1-86-25
XI-1-86-75
XI-1-89-18
XI-1-89-19
XI-1-83-35R
XI-1-89-31
XI-1-83-35R
XI-1-83-58
XI-1-86-35
XI-1-98-66
XI-1-98-66
XI-1-95-60
XI-1-86-51
XI-1-95-29
XI-1-98-51
XI-1-98-51R
XI-1-83-26
XI-1-83-26R
XI-1-83-54R
XI-1-83-85
XI-1-83-86
XI-1-83-86R
XI-1-86-51
XI-1-92-65
XI-1-98-42
XI-1-95-50
XI-1-98-52
XI-1-98-52R
XI-1-95-48
XI-1-95-48R
XI-1-83-05
XI-1-83-54
XI-1-86-35
XI-1-89-08
XI-1-89-18

IWA-4210
IWA-4220

IWA-4226
IWA-4300

IWA-4310
IWA-4330
IWA-4400

IWA-4400(a)
IWA-4400(b)(5)

IWA-4410
IWA-4421
IWA-4422
IWA-4500
IWA-4540(c)
IWA-4600

IWA-4700

IWA-4710(c)
IWA-5000

File
No.
IN99-031
BC84-392
IN92-023
IN92-023*
IN87-036
IN96-023
IN96-023
IN99-031
IN96-023
IN96-023
BC84-179
BC84-322
BC84-687
IN87-036
IN91-024
IN93-023
IN95-001B
IN98-024
BC83-179
IN89-006
BC82-425
BC83-344
BC83-587
BC83-588
BC82-425
BC82-425**
BC84-321*
BC84-422
BC85-528
IN87-032
IN86-031
IN88-009
BC83-588*
IN89-023
BC83-588*
BC84-422
IN86-019
IN99-031
IN99-031
IN95-018
IN86-027
IN95-001B
IN99-011
IN99-011*
BC83-244
BC83-244*
BC84-321*
BC84-683
BC85-113A
BC85-113A*
IN86-027
IN94-001
IN98-008
IN96-012
IN99-013
IN99-013*
IN95-007A
IN95-007A*
BC82-425
BC84-321
IN86-019
IN87-018
IN86-031

Page
No.
413
57
265
289
165
347
359
413
347
359
44
56
78
165
245
282
315
408
79
204
7
31
39
40
41
185
186
57
110
158
188
188
67
203
67
57
120
413
413
348
129
315
399
406
30
87
186
81
82
102
129
290
390
339
399
406
338
407
7
55
120
168
188

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 2

Location

Interpretation

File
No.

Page
No.

Location

Subsection IWA (Contd)

IWA-5110
IWA-5120
IWA-5200
Table IWA-5210-1

IWA-5211

IWA-5212
IWA-5213
IWA-5214

IWA-5220
IWA-5224
IWA-5240

IWA-5241
IWA-5242

IWA-5243
IWA-5244

XI-1-95-37
XI-1-95-54
XI-1-95-50
XI-1-95-50
XI-1-98-52
XI-1-83-35
XI-1-86-13
XI-1-83-70
XI-1-83-70R
XI-1-92-19
XI-1-83-19
XI-1-83-34
XI-1-83-49
XI-1-83-63
XI-1-83-70
XI-1-83-70R
XI-1-86-03
XI-1-86-03R
XI-1-86-13R
XI-1-86-34
XI-1-86-53
XI-1-89-15
XI-1-89-33
XI-1-92-04
XI-1-92-18
XI-1-92-23
XI-1-86-46
XI-1-86-46
XI-1-83-63
XI-1-83-63R
XI-1-83-70
XI-1-83-70R
XI-1-86-13R
XI-1-86-27
XI-1-86-27R
XI-1-86-29
XI-1-86-29R
XI-1-89-08
XI-1-89-37
XI-1-89-42
XI-1-89-52
XI-1-92-30
XI-1-95-48
XI-1-95-48R
XI-1-95-66
XI-1-95-52
XI-1-98-03
XI-1-89-45
XI-1-95-50
XI-1-83-67
XI-1-89-54
XI-1-83-63
XI-1-92-34
XI-1-98-06
XI-1-92-64
XI-1-89-39
XI-1-89-39R
XI-1-92-64
XI-1-92-47
XI-1-92-64
XI-1-95-41
XI-1-83-19

IN95-015
IN96-003
IN96-012
IN96-012
IN99-013
BC83-588
BC85-111
BC84-198
BC84-198*
IN92-005
BC82-607
BC83-587
BC82-776
BC84-310
BC84-198
BC84-198*
BC83-112
BC83-112*
BC85-111*
IN86-017B
IN86-017A
IN88-002A
IN88-017
IN91-009
IN92-003
IN86-017B
IN86-023
IN86-023
BC84-310
BC84-310*
BC84-198
BC84-198*
BC85-111*
IN86-007
IN86-007*
IN86-009
IN86-009*
IN87-018
IN88-002C
IN90-001
IN88-002B
IN92-015
IN95-007A
IN95-007A*
IN95-007B
IN95-021
IN96-025
IN90-006
IN96-012
BC82-606
IN90-018B
BC84-310
IN92-020
IN97-034
IN93-038
IN89-013A
IN89-013A*
IN93-038
IN92-046
IN93-038
IN95-016
BC82-607

329
346
339
339
399
40
104
70
201
253
27
39
53
60
70
201
92
103
225
120
136
178
203
243
253
255
127
127
60
101
70
201
225
111
187
112
143
168
205
208
219
258
338
407
350
345
362
209
339
62
226
60
264
364
290
206
289
290
274
290
335
27

IWA-5250

IWA-5260
IWA-5262
IWA-5265

IWA-5300
IWA-5350
IWA-6000

IWA-6230

IWA-6300
IWA-7000

IWA-7120
IWA-7121
IWA-7210

Interpretation
XI-1-92-52
XI-1-89-64
XI-1-89-64R
XI-1-92-01
XI-1-92-03
XI-1-92-19
XI-1-92-31
XI-1-92-48
XI-1-92-64
XI-1-98-39
XI-1-89-74
XI-1-92-10
XI-1-83-49
XI-1-83-49R
XI-1-86-75
XI-1-89-54
XI-1-89-66
XI-1-95-07
XI-1-92-51
XI-1-86-14
XI-1-86-14R
XI-1-89-64
XI-1-89-64R
XI-1-92-02
XI-1-83-03
XI-1-83-08
XI-1-83-15
XI-1-89-48
XI-1-83-28
XI-1-83-28R
XI-1-83-38
XI-1-83-42
XI-1-83-46
XI-1-83-47
XI-1-83-50
XI-1-83-50R
XI-1-83-52
XI-1-83-54
XI-1-83-65
XI-1-83-66
XI-1-86-13R
XI-1-86-44
XI-1-86-44R
XI-1-86-47
XI-1-86-55
XI-1-86-55R
XI-1-86-58
XI-1-86-65
XI-1-89-22
XI-1-89-40
XI-1-89-56
XI-1-89-64
XI-1-89-64R
XI-1-92-31
XI-1-95-09
XI-1-95-13
XI-1-98-61
XI-1-89-34
XI-1-83-83
XI-1-83-20
XI-1-83-21
XI-1-83-21R
XI-1-83-40

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 3

File
No.
IN93-005
IN89-017B
IN89-017B*
IN90-023
IN91-017
IN92-005
IN91-018
IN93-001
IN93-038
IN97-033
IN91-008
IN91-029
BC82-776
BC82-776*
IN87-032
IN90-018B
IN90-018A
IN94-011
IN93-011
BC85-112
BC85-112*
IN89-017B
IN89-017B*
IN91-012
BC82-406
BC82-523
BC82-610
IN90-011
BC83-344
BC83-344*
BC84-122
BC84-123
BC83-595
BC84-197
BC84-175
BC84-175*
BC83-625
BC84-321
BC84-647
BC84-652
BC85-111*
IN86-015
IN86-015*
IN86-025B
IN87-002
IN87-002*
IN87-010
IN87-031
IN89-009
IN89-017A
IN90-022
IN89-017B
IN89-017B*
IN91-018
IN94-014
IN93-027B
IN99-010
IN89-012
BC83-179
BC82-430
BC82-434
BC82-434*
BC84-043

Page
No.
276
231
241
242
242
253
263
274
290
388
235
246
53
89
158
226
232
301
275
104
118
231
241
242
6
9
19
217
31
185
41
43
51
52
54
68
55
55
61
61
225
126
144
127
137
153
138
148
191
207
227
231
241
263
302
304
411
204
79
27
28
117
42

(c)

Location

Interpretation

File
No.

Page
No.

Location

Interpretation

Subsection IWA (Contd)

IWA-7210(c)

IWA-7220
IWA-7300

IWA-7310
IWA-7320
IWA-7330

IWA-7400

IWA-7400(d)

IWA-7520
IWA-7530

Subsection IWB
IWB-1220(a)
IWB-1220(b)
IWB-2200

(d)

XI-1-83-40R
XI-1-83-72
XI-1-86-08
XI-1-86-12
XI-1-86-59
XI-1-89-07
XI-1-89-20
XI-1-89-24
XI-1-89-29
XI-1-89-34
XI-1-89-46
XI-1-89-46R
XI-1-89-68
XI-1-86-18
XI-1-86-38
XI-1-86-38R
XI-1-86-39
XI-1-86-39R
XI-1-89-41
XI-1-92-15
XI-1-95-02
XI-1-83-72
XI-1-86-03
XI-1-86-03R
XI-1-86-08
XI-1-83-50R
XI-1-83-72
XI-1-98-54
XI-1-83-02
XI-1-83-46
XI-1-83-72
XI-1-89-24
XI-1-98-57
XI-1-83-37
XI-1-83-37R2
XI-1-83-54R
XI-1-89-36
XI-1-92-27
XI-1-98-34
XI-1-83-26
XI-1-83-83
XI-1-83-85
XI-1-83-86
XI-1-83-86R
XI-1-86-65
XI-1-89-04
XI-1-92-32
XI-1-92-44
XI-1-92-66
XI-1-83-38
XI-1-86-68
XI-1-83-37
XI-1-86-51
XI-1-89-36

BC84-043*
BC81-568A
BC81-568B
BC85-098
BC85-550
IN88-011
IN88-014
IN89-014
IN89-008
IN89-012
IN90-008
IN90-008*
IN90-015
BC85-254
BC85-141
BC85-141*
BC85-525C
BC85-525C*
IN89-025
IN91-040
IN93-026
BC81-568A
BC83-112
BC83-112*
BC81-568B
BC84-175*
BC81-568A
IN98-024
BC81-476
BC83-595
BC81-568A
IN89-014
IN99-018
BC82-425
BC82-425**
BC84-321*
IN89-024
IN92-016
IN98-011
BC83-244
BC83-179
BC84-683
BC85-113A
BC85-113A*
IN87-031
IN88-004
IN91-031
IN91-031B
IN93-041
BC84-122
IN87-024
BC82-425
IN86-027
IN89-024

67
72
94
103
145
167
189
193
202
204
210
225
232
106
122
143
123
144
207
252
299
72
92
103
94
68
72
408
6
51
72
193
409
41
185
186
205
257
386
30
79
81
82
102
148
166
263
273
291
41
154
41
129
205

XI-1-92-40
XI-1-92-45
XI-1-86-45
XI-1-98-09
XI-1-86-20
XI-1-86-50

IN92-022A
IN92-022B
IN86-020
IN97-018
IN86-006
IN86-026C

267
273
126
365
107
128

IWB-2200(a)
IWB-2200(c)
IWB-2410
IWB-2412
Table IWB-2412-1
IWB-2420
IWB-2420(b)
IWB-2430

IWB-2430(a)

IWB-2500
Fig. IWB-2500-6
Fig. IWB-2500-7
Fig. IWB-2500-8
Fig. IWB-2500-13

Fig. IWB-2500-14
Fig. IWB-2500-15

Table IWB-2412-1
Table IWB-2500-1

XI-1-89-63
XI-1-98-43
XI-1-86-24
XI-1-83-71
XI-1-95-11
XI-1-95-10
XI-1-86-74
XI-1-95-55
XI-1-92-12
XI-1-98-46
XI-1-98-49
XI-1-92-24
XI-1-95-42
XI-1-98-41
XI-1-92-61
XI-1-95-13
XI-1-98-10
XI-1-92-40
XI-1-95-44
XI-1-86-71
XI-1-83-75
XI-1-89-49
XI-1-83-75
XI-1-89-21
XI-1-89-27
XI-1-89-21
XI-1-89-21
XI-1-89-27
XI-1-98-40
XI-1-95-11
XI-1-83-11
XI-1-83-12
XI-1-83-33
XI-1-83-39
XI-1-83-40R
XI-1-83-51
XI-1-83-56
XI-1-83-69
XI-1-83-76
XI-1-86-04
XI-1-86-10
XI-1-86-20
XI-1-86-21R
XI-1-86-24
XI-1-86-34
XI-1-86-45
XI-1-86-62
XI-1-86-71
XI-1-86-74
XI-1-89-11
XI-1-89-14
XI-1-89-21
XI-1-89-27
XI-1-89-33
XI-1-89-43
XI-1-89-49
XI-1-89-50
XI-1-92-05
XI-1-92-09
XI-1-92-12
XI-1-92-13
XI-1-92-23
XI-1-92-43

File
No.

Page
No.

IN90-034
IN98-018
BC85-526
BC80-583
IN94-024
IN94-023
IN86-003A
IN96-019
IN91-025
IN98-027
IN99-008
IN91-014
IN96-002
IN98-007
IN93-027A
IN93-027B
IN93-027C
IN92-022A
IN96-008
IN87-005A
BC83-055
IN90-013
BC83-055
IN89-004A
IN89-004C
IN89-004A
IN89-004A
IN89-004C
IN98-002
IN94-024
BC82-304
BC82-230
BC83-589
BC83-527
BC84-043*
BC83-240
BC84-388
BC84-616
BC84-390
BC83-438
BC84-393
IN86-006
IN86-004*
BC85-526
IN86-017B
IN86-020
IN86-032
IN87-005A
IN86-003A
IN88-016
IN86-003B
IN89-004A
IN89-004C
IN88-017
IN90-003
IN90-013
IN90-014
IN91-016
IN91-027
IN91-025
IN91-026
IN86-017B
IN92-033

230
395
109
71
303
303
157
346
251
396
398
255
335
389
283
304
365
267
336
156
75
217
75
190
195
190
190
195
389
303
17
18
39
42
67
54
56
69
75
92
95
107
186
109
120
126
146
156
157
175
176
190
195
203
208
217
218
243
245
251
251
255
268

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 4

Location

Interpretation

File
No.

Page
No.

IN92-043
IN93-013
IN94-006B
IN94-006A
IN96-008
IN97-010A
IN97-010B
IN97-017
IN97-028
IN98-018
IN98-009
BC83-240
BC84-393
BC85-481
BC85-524*
IN89-017C
IN92-005
IN92-023
IN92-023*
IN86-022
IN99-008
IN86-032
IN86-032
IN96-002
IN96-010
IN91-014
BC82-050
BC85-524
BC85-524*
BC82-428
BC82-437
IN93-021
BC82-429
IN98-002
IN98-002B
IN90-006
IN97-001
IN98-006
BC82-050
IN86-005
IN92-009B
IN91-005
IN91-005
IN94-031
IN99-015
IN99-015
IN91-031
BC82-604
BC82-604*
BC84-064
BC84-064*
IN87-018
IN96-003
IN86-017B
IN86-017B
BC83-219
IN91-008

274
281
315
314
336
350
368
368
376
395
415
54
95
94
187
232
253
265
289
121
398
146
146
335
339
255
32
135
187
8
33
282
8
389
414
209
366
408
32
124
254
233
351
322
400
400
263
9
10
43
88
168
346
120
255
30
235

Location

Subsection IWB (Contd)

Table IWB-2600-1
IWB-3000

IWB-3112
IWB-3132.3
IWB-3142
IWB-3144
IWB-3200
IWB-3461
Table IWB-3410-1
IWB-3500

Table IWB-3510-1
IWB-3512
IWB-3514.2
Table IWB-3514-2
IWB-3516.1(a)
IWB-3517.1
IWB-3521
IWB-3522
IWB-3600
IWB-4000
IWB-4212
IWB-4230
IWB-4232.2(d)
IWB-4232.4
IWB-4300
IWB-4340
IWB-4400
IWB-5000
IWB-5200
IWB-5210
IWB-5222

XI-1-92-46
XI-1-92-56
XI-1-95-28
XI-1-95-27
XI-1-95-44
XI-1-95-65
XI-1-98-16
XI-1-98-17
XI-1-98-22
XI-1-98-43
XI-1-98-70
XI-1-83-51
XI-1-86-10
XI-1-86-07
XI-1-86-52R
XI-1-89-67
XI-1-92-19
XI-1-92-35
XI-1-92-35R
XI-1-86-37
XI-1-98-49
XI-1-86-62
XI-1-86-62
XI-1-95-42
XI-1-95-49
XI-1-92-24
XI-1-83-29
XI-1-86-52
XI-1-86-52R
XI-1-83-06
XI-1-83-32
XI-1-92-58
XI-1-83-07
XI-1-98-40
XI-1-98-69
XI-1-89-45
XI-1-98-11
XI-1-98-55
XI-1-83-29
XI-1-86-41
XI-1-92-21
XI-1-89-70
XI-1-89-70R
XI-1-95-33
XI-1-98-53
XI-1-98-53
XI-1-92-32
XI-1-83-09
XI-1-83-09R
XI-1-83-41
XI-1-83-41R
XI-1-89-08
XI-1-95-54
XI-1-86-34
XI-1-92-23
XI-1-83-25
XI-1-89-74

IWC-1221

IWC-2000
IWC-2100
IWC-2200

IWC-2200(b)(1)
IWC-2410
IWC-2411
IWC-2412
Table IWC-2412-1
IWC-2420
IWC-2420(b)
IWC-2430

IWC-2430(a)
Table IWC-2500-1

Fig. IWC-2500-5
IWC-2520
Table IWC-2520
Table IWC-2600-1

IWC-3000
Subsection IWC
IWC-1200
IWC-1220

XI-1-83-27R
XI-1-83-27
XI-1-86-43

BC83-437*
BC83-437
IN86-012

88
31
125

Interpretation
XI-1-86-43R
XI-1-89-53
XI-1-89-61
XI-1-95-17
XI-1-86-05
XI-1-86-42
XI-1-95-03
XI-1-86-57
XI-1-86-22
XI-1-89-42
XI-1-95-47
XI-1-98-42
XI-1-98-50
XI-1-95-10
XI-1-83-68
XI-1-86-74
XI-1-95-11
XI-1-98-46
XI-1-98-49
XI-1-83-04
XI-1-92-24
XI-1-95-06
XI-1-95-42
XI-1-98-41
XI-1-92-61
XI-1-95-13
XI-1-83-39
XI-1-83-40R
XI-1-83-51
XI-1-83-53
XI-1-83-69
XI-1-83-80
XI-1-83-80R
XI-1-86-57
XI-1-86-74
XI-1-89-21
XI-1-89-30
XI-1-89-43
XI-1-89-51
XI-1-89-53
XI-1-89-57
XI-1-89-58
XI-1-89-61
XI-1-89-75
XI-1-92-05
XI-1-92-47
XI-1-92-62
XI-1-98-36
XI-1-95-63
XI-1-95-13
XI-1-98-67
XI-1-89-38
XI-1-83-27
XI-1-83-51
XI-1-83-68
XI-1-83-51
XI-1-83-68
XI-1-83-68R
XI-1-89-67
XI-1-92-19
XI-1-92-24
XI-1-92-35
XI-1-92-35R

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 5

File
No.

Page
No.

IN86-012*
IN90-019
IN90-032
IN95-017
BC84-686
IN86-011
IN93-042
IN87-007
IN86-010
IN90-001
IN96-016
IN98-008
IN99-009
IN94-023
BC83-441
IN86-003A
IN94-024
IN98-027
IN99-008
BC82-427
IN91-014
IN94-002A
IN96-002
IN98-007
IN93-027A
IN93-027B
BC83-527
BC84-043*
BC83-240
BC83-656
BC84-616
BC84-685
BC84-685*
IN87-007
IN86-003A
IN89-004A
IN89-011
IN90-003
IN90-017
IN90-019
IN90-024
IN90-025
IN90-032
IN91-010
IN91-016
IN92-046
IN93-030
IN98-025
IN97-012
IN97-007
IN96-015
IN89-007
BC83-437
BC83-240
BC83-441
BC83-240
BC83-441
BC83-441*
IN89-017C
IN92-005
IN91-014
IN92-023
IN92-023*

125
219
229
368
93
124
300
138
108
208
337
390
398
303
62
157
303
396
398
7
255
301
335
389
283
304
42
67
54
55
69
77
241
138
157
190
202
208
218
219
227
228
229
235
243
274
284
387
349
367
413
206
31
54
62
54
62
101
232
253
255
265
289

(e)

Location

Interpretation

Subsection IWC (Contd)


IWC-3112
XI-1-86-37
IWC-3122.3
XI-1-98-49
IWC-3200
XI-1-95-42
IWC-3500
XI-1-95-35
Table IWC-3510-1
XI-1-95-11
XI-1-98-55
IWC-3516
XI-1-98-55
IWC-4000
XI-1-86-27R
IWC-5000
XI-1-86-32
XI-1-89-08
XI-1-92-34
XI-1-95-54
IWC-5210
XI-1-83-25
XI-1-92-18
IWC-5210(a)
XI-1-92-62
IWC-5222
XI-1-83-67
XI-1-86-09
XI-1-89-30
XI-1-89-66
XI-1-89-74
XI-1-95-13
IWC-5223
XI-1-83-67
IWC-5240
XI-1-95-13
IWC-7000
XI-1-86-27R
Subsection IWD
IWD-1220
IWD-2000
IWD-2410
Table IWD-2412-2
IWD-2420
Table IWD-2500-1

IWD-2600
IWD-2620
IWD-3000

IWD-3500
IWD-4000
IWD-5000

IWD-5210
IWD-5223

(f)

XI-1-89-47
XI-1-95-17
XI-1-86-67
XI-1-95-10
XI-1-95-11
XI-1-98-46
XI-1-98-49
XI-1-83-40R
XI-1-83-69
XI-1-86-15
XI-1-86-15R
XI-1-86-69
XI-1-89-43
XI-1-89-58
XI-1-89-75
XI-1-92-05
XI-1-95-36
XI-1-95-13
XI-1-98-32
XI-1-98-60
XI-1-83-27
XI-1-89-47
XI-1-89-67
XI-1-92-19
XI-1-92-35
XI-1-92-35R
XI-1-95-36
XI-1-98-55
XI-1-95-35
XI-1-86-27R
XI-1-86-32
XI-1-89-08
XI-1-92-34
XI-1-92-18
XI-1-83-67
XI-1-89-66

File
No.

Page
No.

IN86-022
IN99-008
IN96-002
IN96-007
IN97-001
IN98-006
IN98-006
IN86-007*
BC85-525B
IN87-018
IN92-020
IN96-003
BC83-219
IN92-003
IN93-030
BC82-606
BC84-391
IN89-011
IN90-018A
IN91-008
IN97-007
BC82-606
IN97-007
IN86-007*

121
398
335
329
366
408
408
187
119
168
264
346
30
253
284
62
94
202
232
235
367
62
367
187

IN90-009
IN95-017
IN87-022
IN94-023
IN94-024
IN98-027
IN99-008
BC84-043*
BC84-616
BC85-130
BC85-130*
IN87-008
IN90-003
IN90-025
IN91-010
IN91-016
IN94-012
IN97-007
IN98-014
IN98-014B
BC83-437
IN90-009
IN89-017C
IN92-005
IN92-023
IN92-023*
IN94-012
IN98-006
IN96-007
IN86-007*
BC85-525B
IN87-018
IN92-020
IN92-003
BC82-606
IN90-018A

210
368
154
303
303
396
398
67
69
105
135
155
208
228
235
243
329
367
386
411
31
210
232
253
265
289
329
408
329
187
119
168
264
253
62
232

File
No.

Page
No.

XI-1-89-74
XI-1-95-13
XI-1-86-27R

IN91-008
IN97-007
IN86-007*

235
367
187

XI-1-95-14
XI-1-98-30
XI-1-98-56
XI-1-98-49
XI-1-98-46
XI-1-86-70
XI-1-89-43
XI-1-92-33
XI-1-98-24
XI-1-98-35
XI-1-98-45
XI-1-98-71
XI-1-98-14
XI-1-98-27
XI-1-92-33
XI-1-95-34
XI-1-95-15

IN97-022
IN97-036
IN99-014
IN99-008
IN98-027
IN87-011
IN90-003
IN91-043
IN97-032
IN98-015
IN98-022
IN99-001
IN97-022
IN97-035
IN91-043
IN95-009
IN97-015

367
385
409
398
396
155
208
264
377
387
395
415
367
380
264
323
367

XI-1-86-02
XI-1-86-11
XI-1-86-17
XI-1-86-50
XI-1-83-30
XI-1-89-69
XI-1-92-20
XI-1-92-22
XI-1-92-29
XI-1-92-29R
XI-1-98-60
XI-1-92-55
XI-1-86-48
XI-1-89-44
XI-1-95-10
XI-1-98-46
XI-1-86-30R
XI-1-86-30
XI-1-86-30R
XI-1-89-60
XI-1-95-30
XI-1-95-32
XI-1-83-12R
XI-1-83-12R-2
XI-1-89-59
XI-1-98-58
XI-1-92-29R
XI-1-83-12
XI-1-83-12R
XI-1-83-12R-2
XI-1-89-69
XI-1-86-48
XI-1-83-12
XI-1-83-12R
XI-1-83-12R-2
XI-1-86-26
XI-1-86-49
XI-1-86-69
XI-1-89-47

BC82-753
BC85-253A
BC85-253B
IN86-026C
BC82-522
IN90-027
IN92-006B
IN92-010
IN92-006A
IN92-006A*
IN99-014B
IN93-016
IN86-026A
IN90-004
IN94-023
IN98-027
IN86-013*
IN86-013
IN86-013*
IN90-029
IN95-004A
IN95-004B
BC82-230*
BC82-230**
IN90-026
IN99-022
IN92-006A
BC82-230
BC82-230*
BC82-230**
IN90-027
IN86-026A
BC82-230
BC82-230*
BC82-230**
IN86-002
IN86-026B
IN87-008
IN90-009

91
96
105
128
32
233
254
254
257
405
411
281
127
209
303
396
321
112
321
229
316
322
49
49
228
410
405
18
49
49
233
127
18
49
49
110
128
155
210

Location

Interpretation

IWD-5246
IWD-7000
Subsection IWE
IWE
IWE-1220(d)
IWE-2420
Table IWE-2500-1

IWE-2600
IWE-3519.3
IWE-5221
IWE-5246
Subsection IWF
IWF

IWF-1100
IWF-1300

IWF-1300(e)
IWF-2000
IWF-2200
IWF-2410(b)
IWF-2420(a)
IWF-2420(b)
IWF-2430

IWF-2500

IWF-2500(a)
Table IWF-2500-1

Table IWF-2500-2
IWF-2510

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 6

Location

File
No.

Page
No.

XI-1-89-61
XI-1-89-72
XI-1-86-63
XI-1-86-30
XI-1-86-30R
XI-1-89-60
XI-1-89-67
XI-1-92-35
XI-1-92-35R
XI-1-92-55
XI-1-89-28

IN90-032
IN90-035
IN87-004
IN86-013
IN86-013*
IN90-029
IN89-017C
IN92-023
IN92-023*
IN93-016
IN89-021

229
234
147
112
321
229
232
265
289
281
195

XI-1-95-05
XI-1-95-64
XI-1-98-26
XI-1-98-31
XI-1-98-59

IN97-027
IN97-014
IN97-013
IN98-004
IN99-002

363
349
377
385
410

Interpretation

Location

Subsection IWF (Contd)

Table IWF-2510(b)
IWF-3000

IWF-4000
Subsection IWL
IWL-2100
IWL-2200

IWL-4000
Subsection IWP
IWP

IWP-3100
IWP-3210
IWP-3500
IWP-4110
Table IWP-4110-1
IWP-4120
Subsection IWV
IWV

IWV-1000
IWV-1100
IWV-1200
IWV-1300
IWV-2200
IWV-3200

IWV-3300
IWV-3400
IWV-3410

IWV-3412

IWV-3413
IWV-3420
IWV-3426
IWV-3427
Table IWV-3510-1
IWV-3511
IWV-3512

XI-82-06R
XI-1-83-08
XI-1-86-21R
XI-1-92-63
XI-1-92-63
XI-1-92-63
XI-1-89-55
XI-1-89-55
XI-1-92-14
XI-1-86-33
XI-1-89-55

BC82-340*
BC82-523
IN86-004*
IN93-036
IN93-036
IN93-036
IN90-021
IN90-021
IN91-037
BC85-529B
IN90-021

5
9
186
284
284
284
226
226
251
119
226

XI-82-06R
XI-1-83-08
XI-1-83-59
XI-1-86-21R
XI-1-89-36
XI-1-89-71
XI-1-89-71R
XI-1-83-59
XI-1-83-59R
XI-1-83-17
XI-1-83-62
XI-1-83-14
XI-1-86-60
XI-1-92-16
XI-1-92-50
XI-1-89-10
XI-1-86-60
XI-1-83-17
XI-1-92-41
XI-1-92-41R
XI-1-83-74
XI-1-89-10
XI-1-92-50
XI-1-89-10
XI-1-83-62
XI-1-83-61
XI-1-83-60
XI-1-89-25
XI-1-89-25
XI-1-89-65

BC82-340*
BC82-523
BC83-439
IN86-004*
IN89-024
IN90-036
IN90-036*
BC83-439
BC83-439*
BC82-597
BC84-178
BC82-626
IN86-001
IN91-045
IN92-041
IN88-015
IN86-001
BC82-597
IN92-025A
IN92-025A*
BC82-752
IN88-015
IN92-041
IN88-015
BC84-178
BC84-176
BC84-095
IN89-019
IN89-019
IN90-002

5
9
58
186
205
234
281
58
90
20
59
19
145
252
275
169
145
20
268
273
74
169
275
169
59
59
58
193
193
231

Interpretation

File
No.

Page
No.

XI-1-92-37
XI-1-98-28
XI-1-89-65
XI-1-92-41
XI-1-92-41R
XI-1-83-73
XI-1-86-01

IN92-027
IN98-017
IN90-002
IN92-025A
IN92-025A*
BC82-665A
BC82-665B

266
378
231
268
273
73
91

XI-1-83-75
XI-1-83-75
XI-1-86-52
XI-1-86-52R
XI-1-86-52R
XI-1-92-59
XI-1-86-21
XI-1-95-25

BC83-055
BC83-055
BC85-524
BC85-524*
BC85-524*
IN93-023
IN86-004
IN95-001

75
75
135
187
187
282
107
313

I-2220
I-2300
I-4421
I-4422
I-4430
I-4450
I-7000

XI-1-89-62
XI-1-89-12
XI-1-89-13
XI-1-95-24
XI-1-95-24
XI-1-83-22
XI-1-83-22
XI-1-83-22
XI-1-83-22
XI-1-83-22

IN90-033
IN89-001A
IN89-005
IN94-026
IN94-026
BC80-567
BC80-567
BC80-567
BC80-567
BC80-567

230
175
176
313
313
28
28
28
28
28

Appendix II
Form NIS-2

XI-1-92-07

IN91-022

244

III-4500

XI-1-89-49
XI-1-92-58
XI-1-86-61
XI-1-89-11
XI-1-89-17
XI-1-89-21
XI-1-89-23
XI-1-89-05
XI-1-92-17
XI-1-92-17
XI-1-89-11
XI-1-89-11
XI-1-86-28
XI-1-95-62
XI-1-95-19
XI-1-95-18
XI-1-89-23
XI-1-89-11
XI-1-89-21
XI-1-89-23
XI-1-83-84

IN90-013
IN93-021
IN86-030
IN88-016
IN89-004B
IN89-004A
IN89-010
IN88-005
IN92-001
IN92-001
IN88-016
IN89-001A
IN86-008
IN97-006
IN97-006A
IN97-023
IN89-010
IN89-016
IN89-004A
IN89-010
BC83-654

217
282
146
175
179
190
192
167
252
252
175
175
111
349
369
369
192
175
190
192
80

Appendix IV
IV-2300
IV-3000
IV-3110(f)
IV-4000

XI-1-92-67
XI-1-92-67
XI-1-98-63
XI-1-92-67

IN94-004
IN94-004
IN99-025B
IN94-004

291
291
412
291

Appendix VII

XI-1-92-42

IN92-030

268

IWV-3514
IWV-3520
IWV-3522

Subsection IWX
IWX-2100
IWX-2500

Table IWX-2500-1
IWX-3100
IWX-4000

Appendix I
I
I-2000

Appendix III
III
III-1100
III-3230

III-3310
III-3320
III-3330
III-3400
III-3410
III-3430
III-4410
III-4420
III-4430

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 7

(g)

File
No.

Page
No.

IN93-007
IN95-008
IN91-035
IN96-005
IN94-016
IN94-022
IN94-019
IN94-007
IN97-030
IN93-007
IN97-030
IN94-015

276
321
246
330
312

IN93-006
IN92-032
IN94-009
IN91-027
IN95-025
IN92-026
IN92-026
IN94-013
IN94-025

275
267
300
245
386
265
265
312

Nonmandatory Appendix J
Article J-3000
XI-1-98-47

IN99-003

396

Code Cases
N-98

IN87-019

168

Location
Appendix IV (Contd)
VII-3300
VII-4240
VII-4310(a)
VII-4310(b)
VII-4323
VII-4342
Supplement 1, 9
Appendix VIII
VIII-1100(c)
VIII-2100
VIII-3100
Supplement 4, 1.1
Supplement 6, 1.1
VIII-4000

(h)

Interpretation
XI-1-92-53
XI-1-95-31
XI-1-92-11
XI-1-95-40
XI-1-95-22
XI-1-95-23
XI-1-92-69
XI-1-98-23
XI-1-92-53
XI-1-98-23
XI-1-95-08
XI-1-92-49
XI-1-92-39
XI-1-95-04
XI-1-92-09
XI-1-98-33
XI-1-92-36
XI-1-92-36
XI-1-95-21

XI-1-89-09

Location

Interpretation

N-308

XI-1-83-02
XI-1-83-47
XI-1-89-03
XI-1-95-03
XI-1-92-25
XI-1-95-12
XI-1-95-37
XI-1-95-45
XI-1-95-01
XI-1-98-48
XI-1-98-48R
XI-1-98-61
XI-1-98-64
XI-1-95-15
XI-1-89-32
XI-1-95-43
XI-1-92-26
XI-1-98-58
XI-1-92-25
XI-1-92-26
XI-1-98-38
XI-1-98-68
XI-1-95-39
XI-1-95-02
XI-1-95-46
XI-1-98-65
XI-1-95-59
XI-1-95-53

N-408
N-416
N-416-1

312
292
376
276
376
302
N-458
N-460
N-481
N-491
N-498

N-504-1
N-509
N-517
N-522
N-524
N-557

File
No.

Page
No.

BC81-476
BC84-197
IN88-003
IN93-042
IN92-012
IN94-028
IN95-015
IN96-009
IN97-008
IN99-004
IN99-004*
IN99-010
IN99-026
IN93-019
IN89-026
IN96-004
IN92-014
IN99-022
IN92-012
IN92-014
IN97-024
IN99-004
IN96-001
IN95-023
IN96-018
IN99-027
IN97-005
IN96-017

6
52
166
300
256
304
329
336
360
397
405
411
412
309
203
336
256
410
256
256
388
414
330
362
337
412
348
345

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 8

SUBJECT INDEX
Subject

Interpretation

File No.

Page No.

Acceptance Criteria
allowable flaws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-11
applicable code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-75
XI-1-86-37
XI-1-89-16
Class 1 reactor vessel ferritic material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-06
constructed to B31.7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-07
definition of flaw depth. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-32
fabrication defects additional examinations . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-04
flaw evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-52
XI-1-86-52R
XI-1-95-49
XI-1-98-20
flaw evaluation Section XI in lieu of construction code . . . . . . . . . . . . . . . . XI-1-92-35
XI-1-92-35R
indications outside examination area. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-52
XI-1-86-52R
leakage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-19
leakage collection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-41
not specified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-45

IN97-001
BC83-055
IN86-022
IN89-001B
BC82-428
BC82-429
BC82-437
BC82-427
BC85-524
BC85-524*
IN96-010
IN97-025
IN92-023
IN92-023*
BC85-524
BC85-524*
IN92-005
IN95-016
IN90-006

366
75
121
178
8
8
33
7
135
187
339
375
265
289
135
187
253
335
209

Applicability
alternative weld repair removal cavity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-25
XI-1-95-29
corrective measures of new bolting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-01
fabrication of replacements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-72
flaws detected outside of an inservice examination . . . . . . . . . . . . . . . . . . . . . . XI-1-89-67
installation requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-85
instrument tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-52
leakage not found during a system pressure test . . . . . . . . . . . . . . . . . . . . . . XI-1-92-03
material removal process considered as thermal . . . . . . . . . . . . . . . . . . . . . . XI-1-95-60
material removal process nonwelded . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-70
XI-1-89-70R
metal removal to prepare surface for NDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-56
owner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-83
preventive maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-19
redundant canopy seal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-19
repair program installing replacements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-42
repair / replacement activities off site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-09
XI-1-98-44
repair subsequent to N-Stamping prior to N-3 . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-10
XI-1-83-46
shot peening . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-73
small items replacement of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-60
storage tank examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-51
through wall leakage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-64
use of AIA for installing replacements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-38

IN95-001
IN95-001B
IN90-023
BC81-568A
IN89-017C
BC84-683
BC83-625
IN91-017
IN-95-018
IN91-005
IN91-005
IN90-022
BC83-179
IN88-009
IN88-009
BC84-123
IN94-014
IN98-020
BC82-277
BC83-595
IN91-006
IN93-024
IN90-017
IN89-017B
BC84-122

313
315
242
72
232
81
55
242
348
233
351
227
79
188
188
43
302
395
17
51
234
283
218
231
41

Brazing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-47
procedures and personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-85
XI-1-83-86

IN86-025B
BC84-683
BC85-113A

127
81
82

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 9

(i)

Subject

Interpretation

File No.

Page No.

Brazing (Contd)
XI-1-83-86R
Repair / Replacement Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-23

BC85-113A*
BC85-525D

102
108

Calibration
angle beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-11
confirmation period of use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-05
demonstration of equivalence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-28
XI-1-86-61
electronic memory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-17
interim check. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-62
of gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-49
series of test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-49
standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-28

IN88-016
IN88-005
IN86-008
IN86-030
IN92-001
IN90-033
BC82-776
BC82-776
IN86-008

175
167
111
146
252
230
53
53
111

Calibration Blocks
different specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
notch reflectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
reactor vessel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
reflectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
reflectorsalternative layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
side drilled holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ultrasonic examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
V path . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

XI-1-86-61
XI-1-86-72
XI-1-89-09
XI-1-86-71
XI-1-95-62
XI-1-98-19
XI-1-89-11
XI-1-89-12
XI-1-89-21

IN86-030
IN87-005B
IN87-019
IN87-005
IN97-006
IN97-006A
IN88-016
IN89-001A
IN89-004A

146
156
168
156
349
369
175
175
190

Classification of Systems
exclusion of components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
high pressure safety injection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
instrument tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
penetrates the containment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
piping visual examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

XI-1-95-56
XI-1-86-42
XI-1-83-78
XI-1-83-44
XI-1-86-67

IN96-022
IN86-011
BC84-682
BC83-448
IN87-022

346
124
76
50
154

IN95-004B
IN86-026B
IN86-026C
IN93-016
BC85-253B
IN95-004A
IN99-022
BC83-437
IN92-010
IN90-009
IN90-026
IN98-002B
IN92-006A
IN92-006A
IN87-008
IN97-026
IN86-013
IN86-013*
IN98-006
IN86-002
IN87-004
BC82-522
IN86-026A
IN86-026C
IN90-004
IN90-027
IN92-006B
BC85-525D
IN89-021
IN90-035

322
128
128
281
105
316
410
31
254
210
228
414
257
405
155
375
112
321
408
110
147
32
127
128
209
233
254
108
195
234

Component Supports
additional examinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-32
associated supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-49
XI-1-86-50
coiled wire rope device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-55
corrective measures additional examinations . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-17
XI-1-95-30
examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-58
examination requirements exemptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-27
XI-1-92-22
integral attachments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-47
XI-1-89-59
XI-1-98-69
interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-29
XI-1-92-29R
integrally attached . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-69
XI-3-98-21
integrity by analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-30
XI-1-86-30R
leakage at threaded connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-55
multiple components. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-26
XI-1-86-63
not constructed to Section III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-30
preservice examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-48
XI-1-86-50
XI-1-89-44
removal of insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-69
XI-1-92-20
Repair / Replacement Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-23
repair requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-28
representative sample . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-72

(j)

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 10

Subject

Interpretation

File No.

Page No.

Component Supports (Contd)


scope expansion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-60
selection of supports for examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-12
XI-1-83-12R
XI-1-83-12R-2
XI-1-86-48
XI-1-86-49
XI-1-86-63
XI-1-89-61

IN90-029
BC82-230
BC82-230*
BC82-230**
IN86-026A
IN86-026B
IN87-004
IN90-032

229
18
49
49
127
128
147
229

Construction Code
certificate requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-57
hydrostatic test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-83
XI-1-86-22
XI-1-86-52R
material manufacturers and suppliers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-50R
XI-1-89-24
reconciliation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-41
repair activities removal cavity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-25
XI-1-95-29
repair / replacement design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-01
replacement of Section III components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-68
replacement pressure vessel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-46
XI-1-89-46R
surface examination acceptance criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-52
use of later editions of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-12
XI-1-86-38R
XI-1-86-39R
XI-1-86-44R
XI-1-89-20
use of later editions of stamping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-21R
XI-1-86-44R
welding requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-51

IN99-018
BC83-179
IN86-010
BC85-524*
BC84-175*
IN89-014
IN89-025
IN95-001
IN95-001B
IN93-003
IN90-015
IN90-008
IN90-008*
BC85-524
BC85-098
BC85-141*
BC85-525C*
IN86-015*
IN88-014
BC82-434*
IN86-015*
IN86-027

409
79
108
187
68
193
207
313
315
299
232
210
225
135
103
143
144
144
189
117
144
129

BC84-652
IN87-032
IN86-031
BC84-321
BC84-652
BC85-528
IN92-015
IN86-017A
IN86-017B
BC83-587
IN87-010
BC85-528
BC80-583
IN90-025
BC83-112*
IN86-019
IN89-011
IN86-010
BC85-525B
BC83-344
IN89-023
BC82-425**
BC84-321*
IN90-018B
IN90-018A
IN99-026
IN91-009

61
158
188
55
61
110
258
136
120
39
138
110
71
228
103
120
202
108
119
185
203
185
186
226
232
412
243

Documentation (see Records and Reports)


Hydrostatic Test (see also System Pressure Test)
after a repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-66
XI-1-86-75
XI-1-89-18
after a replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-54
XI-1-83-66
alternative test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-25
XI-1-92-30
core criticality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-53
elevated temperatures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-34
exempt from . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-34
fabricated spool piece Construction Code . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-58
impractical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-25
induction stress improvement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-71
inspection interval extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-58
nonwelded modification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-03R
NPS 1 and smaller component connected to. . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-35
open ended portions of systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-30
piping, pumps, and valves preservice. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-22
pressurization pressure factors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-32
removal of a seal weld . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-28R
repair to a flange . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-31
requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-37R2
XI-1-83-54R
static head considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-54
XI-1-89-66
system leakage test NDE specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-64
system pneumatic test in lieu of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-04

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 11

(k)

Subject

Interpretation

File No.

Page No.

Hydrostatic Test (Contd)


XI-1-92-18
test pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-67
XI-1-92-23
test pressure gage accuracies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-74
test temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-23
through-wall leakage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-40
when performed order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-63

IN92-003
BC82-606
IN86-017B
IN91-008
IN86-017B
IN89-017A
IN90-034

253
62
255
235
255
207
230

Inservice Inspection Summary Report


additional examinations similar components . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-13
additional examinations within system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-10
authorized nuclear inservice inspector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-05
XI-1-98-25
pressure retaining components and their supports . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-03
pumps and valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-08
when performing preservice inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-15

IN93-027B
IN97-027C
IN97-027
IN98-003
BC82-406
BC82-523
BC82-610

304
365
363
377
6
9
19

Inspection Interval
deferral of required examinations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-65
extended or decreased . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-57
XI-1-95-55
extension of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-54
hydrostatic test interval extension . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-58
inspection completion percentages calculation of . . . . . . . . . . . . . . . . . . . . . XI-1-95-11
multiple components NDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-26
scheduling requirements applied by . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-74
successive inspections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-46
XI-1-98-49
support examinations percentage requirements . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-10
visual examination multiple stream. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-68R
volumetric examination successive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-50

IN96-019
IN93-002
IN96-019
IN87-001
IN90-025
IN94-024
IN86-002
IN86-003A
IN98-027
IN99-008
IN94-023
BC83-441*
IN90-014

346
282
346
136
228
303
110
157
396
398
303
101
218

Installation
concrete anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-59

IN99-002

410

Instrument Tubing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-52


XI-1-83-77
XI-1-83-86
XI-1-83-86R

BC83-625
BC84-603
BC85-113A
BC85-113A*

55
76
82
102

Liquid Metal Cooled Plants


inspection of inaccessible welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-3-83-01
preservice system leakage test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-3-89-02
system leakage monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-3-86-01

BC81-330
IN86-024B
IN86-024A

11
211
159

Material Manufacturer or Material Supplier


qualification of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-50
XI-1-86-55R
Quality Assurance Program update. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-44R

BC84-175
IN87-002*
IN86-015*

54
153
144

Metric Versus Customary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-76

IN87-035

158

Nondestructive Examination (see also Ultrasonic, Visual, and


Volumetric Examinations)
examination of dissimilar metal welds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-57
induction stress improvement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-71
items NPS 1 and smaller. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-86
XI-1-83-86R
XI-1-86-45
for installation welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-51
liquid penetrant comparator blocks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-64
longitudinal welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-51
magnetic particle material used for. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-23

IN90-024
BC80-583
BC85-113A
BC85-113A*
IN86-020
IN86-027
BC84-562
BC83-240
IN94-019

227
71
82
102
126
129
60
54
312

(l)

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 12

Subject

Interpretation

Nondestructive Examination (Contd)


multiple stream pressure retaining bolting . . . . . . . . . . . . . . . . . . . . . . . . . . .
multiple stream pressure retaining nozzle weld. . . . . . . . . . . . . . . . . . . . . . .
nonferromagnetic steam generator heat exchanger tubing . . . . . . . . . . . . . . . . .
of emergency core cooling systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
of pipe lugs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
performance demonstration thermal fatigue crack . . . . . . . . . . . . . . . . . . . . .
piping pressure retaining welds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
reactor vessel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
surface flaw evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

File No.

Page No.

XI-1-83-68R
XI-1-83-53
XI-1-92-67
XI-1-92-45
XI-1-89-38
XI-1-92-49
XI-1-86-57
XI-1-86-71
XI-1-83-85
XI-1-86-52
XI-1-86-52R
XI-1-95-42
use of one examination to satisfy two categories . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-33

BC83-441*
BC83-656
IN94-004
IN92-022B
IN89-007
IN93-006
IN87-007
IN87-005A
BC84-683
BC85-524
BC85-524*
IN96-002
BC83-589

101
55
291
273
206
275
138
156
81
135
187
335
39

Nonpressure Retaining Welds


sealwelds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-28R

BC83-344*

185

Nonwelded Work
maintenance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-21
XI-1-86-21R
mechanical tube plugging. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-41
XI-1-92-44
modification hydrostatic test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-03R
pressure retaining material requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-21
XI-1-86-21R
repair program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-42
replacement documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-14R
sleeving of heat exchanger tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-32
sleeving of steam generator tubes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-41
use of an AIA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-13
XI-1-83-38

IN86-004
IN86-004*
IN86-005
IN91-031B
BC83-112*
IN86-004
IN89-004*
BC84-123
BC85-112*
IN91-031
IN86-005
BC82-407
BC84-122

107
186
124
273
103
107
186
43
118
263
124
18
41

NPS 1 and Smaller


connected to a valve hydrostatic test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-58
XI-1-86-35
drilling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-34
exempted pressure test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-85R
XI-1-83-83
heat exchanger tube plugging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-44
heat exchanger tube sleeving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-32
items exempted from . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-86
XI-1-83-86R
XI-1-86-45
XI-1-92-66
piping, valves, and fittings exemptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-26
XI-1-83-26R
XI-1-89-04
XI-1-92-68
piping, valves, and fittings supports for . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-65
valve replacements exemptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-36

BC84-422
IN86-019
IN98-011
BC83-588*
BC83-179
IN91-031B
IN91-031
BC85-113A
BC85-113A*
IN86-020
IN93-041
BC83-244
BC83-244*
IN88-004
IN94-005
IN87-031
IN89-024

57
120
386
67
79
273
263
82
102
126
291
30
87
166
292
147
205

IN86-012*
IN99-014
BC85-130*
IN86-027
IN87-007
IN93-013
IN97-017
IN99-010
IN86-026B
IN87-004
IN87-031

125
409
135
129
138
281
368
411
128
147
147

Piping
component connected to NPS 4 and smaller NDE . . . . . . . . . . . . . . . . . . . .
containment vessels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
multiloop system inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NDE installation welds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
pressure retaining welds NDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
pressure retaining welds selection criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . .
subassembly installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
supports examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
supports exempted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

XI-1-86-43R
XI-1-98-56
XI-1-86-15R
XI-1-86-51
XI-1-86-57
XI-1-92-56
XI-1-98-17
XI-1-98-61
XI-1-86-49
XI-1-86-63
XI-1-86-65

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 13

(m)

Subject

File No.

Page No.

Piping (Contd)
supports multiloop system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-63
system visual inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-67

Interpretation

IN87-004
IN87-022

147
154

Preservice Examination. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-24


after a hydrostatic test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-50
component supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-48
XI-1-86-50
edition of Section V . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-02
exemptions gasket replacements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-36
XI-1-98-30
integrally cast steam generator nozzle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-71
limited to . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-24
of Class 2 vessel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-42
of manways bolting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-11
piping, pumps, and valves hydrostatic testing . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-22
pumps and valves VT-3 prior to service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-20
replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-47
ultrasonic examination acceptance standards . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-37
XI-1-98-26

BC85-526
IN99-009
IN86-026A
IN86-026C
IN88-001
IN89-024
IN97-036
IN87-005A
BC85-526
IN90-001
BC82-304
IN86-010
IN86-006
IN96-016
IN86-022
IN97-013

109
398
127
128
165
205
385
156
109
208
17
108
107
337
121
377

IN89-009
BC82-304
IN89-013A*
BC83-441*
IN86-020
IN93-038
BC84-390
IN98-022
BC85-528
IN92-023
IN97-021
IN89-017B*
BC82-406
IN90-019
IN98-015
IN86-004
IN86-004*
IN95-002
BC83-179
BC82-434*
IN86-003B
IN87-007
IN93-013
IN87-011
BC85-526

191
17
289
101
126
290
75
395
110
265
365
241
6
219
387
107
186
314
79
117
176
138
281
155
109

Procurement of
material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-55R
material MM and MS qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-50R
XI-1-89-24
parts as material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-21R
parts by non-Certificate Holder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-29
pipings, valves, and fittings NPS 1 and smaller . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-04
pressure retaining part Code Data Report. . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-21R
replacements later edition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-12
replacements perform work on it . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-59
replacement stamping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-20
spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-21R
XI-1-86-18
spares transfer of custody. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-07

IN87-002*
BC84-175*
IN89-014
BC82-434*
IN89-008
IN88-004
BC82-434*
BC85-098
BC85-550
BC82-430
BC82-434*
BC85-254
IN88-011

153
68
193
117
202
166
117
103
145
27
117
106
167

Pumps
Class 2 and 3 exemption from examination. . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-12

IN95-017

366

Pressure Retaining
bolting documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
bolting manways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
bolting removal of insulation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
bolting visual examination. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

bolts and studs examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


boundary alternative test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
boundary flaw evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
boundary machining of sealing surface . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
component through-wall leakage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
components and their supports summary report . . . . . . . . . . . . . . . . . . . . . .
components exempt from visual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
electrical containment penetrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
material nonwelded work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
material sealants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
parts hydrostatic test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
parts ordered as spares. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
welds examination schedule requirements . . . . . . . . . . . . . . . . . . . . . . . . . . .
welds in piping NDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
welds in vessels examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
welds preservice examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(n)

XI-1-89-22
XI-1-83-11
XI-1-89-39R
XI-1-83-68R
XI-1-86-45
XI-1-92-64
XI-1-83-76
XI-1-98-45
XI-1-86-25
XI-1-92-35
XI-1-98-08
XI-1-89-64R
XI-1-83-03
XI-1-89-53
XI-1-98-35
XI-1-86-21
XI-1-86-21R
XI-1-95-26
XI-1-83-83
XI-1-83-21R
XI-1-89-14
XI-1-86-57
XI-1-92-56
XI-1-86-70
XI-1-86-24

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 14

Subject

Interpretation

Pumps (Contd)
instrument accuracy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-55
XI-1-92-14
required weld examinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-63
testing of inservice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-63
visual VT-3 prior to service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-20
vibration measurement instrumentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-33
Qualification of NDE Personnel
certification date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-73
certification examinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-56
XI-1-86-66
XI-1-86-73
XI-1-89-06
certified to a later edition of SNT-TC-1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-18
XI-1-83-24
XI-1-86-40
certified to an earlier edition of SNT-TC-1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-24
certified to SNT-TC-1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-18
XI-1-83-23
XI-1-83-29
XI-1-83-82
XI-1-89-26
color vision examination frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-36
duties of Authorized Inspector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-48
examinations scoring. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-54
XI-1-92-70
examinations random selection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-22

examinations use of grading unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


experience requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
eye examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
for pumps and valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
other than to SNT-TC-1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
outside agency. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
perform examinations to earlier editions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
performance demonstration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
practical examination requirements alternatives to . . . . . . . . . . . . . . . . . . . .
pressure loss, flow change and test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
pumps and valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
qualification SNT-TC-1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
recertification ASNT certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
recertification contract employee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
recertification examinations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
recertification examination only . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
recertification Level III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
recertification SNT-TC-1A or CP-189 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
supplemental training Level III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
to another code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ultrasonic examination technicians . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ultrasonic examination annual training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ultrasonic examination outside agency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
used to perform repair examinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
visual examination SNT-TC-1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
visual examination VT1, VT2, VT3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

XI-1-98-22
XI-1-95-23
XI-1-92-28
XI-1-83-01
XI-82-06R
XI-1-83-45
XI-1-92-53
XI-1-86-40
XI-1-92-70
XI-1-92-39
XI-1-92-69
XI-1-92-52
XI-1-92-37
XI-1-95-61
XI-1-86-66
XI-1-95-58
XI-1-86-16
XI-1-95-68
XI-1-86-19
XI-1-95-67
XI-1-95-08
XI-1-95-40
XI-1-83-40R
XI-1-92-39
XI-1-92-11
XI-1-95-31
XI-1-83-40
XI-1-83-16
XI-1-95-38
XI-1-98-24

Quality Assurance Program


Ownerss final safety analysis report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-46
qualification of plant and contractor personnel . . . . . . . . . . . . . . . . . . . . . . . . . XI-82-06R
review of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-64

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 15

File No.

Page No.

IN90-021
IN91-037
IN97-012
IN93-036
IN86-006
BC85-529B

226
251
349
284
107
119

IN87-029
IN86-028
IN87-015
IN87-029
IN88-006
BC83-060
BC83-178
BC85-571
BC83-178
BC83-060
BC83-056
BC82-050
BC83-176
BC80-231*
BC83-585
BC84-177
IN93-015
IN93-022
IN94-016
IN94-022
IN97-030
IN94-019
IN92-019
BC80-582
BC82-340*
BC83-535
IN93-007
BC85-571
IN93-022
IN92-032
IN94-007
IN93-005
IN92-027
IN95-022
IN87-015
IN96-027
BC85-142
IN95-024
BC85-071
IN96-013
IN94-015
IN96-005
BC84-043*
IN92-032
IN91-035
IN95-008
BC84-043
BC82-775
IN95-019
IN97-032

157
137
153
157
167
21
29
123
29
21
29
32
78
194
40
52
276
293
312

IN96-018
BC82-340*
IN87-028A

337
5
147

376
312
257
5
5
50
276
123
293
267
292
276
266
348
153
347
105
351
106
351
302
330
67
267
246
321
42
20
330
377

(o)

Subject

Interpretation

Quality Assurance Program (Contd)


updating to a later Construction Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-44
XI-1-86-44R

File No.

Page No.

IN86-015
IN86-015*

126
144

XI-1-83-21R
XI-1-83-21R
XI-1-89-34
XI-1-89-20
XI-1-89-34
XI-1-89-48
XI-1-89-64R
XI-1-95-02
XI-1-95-07
XI-1-98-63
XI-1-89-22
XI-1-92-02
XI-1-92-07
XI-1-83-65
XI-1-83-79
XI-1-86-14R
XI-1-83-02
XI-1-86-68
XI-1-98-66
XI-1-98-04
XI-1-89-48
XI-1-83-47
XI-1-86-14R
XI-1-86-31
XI-1-86-31
XI-1-86-68
XI-1-92-06

BC82-434*
BC82-434*
IN89-012
IN88-014
IN89-012
IN90-011
IN89-017B*
IN93-026
IN94-011
IN99-025B
IN89-009
IN91-012
IN91-022
BC84-647
BC84-684
BC85-112*
BC81-476
IN87-024
IN99-031
IN97-029
IN90-011
BC84-197
BC85-112*
BC85-525A
BC85-525A
IN87-024
IN91-019

117
117
204
189
204
217
241
299
301
412
191
242
244
61
77
118
6
154
413
363
217
52
118
118
118
154
244

Repair / Replacement Program


activities off site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-09
activities ANII services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-62
applies to . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-36
XI-1-86-41
XI-1-86-62
XI-1-98-29
XI-1-98-29R
component supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-23
contract services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-62
design reconciliation requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-57
XI-1-95-57R
failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-15
impractical NDE alternative examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-51
initiation of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-14
installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-61
items NPS 1 and smaller. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-86
XI-1-83-86R
jurisdiction of rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-03
nonpressure boundary material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-23
Owners responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-09
XI-1-98-44
paint or coatings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-14
Preservice Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-43
Quality Assurance Program review of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-64
seals, gaskets, and moisture barriers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-14
structural integrity test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-64
use of later rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-25
welding requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-54
XI-1-86-31

IN94-014
IN99-024
IN86-021
IN86-005
IN86-032
IN97-021A
IN97-021A*
BC85-525D
IN99-024
IN96-023
IN96-023*
IN91-040
IN86-027
IN93-029
IN99-010
BC85-113A
BC85-113A*
IN96-025
BC85-525D
IN94-014
IN98-020
IN97-022
IN98-018
IN87-028A
IN97-022
IN97-014
BC85-528
IN98-024
BC85-525A

302
411
121
124
146
378
379
108
411
347
359
252
129
304
411
82
102
362
108
302
395
367
395
147
367
349
110
408
118

Records and Reports


certificate of compliance and CMTR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Code Data Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
design documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
documentation construction code. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

documentation inservice degradation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


documentation installation of replacement. . . . . . . . . . . . . . . . . . . . . . . . . . .
documentation test temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
eddy current instrument channel amplifiction. . . . . . . . . . . . . . . . . . . . . . . . . . .
for pressure retaining bolting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
inservice inspection plan requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
manufacturers data report NIS-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NIS forms signature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
nonwelded replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Owners data form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
replacements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
report of reconciliation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
retention of eddy current data storage units . . . . . . . . . . . . . . . . . . . . . . . . . . . .
retention of radiographs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
use of NIS-1 Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

use of NIS-2 Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


weld reference system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(p)

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 16

Subject

Interpretation

File No.

Page No.

Sealants
use of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-40
XI-1-95-26

IN89-017A
IN95-002

207
314

Shutdown
cold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-73
XI-1-83-74
extended valve testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-41R
valve testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-74

BC82-665A
BC82-752
IN92-025A*
BC82-752

73
74
273
74

BC81-476
BC82-434*
BC82-430
BC81-568A

6
117
27
72

Surfaces
accessible surface areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-71

IN99-001

415

System Pressure Test (also see Hydrostatic Testing)


after a repair or replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-05
XI-1-95-52
alternate pressure test requirement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-01
XI-1-98-48
exempted from open-ended portions of Class 2 and 3 . . . . . . . . . . . . . . . . . . XI-1-98-13
replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-47
that does not involve replacement items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-51
XI-1-98-51R
XI-1-98-52
XI-1-98-52R
applies to . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-34
XI-1-83-37R2
XI-1-86-13
XI-1-86-13R
XI-1-86-21
XI-1-86-21R
corrective measures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-19
XI-1-92-51
determining test pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-54
exempted from NPS 1 and smaller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-35R
leak test core criticality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-53
open ended portions of systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-30
pressurizing medium . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-25
XI-1-86-34
XI-1-92-23
pressure retaining boundary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-34
reassembled components / breaking pressure boundary . . . . . . . . . . . . . . . . . . . XI-1-83-63R
XI-1-83-70
XI-1-83-70R
XI-1-86-13
XI-1-86-13R
XI-1-86-27
XI-1-86-27R
XI-1-86-29R
XI-1-89-15
XI-1-89-33
XI-1-89-37
XI-1-89-52
reduction of pressure visual examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-46
replacement of bolts, studs, and nuts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-08
XI-1-92-65
replacement of bolts, studs, and nuts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-03

BC82-425
IN95-021
IN97-008
IN99-004
IN97-007
IN96-016
IN99-011
IN98-011R
IN99-013
IN99-013*
BC83-587
BC82-425**
BC85-111
BC85-111*
IN86-004
IN86-004*
IN92-005
IN93-011
IN96-003
BC83-588*
IN86-017A
IN89-011
BC83-219
IN86-017B
IN86-017B*
IN95-009
BC84-310*
BC84-198
BC84-198*
BC85-111
BC85-111*
IN86-007
IN86-007*
IN86-009*
IN88-002A
IN88-017
IN88-002C
IN88-002B
IN86-023
IN87-018
IN94-001
IN96-025

7
345
360
397
367
337
399
406
399
406
39
185
104
225
107
186
253
275
346
67
136
202
30
120
255
323
101
70
201
104
225
111
187
143
178
213
205
219
127
168
290
362

Spares (see Procurement of)


Stamping
installation of replacement parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
of replacement parts ordered as spares. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
of replacement parts valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section III. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

XI-1-83-02
XI-1-83-21R
XI-1-83-20
XI-1-83-72

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 17

(q)

Subject

Interpretation

File No.

Page No.

System Pressure Test (Contd)


required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-50
systems not required to operate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-62
through-wall leakage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-64
XI-1-89-64R
through-wall leakage corrective action. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-31

IN96-012
IN93-030
IN89-017B
IN89-017B*
IN91-018

Temporary Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-14


XI-1-83-57

BC82-626
BC84-392

19
57

IN94-026
IN97-028
IN92-001
IN92-026
BC80-567
BC82-050
BC84-388
IN89-004B
IN90-013
IN92-026
IN93-021
IN94-013
IN94-025
IN95-008
IN91-027
BC83-654
BC83-654
IN89-005
IN89-010
BC82-630
IN95-011
IN94-026
IN89-010

313
376
252
265
28
32
56
179
217
265
282
312

Use of Code Cases


N-98. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-09
N-308. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-02
XI-1-83-47
N-408. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-03
N-416-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-12
XI-1-95-37
N-416. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-25
N-458. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-15
N-460. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-32
N-481. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-26
N-491. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-58
N-498. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-10
XI-1-92-25
XI-1-92-26
XI-1-98-38
XI-1-98-68
N-504-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-39
N-522. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-65
N-524. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-59
N-557. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-53

IN87-019
BC81-476
BC84-197
IN87-003
IN94-028
IN95-015
IN92-012
IN93-019
IN89-026
IN92-014
IN99-022
IN91-029
IN92-012
IN92-014
IN97-024
IN97-004
IN96-001
IN99-027
IN97-005
IN96-017

168
6
52
166
304
329
256
309
203
256
410
246
256
256
388
414
330
412
348
345

Valve
Class 2 and 3 exemption from examination. . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-12
classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-59R
XI-1-83-62
XI-1-92-13
disc and seat hard facing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-35R
examination bolts and studs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-76

IN95-017
BC83-439
BC84-178
IN91-026
IN92-023
BC84-390

366
90
59
251
289
75

Ultrasonic Examination
bolts and studs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-24
XI-1-98-22
calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-17
detection specimens orientation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-36
equalized sensitivity recording of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-22
evaluation of flaws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-29
full penetration weld of nozzles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-56
material attenuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-17
nozzle-to-safe end welds extent of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-49
performance demonstration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-36
piping outer surface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-58
procedure qualification search unit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-21
qualification outside agency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
qualified by performance demonstration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
reflectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
search unit overlap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
sweep display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
three-point DAC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
welds > 2 inches in thickness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
welds in piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
V path . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(r)

XI-1-95-31
XI-1-92-09
XI-1-83-84
XI-1-83-84
XI-1-89-13
XI-1-89-23
XI-1-83-31
XI-1-95-51
XI-1-95-24
XI-1-89-23

339
284
231
241
263

321
245
80
80
176
192
33
345
313
192

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 18

Subject

Interpretation

Valve (Contd)
exercising test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-10
full stroke exercising . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-50
inservice testing program corrective action . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-60
XI-1-98-28
inservice testing scope of. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-71
XI-1-89-71R
limiting values of stroke time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-17
measured leakage rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-60
XI-1-83-61
mechanical disassembly and reassembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-66
packing adjustment seat leakage testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-38
replacements NPS 1 and smaller. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-36
replacement valve bonnet/body/pressure retaining part . . . . . . . . . . . . . . . . . . . XI-1-95-48
XI-1-95-48R
required weld examinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-63
set point adjustments. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-65
stroke time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-16
supervisor qualification set point testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-37
supports exempted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-65
test scheduling extended shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-41R
test scheduling outage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-25
XI-1-92-41
visual VT-3 prior to service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-20
Visual Examinations
components exempt volumetric and surface . . . . . . . . . . . . . . . . . . . . . . . . .
core support structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
exempt from . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
leakage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

liquid-metal containing components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


multiple stream pressure retaining bolting . . . . . . . . . . . . . . . . . . . . . . . . . . .
near-distance acuity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
piping system classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
pressure test pressure requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
removal of insulated . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
reactor vessel spaces below the core . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
reactor vessel spaces within . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
vessels pressure retaining welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT categories requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-1 base metal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-1, VT-3 interchangeable. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-1 pressure retaining bolting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 containment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 by direct examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 during a functional test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 of borated water systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 of buried components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 exemption from open-ended portions of Class 2 and 3. . . . . . . . . . . . .
VT-2 personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 removal of insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2, VT-3 piping system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 surrounding areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-2 system leakage test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-3 bolted connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-3 bolting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-3 class 3 components. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-3 insulation removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
VT-3 disassembly & reassembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

XI-1-92-40
XI-1-92-46
XI-1-89-53
XI-1-92-19
XI-1-92-48
XI-1-92-51
XI-3-89-01
XI-1-83-68R
XI-1-98-07
XI-1-86-67
XI-1-86-46
XI-1-89-39
XI-1-98-32
XI-1-95-28
XI-1-95-27
XI-1-86-70
XI-1-89-26
XI-1-92-33
XI-1-83-69
XI-1-86-45
XI-1-98-15
XI-1-98-06
XI-1-89-75
XI-1-89-39
XI-1-83-19
XI-1-92-34
XI-1-98-13
XI-1-83-63R
XI-1-92-47
XI-1-86-67
XI-1-98-06
XI-1-95-45
XI-1-92-48
XI-1-98-39
XI-1-92-51
XI-1-95-36
XI-1-98-60
XI-1-98-47

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 19

File No.

Page No.

IN88-015
IN92-041
IN86-001
IN98-017
IN90-036
IN90-036*
BC82-597
BC84-095
BC84-176
IN95-007B
IN92-031
IN89-024
IN95-007A
IN95-007A*
IN97-012
IN90-002
IN91-045
IN92-027
IN87-031
IN92-025A*
IN89-019
IN92-025A
IN86-006

169
275
145
378
234
281
20
58
59
350
266
205
338
405
349
231
252
266
147
273
193
268
107

IN92-022A
IN92-043
IN90-019
IN92-005
IN93-001
IN93-011
IN86-024C
BC83-441*
IN97-031
IN87-022
IN86-023
IN89-013A
IN98-014
IN94-006B
IN94-006A
IN87-011
BC80-231*
IN91-043
BC84-616
IN86-020
IN97-015
IN97-034
IN91-010
IN89-013A
BC82-607
IN92-020
IN97-007
BC84-310*
IN92-046
IN87-022
IN97-034
IN96-009
IN93-001
IN97-033
IN93-011
IN94-012
IN98-014B
IN99-003

267
274
219
253
274
275
169
101
364
154
127
206
386
315
314
155
194
264
69
126
367
364
235
206
27
264
367
101
274
154
364
336
274
388
275
329
411
396

(s)

Subject

Interpretation

File No.

Page No.

Visual Examinations (Contd)


VT-3 pumps and valves prior to service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-20
VT-3 reactor vessel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-28
XI-1-95-27
VT-3 supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-26
VT-3 when leakage of borated water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-16
VT-4 pumps and valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-69
VTM-2 Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-3-89-01
welds on multiple components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-26
XI-1-98-27
responsible engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-98-31

IN86-006
IN94-006B
IN94-006A
BC80-231*
IN97-010B
BC84-616
IN86-024C
IN86-002
IN97-035
IN98-004

107
315
314
194
368
69
169
110
378
385

Volumetric Examinations
and surface exemptions to. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-43R
XI-1-92-40
XI-1-92-45
XI-1-95-03
as an alternative to surface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-21
XI-1-89-27
Code Case N-460 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-32
fabrication defects additional examinations . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-04
or surface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-11
XI-1-92-43
piping outer surface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-58
prior to hydrostatic test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-63
required volume to be examined . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-32
successive inspection intervals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-50

IN86-012*
IN92-022A
IN92-022B
IN93-042
IN89-004A
IN89-004C
IN89-026
BC82-427
IN88-016
IN92-033
IN93-021
IN90-034
IN89-026
IN90-014

125
267
273
300
190
195
203
7
175
268
282
230
203
218

BC85-526
IN93-027A
IN95-023
BC83-527
IN86-019
IN97-023
IN95-025
IN91-026
IN90-003
IN96-015
IN91-016
IN96-015
IN98-009
BC84-685
BC84-685*
IN91-025
IN90-003
IN86-003B
IN96-008
IN96-007
IN96-004
IN91-014
IN94-031
BC82-604
BC82-604*
IN97-018
BC85-113A
BC85-113A*
BC85-130*
IN86-002
BC85-130*
IN86-027
BC83-344*
IN98-025
IN86-021

109
283
362
42
120
369
386
251
208
413
243
413
415
77
241
251
208
176
336
329
336
255
322
9
10
365
82
102
135
110
135
129
185
387
121

Weld
accessible preservice examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
additional examinations similar components . . . . . . . . . . . . . . . . . . . . . . . . .
alternate rules for the selection and examination . . . . . . . . . . . . . . . . . . . . . . . .
between different P-numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
connecting NPS 1 and less hydrostatic test . . . . . . . . . . . . . . . . . . . . . . . . . .
examination austenitic welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
examination dissimilar metal welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
examination full penetration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
examination
examination
examination
examination

of integrally welded attachments . . . . . . . . . . . . . . . . . . . . . . . . . .


nozzle-to-nozzle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
nonexempt weld population . . . . . . . . . . . . . . . . . . . . . . . . . . .
of pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

examination partial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
examination partial penetration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
examination schedule requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
examination volume Category B-B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
flow size acceptance standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
examination volume Class 1 and 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
fusion welding repair of tube or tubesheet. . . . . . . . . . . . . . . . . . . . . . . . . . .
half bead weld repair automatic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
items NPS 1 and smaller exemption from examination . . . . . . . . . . . . . . . . .
items NPS 1 and smaller requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
multiple components NDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
multiple loop piping inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NDE examination requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
nonpressure retaining . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
nozzle-to-vessel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
overlay cladding to replacement parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(t)

XI-1-86-24
XI-1-92-61
XI-1-98-02
XI-1-83-39
XI-1-86-35
XI-1-98-18
XI-1-98-33
XI-1-92-13
XI-1-89-43
XI-1-98-67
XI-1-92-05
XI-1-98-67
XI-1-98-70
XI-1-83-80
XI-1-83-80R
XI-1-92-12
XI-1-89-43
XI-1-89-14
XI-1-95-44
XI-1-95-35
XI-1-95-43
XI-1-92-24
XI-1-95-33
XI-1-83-09
XI-1-83-09R
XI-1-98-09
XI-1-83-86
XI-1-83-86R
XI-1-86-15R
XI-1-86-26
XI-1-86-15R
XI-1-86-51
XI-1-83-28R
XI-1-98-36
XI-1-86-36

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 20

Subject

Interpretation

File No.

Page No.

Weld (Contd)
piping additional examinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-06
piping examination of (calibration method) . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-04
piping NDE requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-51
XI-1-86-57
piping supports examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-49
pressure retaining boundary alternative test . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-25
procedure qualification record sharing of. . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-08
procedures qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-41
XI-1-83-55
XI-1-83-81
XI-1-89-01
reference system recording of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-06
reference system identification of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-95-05
Repair / Replacement Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-23
repair internal wall thinning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-59
repair steam generator tube plug. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-92-21
temper bead method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-18
tungsten-inert gas process automatic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-09
XI-1-83-09R
vessels examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-86-70

IN94-002A
IN94-009
IN86-027
IN87-007
IN86-026B
BC85-528
IN91-024
BC84-064
BC84-322
BC84-687
IN87-036
IN91-019
IN93-035
BC85-525D
IN93-023
IN92-009B
IN86-031
BC82-604
BC82-604*
IN87-011

301
300
129
138
128
110
245
43
56
78
165
244
301
108
282
254
188
9
10
155

Welder
qualification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-55
XI-1-98-53
qualification of simultaneously . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-35
requalification change in contractor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-43
required qualification Section IX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-89-01
supervision. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI-1-83-81

BC84-322
IN99-015
IN89-006
BC84-179
IN87-036
BC84-687

56
400
204
44
165
78

Cumulative Index Interpretations Vols. 12 46

This is electronic arabic page # 21

(u)

This is BLANK electronic arabic page # 22

Anda mungkin juga menyukai