Insert USB ash drive into USB port and install software.
Install System Setup software
3
4 1 2 3 5
5 1 2 3 4
Getting Started and training videos: https://communities.netapp.com/community/netapp_university/getting_started
NetApp solutions: http://www.netapp.com/us/solutions/
Technical reports: http://www.netapp.com/us/library/technical-reports.html
General information: http://www.netapp.com/us/library/
LEARN MORE
System Setup information: http://support.netapp.com/NOW/public/system_setup/
Site Requirements Guide: https://library.netapp.com/ecm/ecm_get_le/ECMP1112530
Controller and conguration examples: http://support.netapp.com/documentation/productlibrary/index.html?productID=61397
OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092
Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL
Site
Requirements
Guide
System Setup
landing page
License site
for your system

Conguration
examples for
FAS2220/2240-2
systems
Data ONTAP library
Storage Management Guide
Logical Storage Management Guide
File Access & Protocols Management Guide
Data Protection Guide
OnCommand
System Manager
documentation set
HELPFUL LINKS
Visit the NetApp web site for more information.
HELPFUL LINKS
Visit the NetApp web site for more information.
Complete System Setup
4
Complete conguration
5
Create an account.
Register your system.
Get your license keys.
Register at support.netapp.com 1
Provision more storage.
Congure other protocols and data protection.
Set up Service Processor and Remote Support Agent.
Download OnCommand System Manager at
http://support.netapp.com/NOW/cgi-bin/software/
2
Cable Windows client 2
Cable your Windows client to the
same network as your controllers.
Complete conguration worksheet
Editable worksheet is available on the USB ash drive or at
1
1
2
e0b e0d
e0a e0c
LNK LNK
0b 0a
! +-
e0b e0d
e0a e0c
LNK LNK
0b 0a
! +-
A
B
1
2

Both power supplies
MUST be powered on.
*If you cannot use System Setup, see the Data ONTAP Software Setup Guide.
the system.
When directed, power on your system (or repower).
Wait for discover to complete. Up to 8 minutes.
Enter the values from the conguration worksheet into System Setup.*
Start System Setup software
4
WINDOWS CLIENT
Subnet
1
2
AC AC
LNK LNK
0b 0a
! +-
FAS2220/2240-2 SYSTEM
http://support.netapp.com/NOW/public/system_setup/
Prepare for installation
1
4 5 1 2 3
You need to provide: 2
Installation and Setup Instructions
Switchless Clustered FAS2220/FAS2240-2 Systems
ACCESSORY TRAY
Find in the box: 1
USB ash drive
Contains software and
conguration worksheet
Power cables Conguration
worksheet
Serial cable not
needed for this
conguration
Microsoft Windows client
Runs the software to congure
your storage system
Screwdriver Additional network cables
For connecting your storage to your network
switch and Microsoft Windows client
Rack space - 2U
Starter network,
storage, and
10 GbE cables
2 1 0 - 0 6 0 3 7 + A 0
4 5 1 2 3
Cabling FAS2220/2240-2 systems
with NO external storage
Cabling FAS2220/2240-2 systems WITH external storage
DS424x disk shelves
Cabling FAS2220/2240-2 systems WITH external storage
DS2246 disk shelves
STOP HERE. If you have NO external storage, skip to .
Cable storage (Choose option A, B, or C below)
3
A
B
C
For additional congurations, see HELPFUL LINKS.
4 5 1 2 3
FAS2240-2 FAS2240-2
Shelf ID display
Bezel
Attention LED
Power LED
FRONT VIEW OF SYSTEM WITH BEZEL ON
Install hardware
2
LIFTING HAZARD CAUTION
25 kg (55 lbs.)
Rack the system.
Rail kit: follow instructions in rail kit. OR System cabinet: install in system cabinet.
Place the bezel over the front of the system.
Install system 1
Cable controller for switchless clustered Data ONTAP
(Choose one option below)
2
DO NOT power on system at this point.
3 Connect both power cords
Power cords
Both power cords MUST be used for all units.
1
2
LNK LNK
0b 0a
! +-
Use retaining clips Use retaining clips
See your network administrator for help connecting to your switch.
PCM Attention LED
NVMEM LED
A
B
1
2
Console port
(Setting: 9600 N-8-1)
One or two controller modules
SAS ports (2)
BACK VIEW OF SYSTEM
Power supply LEDs
A
B
1
2
Remote/Node
Management port
(wrench icon)
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
10 GbE cards
A
B
1
2
ACP port
(locked wrench
icon)
Gigabit Ethernet
ports (4)
Single controller model Double controller model
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
No additional cabling required for single controller.
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
Single controller model Double controller model
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
1
2
AC AC
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
1
2
AC AC
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
Single controller model Double controller model
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
Double controller in one chassis A
5
1
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
1
2
AC AC
TO DATA NETWORK SWITCH TO MANAGEMENT NETWORK SWITCH
2
4
3
Single node B
e1a e1b
ACT
LNK
ACT
LNK
1
AC AC
5
1
3
TO DATA NETWORK SWITCH TO MANAGEMENT NETWORK SWITCH
2
Network cables
Attach cable management arms.
Connect port e0a to the network switch.
NOTE: Port e0a is required;
other ports are available if needed.
Connect the wrench port
to the network switch.
For option A only
Connect port e1a to port e1a and e1b to e1b
Strap the cables to the cable management arms.
4
5
1
2
3
10 GbE cables
If you are converting from a switchless to a switched
conguration, see the appropriate migration manual in the
Cluster Management and Interconnect Switches library
on the Support site.
Connect SAS ports
Connect controller one 0a port
to controller two 0b port
and controller one 0b port to
controller two 0a port
Network cables
Cable ACP ports
Connect the locked wrench ports
2
Storage cables
Network cables
Daisy chain SAS ports
Connect rst SAS ports
Connect last SAS ports
Connect ACP ports
on controllers to the
disk shelves
1
2
3
4
Storage cables
Network cables
Daisy chain SAS ports
Connect rst SAS ports
Connect last SAS ports
Connect ACP ports
on controllers to the
disk shelves
1
2
3
4
Storage cables
4 5 1 2 3
Cabling FAS2220/2240-2 systems
with NO external storage
Cabling FAS2220/2240-2 systems WITH external storage
DS424x disk shelves
Cabling FAS2220/2240-2 systems WITH external storage
DS2246 disk shelves
STOP HERE. If you have NO external storage, skip to .
Cable storage (Choose option A, B, or C below)
3
A
B
C
For additional congurations, see HELPFUL LINKS.
4 5 1 2 3
FAS2240-2 FAS2240-2
Shelf ID display
Bezel
Attention LED
Power LED
FRONT VIEW OF SYSTEM WITH BEZEL ON
Install hardware
2
LIFTING HAZARD CAUTION
25 kg (55 lbs.)
Rack the system.
Rail kit: follow instructions in rail kit. OR System cabinet: install in system cabinet.
Place the bezel over the front of the system.
Install system 1
Cable controller for switchless clustered Data ONTAP
(Choose one option below)
2
DO NOT power on system at this point.
3 Connect both power cords
Power cords
Both power cords MUST be used for all units.
1
2
LNK LNK
0b 0a
! +-
Use retaining clips Use retaining clips
See your network administrator for help connecting to your switch.
PCM Attention LED
NVMEM LED
A
B
1
2
Console port
(Setting: 9600 N-8-1)
One or two controller modules
SAS ports (2)
BACK VIEW OF SYSTEM
Power supply LEDs
A
B
1
2
Remote/Node
Management port
(wrench icon)
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
10 GbE cards
A
B
1
2
ACP port
(locked wrench
icon)
Gigabit Ethernet
ports (4)
Single controller model Double controller model
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
No additional cabling required for single controller.
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
Single controller model Double controller model
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
1
2
AC AC
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
1
2
AC AC
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
N
3
1
4
2
Disconnect all supply power for complete isolation.
N
3
1
4
2
D i s c o n n e c t a l ls u p p l y p o w e r f o rc o m p l e t e i s o l a t i o n .
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
IOM3
I O M 3
LIN K
LIN K
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
Single controller model Double controller model
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
1
2
AC AC
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
LNK LNK
0a 0b
e0a
e0b
e0c
e0d
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
1
2
AC AC
IOM3
I O M 3
LIN K
LIN KIOM3
I O M 3
LIN K
LIN K
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
Double controller in one chassis A
5
1
e1a e1b
ACT
LNK
ACT
LNK
e1a e1b
ACT
LNK
ACT
LNK
1
2
AC AC
TO DATA NETWORK SWITCH TO MANAGEMENT NETWORK SWITCH
2
4
3
Single node B
e1a e1b
ACT
LNK
ACT
LNK
1
AC AC
5
1
3
TO DATA NETWORK SWITCH TO MANAGEMENT NETWORK SWITCH
2
Network cables
Attach cable management arms.
Connect port e0a to the network switch.
NOTE: Port e0a is required;
other ports are available if needed.
Connect the wrench port
to the network switch.
For option A only
Connect port e1a to port e1a and e1b to e1b
Strap the cables to the cable management arms.
4
5
1
2
3
10 GbE cables
If you are converting from a switchless to a switched
conguration, see the appropriate migration manual in the
Cluster Management and Interconnect Switches library
on the Support site.
Connect SAS ports
Connect controller one 0a port
to controller two 0b port
and controller one 0b port to
controller two 0a port
Network cables
Cable ACP ports
Connect the locked wrench ports
2
Storage cables
Network cables
Daisy chain SAS ports
Connect rst SAS ports
Connect last SAS ports
Connect ACP ports
on controllers to the
disk shelves
1
2
3
4
Storage cables
Network cables
Daisy chain SAS ports
Connect rst SAS ports
Connect last SAS ports
Connect ACP ports
on controllers to the
disk shelves
1
2
3
4
Storage cables
2 4 6 8
1 3 5 7
10 12 14 16
9 11 13 15
12
11
14
13
16
15
6
5
8
7
10
9
2
1
4
3 1000/100/10M
LNK /
1000/100/10M
LNK /
MANAGEMENT SUBNET
Insert USB ash drive into USB port and install software.
Install System Setup software
3
4 1 2 3 5
5 1 2 3 4
Getting Started and training videos: https://communities.netapp.com/community/netapp_university/getting_started
NetApp solutions: http://www.netapp.com/us/solutions/
Technical reports: http://www.netapp.com/us/library/technical-reports.html
General information: http://www.netapp.com/us/library/
LEARN MORE
System Setup information: http://support.netapp.com/NOW/public/system_setup/
Site Requirements Guide: https://library.netapp.com/ecm/ecm_get_le/ECMP1112530
Controller and conguration examples: http://support.netapp.com/documentation/productlibrary/index.html?productID=61397
OnCommand System Manager documentation set: http://support.netapp.com/documentation/productlibrary/index.html?productID=61372
Data ONTAP 8 library: http://support.netapp.com/documentation/productlibrary/index.html?productID=30092
Licenses: http://support.netapp.com/eservice/agree.do?moduleName=PROTOCOL
Site
Requirements
Guide
System Setup
landing page
License site
for your system

Conguration
examples for
FAS2220/2240-2
systems
Data ONTAP library
Storage Management Guide
Logical Storage Management Guide
File Access & Protocols Management Guide
Data Protection Guide
OnCommand
System Manager
documentation set
HELPFUL LINKS
Visit the NetApp web site for more information.
HELPFUL LINKS
Visit the NetApp web site for more information.
Complete System Setup
4
Complete conguration
5
Create an account.
Register your system.
Get your license keys.
Register at support.netapp.com 1
Provision more storage.
Congure other protocols and data protection.
Set up Service Processor and Remote Support Agent.
Download OnCommand System Manager at
http://support.netapp.com/NOW/cgi-bin/software/
2
Cable Windows client 2
Cable your Windows client to the
same network as your controllers.
Complete conguration worksheet
Editable worksheet is available on the USB ash drive or at
1
1
2
e0b e0d
e0a e0c
LNK LNK
0b 0a
! +-
e0b e0d
e0a e0c
LNK LNK
0b 0a
! +-
A
B
1
2

Both power supplies
MUST be powered on.
*If you cannot use System Setup, see the Data ONTAP Software Setup Guide.
the system.
When directed, power on your system (or repower).
Wait for discover to complete. Up to 8 minutes.
Enter the values from the conguration worksheet into System Setup.*
Start System Setup software
4
WINDOWS CLIENT
Subnet
1
2
AC AC
LNK LNK
0b 0a
! +-
FAS2220/2240-2 SYSTEM
http://support.netapp.com/NOW/public/system_setup/
Prepare for installation
1
4 5 1 2 3
You need to provide: 2
Installation and Setup Instructions
Switchless Clustered FAS2220/FAS2240-2 Systems
ACCESSORY TRAY
Find in the box: 1
USB ash drive
Contains software and
conguration worksheet
Power cables Conguration
worksheet
Serial cable not
needed for this
conguration
Microsoft Windows client
Runs the software to congure
your storage system
Screwdriver Additional network cables
For connecting your storage to your network
switch and Microsoft Windows client
Rack space - 2U
Starter network,
storage, and
10 GbE cables
2 1 0 - 0 6 0 3 7 + A 0

Anda mungkin juga menyukai