Review
Lifecycles
Create/acquire
Utilise
Maintain
Dispose/renew
EA Technology Limited 2011
Asset management
Condition-based Risk Management (CBRM)
EA Technology Limited 2011
What is CBRM?
It is a process that uses
engineering knowledge
practical experience
asset information
computer models
to quantify current and future asset
condition, performance and risk
EA Technology Limited 2011
4
What is CBRM?
EA Technology Limited 2011
What is CBRM?
It is used to
optimise asset replacement strategy
develop investment plans
prepare and justify regulatory submissions
demonstrate efficiency
EA Technology Limited 2011
6
Condition - Health Index
EA Technology Limited 2011
Health Index
Condition Management Strategy
Intervention required
Poor
Fair
Good
At end of life Bad
Routine maintenance
New condition
10
0
EA Technology Limited 2011
Health index: case studies
EA Technology Limited 2011
0 3 5 10
Health index (HI)
Measurable
deterioration but
no significant
increase in POF
Significant
deterioration
small increase
in POF
Serious
deterioration
significant
increase in
POF
P
r
o
b
a
b
i
l
i
t
y

o
f

f
a
i
l
u
r
e
9
Performance - Probability of
failure
EA Technology Limited 2011
Health Index: now
Y0 HI Profile - Primary Transformers
0
4
8
12
16
20
24
28
32
0-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10+ No
Result
HI Category
N
u
m
b
e
r

o
f

A
s
s
e
t
s
0
1
2
3
4
5
6
7
P
r
o
j
e
c
t
e
d

A
n
n
u
a
l

F
a
u
l
t

R
a
t
e
EA Technology Limited 2011
Health Index: +10 years
Y10 HI Profile - Primary Transformers
0
4
8
12
16
20
24
28
32
0-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10+ No
Result
HI Category
N
u
m
b
e
r

o
f

A
s
s
e
t
s
0
1
2
3
4
5
6
7
P
r
o
j
e
c
t
e
d

A
n
n
u
a
l

F
a
u
l
t

R
a
t
e
EA Technology Limited 2011
12
Consequence Category
Network performance
Safety
Financial
Environmental
Minor
Catastrophic
Consequence-Criticality factors
EA Technology Limited 2011
Consequences: case studies
Consequence Category
Network performance
Safety
Financial
Environmental
Consequence Category
Network performance
Safety
Financial
Environmental
EA Technology Limited 2011
Risk =
Probability of failure x Consequences of failure
Consequences of failure =
Criticality factor x Average consequences
Risk
EA Technology Limited 2011
Risk: case studies
EA Technology Limited 2011
Risk over time: now
Y0 Risk Profile - Primary Transformers
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
Asset
R
i
s
k

(
$
)
Performance Safety Opex Capex Environment
EA Technology Limited 2011
Risk over time: + 10 years
Y10 Risk Profile - Primary Transformers
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
Asset
R
i
s
k

(
$
)
Performance Safety Opex Capex Environment
EA Technology Limited 2011
18
$0
$1m
$2m
$3m
$4m
$5m
$6m
$7m
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
V
a
l
u
e

o
f

R
i
s
k
No investment
3.3% replacement (optimum investment)
1.5% replacement (reduced investment)
5% replacement
Y11-Y20
Do nothing
Constrain
investment
Manage
risk
Risk over time
EA Technology Limited 2011
19
Asset Investment Plan
EA Technology Limited 2011
20
Asset Investment Plan
EA Technology Limited 2011
Present Value optimisation
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
Discounted investment
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
Discounted investment
Discounted delta risk
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
Discounted investment
Discounted delta risk
Total cost of replacement
Optimum
replacement
period
EA Technology Limited 2011
Optimised investment
Asset due for replacement
Asset with life remaining
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
Discounted investment
Discounted delta risk
Total cost of replacement
Optimum
replacement
period
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
Discounted investment
Discounted delta risk
Total cost of replacement
Optimum
replacement
period
EA Technology Limited 2011
Optimised investment
Asset due for replacement
Asset with life remaining
Future investment plan
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
$160,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
Discounted investment
Discounted delta risk
Total cost of replacement
Optimum
replacement
period
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
$400,000
$450,000
$500,000
$550,000
$600,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Year
Discounted investment
Discounted delta risk
Total cost of replacement
Optimum
replacement
period
Replacement Pr of ile f or Year s 1-20
0
10
20
30
40
50
60
1 2 3 4 5 6 7 8 9 1011121314151617181920
Year
N
u
m
b
e
r

r
e
p
l
a
c
e
d
EA Technology Limited 2011
24
Optimum economic performance
EA Technology Limited 2011
25
Optimum economic performance
EA Technology Limited 2011
26
Optimum economic performance
EA Technology Limited 2011
27
Optimum economic performance
EA Technology Limited 2011
28
1. Assethealthindex(HI)andageingrate
2. Probabilityoffailureforeachasset(POF)
3. Consequencesoffailureandfinancialrisk
4. Runfuturescenariosandoptions
Health Index Probability of failure Consequences Risk
L M H L M H L M H 1 10
CBRM: step-by-step
EA Technology Limited 2011
29
Condition Performance Consequences Risk
T
r
a
n
s
f
o
r
m
e
r
s
132kV
33kV
S
w
i
t
c
h
g
e
a
r
132kV
33kV
11kV
Case Study - CBRM Audit
EA Technology Limited 2011
30
Integrated CBRM
EA Technology Limited 2011
31
Integrated CBRM
EA Technology Limited 2011
Further reading
1. The use of " Health Indices" to determine end of life and estimate remnant
life for distribution assets
D. Hughes, CIRED2003 Session 5, Barcelona: 2003
2. Condition Based Risk Management (CBRM) Enabling Asset Management
Condition Information To Be Central To Corporate Asset Management
Decision Making
D. Hughes, CIRED2005 Session 5, Turin: 2005
3. Condition Based Risk Management (CBRM), a Process to Link Engineering
Knowledge and Practical Experience to Investment Planning an Update
D. Hughes and T. Pears, CIRED2007 Session 5, Vienna: 2007
4. Condition Based Risk Management (CBRM): Bringing Excellence In Asset
Management Into The Boardroom
D. Hughes, P. Barnfather and T. Pears, CIRED 2009 Session 5, Prague: 2009
5. Determination of asset criticality: a practical method for use in risk-based
investment planning
P. Barnfather, D. Hughes and S. Holmes, CIRED 2011 Session 5, Frankfurt: 2011
EA Technology Limited 2011
Any further questions:-

Anda mungkin juga menyukai