Requirements of Engineering Geological Investigation

1. Geotechnical investigation object:


This is a detail geological investigation used for construction drawing
design. The purpose of the survey is to provide technical data of rock/soil for
buildings and structures construction, to make engineering evaluation for
building foundations, to give demonstration and recommendation for
foundation design and treatment, so as to avoid bad geological tendencies
during project construction.
2. Survey requirements:
For borehole location of the intended plant site see the plan of borehole
position. The position and quantity set in this plan is only for reference,
the final decision shall be made according to the actual design of
geological survey company. The existing borehole should be fully used
when making detail exploration design by survey team.
.! "xploration work should be made in accordance with the current
international standard.
. To make clear the type, structure, thickness, slop degree and engineering
property of each layer rock/soil. To evaluate the foundation stability# to
provide foundation bearing capacity and calculation data of foundation
deformation# to estimate deformation character# to propose suggestions
of foundation design and treatment of each buildings and structures.
.$ %scertain if there has karst, earth slide and fault under the ground of
construction site. To propose the assessment and regulation about
rock/soil as well as technical data of the needed rock/soil work.
.& %scertain the type, trapped water condition, water level and variation
regular, as well as layer penetrability of underground water. To determine
the eroding impact of soil and water on building materials and metals as
well as to give the protection suggestions and calculation data.
.' To provide stability calculation for deep foundation pit and technical data
of rock/soil need for support design. To proof and estimate the influence
of excavation and draining on surrounding project.
.( )rovide design parameter of shallow foundation, i.e. supply ground
bearing capacity and modulus of compressibility of each layer *rock+.
., )rovide the histogram and sectional drawing indicating the -eological
age of layer and origin
.. To estimate earthquake intensity and earthquake acceleration for plant
site design. To determine soil type, shear wave velocity and building type
of plant site. To estimate rock/soil stability and cycle time of earthquake.
To determine liquidation possibility of earthquake, if liquefy is possible,
give further determination on liquidation degree and propose handling
method.
./ The depth of boreholes0
The depth of boreholes shall be decided by the 1nvestigation Team. The
Page 1
suggested depth of boreholes shall be followings0
-eneral boreholes, the depth should be more than 2m.
3ontrol borehole, the depth should be more than $'m.
4hen the site field is complicated, the depth of boreholes can be added.
1n the process of drilling before to the demanding depth, if bedrock was
encountered, the hole should be drilled through weathered layer, solution
cavity, carst well developed layer and into the moderate or slight
weathered layer. For general boreholes, the depth of drilled into the
moderate or slight weathered layer should be no less than meters# for
control holes, the depth should be no less than 'm.
.!2 The coordinate in general layout for all boreholes need to be
provided.
. Requirement of the Re!ort on Geotechnical Investigation "or#s:
The geotechnical investigation report should be submitted to all information
as follows0
$.! )reface
1n general
)urpose
4ork requirement
Technical standard
5uantities of works
6ate
$. -eotechnical 3ondition of 7ite )lant
Topography and 8andforms
3haracter of each stratum
)hysical properties of Foundation 7oil *%nalysis and 7election of
Foundation 7oil )arameter+
3alculation 9ethod on :earing 3apacity of Foundation 7oil *7oil and
;ock+.
$.$ "valuation on 7tability and %vailability of )lant 7ite
$.& 7eismic 1nfluences of )lant 7ite
7eismic 1ntensity
4ave <elocity
Type of )lant 7ite
"valuation on liquefaction
$.' =ydrographical 3ondition of )lant 7ite
3ondition of -roundwater
Type of -roundwater
-roundwater level and its <ariation
-roundwater 3orrosion to 3oncrete Foundation
Page 2
$.( 3onclusion and 7uggestion
%ccording to detailed soil investigation, results on following items shall be
acquired.
> :earing 3apacity on ;ocks and 7oil of "ach 8ayer
> 9odulus of 3ompressibility*compressive stress+
> 6ynamic parameters*young modulus+
Forecasting and 9onitoring on )roblems of 7oil and ;ocks possibly
occurred in engineering design, construction and soil investigation shall
be made. 7uggestion on prevention shall be provided.
$., -raphic table
6atasheet on "xploratory )oints of 7oil 1nvestigation
)lan %rrangement of "xploratory )oints of 7oil 1nvestigation
7ection 6rawings of 7oil 1nvestigation
-eotechnical :ar 3hart of 9ain 6rilling =oles
1n site Test -raphic Table
1ndoors Test -raphic Table