Barru

Location: South Sulawesi


Operator: PT PLN Persero
Configuration: 2 X 50 MW
Fuel: coal
Operation: 2013
Boiler supplier: Hangzhou
T/G supplier: Nanjing
EPC: Hubei Hongyuan Power Engineering Co Ltd, PT
Bagus Karya, PT Gemilang Pratama Karya
Quick facts: Emerson supplied an Ovation control system
for PLTU Labuanm Banten. The first unit was connected
in J ul 2009 and officially opened by President Susilo
Bambang Yudhoyono on 28 J an 2010, but the plant did
not go into full commercial service until 2013.
Photograph courtesy of PT PLN
Posted 12 Aug 2012
Bukit Asam
Location: South Sumatra
Operator: PT PLN
Configuration: 4 X 65 MW
Operation: 1989-1995
Fuel: subbituminous coal, oil
Boiler supplier: Stein
T/G supplier: Rateau, GEC-Alsthom
EPC: Sogeah, J apan J urong Engineering
Photograph courtesy of PT Bukit Asam Batubara
Posted 2 Nov 2005
Lampung
Location: South Sumatra
Operator: PT PLN
Configuration: 2 X 100 MW
Operation: 2012
Fuel: coal
Boiler supplier: J inan
T/G supplier: Wuhan Turbine
EPC: J iangxi Electric Power Overseas Engineering, PT
Adhi Karya
Quick facts: In Mar 2008, PLN broke ground on PLTU
Lampung in Kec Katibung, Tarahan Lampung. In J ul
2009, PLN secured financing for the $154.3mn project
from Bank Rakyat Indonesia.
Photograph by RiZaL MuKhTaR (Panoramio)
Posted 30 Sep 2012
Nagan Raya
Location: Aceh
Operator: PT PLN
Configuration: 2 X 110 MW
Operation: 2013-2014
Fuel: coal
Boiler supplier: Wuxi
T/G supplier: Nanjing
EPC: Sinohydro, Sinohydro No 8, Northwest Power
Construction Group Corp
Quick facts: Nagan Raya is atSuak Puntong Village,
Kuala District, Nagan Raya Regency. The kickoff meeting
was held on on 8 May 2008, the first pile was driven on
25 Nov. It was a $247mn contract for Sinohydro.
Photograph courtesy of PT PLN
Posted 25 J an 2014
Ombilin
Location: West Sumatra
Operator: PT PLN
Configuration: 2 X 100 MW
Operation: 1996-1997
Fuel: subbituminous coal, oil
Boiler supplier: Stein
T/G supplier: GEC-Alsthom
EPC: GEC-Alstom, Cegelec, Lahmeyer
Quick facts: EPC contract awarded in late 1993. The
ESPs were built by Walther.
Photograph courtesy of PT Bukit Asam Batubara
Posted 2 Nov 2005
Palu
Location: Central Sulawesi
Operator: PT Pusaka J aya Palu Power
Configuration: 2 X 15 MW
Operation: 2006
Fuel: coal
Boiler supplier: Wuxi
T/G supplier: Qingdao, J inan
EPC: SEPCO No 3
Quick facts: This is an IPP project of PT Toba Sejahtera.
Coal is supplied by PT PLN via barge from East
Kalimantan.
Photograph courtesy of SEPCO No 3
Posted 6 Nov 2011
st-coal-indonesia http://www.industcards.com/st-coal-indonesia.htm
1 of 2 10/10/2014 10:49
Punagaya
Location: South Sulawesi
Operator: PT Bosowa Makassar
Configuration: 2 X 125 MW
Operation: 2012
Fuel: coal
Boiler supplier: ??
T/G supplier: ??
EPC: Chengda, Southwest Electric Power Design
Institute, Wika
Quick facts: In Nov 2010, local industrial and
infrastructure conglomerate PT Bosowa Corp began
construction on this IPP at Pungaya, Bangkala, Kab
J eneponto. The project was completed by SPV PT
Bosowa Makassar at a cost of about $250mn with
Chinas Chengda acting as lead EPC contractor. Bosowa
has a 200-MW PPA with PLN for the Phase-I plant at US
5.5 cents/kWh excluding fuel costs. The project took only
19mos to complete according to the owner, a substantial
improvement over the original 30mo schedule.
Photograph courtesy of ekonomi.inilah.com
Posted 12 Sep 2012
Tanjung Tabalong
Location: South Kalimantan
Operator: PT Adaro Energy Tbk
Configuration: 2 X 30 MW
Operation: 2013
Fuel: subbituminous coal
Boiler supplier: BHEL
T/G supplier: Siemens
EPC: Punj Llyod, International Development and
Engineering Associates
Quick facts: This power station is associated with the
largest single-site coal mine in the southern hemishpere,
located in Tabalong and Balangan districts. Annual
production is on the order of 40mn typy of ultra
low-sulfur, moderate CV subbituminous coal. The new
TPP replaces a 20-MW diesel plant. Electricity will be
used to power the converyor system and other mine and
handling infrastructure as well as the local grid. The
development company is Adaro subsidiary PT Makmur
Sejahtera Wisesa (MSW). The project cost about
$160mn. Fuel burn is expected to be about 300,000 tpy.
Photograph courtesy of sarabakawa.com
Re-posted 18 May 2014
Teluk Sirih
Location: West Sumatra
Operator: PT PLN
Configuration: 2 X 112MW
Operation: 2014
Fuel: coal
Boiler supplier: ??
T/G supplier: Nanjing
EPC: China National Technical Import & Export Corp,
Rekayasa
Quick facts: In May 2008, CNTIC and PT Rekayasa
Industri signed contracts with PLN for PLTU Teluk Sirih in
Kec Bungu, 30km south of Padang. In Nov 2010, CNTIC
contracted with Nanjing Turbines for a pair of 112-MW
T/G sets for the coastal project. Commissioning for Unit-1
began in Nov 2013. The project was partially financed by
China Development Bank.
Photograph by anindityo a (foursquare)
Posted 18 May 2014
Abbreviations
Data: industcards, Platts UDI World Electric Power Plants Data Base
Updated 18-May-2014