Anda di halaman 1dari 16

Site ID- Name

Company Comatec Date 18,Oct,2014


Surveyor Ahmad Ismail Phone 799513993
RF Approver Date
MW Approver Date
BTS Approver Date
Zain Approver Date
Information of Site Surveyor
Approve Record
Huawei
Zain
Technical Site Survey Report
2756-Qalaa_Hill_MW_Node
(120) Degree (150) Degree
(180) Degree (210) Degree
(240) Degree (270) Degree
(300) Degree (330) Degree
Remark
Call the Owner before any work
Region Middle City Amman
Coordinates longitude: 35.940639
Address
Site Type
Coverage
Site Location
Tower information
Load on the Mast\Tower
Whether shared site other operator
Equipment Room Size
Equipment Fixing Method
Indoor Grounding Bar
External view of the equipment room Internal view of the equipment room
Lower side walls level (show space on existing rack) Middle side wall level (show any device attached or Mounted on wall)
On floor On wall Others_ _
Quantity of holes on indoor grounding bar:_16 (Used:_9_ Remaining:_7 )
Outdoor Grounding Bar Quantity of Grounding bar holes within one meter away from the platform on the top of tower : (Used: Remaining: )
, (Used: Remaining: )
Quantity of Grounding bar holes within one meter between the tower body and the outdoor cabling ladder:
_16 (Used: 8 Remaining:_8 )
Quantity of Grounding bar holes within one meter between the feeder cable and the feeder window : 16 (Used: 12
Remaining: 4 )
Quantity of cabling holes on the feeder window1: 12 (Used: 7 Remaining:_5 )
Quantity of cabling holes on the feeder window2: (Used: Remaining: )
A new feeder window need or not Yes ,need no need
Information for Indoor Site
Shelter Others
Equipment Room Type Wall typ Cement concrete Shelter Others_ _
Shelter Cement Others: Channel steel base_
Floor typ
Antistatic Floor, Floor Height mm
Downtown City Suburb Rural area
Shore Mountainous area Others_
Green area,Tower height_XX m In building,height m On buiding top,height 17 m
Existing water tower /chimney
4 legs lattice height 12_ Guyedmast Rooftop selfsupport tower height m Monopole height _m
selfsupport pole_ Wall mount pole Wall mount pole
Other type: name height m
Leg 1 : 1* 2G + 1 * 3G
Leg 2 : 1* 2G + 2*0.6 MW + 4*0.3 MW Leg3 : 1*3G + 0.6 MW + 0.3 MW
Leg 4 : Free
No Shared site, shared with
Location Information
latitude: 31.95456
Amman -Qala'a Hill
Basic Information
Greenfield Rooftop Share site Micro outdoor Macro outdoor GRD COW
2G BTS only 2G+3G BTS BTS+Wi-MAX Terminal MW MW Hub site,more than 1 link
Upper side walls (show cable ladders)
Fiber BoxLocation
Photo of Indoor Grounding Bar Outdoor Grounding Bar near Antenna
Transmission free port Outdoor Grounding Bar near Feeder window
Existing 8*FE port+ 2*GE port + 8*SDH port
Outdoor Grounding Bar leave tower body Feeder window (position and free holes)
Remark
Avalible Space on 2G or 3G Cabinet for the New DCDU and BBU
Need to install New DCDU
& BBUfor LTE inside the
2G Cabinet
1- the New BBU & DCDU will be installed inside the 2G Cabinet
2-Need Fiber Box
Quantity of existing IDU Total:_ 6
Quantity of Existing MWAntenna 6
existing Link ID (r ef er to des gi n s heet) Link5638 Link5196 Link5195 Link6314 Link5194
direction of Existing MWAntenna BSC_Shabsough_Fiber/AME-332-R Al_Taj_Street/AME-618-R 702-U_Raghadan_Comple 5402-U_Tafaylah_2_Mini 5403-U_Hay_Al_Tafaylah_O
antenna LOS and space confirm Yes Yes YES YES Yes
Protection Type 1+1 HSB 1+1 HSB 1+1 HSB 1+0 NP 1+0 NP
Antenna Height(m)( base on tower) 10 10 12 8 6
Tower height
Building height
interface type (E1)
Mention avaliable Eth FE ports (NE Name/ NE ID/Slot/Port) Total free:_8_
Mention avaliable Eth GE ports (NE Name/ NE ID/Slot/Port) Total free:__2
Mention avaliable SDH ports (NE Name/ NE ID/Slot/Port) Total free:__8
Mention avaliable Free slots for IF Cards (NE Name/ NE ID/Slot/Port) Total free:_3
Quantity of IDU
Installation of IDU
Quantity of New MWAntenna
Length of IF cable 30 30
existing Link ID (refer to desgin sheet) Link5638 Link5196 Link5195(Only Lisence) Link6314(Only Lisence) Link5194(Only Lisence)
Far End Site Name & ID BSC_Shabsough_Fiber/AME-332-R Al_Taj_Street/AME-618-R 702-U_Raghadan_Comple 5402-U_Tafaylah_2_Mini 5403-U_Hay_Al_Tafaylah_O
New MWAntenna YES YES
Diameter/Polarization 0.6 0.6
Antenna Height (m)(base on tower) 10 10
Azimuth fromMagnetic North(deg) 227 107
Link Frequency channel (MHz) 26 GHz 56MHz 18 GHz 28MHz
Protection Type XPIC 2+0 OR XPIC 2(1+0) XPIC 2+0 OR XPIC 2(1+0)
Quantity of ODU combiner or OMT 2 2
Quantity of ODU/HYB adapter 0 0
Enough space for new antenna Yes No Yes No Yes No No Yes Yes No Yes No
Yes No Yes No Yes No Yes No Yes No Yes No
Yes No Yes No Yes No Yes No Yes No Yes No
if yes, Space: Yes , Height: , Type: 1.8/1mmount
Yes No
Length of ODU grounding cable 2m 2m
Enough space for IDU in existing MWrack
Enough space for IF cable in feeder window
Length of power cable between IDU and DC circuit breaker 2 2
Length of E1 cable
Length of network cable between IDU and NodeB
Length of IDU grouding cable
Remark
2
1- Need to Install new MWAnt 0.6
2-Need to Install 3 IFX Card.
Yes No
Yes No detailed: .
Quantity of DC circuit breaker number of exist Fuse Panel: _20
number and capacity of free slots on the Fuse Panel: 12
Free CB new new rack: A FREE SLOTS for new CB ( ).
Length of power cable between New CB & Rectifire: m.
0.3: . 0.6: 2 . 0.9: 1.2: . 1.8: .
Have existing mount or H-Frame for the new dish?
Total free MW Mount: 0 , Total Free H-Frame:_ 0
New mount required according the dish design height and azimuth
New H-Frame required according the dish design height and azimuth
if yes, Space: Yes/No , Height: , Type: 1.8/1mmount
New Microwave system
RTN980: , RTN950A: , RTN950: , RTN910: , RTN380: , IF Cards:_3
ch space in 19 inch _5 U (1U=44.4
New 19" Rack required Have space for New 19" Rack No space for New 19" Rack
12m
17m
120 75
ID 119018 (TAJ _STREET & BSC_SHABSOUGH)
Existing Microwave system
RT980:_ , RTN950:__2 , RTN910: 1 , Others:_ 3 NEC
Tower type Angle steel tower Roof top mast Hidden: (LW Dmm ) .
other: .
General view for tower/stub tower or masts Feeder& RF cable routing to Site
Existing Antenna type for cell A Existing Antenna type for cell B
Need to Swap Sec.A 3G Antenna to New XXP Antenna with Azimuth
150degree @ 4m.
Install the New RRU for Sec.
A @ 2m.
Need to Swap Sec.B3G Antenna to New XXP Antenna with Azimuth
5degree @ 3m.
Install the New RRU for Sec.
B @ 1m.
Existing Antenna type for cell C Existing Antenna type for cell D
Existing Antenna cover direction of cell A Existing Antenna cover direction of cell B
Existing Antenna cover direction of cell C Existing Antenna cover direction of cell D
Outdoor jumper overview Cable Tray
New Cable Tray Rout
Remark
1-Need to Swap Sec.A 3G Antenna to New XXP Antenna with Azimuth 150degree @ 4m.
2-Install the New RRU for Sec. A @ 2m.
3-Need to Swap Sec.B3G Antenna to New XXP Antenna with Azimuth 5degree @ 3m.
4-Install the New RRU for Sec. B @ 1m.
the power source that will be used for BTS
AC Power Type
AC Box Output
Capacity
DC Equipment Model
Rectifier
DC Power Solution
Expansion Rectifier
Module
Expansion Rectifier
Existing batteries spacifications
Site grounding system available or not
Indoor AC Circuit Breaker
Generator
N/A
Outdoor AC Input box
Battery
Connect empty breaker of existing rectifier
Remove original BTS/MW and reuse the old breakor
Install new breakor
No Yes, Required Specifications: A ,Quantity:
Rectifier need expansion
Rectifier no need expansion
have apace and port for expansion no space and port for expansion
No yes
Specifications: 150 A_ , Quantity: 16
Yes ,available No ,destroyed
DC Power Box for Indoor
Delta
Capacity of each module: 42 A, Number of module 4 used; 3
Available DC Breaker
DBS3900
Require around 40A)
Capacity 1 125 A Total Quantity _2 (In Use 1 Left 1 )
Capacity 2 63_ A Total Quantity 12 (In Use_2 Left 10 )
Capacity 3 40 A Total Quantity _6 (In Use 6 Left 0_) Capacity 4 25 A Total Quantity 2 (In
Use 2 Left 0 )
BTS power sources
220V(1 phase) -48V DC Other
AC Power Box for Outdoor
220V(1 phase) 380V (220V 3 phase) AC main input Breaker 30 A , AC Power cable size 4 * 25
100A
Solar location Manostat
N/A N/A
DC rectifier DC Breaker
Rectifier module Detail breaker
Remark
Need to connect the new DCDU to 63A C.B.
3G Cell 1 3G Cell 2 3G Cell 3
Antenna Band 2100 2100
Existing Antenna Type 2100M-2Port 2100M-2Port
Antenna Model A19451803 A19451803
hight of Pole (m)/ pole type 4 3
Height of Antenna AGL (m) 21 20
Quantity of Antenna
1 1
Azimuth 150 5
Tilt (mech.) 4 3
Tilt (elec.) 5 6
Antenna Solution swap swap
Fiber Length 30 30
RF Jumper Length 2 2
3G Cell 4 3G Cell 5
Telecom Equipment Cable Tray Status Avalibale Space for
New Civil
Mast 1
Mast 2
Mast 3
Mast 4
Mast 5
Tower Leg 1 : 1* 2G + 1 * 3G
Leg 2 : 1* 2G + 2*0.6 MW + 4*0.3 MW Leg3 : 1*3G + 0.6 MW + 0.3 MW
Leg 4 : Free
have Space for new Cable Yes
New Civil Requirment New UHF Load New MW Load Type of
Basement
No need 2 XXP Antenna new 2MW 0.6 Cement
Link ID Anntenna Solution New Hight 1m DP 2m DP H-Farame
Link5638 New MW o.6
10
No No No
Link5196 New MW o.6
10
No No No
Link5195 Only Lisence
Link6314 Only Lisence
Link5194 Only Lisence
2702-U_Raghadan_Complex
DCDP DCDPX New Rack Tower free Space
No No N/N yes
No No N/N yes
2702-U_Raghadan_Complex
IDU Solution in the site IF card IF cable
No Need
2
30
No Need
1
30
Site access Call the Owner before any work
Goods Transportation No Comment
BTS installation space 1- The New BBU & DCDU will be installed inside the 2G Cabinet
2- Need to fiber box
Grounding System No Comment
Antenna&Feeder System 1-Need to Swap Sec.A 3G Antenna to New XXP Antenna with
Azimuth 150degree @ 4m.
2-Install the New RRU for Sec. A @ 2m.
3-Need to Swap Sec.B3G Antenna to New XXP Antenna with
Azimuth 5degree @ 3m.
4-Install the New RRU for Sec. B @ 1m.
MW IDU installtion space 1-Need to Install 1IFX Card to Al_Taj_Street
2-Need to Install 2IFX Card toBSC_Shabsough_Fiber
3-(2702-U_Raghadan_Complex and 5402-U_Tafaylah_2_Mini and 5403-
U_Hay_Al_Tafaylah_O MW Solution (Only Lisence))
MW ODU&Anntenna installtion space 1-Add new MW (0.6) with Azimuth 227 @ 10m with shift down exist MW
2-Add new MW (0.6) with Azimuth 107 @ 10m with shift down
MW EXIST
3-(2702-U_Raghadan_Complex and 5402-U_Tafaylah_2_Mini and 5403-
U_Hay_Al_Tafaylah_O MW Solution (Only Lisence))
DC power system Need to connect the new DCDU to 63A C.B.
AC power system No Comment
Cable Ladder \Tray there is Avalible Space
Tower No Comment
Feeder window there is Avalible Space
Others No Comment
Remark No Comment
Site survey problem summary&Civil work summary

Anda mungkin juga menyukai