Anda di halaman 1dari 9

I.

SUBJECT: Inspection After Lightning Strike


Corrective Action and Temporary Repair of
Burns on Lower Fuselage Skin

II. REFERENCE: AIRBUS320 Structural Repair Manual 51-11-11
AIRBUS320 Structural Repair Manual 51-11-13
AIRBUS320 Structural Repair Manual 51-23-11
AIRBUS320 Structural Repair Manual 51-75-12
AIRBUS320 Structural Repair Manual 53-00-11-201
AIRBUS320 Structural Repair Manual 53-21-11-201
AIRBUS320 Structural Repair Manual 53-41-11-101

III. EFFECTIVITY: RP-C8191 (AIRBUS A320-216 S/N: 4989)

IV. BACKGROUND: During Daily Check on 23 November 2013 at CRK,
Maintenance Personnel reported indications of small
burns was found on 11 different locations on the
lower fuselage. The probable cause is that the
aircraft had a lightning strike during the Flight No.PQ7305.


V. DESCRIPTION: E.I. NO.: A320 EI 53-01R1 gives instruction on the
preparation, inspection and repair of the damage on
burns located on the skin plates on lower fuselage.

VI. COMPLIANCE: E.I. NO.: A320 EI 53-01R1must be completed on the
next B-Check.







ENGINEERING
INSTRUCTION

PAB AVIATION INC.
Technical Services Department


E.I. NO.: A320-216 EI 53-01R1

DATE: AUGUST 30, 2014


VII. MANPOWER: Including preparation, inspection/evaluation
repair
and close-up, E.I. No.: A320 EI 53-01R1 can be
completed at approximately 12.0 MH.


VIII. MATERIAL INFORMATION:

















ITEM PARTICULAR P/N QUANTITY
1 Cleaning Agent Material No. 11 -003 as required
2 Polyurethane Primer Material No. 16 - 001 as required
3 Epoxy Primer Material No. 16 - 006 as required
4 Epoxy Primer Material No. 16 - 060 as required
5
Polyurethane top coat

Material No. 16 - 006 plus 16
002

as required
6
Masking Tape and
Paper
- as required
7 Emery Cloth
320 grade

as required
8 Plastic Scraper - as required
Page 1 of 8


INSTRUCTIONS

IX. MAINTENANCE PLANNER:

A. Schedule the completion of E.I. NO.: A320 EI 53-01R1 _____
B. Inform Maintenance Controller to monitor the
Accomplishment of E.I. NO.: A320 EI 53-01R1 _____

X. MAINTENANCE CONTROLLER

A. Monitor accomplishment of E.I. NO: A320 EI 53-01R1 _____
B. Issue Work Order and Task Card prior to completion of
this E.I. _____
C. Inform Material Planner for the materials require for the
completion of E.I. NO.: A320 EI 53-01R1 _____

XI. MATERIAL PLANNER

A. Ensure the availability of materials needed prior to the
completion of E.I. NO.: A320 EI 53-01R1


XII. ACCOMPLISHMENT PROCEDURES

*Caution: The aircraft must be safe for maintenance and obey the
general maintenance practices when working on the aircraft.

1) Visually inspect and evaluate damage of the affected area ______
2) Perform Eddy Current inspection on the surroundings to ensure
no cracks can be found.

Remarks: _______________________________________

3) Eliminate surface damage by blend out but stop before
exceeding those rework limits with no flight restrictions
as per relevant SRM Chapter. ______

4) If damage is eliminated, perform surface protection IAW
SRM Chapter 51-75-12 (Permanent Repair). ______

5) If the damage is not eliminated by doing the first procedure,
perform the following:

a. To eliminate small damage drill hole starting with
minimum diameter necessary to remove damage
MECH. INSP.
SIGN OFF
Page 2 of 8
and check visually for damage.

INSTRUCTIONS

Note:
In case of findings increase diameter in steps of
0.4mm (0.016in.) and re-inspection maximum allowable
diameter is 6.35mm (0.250in.).

b. Install blind fastener as per fastener Table 1 (Sheet 10)
and refer to A320 SRM 51-42-11. _______
b.1. In a maximum area of diameter 25.4mm (1.0in.)
multiple small damage may be treated in the same way,
provided that a correct fastener installation is ensured
(minimum 2.0 pitch where D is the maximum burn mark
diameter see Example 6 (Sheet 9)). _______
For single damage sizes greater than 6.35mm
(0.250in.), perform temporary repair IAW A320
SRM Chapter 53-00-11.

c. Perform surface protection IAW A320 SRM Chapter
51-75-12. ______

Note:
Applicable for burn marks on skin caused by lightning
strikes located at a distance 15mm (0.591in.) from an
existing fastener (refer to Example 5, Sheet 8) and for
a skin thickness up to 3.2mm (0.126in.) and effective
in accordance with Figure 210.
In case access to the inside of the fuselage skin has
been made or is possible at the affected area it is
highly recommended to perform a permanent repair.



SIGN OFF
MECH.
INSP.
Page 3 of 8



Page 4 of 8



Figure 1: Location of Damage on Fuselage



Page 5 of 8












Page 6 of 8



Figure 2: Location of Burned Rivets








Prepared by:
Approved by: Concurred by:
INSP.
INSTRUCTIONS
SIGN OFF
MECH.
XIII. JOB CLOSE UP:
1) Clean the work area; remove all dirt and other foreign
objects.
2) Install all the panels removed.
3) Return the aircraft to its airworthy status.


XIV. ACCOMPLISHMENT RECORD:
A. Aircraft Registration: ____________________________

B. Aircraft TSN / CSN: _____________________________

C. Date Accomplished: _____________________________

D. Mechanic Performed & License No.: ________________

E. Inspector & License No.: _________________________
Page 7 of 8



Paul Adrian V. Basilio
OIC- PAV AVIATION


Date: 30 August 2014


Engr. Ernesto E. Reaso Jr.
Airframe/Powerplant Engineer


Date: 30 August 2014


Chelsey O. Aguinaldo
Dir. of Maintenance - PAVA


Date: 30 August 2014


Page 8 of 8