Anda di halaman 1dari 24

CONFIGURATION MANAGEMENT

Maturity Level 2 – Support Group


CMMI V1.2
Process Owner – Ramya
24st Dec. 2009 Thursday
The Process Areas
5 • Organizational
• Causal Analysis & Resolution
5
Innovation & Deployment

4 • Organizational 4
• Quantitative Project Management Process Performance

3 • Validation
• Verification • Risk Management
• Organizational Training
• Organizational Process Definition
3
• Product Integration • Integrated Project Management • Decision Analysis & Resolution
+ IPPD
• Technical Solution + IPPD
• Organizational Process Focus
• Requirements Development

2 • Supplier Agreement Management


• Configuration Management
• Process & Product
2
• Requirements Management • Project Monitoring and Control
Quality Assurance
• Project Planning
• Measurement & Analysis

Engineering Project Management Process Management Support

Page 16 QUALITY MANAGEMENT SYSTEMS


• A carelessly planned project takes three
times longer to complete than expected; a
carefully planned project takes only twice as
long.
Whose requirement?
• This process is not CMMI requirement but
it is OUR requirement.
Purpose of CM
• The purpose of Configuration Management (CM) is to
establish and maintain the integrity of work products
using configuration identification, configuration control,
configuration status accounting, and configuration audits.
CMMI V1.2 page 114
• Judgments may need to be made about
whether the value of the results will be
commensurate with the resources
devoted to doing the work.
Configuration Management Plan

• Organizational level Plan


• Project level Plan
Specific Goal and Practice Summary

• SG 1 Establish Baselines
– SP 1.1 Identify Configuration Items
– SP 1.2 Establish a Configuration Management System
– SP 1.3 Create or Release Baselines

• SG 2 Track and Control Changes


– SP 2.1 Track Change Requests
– SP 2.2 Control Configuration Items

• SG 3 Establish Integrity
– SP 3.1 Establish Configuration Management Records
– SP 3.2 Perform Configuration Audits
Identify Configuration Items

• Configuration Items (Tier-1)


• Version Control Documents (Tier-2)
• Non-version Control Documents (Tier-3)

• SP 1.1
Criteria for Selection of Work Products to be placed Under
Configuration Management
The work product shall be placed under configuration management if it satisfies any
one of the following conditions.

1) Work products that may be used by two or more groups


2) Work products that are expected to change over time either because of errors or
change of requirements
3) Work products that are dependent on each other in that a change in one mandates
a change in the others
4) Work products that are critical for the project

Typical examples of the work product to be placed under configuration management


are as follows.

1) Process descriptions (Standard Operating Procedures, Work Processes etc.)


2) Requirements (Contract Document, Input data etc.)
3) Design (Calculations, Drawings, Specifications etc.)
4) Interface descriptions
Establish Configuration Management System
• Organizational Level
– Process Asset Library (PAL)
– S&L Standard tool
– PIP Portal
– Knowmore
– With Backup procedure

• Project Level
– Project server drive on the network
– PLADES server
– CICO server
– Hard copy storage system

• S P 1.2
Create or Release Baselines

• A baseline is a set of specifications or work products that


has been formally reviewed and agreed on, that
thereafter serves as the basis for further development or
delivery, and that can be changed only through change
control procedures.

• SP 1.3.
Track and Control Changes

• Configuration Control Board (CCB)


– Organizational Level
– Project Level
• To control the changes to the various configuration
items, both projects and organizational related, proper
authorization shall be sought from Configuration Control
Board (CCB).
• SP 2.1 & SP 2.2
Establish Integrity

• Revision history of configuration items shall be maintained.


• The updated Project Deliverable List shall be maintained.
• The updated vendor document list and or the PDIS report indicating current
status of vendor documents shall be maintained.
• The design change notice (DCN) log sheet shall be maintained.
• The updated Process Asset Library (PAL) content list shall be maintained.
• The updated software list shall be maintained in the Process Asset Library
(PAL)

• Audits

• SP 3.1 & SP 3.2


Generic Goal and Practices Summary

• GG 2 Institutionalize a Managed Process

– GP 2.1 Establish an Organizational Policy


– GP 2.2 Plan the Process
– GP 2.3 Provide Resources
– GP 2.4 Assign Responsibility
– GP 2.5 Train People
– GP 2.6 Manage Configurations
– GP 2.7 Identify and Involve Relevant Stakeholders
– GP 2.8 Monitor and Control the Process
– GP 2.9 Objectively Evaluate Adherence
– GP 2.10 Review Status with Higher Level Management

• GG 3 Institutionalize a Defined Process

– GP 3.1 Establish a Defined Process


– GP 3.2 Collect Improvement Information
• SOP 0404 DOCUMENT AND DATA CONTROL
– Rev 0 15.06.2002
– Pages : 2 no.
– SOP Owner:

• SOP 0405 CONTROL OF EXTERNAL CODES AND STANDARDS


– Rev 1 07.09.2009
– Pages : 2 no.
– SOP Owner:

• SOP 0408 FILING AND STORAGE OF PROJECT DOCUMENTS


– Rev 0 15.06.2002
– Pages : 6 no.
– SOP Owner:

Anda mungkin juga menyukai