Anda di halaman 1dari 8

INITIAL DATA

Soil properties
No. Description Unit Wt
K0
Ka
Kp Kac Kpc Kr Earth pressure
[kNm3]
coefficients.
1 Dry Fill
18.00 0.426 0.270 7.171 .000 .000 .000 User_Specified
2 Wet Fill
19.00 0.426 0.270 7.171 .000 .000 .000 User_Specified
3 Wet Marine
20.00 0.577 0.420 3.608 .000 .000 .000 User_Specified
Clay
No.
c0 y0 Gradient
E0 Gradient Drained
of c
of E
[kNm2] [m] [kNm2m] [kNm2] [kNm2m] Undrained
1
.00 .00
.00 12000.0
.00 Drained
2
.00 .00
.00 12000.0
.00 Drained
3 20.00 .00
.00 4000.0
.00 Drained
Surcharge properties
No. Stage
Side Level Pressure Offset Width
Ks
In Out
[m] [kNm2]
[m] [m]
1
0
- Right 0.0
10.00
0.0 8.000 1.000
STAGE 0 INITIAL CONDITION
Geometry
Node Level

Soil

Boundary

[m] Left Right Left Right


0.0
1
1 50.00 50.00
-1.000
2
2 50.00 50.00
-2.750
2
2 50.00 50.00
-4.500
2
2 50.00 50.00
-5.500
3
3 50.00 50.00
-7.303
3
3 50.00 50.00
-9.106
3
3 50.00 50.00
-10.91
3
3 50.00 50.00
-12.71
3
3 50.00 50.00
10 -14.52
3
3 50.00 50.00
11 -16.34
3
3 50.00 50.00
12 -18.17
3
3 50.00 50.00
13 -20.00
3
3 50.00 50.00
1
2
3
4
5
6
7
8
9

EI below
node
[kNm2m]
27550.
27550.
27550.
27550.
27550.
27550.
27550.
27550.
27550.
0.0
0.0
0.0
0.0

Wall toe level -14.52


Water data on LEFT side
No. Level Pressure
Unit
wt.
[m] [kNm2] [kNm3]
1 -0.5000
0.0 9.810
Water data on RIGHT side
No. Level Pressure
Unit
wt.
[m] [kNm2] [kNm3]
1 -0.5000
0.0 9.810
Analysis details
SAFE model with redistribution
and without friction at wallsoil interface
Left
Right

E profile Generated
Boundary distances [m]

50.00

50.00

Convergence control parameters


Maximum number of iterations 900
Tolerance for displacement convergence [mm] 25.00
Tolerance for pressure convergence [kNm2] 0.1000
Damping coefficient 1.000
Maximum incremental displacement [m] 1.000
RESULTS FOR STAGE 0 Initial condition
Surcharge or strut changes
Surcharge no. 1 applied at this stage
Calculation details
E Profiles assumed for calculation (generated)
On the LEFT E at ground level = 7500. E at bottom node = 7500. kNm2
On the RIGHT E at ground level = 7500. E at bottom node = 7500. kNm2
Iter Inc Node Disp Node Press Node
no. max no. error. no. error no.
displ
[mm]
[mm]
[kNm2]
1 0.0
1 6.4823
2
0.00
1
2 6.5
2 0.0000
2
0.00
1
3 6.5
2 0.0000
2
0.00
1
Ground level left =

Node Level
Vt
[m]
Nm2] [kNm2]
1
0.0
14.50
2 -1.000
28.49
3 -2.750
61.60
4 -4.500
94.46
5 -5.500
113.6
6 -7.303
149.0
7 -9.106
184.4
8 -10.91
219.8
9 -12.71
255.2
10 -14.52
290.7
11 -16.34
326.8

0.00

Ground level right =

0.00

Stress
Pore
Stress
Pore
Disp
Vt
Ve
Pt
Pe Pressure
Soil
Ve
Pt
Pe Pressure
BM Shear
[mm] [kNm2] [kNm2] [kNm2] [kNm2] [kNm2]
Left Right
[kNm2] [kNm2] [kNm2] [kNmm] [kNm]
-5.946 4.500 4.500 6.720 6.720
0.0
1
14.50 6.720 6.720
0.0
0.0
0.0
-6.482 18.50 13.59 14.91 10.01
4.905
2
23.59 14.91 10.01
4.905
0.0
0.0
-5.750 51.75 29.68 37.70 15.62
22.07
2
39.53 37.70 15.62
22.07
0.0
0.0
-5.066 85.00 45.76 60.76 21.52
39.24
2
55.22 60.76 21.52
39.24
0.0
0.0
-4.978 104.5 55.45 82.64 33.59
49.05
3
64.59 82.64 33.59
49.05
0.0
0.0
-4.261 140.6 73.82 110.4 43.66
66.74
3
82.28 110.4 43.66
66.74
0.0
0.0
-3.484 176.6 92.20 138.3 53.91
84.43
3
99.94 138.3 53.91
84.43
0.0
0.0
-2.773 212.7 110.6 166.4 64.30
102.1
3
117.6 166.4 64.30
102.1
0.0
0.0
-2.152 248.8 128.9 194.6 74.75
119.8
3
135.4 194.6 74.75
119.8
0.0
0.0
-1.610 284.8 147.3 222.8 85.26
137.5
3
153.2 222.8 85.26
137.5
0.0
0.0
-1.122 321.4 165.9 251.4 95.94
155.4
3
171.4 251.4 95.94
155.4
0.0
0.0

[k
1
2
2
2
3
3
3
3
3
3
3

12 -18.17 -0.6590 357.9 184.6 280.0


362.9 189.6 280.0 106.6
173.4
13 -20.00 -25.95E-6 394.5 203.2 308.7
399.1 207.8 308.7 117.4
191.3

106.6
173.4
0.0
0.0
117.4
191.3
0.0
0.0

NOTE Displacements from STAGE 0 are disregarded in later stages


Vt, Ve vertical total and effective stress
Pt, Pe horizontal total and effective stress
Surcharge 1 present in this stage
STAGE 1
Geometry
Node Level

INSTALLATION OF SHEET PILE WALL


Soil

Boundary

[m] Left Right Left Right


0.0
1
1 50.00 50.00
-1.000
2
2 50.00 50.00
-2.750
2
2 50.00 50.00
-4.500
2
2 50.00 50.00
-5.500
3
3 50.00 50.00
-7.303
3
3 50.00 50.00
-9.106
3
3 50.00 50.00
-10.91
3
3 50.00 50.00
-12.71
3
3 50.00 50.00
10 -14.52
3
3 50.00 50.00
11 -16.34
3
3 50.00 50.00
12 -18.17
3
3 50.00 50.00
13 -20.00
3
3 50.00 50.00
1
2
3
4
5
6
7
8
9

EI below
node
[kNm2m]
27550.
27550.
27550.
27550.
27550.
27550.
27550.
27550.
27550.
0.0
0.0
0.0
0.0

Wall toe level -14.52


RESULTS FOR STAGE 1

Installation of Sheet pile wall

Calculation details
E Profiles assumed for calculation (generated)
On the LEFT E at ground level = 7500. E at bottom node = 7500. kNm2
On the RIGHT E at ground level = 7500. E at bottom node = 7500. kNm2
Iter Inc Node Disp Node Press Node
no. max no. error. no. error no.
displ
[mm]
[mm]
[kNm2]
1 0.0
1 0.0000
8
0.00
1
2 0.0
8 0.0000
8
0.00
1
3 0.0
8 0.0000
8
0.00
1
Ground level left =

0.00

Ground level right =

0.00

Stress
Pore
Stress
Pore
Node Level Disp
Vt
Ve
Pt
Pe Pressure
Soil
Vt
Ve
Pt
Pe Pressure
BM Shear
[m] [mm] [kNm2] [kNm2] [kNm2] [kNm2] [kNm2]
Left Right
[kNm2] [kNm2] [kNm2] [kNm2] [kNmm] [kNm]

[kNm2]

1
0.0 0.0 4.500 4.500 6.720 6.720
0.0
14.50 14.50 6.720 6.720
0.0
0.0
0.0
2 -1.000 0.0 18.50 13.59 14.91 10.01
4.905
28.49 23.59 14.91 10.01
4.905
0.0
0.0
3 -2.750 0.0 51.75 29.68 37.70 15.62
22.07
61.60 39.53 37.70 15.62
22.07
0.0
0.0
4 -4.500 0.0 85.00 45.76 60.76 21.52
39.24
94.46 55.22 60.76 21.52
39.24
0.0
0.0
5 -5.500 0.0 104.5 55.45 82.64 33.59
49.05
113.6 64.59 82.64 33.59
49.05
0.0
0.0
6 -7.303 0.0 140.6 73.82 110.4 43.66
66.74
149.0 82.28 110.4 43.66
66.74
0.0
0.0
7 -9.106 0.0 176.6 92.20 138.3 53.91
84.43
184.4 99.94 138.3 53.91
84.43
0.0
0.0
8 -10.91 0.0 212.7 110.6 166.4 64.30
102.1
219.8 117.6 166.4 64.30
102.1
0.0
0.0
9 -12.71 0.0 248.8 128.9 194.6 74.75
119.8
255.2 135.4 194.6 74.75
119.8
0.0
0.0
10 -14.52 0.0 284.8 147.3 222.8 85.26
137.5
90.7 153.2 222.8 85.26
137.5
0.0
0.0
11 -16.34 0.0 321.4 165.9 251.4 95.94
155.4
326.8 171.4 251.4 95.94
155.4
0.0
0.0
12 -18.17 0.0 357.9 184.6 280.0 106.6
173.4
362.9 189.6 280.0 106.6
173.4
0.0
0.0
13 -20.00 0.0 394.5 203.2 308.7 117.4
191.3
399.1 207.8 308.7 117.4
191.3
0.0
0.0
Vt, Ve vertical total and effective stress
Pt, Pe horizontal total and effective stress
Wall toe level -14.52
WARNING - Residual moment 1% of peak moment in wall
EXTREME values so farDisplacements [mm] Moments [kNmm] Shears [kNm]
Min
Max Min
Max Min
Max
0.0
0.0 0.0
0.0 0.0
0.0
Surcharge 1 present in this stage
STAGE 2

DEWATERING

Water data on LEFT side


No. Level Pressure
Unit
wt.
[m] [kNm2] [kNm3]
1 -5.500
0.0 9.810
Water data on RIGHT side
No. Level Pressure
Unit
wt.
[m] [kNm2] [kNm3]
1 -0.5000
0.0 9.810
RESULTS FOR STAGE 2
Calculation details

Dewatering

E Profiles assumed for calculation (generated)


On the LEFT E at ground level = 7500. E at bottom node = 7500. kNm2
On the RIGHT E at ground level = 7500. E at bottom node = 7500. kNm2
Iter Inc Node
Disp Node Press Node
no. max no. error. no. error no.
displ
[mm]
[mm]
[kNm2]
1 0.0
1 71.2190
7
7.95
6
2 71.2
7 4.4908
6 21.80
4
3 75.5
7 6.1590
6 74.39
9
4 81.1
7 4.1981
6 11.12
5
5 84.9
7 3.6566
6
9.45
5
10 97.7
7 1.4823
7
2.90
9
15 102.6
7 0.4968
9
1.18 10
20 103.8
7 0.1393 10
0.34 11
27 103.8
7 0.0313
6
0.08
8
Ground level left =

0.00

Ground level right =

0.00

Stress
Pore
Stress
Pore
Node Level Disp
Vt
Ve
Pt
Pe Pressure
Soil
Vt
Ve
Pt
Pe Pressure
BM Shear
[m] [mm] [kNm2] [kNm2] [kNm2] [kNm2] [kNm2]
Left Right
[kNm2
] [kNm2] [kNm2] [kNm2] [kNm2] [kNmm] [kNm]
1
0.0 -37.84 4.500 4.500 17.54 17.54
0.0
1
1 A
14.50 14.50 3.919 3.919
0.0
0.0
0.0
2 -1.000 -47.92 18.50 18.50 6.692 6.692
0.0
2
2
28.49 23.59 16.14 11.23
4.905 -6.812 0.3183
3 -2.750 -65.23 51.75 51.75 41.46 41.46
0.0
2
2 a
61.60 39.53 28.98 6.905
22.07 3.995 4.750
4 -4.500 -82.28 85.00 85.00 67.08 67.08
0.0
2
2 A
94.46 55.22 54.33 15.09
39.24 -23.44 24.44
5 -5.500 -90.95 101.7 101.7 56.56 56.56
0.0
3
3 A
113.6 64.59 76.60 27.55
49.05 -56.65 21.17
6 -7.303 -101.4 140.6 122.9 93.48 75.80
17.69
3
3 A
149.0 82.28 102.0 35.26
66.74 -73.10 1.444
7 -9.106 -103.8 176.6 141.2 125.1 89.76
35.38
3
3 A
184.4 99.94 127.4 42.99
84.43 -61.86 -8.289
8 -10.91 -99.02 212.7 159.6 152.2 99.11
53.07
3
3 A
219.8 117.6 152.8 50.72
102.1 -43.21 -10.94
9 -12.71 -89.19 248.8 178.0 177.0 106.2
70.75
3
3 A
255.2 135.4 177.5 57.68
119.8 -22.42 -11.98
10 -14.52 -76.75 284.8 196.4 206.5 118.1
88.44
3
3 A
290.7 153.2 199.6 62.16
137.5
0.0
0.0
11 -16.34 -56.11 321.4 215.0 225.3 118.9
106.4
3
3 A
326.8 171.4 225.3 69.89
155.4
0.0
0.0
12 -18.17 -33.52 357.9 233.6 251.0 126.7
124.3
3
3 a
362.9 189.6 251.0 77.66
173.4
0.0
0.0
13 -20.00
0.0 394.5 252.3 284.1 141.9
142.2
3
3
399.1 207.8 284.1 92.84
191.3
0.0
0.0
Vt, Ve vertical total and effective stress
Pt, Pe horizontal total and effective stress
Wall toe level -14.52

EXTREME values so farDisplacements [mm] Moments [kNmm] Shears [kNm]


Min
Max
Min
Max
Min
Max
-103.8
0.0 -73.10
3.995 -11.98 24.44
Surcharge 1 present in this stage
STAGE 3
Geometry
Node Level

EXCAVATE TO -2.5MPD
Soil

Boundary

[m] Left Right Left Right


0.0
0
1 50.00 50.00
-1.000
0
2 50.00 50.00
-2.750
0
2 50.00 50.00
-4.500
0
2 50.00 50.00
-5.500
3
3 50.00 50.00
-7.303
3
3 50.00 50.00
-9.106
3
3 50.00 50.00
-10.91
3
3 50.00 50.00
-12.71
3
3 50.00 50.00
10 -14.52
3
3 50.00 50.00
11 -16.34
3
3 50.00 50.00
12 -18.17
3
3 50.00 50.00
13 -20.00
3
3 50.00 50.00
1
2
3
4
5
6
7
8
9

EI below
node
[kNm2m]
27550.
27550.
27550.
27550.
27550.
27550.
27550.
27550.
27550.
0.0
0.0
0.0
0.0

Wall toe level -14.52


RESULTS FOR STAGE 3

Excavate to -2.5mPD

Calculation details
E Profiles assumed for calculation (generated)
On the LEFT E at ground level = 4000. E at bottom node = 4000. kNm2
On the RIGHT E at ground level = 7500. E at bottom node = 7500. kNm2
Iter no. Inc Node
Disp Node Press Node
max no. error. no. error no.
displ
[mm]
[mm]
[kNm2]
1 0.0
1 45.6809
3 30.75
5
2 45.7
3 19.0601
1 39.36
1
3 61.7
2 21.1808
1 30.22
2
4 82.4
1 21.4503
1 29.19
1
5 103.8
1 21.5634
1 29.64
1
10 210.2
1 20.7256
1 29.23
1
15 311.6
1 19.5917
1 27.70
1
20 407.4
1 18.5125
1 26.17
1
30 583.3
1 16.4968
1 23.33
1
40 740.1
1 14.7670
1 20.75
1
50 882.3
1 13.6545
1 18.74
1
Displacement
excessive at
iteration 59
Ground level left = -5.00

Ground level right =

0.00

Stress
Pore
Stress
Pore
Node Level Disp
Vt
Ve
Pt
Pe Pressure
Vt
Ve
Pt
Pe Pressure
BM Shear
[m] [mm] [kNm2] [kNm2] [kNm2] [kNm2] [kNm2]
] [kNm2] [kNm2] [kNm2] [kNm2] [kNmm] [kNm]
1
0.0 -37.84
0.0
0.0
0.0
0.0
0.0
14.50 14.50 3.919 3.919
0.0
0.0
0.0
2 -1.000 -47.92
0.0
0.0
0.0
0.0
0.0
28.49 23.59 16.14 11.23
4.905
0.0
0.0
3 -2.750 -65.23
0.0
0.0
0.0
0.0
0.0
61.60 39.53 28.98 6.905
22.07
0.0
0.0
4 -4.500 -82.28
0.0
0.0
0.0
0.0
0.0
94.46 55.22 54.33 15.09
39.24
0.0
0.0
5 -5.500 -90.95 7.155 7.155 56.56 56.56
0.0
113.6 64.59 76.60 27.55
49.05
0.0 44.97
6 -7.303 -101.4 46.06 28.37 93.48 75.80
17.69
149.0 82.28 102.0 35.26
66.74
0.0 224.5
7 -9.106 -103.8 82.13 46.75 125.1 89.76
35.38
184.4 99.94 127.4 42.99
84.43
0.0 373.5
8 -10.91 -99.02 118.2 65.12 152.2 99.11
53.07
219.8 117.6 152.8 50.72
102.1
0.0 299.3
9 -12.71 -89.19 154.3 83.50 177.0 106.2
70.75
255.2 135.4 177.5 57.68
119.8
0.0 287.5
10 -14.52 -76.75 190.3 101.9 206.5 118.1
88.44
290.7 153.2 199.6 62.16
137.5
0.0 322.6
11 -16.34 -56.11 226.9 120.5 225.3 118.9
106.4
326.8 171.4 225.3 69.89
155.4
0.0 407.9
12 -18.17 -33.52 263.4 139.1 251.0 126.7
124.3
362.9 189.6 251.0 77.66
173.4
0.0 456.2
13 -20.00
0.0 300.0 157.8 284.1 141.9
142.2
399.1 207.8 284.1 92.84
191.3
0.0 259.7

Soil
Left Right

[kNm2

1 ra

2 ra

2 ra

2 ra

rp

3 ra

rp

3 ra

rp

3 ra

3 ra

3 ra

3
3

3 a

3 a

Vt, Ve vertical total and effective stress


Pt, Pe horizontal total and effective stress
Wall toe level -14.52

DISPLACEMENT EXCESSIVE AT ITERATION 59


EXTREME values so farDisplacements [mm] Moments [kNmm] Shears [kNm]
Min
Max
Min
Max
Min
Max
-103.8
0.0 -73.10
3.995 -11.98 456.2
Surcharge 1 present in this stage
ENVELOPE FOR STAGES 1 TO 2 ONLY. STAGE 3 FAILED DUE TO EXCESSIVE DISPLACEMENT
Results Envelope
Node Level Displacements [mm] Moments [kNmm] Shears [kNm]
[m]
Min
Max
Min
Max
Min
Max
1
.00 -37.84
0.0
0.0
0.0
0.0
0.0
2 -1.00 -47.92
0.0 -6.812
0.0
0.0 0.3183
3 -2.75 -65.23
0.0
0.0
3.995
0.0 4.750

4
5
6
7
8
9
10
11
12
13

-4.50
-5.50
-7.30
-9.11
-10.91
-12.71
-14.52
-16.34
-18.17
-20.00

-82.28
-90.95
-101.4
-103.8
-99.02
-89.19
-76.75
-56.11
-33.52
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

-23.44
-56.65
-73.10
-61.86
-43.21
-22.42
0.0
0.0
0.0
0.0

0.0
0.0 24.44
0.0
0.0 21.17
0.0
0.0 1.444
0.0 -8.289
0.0
0.0 -10.94
0.0
0.0 -11.98
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Anda mungkin juga menyukai