Anda di halaman 1dari 11

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable AIM Task Name


AIM
Task ID

A Inception
A.ACT.GBRI Gather Business Requirements - Inception
A.RD.001

Detail Business and System Objectives

AP.010
BP.010

Define Executive Project Strategy


Define Business and Process Strategy

A.RD.005
A.RD.011.1

Create System Context Diagram


Develop Future Process Model

BR.060
BP.050
BP.080

Create Information Model


Review Leading Practices
Develop Future Process Model

A.RD.020
A.RA.015
A.RD.065

Obtain High-Level Business Descriptions


BP.060
Develop Business Use Case Model
BP.070
Develop Domain Model (Business Entities) (Class Diagram)

Develop High-Level Process Vision


Develop High-Level Process Designs

A.RD.012
A.RD.015

Document Present and Future Organization Structures


Determine KPI Collection and Reporting Strategy

RD.010

Identify Current Financial and Operating Structure

BP.040
RD.020

Develop Current Process Model


Conduct Current Business Baseline

A.ACT.ECBB Establish Current Business Baseline


A.RD.030
A.RD.034

Develop Current Business Process Model


Document Current Business Baseline Metrics

A.ACT.GR Gather Solution Requirements


A.RD.042.1
A.RD.045.1
A.RD.055
A.RD.130.1

Develop Glossary
Prioritize Requirements (MoSCoW)
Detail Supplemental Requirements
Develop Baseline Architecture Description

DO.030

Prepare Glossary

RD.070
TA.010

Identify Business Availability Requirements


Define Architecture Requirements and Strategy

A.RA.023.1
A.RA.027.1

Develop Use Case Model


Identify Candidate Business Rules

RD.050

Gather Business Requirements

A.RA.028.1

Populate Business Rules Repository

CV.010
TE.010
RD.040

Define Data Conversion Requirements and Strategy


Define Testing Requirements and Strategy
Gather Business Volumes and Metrics

A.ACT.CR Consolidate Solution Requirements


A.RD.140.1

Create Requirements Specification

A.RD.150.1

Review Requirements Specification

A.ACT.CCPI Create Conceptual Prototype - Inception


A.IM.005.1
A.RA.030.1

Develop Conceptual Prototype


Validate Conceptual Prototype

A.ACT.GSP Gather Supporting Requirements


A.CV.010
A.TE.005.1
A.PT.010
A.TA.010

Define Data Acquisition and Conversion Requirements


Determine Testing Requirements
Conduct Performance Management Workshop
Conduct Technical Architecture Workshop

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

A.DO.010
A.RD.070

Define Documentation Requirements and Strategy


Determine Audit and Control Requirements

Comparable Comparable AIM Task Name


AIM
Task ID
DO.010
RD.060

Define Documentation Requirements and Strategy


Determine Audit and Control Requirements

TA.040
TA.040

Define Application Architecture


Define Application Architecture

AP.070
AP.070
AP.070

Develop Project Readiness Roadmap


Develop Project Readiness Roadmap
Develop Project Readiness Roadmap

AP.030
AP.040
AP.050
AP.050

Develop Project Team Learning Plan


Prepare Project Team Learning Environment
Conduct Project Team Learning Events
Conduct Project Team Learning Events

AP.090
AP.090

Develop Managers' Readiness Plan


Develop Managers' Readiness Plan

AP.070
AP.070
AP.070

Develop Project Readiness Roadmap


Develop Project Readiness Roadmap
Develop Project Readiness Roadmap

A.ACT.SKSD Specify Key Structure Definition


A.RA.040.1
A.DS.010

Define Business Data Structures


Define Business Data Structure Setups

A.ACT.CMAHC Create and Manage Ad Hoc Communications


A.OCM.010

Create and Manage Ad Hoc Communications

A.ACT.CEAW Conduct Executive Alignment Workshop


A.OCM.020
A.OCM.030
A.OCM.040

Prepare for Executive Alignment Workshop


Conduct Executive Alignment Workshop
Build and Deploy Sponsorship Program

A.ACT.TPT Train Project Team


A.TR.010.1

Define Training Strategy

A.TR.020
A.TR.030
A.TR.040
A.TR.050

Prepare Project Team Learning Plan


Prepare Project Team Learning Environment
Develop Project Team Learningware
Conduct Project Team Learning Events

A.ACT.CAWI Conduct Alignment Workshops - Inception


A.OCM.050
A.OCM.060
A.OCM.070
A.OCM.080
A.OCM.090
A.OCM.100

Prepare for Team-Building Workshop


Conduct Team-Building Workshop
Design Managers' Project Alignment Workshop
Conduct Managers' Project Alignment Workshop
Design Change Agent Workshop
Conduct Change Agent Workshop

A.ACT.CORA Conduct Organizational Readiness Assessment


A.OCM.110
A.OCM.120
A.OCM.130

Create Assessment Tools


Gather and Analyze Assessment Data
Build Communication Strategy and Change Management
Roadmap

A.ACT.DCMRCCI Deploy Change Management Roadmap / Communication Campaign - Inception


A.OCM.140
Develop Communication Campaign
A.OCM.150.1 Conduct Change Management Roadmap / Communication
Campaign

A.ACT.LCOB Lifecycle Objective Milestone Summary


A.PMC.LCOB Lifecycle Object Milestone

B Elaboration
2

AP.080
AP.080

Develop and Execute Communication Campaign


Develop and Execute Communication Campaign

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable AIM Task Name


AIM
Task ID

B.ACT.GBRE Gather Business Requirements - Elaboration


B.RD.011.2
B.RA.055.1

Develop Future Process Model


Document Business Procedures

BP.080
BP.090

Develop Future Process Model


Document Business Procedures

RD.050
RD.050

Gather Business Requirements


Gather Business Requirements

DO.030

Prepare Glossary

B.ACT.DUC Develop Use Cases


B.RA.023.2
B.RA.024.1

Develop Use Case Model


Develop Use Case Details

C.ACT.CCPE Create Conceptual Prototype - Elaboration


B.IM.005.2
B.RA.030.2

Develop Conceptual Prototype


Validate Conceptual Prototype

B.ACT.CS Consolidate Specification


B.RD.042.2
B.RD.045.2
B.RD.140.2
B.RD.150.2
B.RA.027.2
B.RA.028.2
B.RA.180.1

Develop Glossary
Prioritize Requirements (MoSCoW)
Create Requirements Specification
Review Requirements Specification
Identify Candidate Business Rules
Populate Business Rules Repository
Review Use Case Model

B.ACT.DPS Define Project Strategy


B.DS.020
B.TE.005.2
B.TE.010
B.CV.020

Define Application Extension Strategy


Determine Testing Requirements
Develop Testing Strategy
Define Data Acquisition, Conversion and Data Quality
Strategy

MD.010
TE.010
TE.010
CV.010

Define Application Extension Strategy


Define Testing Requirements and Strategy
Define Testing Requirements and Strategy
Define Data Conversion Requirements and Strategy

B.DO.020
B.TR.010.2

Define Documentation Standards and Procedures


Define Training Strategy

DO.020

Define Documentation Standards and Procedures

B.TS.020.1

Define Cutover Strategy

PM.010

Define Transition Strategy

B.ACT.DI Define Infrastructure


B.TA.020

Define Technical Architecture Requirements and Strategy

TA.010
TA.020

Define Architecture Requirements and Strategy


Identify Current Technical Architecture

B.TA.030
B.TA.040
B.TA.050
B.TA.060
B.TA.070
B.TA.080
B.TA.090

Define Integration Requirements and Strategy


Define Reporting and Information Access Strategy
Define Disaster Recovery Strategy
Define System Operations and Management Strategy
Define Initial Architecture and Application Mapping
Define Backup and Recovery Strategy
Develop Security and Control Strategy

BR.050
TA.060

Conduct Integration Fit Analysis


Define Reporting and Information Access Strategy

TA.050
TA.030
TA.150
TA.080

Define System Availability Strategy


Develop Preliminary Conceptual Architecture
Define System Management Procedures
Define Application Security Architecture

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable AIM Task Name


AIM
Task ID

B.ACT.DTP Develop Test Plans


B.TE.015.1
B.TE.050.1
B.TE.080
B.TE.082

Develop Integration Test Plan


Develop System Test Plan
Develop Systems Integration Test Plan
Develop Acceptance Test Plan

TE.010
TE.010
TE.010
TE.010

Define Testing Requirements and Strategy


Define Testing Requirements and Strategy
Define Testing Requirements and Strategy
Define Testing Requirements and Strategy

B.ACT.PEE Prepare Environments-Elaboration


B.IM.007.1
B.TE.018.1
B.TE.038.1
B.TE.060.1

Prepare Development Environment


Prepare Test Data
Prepare Integration Test Environment
Prepare System Test Environment

MD.090
TE.010
TE.060
BR.020
TE.060

Prepare Development Environment


Define Testing Requirements and Strategy
Prepare Testing Environments
Prepare Mapping Environment
Prepare Testing Environments

B.DO.040

Prepare Documentation Environment

DO.040

Prepare Documentation Environment

BR.030
MD.020
BR.090

Map Business Requirements


Define and Estimate Application Extensions
Confirm Integrated Business Solutions

BR.100
BR.100

Define Application Setups


Define Application Setups

B.MD.050
B.MD.050
B.MD.050
B.MD.050
B.MD.050
B.MD.080

Create Application Extensions and Interfaces Functional Design


Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Review Functional and Technical Designs

B.ACT.PFG Perform Fit Gap


B.AN.010
B.AN.020
B.AN.030

Map Business Requirements


Define and Estimate Application Extensions
Define Gap Resolutions

B.ACT.SSC Specify Software Configuration (Multiply Instantiated)


Business
Data Structures
(Alternative B.RA.040.2
Task Name)Define
Specify
Business
Data for Configuration
B.DS.030.1
Application
Setups
This is an Analysis
and Define
Design
Activity
B.ACT.BSA Baseline Software Architecture
B.RA.035
B.AN.040.1
B.DS.040.1

Develop High-Level Software Architecture Description


Develop Analysis Architecture Description
Develop Design Architecture Description

B.ACT.AE Analyze - Elaboration


B.AN.050.1
B.AN.060.1
B.AN.070.1
B.AN.090.1
B.AN.100.1
B.AN.110.1

Analyze Data
Analyze Behavior
Analyze Business Rules
Analyze User Interface
Prepare Analysis Specification
Review Analysis Model

B.ACT.DE Design - Elaboration


B.DS.050

Determine Design and Build Standards

MD.030
MD.040

Define Design Standards


Define Build Standards

B.DS.060

Define Business Rules Implementation Strategy

B.MD.070

Define Application Setups


(Business Rules may be realized through configuration)

B.DS.080.1
B.DS.090.1

Design Software Components


Design Data

B.MD.070
B.MD.070

Create Application Extensions Technical Design


Create Application Extensions Technical Design

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable AIM Task Name


AIM
Task ID

B.DS.100.1
B.DS.110.1

Design Behavior
Design Business Rules

B.MD.070
B.MD.070

Create Application Extensions Technical Design


Define Application Setups
(Business Rules may be realized through configuration)

B.DS.130.1
B.DS.140.1
B.DS.150.1
B.DS.160.1

Design User Interface


Prepare Design Specification
Develop Database Design
Review Design Model

B.MD.070
B.MD.070
B.MD.060
B.MD.080

Create Application Extensions Technical Design


Create Application Extensions Technical Design
Design Database Extensions
Review Functional and Technical Designs

MD.110
MD.090
MD.110
MD.100
BR.100

Create Application Extension Modules


Prepare Development Environment
Create Application Extension Modules
Create Database Extensions
Define Application Setups
(Business Rules may be realized through configuration)

B.ACT.DP Develop Prototypes (for Custom Extensions)


B.IM.010
B.IM.020
B.IM.085
B.IM.040.1
B.IM.055.1

Develop Functional Prototype


Develop Architectural Foundation
Develop User Interface Standards Prototype
Implement Database
Perform Business Rules Implementation (Rules Engine)

B.IM.060.1

Perform Component Review

B.ACT.VP Validate Prototypes (for Custom Extensions)


B.RA.085

Validate Functional Prototype

BR.080
TE.110

Test Business Solutions


Perform System Test

B.RA.090

Conduct Reporting Fit Analysis

BR.070
TE.110

Conduct Reporting Fit Analysis


Perform System Test

B.RA.095

Validate User Interface Standards Prototype

BR.080
TE.110

Test Business Solutions


Perform System Test

B.TE.019.1

Collect, Assess and Refine KPI Measurements


TE.020
TE.070

Develop Unit Test Script


Perform Unit Test

B.ACT.PUTE Perform Unit Test - Elaboration


B.TE.020.1
B.TE.030.1

Develop Unit Test Scripts


Perform Unit Test

B.ACT.PITE Perform Integration Test - Elaboration


B.TE.035.1
B.TE.040.1

Create Integration Test Scenarios


Perform Integration Test

TE.030
TE.080

Develop Link Test Script


Perform Link Test

B.TE.025.1
B.TE.070.1

Create System Test Scenarios


Perform System Test

TE.040
TE.110

Develop System Test Script


Perform System Test

PT.010

Define Performance Testing Strategy

B.ACT.PSTE Perform System Test Elaboration

B.ACT.PPM Plan Performance Management


B.PT.020

Define Performance Management Requirements and


Strategy

B.PT.030

Define Performance Testing Strategy

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable AIM Task Name


AIM
Task ID

B.PT.040

Identify Performance Testing Models and Scenarios

PT.020
PT.030

Identify Performance Test Scenarios


Identify Performance Test Transaction Models

B.PT.050

Design Performance Test Scripts and Programs

PT.040
PT.050

Create Performance Test Scripts


Design Performance Test Transaction Programs

B.PT.060

Design Performance Test Data and Load Programs

PT.060
PT.070

Design Performance Test Data


Design Test Database Load Programs

CV.020
BR.040

Define Conversion Standards


Map Business Data

AP.070

Develop Project Readiness Roadmap

B.ACT.PACDE Prepare to Acquire and Convert Data - Elaboration


B.CV.025
B.RA.160

Define Data Acquisition and Conversion Standards


Conduct Business Data Source Gap Analysis

B.ACT.MSP Monitor Sponsorship Program


B.OCM.160

Monitor Sponsorship Program

B.ACT.DCMRCCE Deploy Change Management Roadmap / Communication Campaign - Elaboration


B.OCM.150.2 Conduct Change Management Roadmap / Communication
Campaign

AP.080

Develop and Execute Communication Campaign

B.OCM.155.1 Monitor Change Management Roadmap / Communication


Campaign Effectiveness

AP.080

Develop and Execute Communication Campaign

DO.030

Prepare Glossary

TA.070
RD.050
RD.050

Revise Conceptual Architecture


Gather Business Requirements
Gather Business Requirements

B.MD.050
B.MD.050
B.MD.050
B.MD.050
B.MD.050
B.MD.080

Create Application Extensions and Interfaces Functional Design


Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Create Application Extensions and Interfaces Functional Design
Review Functional and Technical Designs

B.ACT.LCAR Lifecycle Architecture Milestone Summary


B.PMC.LCAR Lifecycle Architecture Milestone

C Construction
C.ACT.FR Finalize Requirements
C.RD.042.3
C.RD.045.3
C.RD.130.2
C.RA.023.3
C.RA.024.2
C.RA.027.3
C.RA.028.3
C.RA.180.2

Develop Glossary
Prioritize Requirements (MoSCoW)
Develop Baseline Architecture Description
Develop Use Case Model
Develop Use Case Details
Identify Candidate Business Rules
Populate Business Rules Repository
Review Use Case Model

C.ACT.AC Analyze - Construction


C.AN.040.2
C.AN.050.2
C.AN.060.2
C.AN.070.2
C.AN.090.2
C.AN.100.2
C.AN.110.2

Develop Analysis Architecture Description


Analyze Data
Analyze Behavior
Analyze Business Rules
Analyze User Interface
Prepare Analysis Specification
Review Analysis Model

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable AIM Task Name


AIM
Task ID

C.ACT.DC Design - Construction


C.DS.040.2
C.DS.080.2
C.DS.090.2
C.DS.100.2
C.DS.110.2
C.DS.130.2
C.DS.140.2
C.DS.150.2
C.DS.160.2

Develop Design Architecture Description


Design Software Components
Design Data
Design Behavior
Design Business Rules
Design User Interface
Prepare Design Specification
Develop Database Design
Review Design Model

TA.070
B.MD.070
B.MD.070
B.MD.070
B.MD.070
B.MD.070
B.MD.070
B.MD.060
B.MD.080

Revise Conceptual Architecture


Create Application Extensions Technical Design
Create Application Extensions Technical Design
Create Application Extensions Technical Design

TE.010
TE.010

Define Testing Requirements and Strategy


Define Testing Requirements and Strategy

MD.090

Prepare Development Environment

TE.060
TE.060
TE.060
CV.030

Prepare Testing Environments


Prepare Testing Environments
Prepare Testing Environments
Prepare Conversion Environment

MD.100
MD.110

Create Database Extensions


Create Application Extension Modules

BR.100

Define Application Setups

MD.120
TE.090

Create Installation Routines


Perform Installation Test

TE.020
TE.070

Develop Unit Test Script


Perform Unit Test

TE.030
TE.080

Develop Link Test Script


Perform Link Test

Create Application Extensions Technical Design


Create Application Extensions Technical Design
Design Database Extensions
Review Functional and Technical Designs

C.ACT.PTP Perform Test Planning


C.TE.015.2
C.TE.050.2

Develop Integration Test Plan


Develop System Test Plan

C.ACT.PEC Prepare Environments - Construction


C.IM.007.2
C.TE.018.2
C.TE.038.2
C.TE.060.2
C.TE.085
C.CV.030.2

Prepare Development Environment


Prepare Test Data
Prepare Integration Test Environment
Prepare System Test Environment
Prepare Systems Integration Test Environment
Prepare Conversion Environment (Initial Load)

C.ACT.IS Implement System


C.IM.040.2
C.IM.050
C.IM.055.2
C.DS.030.2
C.IM.060.2
C.IM.070
C.IM.080
C.IM.090
C.TE.065

Implement Database
Implement Components
Perform Business Rules Implementation (Rules Engine)
Define Application Setups
Perform Component Review
Assemble Components
Integrate Services
Create Installation Routines
Perform Installation Test

C.ACT.PUTC Perform Unit Test - Construction


C.TE.020.2
C.TE.030.2

Develop Unit Test Scripts


Perform Unit Test

C.ACT.PITC Perform Integration Test - Construction


C.TE.035.2
C.TE.040.2

Create Integration Test Scenarios


Perform Integration Test

C.ACT.PSTC Perform System Test - Construction

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

C.TE.025.2
C.TE.068
C.TE.070.2
C.RA.055.2
C.TE.019.2

Create System Test Scenarios


Configure System Test Environment
Perform System Test
Document Business Procedures
Collect, Assess and Refine KPI Measurements

Comparable Comparable AIM Task Name


AIM
Task ID
TE.040
PM.050
TE.110
BP.090

Develop System Test Script


Set Up Applications
Perform System Test
Document Business Procedures

TE.050
TE.120

Develop Systems Integration Test Script


Perform Systems Integration Test

C.ACT.CSIT Conduct Systems Integration Test


C.TE.090
C.TE.100

Develop Systems Integration Test Scenarios


Perform Systems Integration Test

C.ACT.PPT Prepare for Performance Testing


C.PT.070

Build Performance Test Scripts and Programs

PT.040
PT.080

Create Performance Test Scripts


Create Performance Test Transaction Programs

C.PT.080

Construct Performance Test Environment and Database

PT.100
PT.110

Construct Performance Test Database


Prepare Performance Test Environment

C.PT.090

Conduct Performance Test Dress Rehearsal


TA.150

Define System Management Procedures

TA.120
TA.110

Define Platform and Network Architecture


Define System Capacity Plan

PM.030
PM.030
PM.020

Develop Transition and Contingency Plan


Develop Transition and Contingency Plan
Design Production Support Infrastructure

CV.040

Perform Conversion Data Mapping

CV.050
CV.060
CV.070

Define Manual Conversion Procedures


Design Conversion Programs
Prepare Conversion Test Plans

CV.080
CV.090

Develop Conversion Programs


Perform Conversion Unit Tests

C.ACT.PT Prepare for Transition


C.TA.100
C.TA.110
C.TA.150
C.TA.160

Define System Management Procedures


Define Operational Testing Plan
Define Final Platform and Network Architecture
Define System Capacity Plan

C.ACT.PCO Prepare for Cutover


C.TS.020.2
C.TS.030
C.TS.040

Define Cutover Strategy


Develop Installation Plan
Design Production Support Infrastructure

C.ACT.TI Test Infrastructure


C.TA.120
C.TA.130
C.TA.140

Conduct Operational Testing


Conduct Backup and Recovery Test
Conduct Disaster Recovery Test

C.ACT.PACDC Prepare to Acquire and Convert Data - Construction


C.CV.027.2
C.RA.170.2
C.CV.035.2
C.CV.040.2
C.CV.050.2

Perform Data Mapping


Conduct Data Quality Assessment
Define Manual Conversion Procedures (Initial Load)
Design Conversion Components (Initial Load)
Prepare Conversion Test Plans (Initial Load)

C.ACT.ACDC Acquire and Convert Data-Construction


C.CV.055.2
C.CV.060.2

Implement Conversion Components (Initial Load)


Perform Conversion Component Unit Test (Initial Load)

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

Comparable Comparable AIM Task Name


AIM
Task ID

C.CV.062.2

Perform Conversion Component Business Object Test


(Initial Load)

CV.100

Perform Conversion Business Object Tests

C.CV.063.2

Perform Conversion Component Validation Test (Initial


Load)

CV.110

Perform Conversion Validation Tests

C.CV.064.1
C.CV.065.1
C.CV.068.1

Install Conversion Components (Initial Load)


Convert and Verify Data (Initial Load)
Clean Data

CV.120
CV.110
CV.110

Install Conversion Components


Perform Conversion Validation Tests
Perform Conversion Validation Tests

DO.060
DO.070
DO.080

Publish User Reference Manual


Publish User Guide
Publish Technical Reference Manual

C.ACT.PD Produce Documentation


C.DO.060
C.DO.070
C.DO.080
C.DO.100

Publish User Reference Manual


Publish User Guide
Publish Technical Reference Material
Produce Online Help

C.ACT.DCMRCCC Deploy Change Management Roadmap / Communication Campaign - Construction


C.OCM.150.3 Conduct Change Management Roadmap / Communication
Campaign

AP.080

Develop and Execute Communication Campaign

C.OCM.155.2 Monitor Change Management Roadmap / Communication


Campaign Effectiveness

AP.080

Develop and Execute Communication Campaign

C.ACT.CJIA Conduct Job Impact Analysis


C.OCM.170
C.OCM.180

Collect and Analyze Job Change Data


Determine Impact of Job Changes

AP.100
AP.100
AP.110

Identify Business Process Impact on Organization


Identify Business Process Impact on Organization
Align Human Performance Support Systems

C.OCM.190

Prepare HR Transition Plan

AP.110

Align Human Performance Support Systems

C.ACT.CMAWC Conduct Managers' Alignment Workshop - Construction


C.OCM.200
C.OCM.210

Design Managers' Unit / Department Impact Workshop


Conduct Managers' Unit / Department Impact Workshop

AP.060
AP.060

Develop Business Unit Managers' Readiness Plan


Develop Business Unit Managers' Readiness Plan

AP.130
AP.140

Conduct User Learning Needs Analysis


Develop User Learning Plan

AP.150
AP.160

Develop User Learningware


Prepare User Learning Environment

C.ACT.DEUT Design End-User Training


C.TR.060
C.TR.070

Conduct User Learning Needs Analysis


Develop User Learning Plan

C.ACT.BEUT Build End-User Training


C.TR.080
C.TR.090

Develop User Learningware


Prepare User Learning Environment

C.ACT.IOCM Initial Operational Capability Milestone Summary


C.PMC.IOCM Initial Operational Capability Milestone

D Transition
D.ACT.SUAT Support User Acceptance Test

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

D.TE.105
D.TE.110
D.TE.120

Prepare Users for Testing


Prepare Acceptance Test Environment
Support Acceptance Test

Comparable Comparable AIM Task Name


AIM
Task ID
TE.100
TE.060
TE.130

Prepare Key Users for Testing


Prepare Testing Environments
Perform Acceptance Test

PT.120
PT.130

Execute Performance Test


Create Performance Test Report

CV.120
CV.130

Install Conversion Components


Convert and Verify Data

D.ACT.CPTST Conduct Performance Test


D.PT.100
D.PT.110

Execute Performance Test


Create Performance Test Report

D.ACT.CDT Convert Data - Transition


D.CV.064.2
D.CV.065.2
D.CV.068.2

Install Conversion Components (Initial Load)


Convert and Verify Data (Initial Load)
Clean Data

D.ACT.DCMRCCT Deploy Change Management Roadmap / Communication Campaign - Transition


D.OCM.150.4 Conduct Change Management Roadmap / Communication
Campaign

AP.080

Develop and Execute Communication Campaign

D.OCM.155.3 Monitor Change Management Roadmap / Communication


Campaign Effectiveness

AP.080

Develop and Execute Communication Campaign

AP.120
AP.120

Align Information Technology Groups


Align Information Technology Groups

AP.170

Conduct User Learning Events

D.ACT.CITA Conduct IT Alignment


D.OCM.220
D.OCM.230

Prepare Assessment of Impact on IT Groups


Prepare IT Transition Plan

D.ACT.TEUT Train End Users - Transition


D.TR.100.2

Conduct User Learning Events

D.ACT.FD Finalize Documentation


D.DO.110

Finalize Documentation

D.ACT.GP Go Production
D.TS.050

Prepare Production Environment

PM.040
PM.050

Prepare Production Environment


Set Up Applications

D.TS.052
D.TS.058
D.TS.060
D.TS.070

Implement Production Support Infrastructure


Verify Production Readiness
Go Production
Shut Down Legacy System

PM.060
PM.070
PM.080
PM.120

Implement Production Support Infrastructure


Verify Production Readiness
Begin Production
Decommission Former Systems

PM.090

Measure System Performance

D.ACT.SIP System in Production Milestone Summary


D.PMC.SIP

System in Production Milestone

E Production
E.ACT.MPSP Manage Production System Performance
E.PT.120

Conduct Production Performance Management

E.ACT.EPS Evaluate Production System

10

OUM to AIM Mapping

PHASE ACTIVITY

OUM
TASK ID

OUM TASK NAME

E.PS.010
E.PS.050

Audit System
Analyze Problems

Comparable Comparable AIM Task Name


AIM
Task ID
AP.180
PM.100

Conduct Effectiveness Assessment


Maintain System

PM.100
PM.110

Maintain System
Refine Production System

E.ACT.RPP Resolve Production Problems


E.PS.060

Monitor and Respond to System Problems

E.ACT.DCMRCCP Deploy Change Management Roadmap / Communication Campaign - Production


E.OCM.150.5 Conduct Change Management Roadmap / Communication
Campaign

AP.080

Develop and Execute Communication Campaign

E.OCM.155.4 Monitor Change Management Roadmap / Communication


Campaign Effectiveness

AP.080

Develop and Execute Communication Campaign

PM.130

Propose Future Business Direction

AP.180

Conduct Effectiveness Assessment

AP.120

Align Information Technology Groups

E.ACT.PF Plan for Future


E.PS.135
E.PS.140
E.OCM.250

Determine Future Functional Enhancements


Plan Enhancements
Measure Organizational Change Effectiveness

E.ACT.DITTP Deploy IT Transition Plan


E.OCM.260

Implement IT Transition Plan

E.ACT.SO Sign Off Milestone Summary


D.PMC.SO

Sign Off Milestone

11

Anda mungkin juga menyukai