ITEM
DESCRIPCION
1.1
1.2
1.3
SUMINISTRO DE MATERIALES
TRANSPORTE DE SUMINISTROS (7.5% de 1.1.)
OBRAS CIVILES
1.4
MONTAJE ELECTROMECANICO
TRAMO AREO
(S/.)
COSTO DIRECTO
3,612,658.75
270,949.41
453,000.25
1,009,841.25
75,738.09
995,305.63
416,036.47
28,536.29
4,752,644.88
2,109,421.26
RESUMEN DE PRESUPUESTO
LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO AREO DE 9,0 km
ITEM
DESCRIPCION
1.1
1.2
1.3
SUMINISTRO DE MATERIALES
TRANSPORTE DE SUMINISTROS (7.5% de 1.1.)
OBRAS CIVILES
1.4
MONTAJE ELECTROMECANICO
COSTO TOTAL
(S/.)
3,612,658.75
270,949.41
453,000.25
416,036.47
COSTO DIRECTO
4,752,644.88
RESUMEN DE PRESUPUESTO
LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO SUBTERRNEO DE 0,92 km
ITEM
DESCRIPCION
1.1
SUMINISTRO DE MATERIALES
1.2
1.3
1.4
MONTAJE ELECTROMECANICO
COSTO DIRECTO
TRAMO
SUBTERRNEO
(S/.)
COSTO TOTAL
(S/.)
1,009,841.25
75,738.09
995,305.63
28,536.29
2,109,421.26
ITEM
DESCRIPCION
1.0
1.1
1.1.1
1.2
1.2.1
1.2.2
2.0
2.1
2.2
2.3
UNIDAD
CANTIDAD CANTIDAD
DEL
DE
METRADO REPUESTO
154,285.22
62,400.00
9,253.44
72,800.00
12
1,445.85
1,156.68
2,891.70
6,940.08
14
24,045.86
26,096.92
168,321.02
521,938.40
28,147.98
34,301.17
28,855.04
33,777.58
34,301.17
56,295.96
34,301.17
115,420.16
33,777.58
102,903.51
26,450.45
28,706.62
30,962.78
34,301.17
105,801.80
86,119.86
123,851.12
137,204.68
6
6
6
6
12
18
24
24
3
4
37,731.28
41,504.41
113,193.84
166,017.64
6
6
18
24
u
u
u
2
1
2
31,577.28
37,731.28
41,161.40
63,154.56
37,731.28
82,322.80
6
6
6
12
6
12
u
u
2
1
45,277.54
49,805.29
90,555.08
49,805.29
6
6
12
6
u
u
u
1
1
1
35,230.85
41,161.40
49,805.29
35,230.85
41,161.40
49,805.29
6
6
6
6
6
6
35,230.85
140,923.40
12
224
2
8
2
2
Patas+/- 0
Estructuras de postes metlicos
Postes de Acero para Armado SM de 80'
Postes de Acero para Armado SM de 85'
Postes de Acero para Armado SM de 90'
u
u
u
5
20
2
2.4
2.5
2.6
2.7
u
u
u
u
1
4
1
3
2.8
2.9
2.10
2.11
u
u
u
u
2
3
4
4
2.12
2.13
u
u
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
3.0
5.0
5.1
5.2
5.3
6.0
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
7.0
7.1
7.2
2,355,836.69
2
257,664.30
u
u
192
224
km
km
28.35
9.45
u
u
84
28
un
9
10
351.50
799.20
70,651.50
187,012.80
8,133.79
230,592.95
6,750.00
63,787.50
72.40
6,660.80
68.75
687.50
2,062.50
4,125.00
4.1
4.2
6.1
6.2
6.3
31,200.00
1,156.68
36,400.00
u
u
u
u
3.1
3.2
4.0
COSTO
UNITARIO
(S/.)
294,380.45
12,848.30
8
2
70.02314815
700.2314815
95,337.81
19.25
85.00
3,888.50
17,170.00
19.60648148
86.57407407
100.00
85.00
45.00
82.50
11.65
22.00
1,200.00
19,720.00
9,090.00
16,665.00
4,042.55
5,104.00
101.8518519
86.57407407
45.83333333
84.02777778
11.86574074
22.40740741
19.25
41.25
19.25
19.25
60.00
2,136.75
1,567.50
500.50
789.25
240.00
19.60648148
42.01388889
19.60648148
19.60648148
61.11111111
75.00
180.00
33.00
20.63
56.56
900.00
2,160.00
2,607.00
1,629.77
4,468.24
76.38888889
183.3333333
33.61111111
21.01203704
57.60740741
19.25
59.00
750.75
708.00
28.67
220.00
34,404.00
6,380.00
19.60648148
60.09259259
0
29.20092593
224.0740741
8
2
6.99
7.00
5.00
13.98
588.00
70.00
7.119444444
7.12962963
5.092592593
u
u
u
192
192
12
10
10
u
u
u
u
u
u
222
192
192
332
222
106
10
10
10
15
10
5
u
u
u
u
u
36
24
39
4
12
2
2
2
u
u
u
u
u
u
12
74
74
74
39
12
m
u
1,200
27
5
5
5
41,385.98
7.3
7.4
7.5
8.0
8.1
u
u
u
2
76
12
12
13,000.00
156,000.00
8.2
8.3
u
u
12
6
15,860.00
9,100.00
190,320.00
54,600.00
73.74074074
400,920.00
3,612,658.75
ITEM
DESCRIPCION
1.1
2.0
2.1
2.2
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
4.0
4.1
5.0
5.1
6.0
6.1
6.2
7.0
7.1
8.0
8.1
9.0
9.1
10.0
10.1
11.0
11.1
12.1
CANTIDAD
km
9.77
u
u
COSTO
UNITARIO
(S/.)
COSTO PARCIAL
(S/.)
4,191.82
429.05
4,191.82
2
2
3,370.65
3,376.12
6,741.30
6,752.24
u
u
5
20
2,029.17
2,029.17
10,145.85
40,583.40
u
u
u
2
1
4
2,233.24
3,253.61
2,396.50
4,466.48
3,253.61
9,586.00
u
u
1
3
2,396.50
2,996.02
2,396.50
8,988.06
u
u
u
2
3
4
2,396.50
2,396.50
2,233.24
4,793.00
7,189.50
8,932.96
u
u
4
3
2,996.02
3,253.61
11,984.08
9,760.83
u
u
u
4
2
1
3,253.61
2,029.17
2,233.24
13,014.44
4,058.34
2,233.24
u
u
u
u
u
u
u
2
2
1
1
1
1
4
2,996.02
3,253.61
3,416.29
2,396.50
2,996.02
3,904.33
2,435.00
5,992.04
6,507.22
3,416.29
2,396.50
2,996.02
3,904.33
9,740.00
km
28.35
2,627.30
74,483.96
km
9.45
3,185.79
30,105.72
u
u
192
224
126.82
90.33
24,349.44
20,233.92
28
324.61
9,202.69
12
551.25
6,615.00
437.36
2,624.16
437.36
2,624.16
84
28
61.14
5,135.76
72.07
2,017.96
13,493.54
176,338.69
74,483.96
30,105.72
44,583.36
9,202.69
6,615.00
2,624.16
2,624.16
7,153.72
u
19,174.20
Puesta a tierra tipo "PAT-1 " , incluye excavacin, instalacin, relleno y rotura de vereda,
desalojo de desmonte , resane y todo trabajo no especificado pero requerido para el
montaje
u
27
269.85
7,285.95
23
u
u
17
1
214.36
263.13
275.49
4,930.28
4,473.21
275.49
u
u
u
3
2
2
231.21
693.63
353.19
404.63
706.38
809.26
gbl
gbl
1
1
20,363.85
5,081.60
20,363.85
5,081.60
12.3
12.3.1
12.3.2
12.3.3
13.0
13.1
13.2
COSTO TOTAL
(S/.)
MONTAJE ELECTROMECANICO
1.0
11.2
12.0
UNIDAD
Puesta a tierra tipo "PAT-C " , incluye excavacin, instalacin, relleno y rotura de vereda,
desalojo de desmonte , resane y todo trabajo no especificado pero requerido para el
montaje
Puesta a tierra tipo "PAT-D y PAT-E" , incluye excavacin, instalacin, relleno y rotura de
vereda, desalojo de desmonte , resane y todo trabajo no especificado pero requerido para
el montaje
Con contrapeso en oposicin de 10 m
Con contrapeso en oposicin de 40 m
Con contrapeso en oposicin de 50 m
Varios
25,445.45
Ingenera de Detalle
Pruebas y Puesta en Servicio
COSTO TOTAL DE MONTAJE ELECTROMECANICO (S/.)
416,036.47
ITEM
II
DESCRIPCION
UNIDAD
CANTIDAD
1.00
COSTO
UNITARIO
(S/.)
COSTO PARCIAL
(S/.)
COSTO TOTAL
(S/.)
OBRAS CIVILES
1.0
Movilizacin y Desmovilizacin
1.1
Movilizacin y desmovilizacin
2.0
Obras Provisionales
3,328.73
3,328.73
3,328.73
4,279.01
ITEM
DESCRIPCION
UNIDAD
CANTIDAD
Global
Global
1.00
1.00
COSTO
UNITARIO
(S/.)
COSTO PARCIAL
(S/.)
3,043.09
1,235.92
3,043.09
124.39
124.39
9.07
23.16
1,128.22
2,880.87
m3
m3
m2
1,063.39
352.62
1,208.42
44.55
47,374.02
11,848.03
89,809.77
m3
m3
26.29
597.76
kg
m3
15,061.35
941.62
2.1
2.2
3.0
3.1
3.2
Demolicion de pavimento
Reposicin de pavimento
m2
m2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
COSTO TOTAL
(S/.)
1,235.92
445,392.51
33.60
74.32
34.63
323.79
5.82
10.87
910.42
193,548.71
87,657.06
10,235.41
453,000.25
710.77
PARTIDA : 1.1
RENDIMIENTO :
2.5 km/dia
DESIGNACIN
MATERIALES
CUAD.
UNID.
Fierro
Cemento Portland tipo I en bolsa de 42,5 kg
Material consumible
Pintura esmalte sinttico
APORTE
COSTO U.
kg
bls
EST
gln
1.00
0.66
0.50
0.13
2.13
14.29
192.50
56.44
MANO DE OBRA
Topgrafo
Oficial
Pen
1.00
1.00
2.00
h-h
h-h
h-h
3.20
3.20
6.40
17.24
12.61
11.40
MAQUINARIAS Y EQUIPOS
Camioneta pick up 4 x 2 d.cab.
Rachet
Espintermetro
Herramientas manuales y equipos de proteccin
1.00
3.00
1.00
h-m
h-m
h-m
% m-o
2.42
7.27
2.42
7.00
45.42
3.50
38.50
168.49
PROYECTO:
PARTIDA : 2.1
RENDIMIENTO :
1.2 Un/dia
DESIGNACIN
MATERIALES
CUAD.
Material consumible
MANO DE OBRA
Ingeniero de seguridad
Capataz en trabajos elctricos
Operario en trabajos elctricos
Oficial en trabajos elctricos
Pen
MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON
Camin gra de 5 TON
Pluma de izaje
Tirfor 3 Ton
Winche de 3 Ton
Equipo de topografa (Teod,Nivel,etc)
Herramientas manuales y equipos de proteccin
COSTO DIRECTO TOTAL
UNID.
APORTE
COSTO U.
EST
0.50
192.50
0.10
1.00
2.00
2.00
10.00
h-h
h-h
h-h
h-h
h-h
0.67
6.67
13.33
13.33
66.67
52.50
20.45
17.24
15.13
11.40
1.00
0.50
1.00
2.00
1.00
1.00
h-m
h-m
h-m
h-m
h-m
h-m
% m-o
6.67
3.33
6.67
13.33
6.67
6.67
7.00
125.25
173.25
18.36
2.88
36.40
1363.00
PARTIDA : 2.2
RENDIMIENTO :
1.198 Un/dia
DESIGNACIN
MATERIALES
CUAD.
UNID.
Material consumible
MANO DE OBRA
Ingeniero de seguridad
Capataz en trabajos elctricos
Operario en trabajos elctricos
Oficial en trabajos elctricos
Pen
MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON
Camin gra de 5 TON
Pluma de izaje
Tirfor 3 Ton
Winche de 3 Ton
Equipo de topografa (Teod,Nivel,etc)
Herramientas manuales y equipos de proteccin
APORTE
COSTO U.
EST
0.50
192.50
0.10
1.00
2.00
2.00
10.00
h-h
h-h
h-h
h-h
h-h
0.67
6.68
13.36
13.36
66.78
52.50
20.45
17.24
15.13
11.40
1.00
0.50
1.00
2.00
1.00
1.00
h-m
h-m
h-m
h-m
h-m
h-m
% m-o
6.68
3.34
6.68
13.36
6.68
6.68
7.00
125.25
173.25
18.36
2.88
36.40
1365.28
PARTIDA : 3.1
RENDIMIENTO :
3 Un/dia
DESIGNACIN
MATERIALES
CUAD.
Material consumible
MANO DE OBRA
Ingeniero de seguridad
Capataz en trabajos elctricos
Operario en trabajos elctricos
Oficial en trabajos elctricos
Pen
MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON
Camin gra de 5 TON
Camioneta pick up 4 x 2 d.cab.
Tirfor 3 Ton
Winche de 3 Ton
Equipo de topografa (Teod,Nivel,etc)
Herramientas manuales y equipos de proteccin
UNID.
APORTE
COSTO U.
EST
1.00
192.50
0.10
1.00
8.00
6.00
8.00
h-h
h-h
h-h
h-h
h-h
0.27
2.67
21.33
16.00
21.33
52.50
20.45
17.24
15.13
11.40
1.00
0.50
0.50
4.00
2.00
1.00
h-m
h-m
h-m
h-m
h-m
h-m
% m-o
2.67
1.33
1.33
10.67
5.33
2.67
7.00
125.25
173.25
45.42
2.88
36.40
921.71
AS DE TRANSMISION
PARQUE INDUSTRIAL
UNIDAD:
km
429.05
AS DE TRANSMISION
PARQUE INDUSTRIAL
UNIDAD:
Un.
3370.65
AS DE TRANSMISION
PARQUE INDUSTRIAL
3m
UNIDAD:
Un.
3376.12
AS DE TRANSMISION
PARQUE INDUSTRIAL
UNIDAD:
Un.
AS DE TRANSMISION
2029.17
Partida
Movilizacin y desmovilizacin
Rendimiento
Glb/DIA
0.5500
Cdigo
Descripcin Recurso
EQ. 0.2208
Unidad
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
INGENIERO ELECTRICISTA
hh
0.2000
CHOFER
hh
0.8000
OPERARIO
hh
1.0000
PEON
hh
4.0000
hh
0.2000
hh
1.0000
%MO
Equipos
2.1
Partida
Rendimiento
Glb/DIA
0.6500
Cdigo
Descripcin Recurso
EQ. 0.6800
Unidad
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
hh
0.8000
CHOFER
hh
0.8000
PEON
hh
4.0000
hh
0.5000
hh
0.2000
hh
1.0000
%MO
Equipos
2.2
Partida
Rendimiento
Glb/DIA
0.6500
Cdigo
Descripcin Recurso
EQ. 0.6800
Unidad
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
ALMACENERO
hh
1.0000
CHOFER
hh
0.5000
PEON
hh
4.0000
hh
0.5000
hh
0.5000
%MO
Equipos
3.1
Partida
DEMOLICIN DE PAVIMENTO
Rendimiento
m2/DIA
50.0000
Cdigo
Descripcin Recurso
EQ. 50.0000
Unidad
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
CAPATAZ
hh
0.1000
PEON
hh
1.0000
hh
0.5000
hh
1.0000
%MO
Equipos
3.2
Partida
REPOSICIN DE PAVIMENTO
Rendimiento
M2/DIA
50.0000
Cdigo
Descripcin Recurso
Unidad
INGENIERO DE SEGURIDAD
hh
m2
m2
3.3
Partida
EQ.
Cuadrilla
0.1000
Rendimiento
m3/DIA
10.0000
Cdigo
Descripcin Recurso
EQ. 10.0000
Unidad
Mano de Obra
INGENIERO DE SEGURIDAD
PEON
0.1000
hh
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
4.0000
3.4
Partida
Rendimiento
ml/DIA
45.0000
Cdigo
Descripcin Recurso
EQ. 45.0000
Unidad
Cuadrilla
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
CAPATAZ
hh
0.2500
OPERARIO
hh
1.0000
PEON
hh
2.0000
hm
1.0000
hm
0.2000
%MO
Equipos
3.5
Partida
Rendimiento
m2/DIA
18.0000
Cdigo
Descripcin Recurso
EQ. 18.0000
Unidad
Cuadrilla
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
CAPATAZ
hh
1.0000
OPERARIO
hh
1.0000
OFICIAL
hh
2.0000
PEON
hh
2.0000
Materiales
ALAMBRE
kg
kg
gal
MATERIALES DIVERSOS
%MT
MADERA NACIONAL
p2
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
3.6
Partida
Rendimiento
m2/DIA
%MO
50.0000
EQ. 50.0000
Cdigo
Descripcin Recurso
Unidad
Cuadrilla
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
CAPATAZ
hh
0.1000
OPERARIO
hh
1.0000
OFICIAL
hh
2.0000
PEON
hh
6.0000
Materiales
CEMENTO PORTLAND TIPO I
bls
ADITIVO
gal
gal
GASOLINA 84 OCTANOS
gal
AGUA
m3
AGREGADO
m3
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
hm
3.7
Partida
1.0000
Rendimiento
m3/DIA
15.0000
Cdigo
Descripcin Recurso
EQ. 15.0000
Unidad
Cuadrilla
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
CAPATAZ
hh
0.5000
OPERARIO
hh
1.0000
OFICIAL
hh
1.0000
PEON
hh
10.0000
Materiales
CEMENTO PORTLAND TIPO I
bls
ADITIVO
gal
gal
GASOLINA 84 OCTANOS
gal
AGUA
m3
AGREGADO
m3
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
hm
hm
1
1
3.8
Partida
Rendimiento
kg/DIA
200.0000
Cdigo
Descripcin Recurso
EQ. 200.0000
Unidad
Cuadrilla
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
CAPATAZ
hh
0.2000
OPERARIO
hh
1.0000
OFICIAL
hh
2.0000
Materiales
ALAMBRE
kg
kg
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
3.9
Partida
%MO
Rendimiento
m3/DIA
350.0000
Cdigo
Descripcin Recurso
EQ. 350.0000
Unidad
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
CAPATAZ
hh
0.2000
PEON
hh
2.0000
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
CAMION VOLQUETE 10 m3
hm
2.0000
QUE INDUSTRIAL
3,328.73
Cantidad
Precio S/.
Parcial S/.
1.4545
52.50
76.36
2.9091
52.50
152.73
11.6364
12.60
146.62
14.5455
14.92
217.02
58.1818
11.70
680.73
1,273.45
2.9091
49.61
144.32
14.5455
125.25
1,821.82
7.0000
1,273.45
89.14
2,055.28
3,043.09
Cantidad
Precio S/.
Parcial S/.
1.2308
52.50
64.62
9.8462
52.50
516.92
9.8462
12.60
124.06
49.2308
11.70
576.00
1,281.60
6.1538
1.32
8.12
2.4615
49.61
122.12
12.3077
125.25
1,541.54
7.0000
1,281.60
89.71
1,761.49
1,235.92
Cantidad
Precio S/.
Parcial S/.
1.2308
52.50
64.62
12.3077
11.70
144.00
6.1538
12.60
77.54
49.2308
11.70
576.00
862.15
6.1538
1.32
8.12
6.1538
49.61
305.29
7.0000
862.15
60.35
373.77
9.07
Cantidad
Precio S/.
Parcial S/.
0.0160
52.50
0.84
0.0160
17.37
0.28
0.1600
11.70
1.87
2.99
0.0800
64.18
5.13
0.1600
4.61
0.74
7.0000
2.99
0.21
6.08
23.16
Cantidad
Precio S/.
Parcial S/.
0.0160
52.50
0.84
1.0000
17.60
17.60
1.0000
4.72
4.72
23.16
44.55
Cantidad
Precio S/.
0.0800
52.50
4.20
3.2000
11.70
37.44
Parcial S/.
41.64
7.0000
41.64
2.91
2.91
33.60
Cantidad
Precio S/.
Parcial S/.
0.0178
52.50
0.93
0.0444
17.37
0.77
0.1778
14.92
2.65
0.3556
11.70
4.16
8.52
0.1778
125.25
22.27
0.0356
21.10
0.75
7.0000
8.52
2.06
25.08
74.32
Cantidad
Precio S/.
Parcial S/.
0.0444
52.50
2.33
0.4444
17.37
7.72
0.4444
14.92
6.63
0.8889
12.97
11.53
0.8889
11.70
10.40
38.61
0.3000
4.15
1.25
0.3000
4.15
1.25
0.0500
81.13
4.06
8.0000
46.86
3.75
6.0000
3.63
21.78
32.08
10.0000
38.61
3.86
3.63
34.63
Cantidad
Precio S/.
Parcial S/.
0.0160
52.50
0.84
0.0160
17.37
0.28
0.1600
14.92
2.39
0.3200
12.97
4.15
0.9600
11.70
11.23
18.89
0.3600
17.10
6.16
0.0050
35.10
0.18
0.0040
50.20
0.20
0.2400
9.82
2.36
0.0200
9.00
0.18
0.1300
32.00
4.16
13.23
7.0000
18.89
1.32
0.1600
7.44
1.19
2.51
323.79
Cantidad
Precio S/.
Parcial S/.
0.0533
52.50
2.80
0.2667
17.37
4.63
0.5333
14.92
7.96
0.5333
12.97
6.92
5.3333
11.70
62.40
84.71
10.0000
17.10
171.00
0.1230
35.10
4.32
0.0067
50.20
0.34
0.5000
9.82
4.91
0.2500
9.00
2.25
1.3250
32.00
42.40
225.21
7.0000
84.71
5.93
0.5333
5.30
2.83
0.5333
9.58
5.11
13.87
5.82
Cantidad
Precio S/.
Parcial S/.
0.0040
52.50
0.21
0.0080
17.37
0.14
0.0400
14.92
0.60
0.0800
12.97
1.04
1.98
0.0900
4.15
0.37
1.0500
3.17
3.33
3.70
7.0000
1.98
0.14
0.14
10.87
Cantidad
Precio S/.
Parcial S/.
0.0023
52.50
0.12
0.0046
18.37
0.08
0.0457
12.37
0.57
0.77
5.0000
0.77
0.04
0.0457
220.00
10.06
10.10
ITEM
DESCRIPCION
UNIDAD
CANTIDAD
TOTAL
Cable de energia unipolar para una tensin nominal de 138 kV entre fases y mxima de servicio de 145
kV, seccin de 240 mm Cu con aislamiento XLPE,.
2412.90
412.50
995,321.25
880.00
16.50
14,520.00
COSTO TOTAL
(S/.)
1,009,841.25
ITEM
CANTIDAD
TOTAL
COSTO
UNITARIO
(S/.)
COSTO TOTAL
(S/.)
DESCRIPCION
UNIDAD
1.1
Cable XLPE de 138 kV 1x240 mm2 Cu, incluye la preapracin para el tendido, el transporte de las bobinas
del cable, la instalacin del winche del jalado, el tendiod del cable guia de acero, y la colocacin de los
respectivos polines de fibra y de metal
2,412.90
8.28
19,978.81
1.2
Cable de Fibra Optica tipo ADSS para 24 fibras,ncluye la preapracin para el tendido, el transporte de las
bobinas del cable, la instalacin del winche del jalado, el tendiod del cable guia de acero, y la colocacin
de los respectivos polines de fibra y de metal
880.00
7.87
6,925.60
2.0
2.1
4.00
407.97
1,631.88
1.0
I. MONTAJE ELECTROMECANICO
TENDIDO DE CABLE SUBTERRNEO
28,536.29
ITEM
DESCRIPCION
UNIDAD
CANTIDAD
TOTAL
COSTO
UNITARIO
(S/.)
COSTO TOTAL
(S/.)
1.0
1.1
1.2
1.3
Glb
Glb
Glb
1.00
1.00
1.00
3,678.11
5,500.00
13,750.10
1.4
1.5
Glb
Glb
1.00
1.00
2,800.00
3,240.00
2,800.00
3,240.00
28,968.21
SUB-TOTAL 1 :
3,678.11
5,500.00
13,750.10
2.0
2.1
2.2
ZANJA
Demolicin de pavimento
Reposicin de Pavimento
m2
m2
733.11
733.11
9.07
23.16
6,649.31
16,978.83
2.3
2.4
m3
m3
2,038.27
1,880.01
44.55
10.87
90,804.93
20,435.71
2.5
2.6
ml
m2
706.26
2,445.92
56.30
74.55
39,762.44
182,343.34
2.7
2.8
m2
m3
1,045.26
574.89
34.63
323.79
36,197.35
186,143.63
2.9
2.10
m3
m3
418.66
627.99
2.11
2.12
Reposicin de jardines
Cinta de sealizacin, comprende el suministro e instalacin
m2
m
15.00
952.83
42.13
33.60
121.11
17,638.15
21,100.46
1,816.65
2.13
2.14
m
m
3,390.05
1,130.02
8.23
26.27
7,841.79
89,056.61
16.80
SUB-TOTAL 2 :
18,984.34
735,753.54
3.0
3.1
CAMARAS DE PASO
Demolicin de pavimento
m2
155.00
9.07
1,405.85
3.2
3.3
Reposicin de Pavimento
Excavacin en material suelto
m2
m3
155.00
385.00
23.16
44.55
3,589.80
17,151.75
3.4
3.5
m3
m2
515.00
470.00
10.87
74.55
5,598.05
35,038.50
3.6
3.7
m2
m3
155.00
165.00
34.63
323.79
5,367.65
53,425.35
3.8
3.9
kg
und
15,600.00
16.00
5.82
120.00
90,792.00
1,920.00
214,288.95
4.0
Varios
4.1
Glb
1.00
16294.93
16,294.93
SUB-TOTAL 3 :
995,305.63
PROYECTO:
PARTIDA : 1.1
RENDIMIENTO :
DESIGNACIN
MATERIALES
0.7 km/dia
CUAD.
Material consumible
UNID.
EST
UNIDAD:
APORTE
COSTO U. C. PARCIAL
1.00
192.50
192.50
MANO DE OBRA
Ingeniero de seguridad
0.10
h-h
0.32
52.50
16.80
1.00
h-h
11.43
20.45
233.69
8.00
h-h
91.43
17.24
1576.59
6.00
h-h
68.57
15.13
1037.62
10.00
h-h
114.29
11.40
1302.86
1.00
h-h
11.43
17.00
194.29
1.00
h-m
11.43
1.32
15.09
0.75
h-m
8.57
125.25
1073.57
1.00
h-m
11.43
112.37
1284.23
0.50
h-m
5.71
45.42
259.54
Tirfor 3 Ton
1.00
h-m
11.43
2.88
32.94
Winche de 3 Ton
1.00
h-m
11.43
36.40
416.00
Tecle 2 Ton
0.50
h-m
5.71
Polines
0.50
h-m
5.71
0.35
2.00
Caballete alzabobina
1.00
h-m
11.43
1.32
15.09
Equipo de tendido
1.00
h-m
11.43
0.00
0.50
h-m
5.71
0.00
8.00
h-m
91.43
3.50
320.00
% m-o
7.00
4361.85
305.33
Pen
Chofer
MAQUINARIAS Y EQUIPOS
0.00
S/.
DESIGNACIN
MATERIALES
CUAD.
Material consumible
UNID.
APORTE
COSTO U. C. PARCIAL
EST
1.00
192.50
192.50
53.85
MANO DE OBRA
Ingeniero de seguridad
0.10
h-h
1.03
52.50
1.00
h-h
10.26
20.45
209.72
8.00
h-h
82.05
17.24
1414.89
6.00
h-h
61.54
15.13
931.20
10.00
h-h
102.56
11.40
1169.23
1.00
h-h
10.26
17.00
174.36
1.00
h-m
11.43
1.32
15.09
0.75
h-m
8.57
125.25
1073.57
1.00
h-m
11.43
112.37
1284.23
0.50
h-m
5.71
45.42
259.54
Tirfor 3 Ton
1.00
h-m
11.43
2.88
32.94
Winche de 3 Ton
1.00
h-m
11.43
36.40
416.00
Tecle 2 Ton
0.50
h-m
5.71
0.00
0.00
Polines
0.50
h-m
5.71
0.35
2.00
Caballete alzabobina
1.00
h-m
11.43
1.32
15.09
Equipo de tendido
1.00
h-m
11.43
0.00
0.00
0.50
h-m
5.71
0.00
0.00
8.00
h-m
91.43
3.50
320.00
% m-o
7.00
4361.85
305.33
Pen
Chofer
MAQUINARIAS Y EQUIPOS
S/.
UNIDAD:
UNID.
APORTE
COSTO U. C. PARCIAL
Material consumible
EST
0.10
192.50
19.25
m3
0.90
227.15
204.44
gln
1.00
56.44
56.44
10.50
MANO DE OBRA
Ingeniero de seguridad
0.10
h-h
0.20
52.50
Capataz
0.10
h-h
0.20
17.04
3.41
Operario
0.50
h-h
1.00
14.37
14.37
Pen
4.00
h-h
8.00
11.40
91.20
MAQUINARIAS Y EQUIPOS
% m-o
7.00
119.48
8.36
S/.
PROYECTO:
PARTIDA : 3.2
RENDIMIENTO :
DESIGNACIN
MATERIALES
#REF!
1.3 Glb/dia
CUAD.
Material consumible
UNID.
UNIDAD:
APORTE
COSTO U. C. PARCIAL
EST
0.10
192.50
19.25
MANO DE OBRA
Ingeniero de seguridad
0.10
h-h
0.62
52.50
32.31
1.00
h-h
6.15
80.00
492.31
1.00
h-h
6.15
20.45
125.83
1.00
h-h
6.15
17.24
106.12
Pen
6.00
h-h
36.92
11.40
420.92
1.00
h-m
6.15
1.32
8.12
0.20
h-m
1.23
49.61
61.06
Megger
1.00
h-m
6.15
5.50
33.85
MAQUINARIAS Y EQUIPOS
% m-o
7.00
1177.49
82.42
S/.
Material consumible
UNID.
UNIDAD:
APORTE
COSTO U. C. PARCIAL
EST
0.10
192.50
19.25
MANO DE OBRA
Ing. Especialista en Lineas de transmisin
0.50
h-h
160.00
80.00
12800.00
Dibujante
0.30
h-h
96.00
11.40
1094.40
0.15
h-m
48.00
49.61
2381.28
MAQUINARIAS Y EQUIPOS
Camioneta pick up 4 x 4 Doble Cabina
S/.
DE TRANSMISION
NDUSTRIAL
km
SUB TOTAL
192.50
4361.85
3723.78
8278.13
DE TRANSMISION
NDUSTRIAL
SUB TOTAL
192.50
3953.25
3723.78
7869.53
DE TRANSMISION
NDUSTRIAL
u
SUB TOTAL
280.13
119.48
8.36
407.97
DE TRANSMISION
NDUSTRIAL
Glb
SUB TOTAL
19.25
1177.49
185.45
1382.19
DE TRANSMISION
NDUSTRIAL
Glb
SUB TOTAL
19.25
13894.40
2381.28
16294.93
1.1
Rendimiento
Glb/DIA
Cdigo
Descripcin Recurso
0.2000
EQ. 0.2000
Unidad
3,678.11
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
4.0000
52.50
210.00
INGENIERO ELECTRICISTA
hh
0.2000
8.0000
52.50
420.00
CHOFER
hh
0.8000
32.0000
12.60
403.20
OPERARIO
hh
1.0000
40.0000
14.37
574.80
PEON
hh
4.0000
160.0000
11.40
1,824.00
3,432.00
Equipos
CAMIONETA PICK UP 4 X 4 DOBLE CABINA
hh
0.2000
8.0000
49.61
hh
1.0000
40.0000
125.25
5.13
0.74
%MO
7.0000
3,432.00
240.24
246.11
Partida
1.2
GUARDIANA
Rendimiento
Glb/DIA
Cdigo
Descripcin Recurso
EQ.
Cuadrilla
5,500.00
Cantidad
Precio S/.
Parcial S/.
1.0000
5,500.00
5,500.00
Mano de Obra
GUARDIAN
Glb
5,500.00
Partida
1.3
ALQUILER LOCAL
Rendimiento
Glb/DIA
Cdigo
Descripcin Recurso
EQ.
Cuadrilla
13,750.10
Cantidad
Precio S/.
Parcial S/.
1.0000
13,750.10
13,750.10
Materiales
ALQUILER DE LOCAL
Glb
13,750.10
Partida
1.4
Rendimiento
Glb/DIA
Cdigo
Descripcin Recurso
EQ.
Cuadrilla
2,800.00
Cantidad
Precio S/.
Parcial S/.
1.0000
2,800.00
2,800.00
Materiales
RPM,RADIOS Y CELULARES
Glb
2,800.00
Partida
1.5
Rendimiento
Glb/DIA
Cdigo
Descripcin Recurso
EQ.
Cuadrilla
3,240.00
Cantidad
Precio S/.
Parcial S/.
1.0000
1,200.00
1,200.00
2.0000
1,020.00
2,040.00
Materiales
Glb
3,240.00
Partida
2.1, 3.1
Rendimiento
m2/DIA
SZ-11-327
DEMOLICIN DE PAVIMENTO
50.0000
EQ. 50.0000
9.07
28 de 43
Descripcin Recurso
Unidad
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0160
52.50
0.84
CAPATAZ
hh
0.1000
0.0160
17.37
0.28
PEON
hh
1.0000
0.1600
11.70
1.87
2.99
Equipos
COMPRESORA NEUMATICA 76 HP 125-175 PCM
hh
0.5000
0.0800
64.18
5.13
hh
1.0000
0.1600
4.61
0.74
%MO
7.0000
2.99
0.21
6.08
Partida
2.2, 3.2
REPOSICIN DE PAVIMENTO
Rendimiento
M2/DIA
Cdigo
Descripcin Recurso
Unidad
INGENIERO DE SEGURIDAD
hh
m2
m2
50.0000
EQ.
23.16
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.1000
0.0160
52.50
0.84
1.0000
17.60
17.60
1.0000
4.72
4.72
23.16
Partida
2.3,3.3
Rendimiento
m3/DIA
Cdigo
Descripcin Recurso
10.0000
EQ. 10.0000
Unidad
44.55
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
0.1000
0.0800
52.50
4.20
4.0000
3.2000
11.70
37.44
Mano de Obra
INGENIERO DE SEGURIDAD
PEON
hh
41.64
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
7.0000
41.64
2.91
2.91
Partida
2.4,3.4
Rendimiento
m3/DIA
Cdigo
Descripcin Recurso
350.0000
EQ. 350.0000
Unidad
10.87
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0023
52.50
0.12
CAPATAZ
hh
0.2000
0.0046
18.37
0.08
PEON
hh
2.0000
0.0457
12.37
0.57
0.77
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
CAMION VOLQUETE 10 m3
hm
2.0000
5.0000
0.77
0.04
0.0457
220.00
10.06
10.10
Partida
2.5
Rendimiento
ml/DIA
Cdigo
Descripcin Recurso
10.0000
EQ. 10.0000
Unidad
56.30
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
SZ-11-327
0.1000
0.0800
52.50
4.20
CAPATAZ
hh
0.1000
0.0800
17.37
1.39
OPERARIO
hh
0.2000
0.1600
14.92
2.39
29 de 43
2.0000
1.6000
11.70
18.72
26.70
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
CAMION VOLQUETE 10 m3
hm
1.0000
5.0000
26.70
1.33
0.1333
212.00
28.27
29.60
Partida
2.6,3.5
Rendimiento
m2/DIA
Cdigo
Descripcin Recurso
18.0000
EQ. 18.0000
Unidad
74.55
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
0.0444
52.50
2.33
CAPATAZ
hh
1.0000
0.4444
17.37
7.72
OPERARIO
hh
1.0000
0.4444
14.92
6.63
OFICIAL
hh
2.0000
0.8889
12.97
11.53
PEON
hh
2.0000
0.8889
11.70
10.40
38.61
Materiales
ALAMBRE
kg
0.3000
4.15
1.25
kg
0.3000
4.15
1.25
gal
0.0500
81.13
4.06
MATERIALES DIVERSOS
%MT
8.0000
46.86
3.75
MADERA NACIONAL
p2
6.0000
3.63
21.78
32.08
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
10.0000
38.61
3.86
3.86
Partida
2.7, 3.6
Rendimiento
m2/DIA
Cdigo
Descripcin Recurso
50.0000
EQ. 50.0000
Unidad
34.63
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
0.0160
52.50
0.84
CAPATAZ
hh
0.1000
0.0160
17.37
0.28
OPERARIO
hh
1.0000
0.1600
14.92
2.39
OFICIAL
hh
2.0000
0.3200
12.97
4.15
PEON
hh
6.0000
0.9600
11.70
11.23
18.89
Materiales
CEMENTO PORTLAND TIPO I
bls
0.3600
17.10
6.16
ADITIVO
gal
0.0050
35.10
0.18
gal
0.0040
50.20
0.20
GASOLINA 84 OCTANOS
gal
0.2400
9.82
2.36
AGUA
m3
0.0200
9.00
0.18
AGREGADO
m3
0.1300
32.00
4.16
13.23
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
hm
1.0000
7.0000
18.89
1.32
0.1600
7.44
1.19
2.51
Partida
SZ-11-327
2.8,3.7
30 de 43
m3/DIA
15.0000
Cdigo
Descripcin Recurso
EQ. 15.0000
Unidad
323.79
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
0.0533
52.5000
2.8000
CAPATAZ
hh
0.5000
0.2667
17.3700
4.6320
OPERARIO
hh
1.0000
0.5333
14.9200
7.9573
OFICIAL
hh
1.0000
0.5333
12.9700
6.9173
PEON
hh
10.0000
5.3333
11.7000
62.4000
84.71
Materiales
CEMENTO PORTLAND TIPO I
bls
10.0000
17.10
171.00
ADITIVO
gal
0.1230
35.10
4.32
gal
0.0067
50.20
0.34
GASOLINA 84 OCTANOS
gal
0.5000
9.82
4.91
AGUA
m3
0.2500
9.00
2.25
AGREGADO
m3
1.3250
32.00
42.40
225.21
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
7.0000
84.71
5.93
hm
1.0000
0.5333
5.30
2.83
hm
1.0000
0.5333
9.58
5.11
13.87
Partida
2.9
Rendimiento
ml/DIA
Cdigo
Descripcin Recurso
45.0000
EQ. 45.0000
Unidad
42.13
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0178
52.50
0.93
CAPATAZ
hh
0.2500
0.0444
17.37
0.77
OPERARIO
hh
1.0000
0.1778
14.92
2.65
PEON
hh
2.0000
0.3556
11.70
4.16
8.52
Materiales
RELLENO COMPACTADO PROPIO PARA ZANJA
m3
1.0000
10.00
10.00
10.00
Equipos
CAMIN PLATAFORMA 4X2, 122 HP, 8 TON
hm
1.0000
0.1778
125.25
22.27
hm
0.2000
0.0356
21.10
0.75
%MO
7.0000
8.52
0.60
23.61
Partida
2.10
Rendimiento
ml/DIA
Cdigo
Descripcin Recurso
45.0000
EQ. 45.0000
Unidad
33.60
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0178
52.50
0.93
CAPATAZ
hh
0.2500
0.0444
17.37
0.77
OPERARIO
hh
1.0000
0.1778
14.92
2.65
PEON
hh
2.0000
0.3556
11.70
4.16
8.52
Equipos
SZ-11-327
hm
1.0000
0.1778
125.25
22.27
hm
0.2000
0.0356
21.10
0.75
31 de 43
%MO
7.0000
8.52
2.06
25.08
Partida
2.11
REPOSICIN DE JARDINES
Rendimiento
m2/DIA
Cdigo
Descripcin Recurso
30.0000
EQ. 30.0000
Unidad
121.11
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0178
52.50
0.93
CAPATAZ
hh
0.2500
0.0444
17.37
0.77
OPERARIO
hh
1.0000
0.1778
14.92
2.65
PEON
hh
2.0000
0.3556
11.70
4.16
8.52
Materiales
GRASS BLOCK MODELO TIPO MICHI O TIPO 8
m3
1.0000
112.00
112.00
112.00
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN
%MO
7.0000
8.52
0.60
0.60
Partida
2.12
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
36.0000
EQ. 36.0000
Unidad
8.23
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0222
52.50
1.17
CAPATAZ
hh
0.1000
0.0222
17.37
0.39
OPERARIO
hh
0.1000
0.0222
14.92
0.33
PEON
hh
2.0000
0.4444
11.70
5.20
7.08
Materiales
CINTA SEALIZADORA
m3
1.0000
0.65
0.65
0.65
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN
%MO
7.0000
7.08
0.50
0.50
Partida
2.13
Rendimiento
m/DIA
Cdigo
Descripcin Recurso
33.0000
EQ. 33.0000
Unidad
26.27
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0242
52.50
1.27
CAPATAZ
hh
0.1000
0.0242
17.37
0.42
OPERARIO
hh
0.1000
0.0242
14.92
0.36
PEON
hh
2.0000
0.4848
11.70
5.67
7.73
Materiales
TUBO PVC 6"CLASE5
m3
1.0000
18.00
18.00
18.00
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN
%MO
7.0000
7.73
0.54
0.54
Partida
SZ-11-327
2.14
32 de 43
m/DIA
33.0000
Cdigo
Descripcin Recurso
EQ. 33.0000
Unidad
16.80
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
hh
0.1000
0.0242
52.50
1.27
CAPATAZ
hh
0.1000
0.0242
17.37
0.42
OPERARIO
hh
0.1000
0.0242
14.92
0.36
PEON
hh
2.0000
0.4848
11.70
5.67
7.73
Materiales
TUBO PVC 3"CLASE5
m3
1.0000
8.53
8.53
8.53
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN
%MO
7.0000
7.73
0.54
0.54
3.8
Partida
Rendimiento
kg/DIA
200.0000
Cdigo
Descripcin Recurso
EQ. 200.0000
Unidad
5.82
Cuadrilla
Cantidad
Precio S/.
Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD
0.1000
0.0040
52.50
0.21
CAPATAZ
hh
0.2000
0.0080
17.37
0.14
OPERARIO
hh
1.0000
0.0400
14.92
0.60
OFICIAL
hh
2.0000
0.0800
12.97
1.04
1.98
Materiales
ALAMBRE
kg
0.0900
4.15
0.37
kg
1.0500
3.17
3.33
3.70
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN
%MO
7.0000
1.98
0.14
0.14
3.9
Partida
TAPA DE F G D=0,80 m
Rendimiento
und/DIA
EQ.
Cdigo
Descripcin Recurso
Unidad
und
Cuadrilla
120.00
Cantidad
Precio S/.
Parcial S/.
1.0000
120.00
120.00
120.00
SZ-11-327
33 de 43
Tipo
N
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Tipo
Cable de
Comunicaci
Armado N estruc. Conductor
n
PORTICO
TR
TR
SMD
SMD
SMD
SMD
SMD
A3M
A2M
SMD
A2M
A1M
A1M
A1M
A1M
A1M
SMD
SMD
TR
TR
A2M
A1M
A1M
A1M
A1M
A1M
SM
A1M
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
AAAC-240
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
OPGW-70
Progresiva
Cota
(m)
(m)
0.00
50.00
174.07
302.03
453.16
576.26
807.34
906.70
991.88
1074.00
1171.37
1309.12
1678.28
2060.97
2205.34
2385.25
2580.01
2767.98
3056.93
3268.45
3652.80
3878.56
3907.39
4035.92
4214.69
4321.87
4426.45
4539.84
4664.81
4756.09
4866.09
4966.73
5067.37
5168.01
5268.65
5369.33
5445.77
5545.14
5644.51
2382.65
2382.65
2384.15
2389.30
2394.00
2395.00
2377.14
2376.17
2369.10
2364.00
2362.45
2310.00
2302.15
2293.40
2292.14
2289.10
2283.60
2279.00
2268.70
2265.90
2255.81
2254.00
2255.90
2257.31
2259.50
2261.50
2264.13
2265.56
2271.32
2272.13
2273.44
2275.39
2275.77
2276.87
2278.67
2280.87
2282.16
2284.72
2286.09
Vrtice
Angulo
Vano
Altura de
-4050'16.02"
1543'23.98"
V2
V3
904'34.99"
-4645'15.00"
V4
V5
V6
V7
V8
V9
V10
V11
V12
V12A
V13
V14
4642'38.99"
729'50.00"
-1647'10.02"
1020'1.03"
-140'56.98"
-1344'55.00"
-055'47.97"
-023'35.97"
244'9.99"
-8314'1.00"
-3340'22.98"
1322'10.00"
V15
V16
V17
67'50.98"
-1415'29.00"
-624'36.01"
V18
636'21.01"
50.00
124.07
127.96
151.13
123.10
231.08
99.36
85.18
82.12
97.36
137.75
369.16
382.69
144.37
179.91
194.76
187.97
288.95
211.52
384.35
225.76
28.83
128.53
178.77
107.18
104.58
113.39
124.97
91.28
110.00
100.64
100.64
100.64
100.64
100.68
76.44
99.37
99.37
99.37
12 m
30 m
30 m
80 pies
85 pies
80 pies
80 pies
80 pies
120 pies
100 pies
100 pies
120 pies
120 pies
120 pies
100 pies
90 pies
80 pies
100 pies
100 pies
33 m
33 m
110 pies
110 pies
90 pies
120 pies
120 pies
100 pies
110 pies
85 pies
85 pies
85 pies
85 pies
80 pies
85 pies
85 pies
80 pies
80 pies
85 pies
85 pies
Vano
Viento(m
Peso(m)
)
-11.08
116.86
156.07
76.13
183.23
255.32
91.07
59.04
201.00
1.31
442.86
-41.64
379.68
283.98
150.52
200.53
132.94
291.34
198.33
348.87
291.14
145.24
33.89
125.58
168.50
130.33
69.22
155.48
86.80
105.70
101.82
117.55
79.84
105.80
107.46
83.46
73.93
114.52
97.77
25.00
87.04
126.01
139.54
137.12
177.09
165.22
92.27
83.65
89.74
117.56
253.46
375.92
263.53
162.14
187.34
191.36
238.46
250.23
297.93
305.06
127.30
78.68
153.65
142.98
105.88
108.98
119.18
108.12
100.64
105.32
100.64
100.64
100.64
100.66
88.56
87.91
99.37
99.37
CP
CG
0
0
6
0
6
0
0
0
0
0
6
6
0
6
6
6
6
6
6
6
0
0
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
2
0
0
0
0
0
2
2
0
2
2
2
2
2
2
2
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Resist.
Puesta a tierra
prom (ohmm)
Tipo
long.
Cont
N
varillas
PAT-E
PAT-E
PAT-D
PAT-C
PAT-C
PAT-C
PAT-1
PAT-1
PAT-1
PAT-1
PAT-1
PAT-C
PAT-D
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-E
PAT-E
PAT-E
PAT-1
PAT-1
PAT-1
PAT-1
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
PAT-C
50
50
40
20
10
10
10
40
25
20
10
10
10
10
10
10
10
10
10
10
10
20
20
20
20
20
20
20
20
1
1
1
1
1
1
1
1
1
-
600
600
500
300
160
75
50
50
50
50
20
125
500
350
220
110
80
70
72
38
30
20
20
25
25
80
95
110
150
175
225
240
250
255
260
270
270
260
Volumen de
Tipo de
Cimentacin
suelo
(m3)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
18.07
18.07
7.75
8.41
7.75
7.75
7.75
14.99
10.78
10.78
14.99
14.99
14.99
10.78
9.14
7.75
10.78
10.78
22.20
22.20
12.68
12.68
9.14
12.68
12.68
10.78
12.68
8.41
8.41
8.41
8.41
7.75
8.41
8.41
7.75
7.75
8.41
8.41
SM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A1M
6-30
20
3
3
0
3
3
1
0
0
0
0
0
1
1
0
0
0
0
3
3
0
3
3
1
0
0
0
0
0
1
1
0
0
0
0
3
6
3
3
6
3
3
8
6
0
0
0
0
2
0
0
0
0
0
2
2
2
1
84
0
84
84
0
84
84
28
0
0
0
0
0
28
SDM
24
0
24
24
0
24
24
8
0
0
0
0
0
8
CANTIDAD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
SDM
0-5
28
SM
A1M
60
120
60
60
120
60
60
160
120
0
0
0
0
40
15
16
17
18
19
28
0
0
0
0
8
0
0
0
0
0
0
0
0
0
20
21
22
23
24
25
Rotula ojal
0
0
0
0
0
0
0
0
0
0
0
0
0
20
0
26
27
28
29
30
31
32
33
34
35
36
0
0
0
0
0
0
0
0
0
Conector de una via de AG para conexin de cable de puesta a tierra a poste
Conector bimetlico de puesta a tierra
0
Manguito
0
#VALUE!
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
40
40
40
20
0
0
A2M
31-60
A3M
61-90
PTM
TR
T. TENS
3
6
3
3
6
3
3
8
6
0
0
0
0
2
0
0
0
0
0
0
6
0
0
6
0
0
8
6
0
0
0
0
2
0
0
0
0
0
0
3
0
0
3
0
0
4
3
0
0
0
0
2
0
0
0
0
0
2
2
2
1
A2M
2
2
2
1
A3M
24
48
24
24
48
24
24
64
48
0
0
0
0
16
3
1
3
0
1
1
1
1
0
PTM
0
18
0
0
18
0
0
24
18
0
0
0
0
6
0
12
0
0
12
0
0
16
12
0
0
0
0
8
PORTICO
4
6
0
0
8
6
0
0
0
0
0
0
0
0
0
0
6
0
0
1
0
0
2
2
2
1
TR. TENS
0
24
0
0
24
0
0
32
24
0
0
0
0
0
0
0
0
3
3
6
3
3
7
0
6
0
0
0
1
1
1
1
1
0
0
3
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Unid
TOTAL
P.Metal
192
198
192
192
198
192
192
300
198
0
0
0
0
106
36
0
0
0
0
0
0
TOTAL
TOTAL
P.concreto
TR
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
24
0
0
24
0
0
32
24
0
0
0
0
0
0
0
0
0
0
24
0
0
PARTE SUBTERRANEA
FASE
8.51
32.45
56.61
143.37
15.2
27.71
71.65
69.58
170.14
42.77
36.18
C.GUARDA
8.56
30.37
56.52
143.19
12.23
26.48
71.54
69.47
169.93
42.7
36.11
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24
0
0
0
8
0
0
0
0
3
0
0
0
0
4
0
0
0
0
4
0
0
0
0
0
0
TOTAL
28.68
23.12
23.91
23.37
719.95
2267.8425
28.63
23.08
23.86
17.97
760.64
0
0
0
0
0
16
16
16
8
0
0
0
0
0
0
0
6
6
6
3
0
0
0
12
4
12
0
4
4
4
4
0
0
0
0
0
0
0
8
8
8
4
0
0
0
0
0
0
0
0
0
0
0
0
0
CONDUCTORES
Descripci Cantidad(m)
AAAC-375
9530.63
OPGW-76 9650.758
TOTAL :
19310.13
2387.8425
AAAC-375
OPGW-76
8810.68
8.811
8810.68
8.811