Content
2 December 2008
Slide 2
DNV-OS-E402
Offshore Standard for Diving
Systems January 2004
(Amendments October 2008)
2 December 2008
Routine operations
Slide 3
2 December 2008
Slide 4
2 December 2008
Slide 5
Content
2 December 2008
Slide 6
Part 1 - General
Operations
2 December 2008
Slide 7
Crane capacity
Rigging capacity,
Part 2 Chapter 6
2 December 2008
Slide 8
2 December 2008
Slide 9
2 December 2008
Slide 10
where:
2 December 2008
Slide 11
Fsling <
MBLsling
sf
2 December 2008
Slide 12
A lateral load of
minimum 3% of the
design load shall be
included. This load
acts in the shackle
bow !
(ref. Pt.2.Ch.5 Sec.2.4.3.4)
DNV Marine Operations' Rules for Subsea Lifting
Table 4.1
2 December 2008
Content
2 December 2008
Slide 14
This
The
2 December 2008
Slide 15
2 December 2008
Slide 16
2 December 2008
Slide 17
Tn = 2
M + A33
K
Heave,
If
If
2 December 2008
Slide 18
8 .9
Hs
g
Tz 13
HS
g
2 December 2008
Slide 19
a = 0 .9 H S
2
v w = a
Tz
2
a w = a
Tz
4 2 d
T z2 g
4 2 d
T z2 g
d :
2 December 2008
v w = 0 .30
g Hs e
aw = 0.10
g e
0 .35 d
Hs
0.35 d
Hs
Slide 20
v s = v c + v ct2 + v w2
vc = lowering speed
vct = vertical crane tip velocity
vw = vertical water particle velocity
at water surface
F = V g
V = Aw a 2 + ct2
2 December 2008
a = wave amplitude
ct = crane tip motion amplitude
w = mean water line area in the
wave surface zone
Slide 21
v r = vc +
Mass force
Mass force is here a combination of inertia
force, Froude-Kriloff force and diffraction
force.
Crane tip acceleration and water particle
acceleration are assumed statistically
independent.
DNV Marine Operations' Rules for Subsea Lifting
2 December 2008
vc = lowering/hoisting speed
vct = vertical crane tip velocity
vw = vertical water particle velocity
at water depth , d
Ap = horizontal projected area
FM =
vct2 + v w2
Fhyd = ( FD + Fslam )2 + ( FM F ) 2
Mi
FD =
Di
2 December 2008
Slide 23
Load Case 2
Still water level above top of buckets
2 December 2008
Slide 24
Load Case 4
Still water level above roof cover.
2 December 2008
Slide 25
2 December 2008
Slide 26
2 December 2008
Slide 27
DAF =
Ftotal
Mg
where
Mg : weight of object in air [N]
Ftotal : is the characteristic total force on the
(partly or fully) submerged object. Taken as the
largest of;
Ftotal = Fstatic-max + Fhyd or
Ftotal = Fstatic-max + Fsnap
2 December 2008
2 December 2008
Slide 29
A33 = 0.76
2 December 2008
a2 b
Slide 30
A33 1 +
A
2 33o
2( 1 + )
1 2
1.8
1.7
1.6
A33/A33o
1.5
1.4
1.3
1+SQRT((1-lambda^2)/(2*(1+lambda^2)))
1.2
and
Ap
h + Ap
1.1
1
0
0.5
1.5
2.5
ln [ 1+ (h/sqrt(A)) ]
where
2 December 2008
Slide 31
volume of water
inside suction anchors
or foundation buckets.
The
volume of water
between large plated
mudmat surfaces and
roof structures.
2 December 2008
Slide 32
A33
= 0.7 + 0.3 cos[ ( p 5 ) / 34]
A33S
if 5 < p < 34
A33
=e
A33 S
10 p
28
if 34 < p < 50
0.9
Added Mass Reduction Factor
A33
= 1.0
A33S
0.8
0.7
0.6
0.5
0.4
e^-P/28
BucketKC0.1-H4D-NiMo
BucketKC0.6-H4D-NiMo
BucketKC1.2-H4D-NiMo
BucketKC0.5-H0.5D-NiMo
BucketKC1.5-H0.5D-NiMo
BucketKC2.5-H0.5D-NiMo
BucketKC3.5-H0.5D-NiMo
PLET-KC1-4
Roof-A0.5-2.5+
Hatch20-KCp0.5-1.8
Hatch18-KCp0.3-0.8
BucketKC0.1
BucketKC0.6
BucketKC1.2
RoofKCp0.1-0.27
RoofKCp0.1-0.37
DNV-Curve
Mudmat CFD
0.3
0.2
0.1
0
0
10
Perforation
20
30
40
50
No reduction applied in added mass when perforation is small. A significant drop in the
added mass for larger perforation rates. Reduction factor applicable for p<50.
2 December 2008
Slide 33
2.0
3.5 + 2.0 2
'
= 0.50 A33
s
= 1 +
1 0.78 2
'
1 0.50
2 1 + 0.50 2
A33o = 33803 kg
A
= 29496 kg
33o
0.4 2
2.0 2
= 0.78
1 + 2.0 2
2.0 2
Height factor : =
2 4
A33o = 2.0 3 = 21867 kg
3
2 4
2.0 3 = 21867 kg
Bucket Dimensions:
P = 100
0.4 2
2.0 2
= 4 SMALL
No reduction of A33s
2 December 2008
Height = 3.5m
Diameter = 4.0m
Plate thickness = 0.25m
Ventilation hole diameter = 0.8m
Slide 34
1.0m
4 2 ( 1+1.25 )
2
2
2
vw = 1.75 e 5.5 9.81 = 1.48 m/s and aw = vw = 1.69 m/s2
5.5
CoG
5.5
Drag force:
Mass force:
FM =
Other Data
Hydrodynamic force:
Fhyd =
(0.37 10 ) + (1.33 10 )
5 2
5 2
Buoyancy, V = 13031kg
Negligible crane tip motions
Lowering speed = 0.25m/s
= 1.4 10 5 N
2 December 2008
Slide 35
Content
2 December 2008
Slide 36
Structure
Inflow boundary,
Airy or Stokes
5th wave
2 December 2008
Fluid
domain
Numerical
beach at
aft end
Slide 37
2 December 2008
Slide 38
Highest upwards
hydrodynamic force
when bucket is fully
submerged occurs
at time t=21s where
the object is located
in a wave trough.
Buoyancy, Vg
2 December 2008
Slide 39
2 December 2008
Slide 40
Slamming load
on roof structure
Slamming load
on aft bucket
2 December 2008
Slide 41
2 December 2008
Slide 42
2
2 2 3.5
Fm = ( V + madd ) aw 2.0 1.0 25
= 0.6 10 5 N
5.5 2
4
2 December 2008
Slide 43
Vertical force,
fwd half
Vertical force,
aft half
2
2
2 3.5
Fm = ( V + madd ) aw 2.0 1025 1.0 25 0.77
= 0.45 10 5 N
4
2
5. 5
2 December 2008
Slide 44
When planning
Marine Operations,
remember to take
into account ....
DNV Marine Operations' Rules for Subsea Lifting
2 December 2008
Slide 45
Easy Handling ..
2 December 2008
Slide 46
2 December 2008
Slide 47
2 December 2008
Slide 48