Anda di halaman 1dari 2

Sri Lankan Engineering Society - Bahrain

Proudly presents

In collaboration with

Sri Lankan Quantity


Surveyors-UAE
and DRSAM FZE
28th & 29th November 2014
8.30AM to 5PM

Contract Administration

At Al Manzil Suites Hotel - Juffair

Limited Seats

Foundation Course
Who Should Attend?

Who is conducting ?
The course has been structured and would be conducted by

Prof. Indrawansa Samaratunga PhD, DSc


FRICS, FAIQS, FIQSSL, FCIArb, FCIOB, FCMI, FASI, FCABE

With over 35 years of experience in the Middle East


Chartered Surveyor, Chartered Manager, Chartered Construction
Manager,, Chartered Building Engineer, Chartered Quantity Surveyor
Arbitrator / Mediator - London Court of International Arbitration
Arbitrator / Expert - Dubai International Arbitration Centre, UAE
Construction Law & Dispute Resolution Advisory Board member
of the British University in Dubai

Quantity Surveyors who wish to progress from their measuring / valuing


roles to administrate contracts such as dealing with variations and claims
Final year undergraduates who wish to gain foundation knowledge on
FIDIC contracts and Contract Administration
Engineers, Architects, Project Managers, Contract Managers,
Commercial Managers, Planners and other construction industry
professionals who wish to have an introduction into administrating
Variations, Extension of Time & Prolongation Cost Claims, and Project
Cost Control etc
In the future, there would be an Advanced Course for those who are
already practising Contract Administration, but they too are welcome to
brush up their foundation knowledge

Why Should You Attend?


The limited time of University / Polytechnic study
programmes and the necessity to deliver a vast
amount of material essential to practice a discipline
such as Quantity Surveying, Engineering, Architecture
etc, do not allow for space to teach the
errors/shortcomings in Standard Forms of Contract
such as FIDIC, and the incorrect practices in the
Industry, and therefore there is no choice other than to
gain such rare knowledge from the industry experts, in
order to identify the Best Practice.

How much does it Cost?


BD 160/- for both days (including
course materials, Lunch and
refreshments)
All
participants
successfully
completing the course will receive a
certificate for 12 CPD hours.
See the reverse for Course details

For registration, contact slesbh@gmail.com


or call Vijitha 39925026 Indika 33410210 Wasantha 39172103

CONTRACT ADMINISTRATION FOUNDATION COURSE


28th & 29th November 2014 Kingdom of Bahrain
1. Introduction to FIDIC Contracts Understanding the terminology in FIDIC.
People - relationships among various
parties
Documents used in different stages of the
project
Dates/Times correct usage
Activities correct meaning
Money terminology related to price,
payments etc.
Pre-contract process.
Project time-line (project process).
2. Variations Explained
Project Change Management.
Understanding Clause 51.
What can/cannot be instructed as
variations.
The Who, When, Which, Why, and How of
Variations.
Engineers authority to instruct, and
Contractors obligation to execute
variations.
Understanding the 10 Sub-Clauses in the
Contract under which variations / varied
work can arise.
What are variations & what are varied
work ?

3. Valuation of Variations
- Project Cost Management.
Lump Sum type / Re-measurement type.
Understanding Clause 52.
Valuation of Variations
Varying the rates/prices
How rates/prices become inapplicable
Provisional Sums & PC Rates

4. Extension of Time & Prolongation Costs


Project Time Management
Understanding the 22 Sub-Clauses in the
Contract from which entitlement to EOT
could be inferred.
Understanding the 21 Sub-Clauses in the
Contract from which entitlement to
prolongation costs could be inferred.
How to identify the entitlement if contract is
silent
How to reserve the rights to EOT and Cost
What is Concurrent Delay ?
What is time-at-large ?
5. The Claim - How to secure the rights
Structure of the Claim
What are Head Office Overheads and how
are they claimed
Hudson Formula
Loss of productivity
Calculation of EOT
Calculation of Prolongation Costs
6. Drafting the Contract Agreement
Contract Law Terminology
8 steps of drafting
8 requirements of a legally binding contract
Definition of a Contract
Incorporation of documents

At the end of each of the above 6 Sessions


there would be time allocated for Questions
& Answers, and also more time at the end
of each day, if required.

For registration, contact slesbh@gmail.com


or call Vijitha 39925026 Indika 33410210 Wasantha 39172103

Anda mungkin juga menyukai