- Plant
- Processing key:
- NETCH for executing MRP on materials that have under gone changes after the last MRP
- NETPL for executing MRP within a defined Planning Horizon
- NEUPL for executing MRP for all the materials in the plant irrespective of changes
- Create purchase request: 2
- Schedule lines: 2
- Create MRP list: 1
- Planning Mode: 2
- Scheduling: 2
- Planning date: Current date
After entering data as above, press Enter threetimes.
After the MRP is executed system displays the statistics of the MRP run.
After entering values as above, press Enter three times and that will trigger MRP run.
After the MRP is executed system displays the statistical result of MRP run.