All the Productivity Rates are for working 8 hours/day

Description
Earth Works

Qty

Rate

Resource

Excavation work in soft soil


Excavation Work in Hard Soil

120
50

m3/day
m3/day

Excavator (bucket type)


Rock breaker

In layer of 150 mm thickness


with 95% MDD value

150

m2/day

1 Skilled, 4 Unskilled,
1 shovel,1 Roller compactor

Including surface preparation


Horizontal/Vertical surface
Horizontal/Vertical Surface

200
150
80

m2/day
m2/day
m2/day

1 skilled + 1 unskilled
1 skilled + 1 unskilled
1 skilled + 1 unskilled

75/100 mm thick Blinding works

120

m2/day

1 Mason + 2 Helper

40/50 mm thick C/S Screed


75/100 mm thick screed with
welded steel fabric

200

m2/day

1 Mason + 2 Helper

120

m2/day

Up to 16 mm dia bars
Above 16 mm dia bars
Up to 12 mm
16 mm and Above

200
300
200
300
400

kg
kg
kg
kg
kg

With Ordinary(Ply wood) shutter


"
"

8
6
12

m2/day
m2/day
m2/day

60
40

m3/hr
m3/hr

Concrete Placing and Trowel Finishing


"
"

160
60
150

m3/day
m3/day
m3/day

1 Mason + 3 helper
1 Mason + 2 helper
2 Mason + 3 Helper

Placing in line and level

400

m2/day

2 Rigger + 1 Mason + 2 Helper

10/15/20 cm thick Block works

10

m2/day

1 mason + 1 Helper

15 mm thick Plaster Works with Acc.


20 mm thick Plaster Works with Acc.

12
10

m2/day
m2/day

1 Plaster Mason + 1 Helper


1 Plaster Mason + 1 Helper

Including Surface preparation works


First Coat
Second Coat

150
75
250
350

m2/day
m2/day
m2/day
m2/day

1 Painter + 1 Helper
1 Painter + 1 Helper
1 painter
1 Painter

Surface Prep + Priming


Painting

50
100

m2/day
m2/day

1 Painter + 1 Helper
1 Painter + 1 Helper

Frame + Gypsum Partition Installation

120

m2/day

1 Mason + 1 Helper

Frame + False Ceiling Fixing

30

m2/day

1 Mason + 1 Helper

Tile Works

On Floor
On Walls

15
12

m2/day
m2/day

1 Mason + 1 Helper
1 Mason + 1 Helper

Marble/Granite Works

on Floor

20

m2/day

2 Mason + 1 Helper

Back Filling + Compaction

Concrete Protection Works


Bitumen Priming Works
Bitustic works
Protection works (torch applied)
Concrete Blinding Works
Screed Works

Reinforcement Works
Isolated/ Strap Footing
Column/Corewall/Staircase
Slab with beam/Raft

Shuttering
Footing
Column/Core Wall/Staircase
Slab
Concrete Pumping Works
Placing with concrete Pump
Boom Placer
Concrete Works
Footings
Staircase
Slab
Placing Precast/Hollow Core Slab

Block works
Plaster Works

Ordinary Painting
Priming Works
Putty Works
Painting Works

Epoxy Paint

Gypsum Partition Works


False Ceiling

1 Mason + 2 Helper

1 SF +
1 SF +
1 SF +
1 SF +
1 SF +

1 Helper
1 Helper
1 Helper
1 Helper
1 Helper

1 Carpenter + 1 Helper
1 Carpenter + 1 Helper
1 Carpenter + 1 Helper