Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Date:
Checked by:
Date:
Description
Reference
BS 8110
Made by:
Data given
Concrete Grade
fcu
fy
=
Cover =
Result
30
N/mm2
fcu
460
40
N/mm2
fy
=
cover =
mm
30
460
40
Preliminary Sizing
Assume Thickness of slab
=
Diameter of bar
=
Effective depth for the short span, d1 =
125
12
mm
mm
79
mm
d1 =
79
67
mm
d2 =
67
(Residential Area)
qk =
gk =
Condition :
(Worst Condition)
=
=
0
4
1
kN/m2
2
2
kN/m2
2
kN/m
Height of brickwall =
kN/m2
12
kN/m2
m
m
= 12
lx =
ly =
2
2
0.000
2
0.056
0.055
Msx = Bsx*n*lx2 =
2
cl 3.4.4.4 k = Msx/fcu*b*d =
z=
77.8
0.0142
( 0.95d = 75.05
Therefore, z =
75.05
As required =
88
mm2
Asmin =
163
mm2
Asmax =
5000
mm2
10
at
Therefore, provide T
Ref. : JPA/P-063/Slab.xls/08-002
2.64
mm
Provided As =
163
mm2
Main
Reinforcement
at MIDSPAN
T
at
10
200
page 1 of 8
JPA No.
Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Date:
Checked by:
Date:
Description
Reference
cl 3.4.6
Made by:
Result
2
Table 3.11 Msx/b*d
0.4231
eqn 8
Fy
eqn 7
Modification factor =
N/mm2
64.55
2
20
40
Deflection Check
25.32
Cracking Check
max. spacing =
250
mm c/c
min. spacing =
100
mm c/c
Spacing provided =
200
mm c/c
OK!
OK!
Cracking Check
OK!
OK!
Msy = Bsy*n*lx2 =
2
cl 3.4.4.4 k = Msy/fcu*b*d =
z=
65.47
Therefore,
z =
2.7
0.0201
( 0.95d = 63.65
63.65
As required =
106
mm
mm2
Asmin =
163
mm2
Asmax =
5000
mm2
Therefore, provide T
10
at
Provided As =
163
mm2
Secondary
Reinforcement
at MIDSPAN
T
at
10
200
z=
Therefore,
79
z =
( 0.95d = 75.05
75.05
mm
As required =
Asmin =
Asmax =
Therefore, provide T
Ref. : JPA/P-063/Slab.xls/08-002
mm2
163
mm2
5000
mm2
10
at
Provided As =
163
mm2
Main
Reinforcement
at SUPPORT
T 10
at 200
page 2 of 8
JPA No.
Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Made by:
Date:
Checked by:
Date:
Description
Reference
Cracking Check
max. spacing =
min. spacing =
Spacing provided =
250
100
200
Result
mm c/c
mm c/c
mm c/c
Cracking Check
OK!
OK!
7.92
0.4963
Therefore,
N/mm
0.1003
< 0.8*sqrt(fcu), OK!
=
Vc
Where Bsx =
0.7977
0.33
Shear
Coefficient
0.33
0.33
( Table 3.16)
0.33
N/mm2
0.33
Shear Check
OK!
z=
Therefore,
67
z =
( 0.95d = 63.65
63.65
mm
As required =
mm2
Asmin =
163
mm2
Asmax =
5000
mm2
Therefore, provide T
Cracking Check
max. spacing =
min. spacing =
Spacing provided =
10
250
100
200
Provided As =
163
mm2
Secondary
Reinforcement
at
mm c/c
mm c/c
mm c/c
at SUPPORT
T
at
10
200
Cracking Check
OK!
OK!
7.92
0.5851
Therefore,
N/mm
0.1183
< 0.8*sqrt(fcu), OK!
=
Vc
Where Bsy =
0.8781
0.33
N/mm2
( Table 3.16)
Shear
Coefficient
0.33
Ref. : JPA/P-063/Slab.xls/08-002
0.33
0.33
0.33
Shear Check
OK!
page 3 of 8
JPA No.
Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Made by:
Date:
Checked by:
Date:
Description
Reference
Result
2
extend from
the edge a
minimum
distance of
0.4 m
T 10
@ 200
T 10
@
200
T 10
@ 200
2
T
@
10
200
T
@
10
200
T 10
@ 200
Ref. : JPA/P-063/Slab.xls/08-002
4.00
4.00
kN/m2
kN/m2
Un factored
D/L
L/L
4.00
4.00
kN/m2
kN/m2
page 4 of 8
JPA No.
Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Date:
Checked by:
Date:
Description
Reference
BS 8110
Made by:
Data given
Concrete Grade
fcu
fy
=
Cover =
Result
30
N/mm2
fcu
460
40
N/mm2
fy
=
cover =
mm
30
460
40
Preliminary Sizing
Assume Thickness of slab
=
Diameter of bar
=
Effective depth for the short span, d1 =
100
12
mm
mm
54
mm
d1 =
54
42
mm
d2 =
42
(Residential Area)
qk =
gk =
3.4
Condition :
(Worst Condition)
=
0
1
kN/m2
0.6
2
kN/m2
2
kN/m
Height of brickwall =
kN/m2
11.16
kN/m2
m
m
= 11.16
lx =
ly =
0.6
0.6
2
0.000
2
0.056
0
Msx = Bsx*n*lx2 =
2
cl 3.4.4.4 k = Msx/fcu*b*d =
z=
54
Therefore, z =
( 0.95d = 51.3
51.3
mm2
Asmin =
130
mm2
Asmax =
4000
mm2
10
at
Therefore, provide T
mm
As required =
Ref. : JPA/P-063/Slab.xls/08-002
0.00
Provided As =
130
mm2
Main
Reinforcement
at MIDSPAN
T
at
10
200
page 5 of 8
JPA No.
Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Date:
Checked by:
Date:
Description
Reference
cl 3.4.6
Made by:
Result
2
Table 3.11 Msx/b*d
eqn 8
Fy
eqn 7
Modification factor =
N/mm2
0
2
20
40
Deflection Check
11.12
Cracking Check
max. spacing =
250
mm c/c
min. spacing =
100
mm c/c
Spacing provided =
200
mm c/c
OK!
OK!
Cracking Check
OK!
OK!
Msy = Bsy*n*lx2 =
2
cl 3.4.4.4 k = Msy/fcu*b*d =
z=
41.74
Therefore,
z =
0.3
0.0057
( 0.95d = 39.9
39.9
As required =
19
mm
mm2
Asmin =
130
mm2
Asmax =
4000
mm2
Therefore, provide T
10
at
Provided As =
130
mm2
Secondary
Reinforcement
at MIDSPAN
T
at
10
200
z=
Therefore,
54
z =
( 0.95d =
51.3
51.3
mm
As required =
Asmin =
Asmax =
Therefore, provide T
Ref. : JPA/P-063/Slab.xls/08-002
mm2
130
mm2
4000
mm2
10
at
Provided As =
130
mm2
Main
Reinforcement
at SUPPORT
T 10
at 200
page 6 of 8
JPA No.
Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Made by:
Date:
Checked by:
Date:
Description
Reference
Cracking Check
max. spacing =
min. spacing =
Spacing provided =
250
100
200
Result
mm c/c
mm c/c
mm c/c
Cracking Check
OK!
OK!
0.726
Therefore,
N/mm2
0
< 0.8*sqrt(fcu), OK!
=
Vc
Where Bsx =
0.9959
( Table 3.16)
Shear
Coefficient
0.33
N/mm2
0.33
Shear Check
OK!
z=
Therefore,
42
z =
( 0.95d = 39.9
39.9
mm
As required =
mm2
Asmin =
130
mm2
Asmax =
4000
mm2
Therefore, provide T
Cracking Check
max. spacing =
min. spacing =
Spacing provided =
10
250
100
200
Provided As =
130
mm2
Secondary
Reinforcement
at
mm c/c
mm c/c
mm c/c
at SUPPORT
T
at
10
200
Cracking Check
OK!
OK!
2.21
0.9334
Therefore,
N/mm
0.0527
< 0.8*sqrt(fcu), OK!
=
Vc
Where Bsy =
1.1531
N/mm2
( Table 3.16)
Shear
Coefficient
0.33
Ref. : JPA/P-063/Slab.xls/08-002
0.33
0
0.33
Shear Check
OK!
page 7 of 8
JPA No.
Sheet
Rev.
Job Title:
Subject:
Client:
CALCULATION SHEET
Made by:
Date:
Checked by:
Date:
Description
Reference
Result
0.6
T 10
@ 200
T 10
@
200
T 10
@ 200
2
T
@
10
200
T
@
extend from
the edge a
minimum
distance of
0.12 m
10
200
T 10
@ 200
0.3
Ref. : JPA/P-063/Slab.xls/08-002
1.02
1.20
kN/m2
kN/m2
1.4
0.3
Un factored
D/L
L/L
0.3
1.02
1.20
kN/m2
kN/m2
0.3
page 8 of 8