CLCULO DE EL INDICE MEDIO DIARIO

DAS
DE LA
SEMANA
LUNES
MARTES
MIRCOLES
JUEVES
VIERNES
SBADO
DOMINGO
TOTAL SEMANAL
IMD

TRFICO LIVIANO
CAMIONETAS

TRAFICO PESADO
AUTOS

ONNIBUS

2
2
2
2
2
2
2
14

2
1
2
1
2
1
2
11

0
0
0
0

PICK-UP

RURALES

1
1
2
2
1
1
2
10
1

TOTAL

CAMIONES
2 EJES

3 EJES

0
0
0
0

9
8
12
9

0
0
0
0

4
4
6
4
4
4
6
32

0
0
0
0

9
8
12
67

ANLISIS DE LA DEMANDA DEL SERVICIO


DEMANDA ACTUAL: TRNSITO VEHICULAR
TIPO DE VEHCULO
AUTOMVILES
CAMIONETAS
CAMION 2E
TOTAL

IMD
2
3
5
10

DISTRIBUCIN
20.00
30.00
50.00
100.00

DEMANDA FUTURA: TRNSITO VEHICULAR


PROYECCIN DEL TRFICO SIN PROYECTO
VEHCULO
AUTOMVILES
CAMIONETAS
CAMION 2E
TOTAL

2007
2
3
5
10

2008
2
3
5
10

2009
2
3
5
10

2010
2
3
6
11

TASA DE CRECIMIENTO TRFICO LIGERO:

1.10

TASA DE CRECIMIENTO TRFICO PESADO:

3.60

2011
2
3
6
11

2012
2
3
6
11

2013
2
3
6
11

2014
2
3
6
11

2015
2
3
7
12

2016
2
3
7
12

2017
2
3
7
12

DEMANDA FUTURA: TRNSITO VEHICULAR


PROYECCIN DEL TRFICO CON PROYECTO

TIPO DE VEHCULO
TRFICO NORMAL

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

10

10

10

11

11

11

11

11

12

12

12

AUTOMVILES
CAMIONETAS
CAMION 2E

2
3
5

2
3
5

2
3
5

2
3
6

2
3
6

2
3
6

2
3
6

2
3
6

2
3
7

2
3
7

2
3
7

TRFICO GENERADO

AUTOMVILES
CAMIONETAS
CAMION 2E

0
0
0

0
0
1

0
0
1

0
0
1

0
0
1

0
0
1

0
0
1

0
0
1

0
0
1

0
0
1

0
0
1

10

11

11

12

12

12

12

12

13

13

13

IMD TOTAL

COSTOS DE OPERACIN VEHICULAR


S/. - VEH - KM A PRECIOS DE MERCADO
TIPO DE
VEHCULO

SIN
PROYECTO

CON PROYECTO
ALTERNATIVA 1

CON PROYECTO
ALTERNATIVA 2

AUTOMVILES
CAMIONETAS
CAMION 2E
Regin/Relieve
Clase/Estado

1.83
2.33
8.10
Sierra/Accidentada
Trocha/Malo

1.30
1.89
7.94
Sierra/Accidentada
Sin Afirmado/Regular

0.94
1.64
4.50
Sierra/Accidentada
Afirmado/Bueno

N DE KILOMETROS

22.53

COSTOS DE OPERACIN VEHICULAR SIN PROYECTO


EN MILES DE SOLES A PRECIOS SOCIALES

TIPO DE VEHCULO

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

30.05

30.05

30.05

30.05

30.05

30.05

30.05

30.05

30.05

30.05

30.05

57.54

57.54

57.54

57.54

57.54

57.54

57.54

57.54

57.54

57.54

57.54

333.18

333.18

333.18

399.81

399.81

399.81

399.81

399.81

466.45

466.45

466.45

420.77

420.77

420.77

487.40

487.40

487.40

487.40

487.40

554.04

554.04

554.04

TRFICO NORMAL
AUTOMVILES
CAMIONETAS
CAMION 2E
TOTAL

COSTOS DE OPERACIN VEHICULAR CON PROYECTO PARA TRFICO NORMAL


EN MILES DE SOLES A PRECIOS DE MERCADO
ALTERNATIVA N 01

TIPO DE VEHCULO

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

394.23

394.23

459.49

459.49

459.49

459.49

459.49

524.74

524.74

524.74

21.35

21.35

21.35

21.35

21.35

21.35

21.35

21.35

21.35

21.35

46.62
326.25

46.62
326.25

46.62
391.51

46.62
391.51

46.62
391.51

46.62
391.51

46.62
391.51

46.62
456.76

46.62
456.76

46.62
456.76

TRAFICO NORMAL
AUTOMVILES
CAMIONETAS
CAMION 2E

BENEFICIOS POR COSTOS DE OPERACIN VEHICULAR CON PROYECTO PARA TRFICO GENERADO
EN MILES DE SOLES A PRECIOS SOCIALES
ALTERNATIVA N 01

TIPO DE VEHCULO

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

TRAFICO GENERADO
AUTOMVILES
CAMIONETAS
CAMION 2E

COSTOS DE OPERACIN VEHICULAR CON PROYECTO PARA TRFICO NORMAL


EN MILES DE SOLES A PRECIOS DE MERCADO
ALTERNATIVA N 02

TIPO DE VEHCULO 2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

TRAFICO NORMAL

240.64

240.64

277.61

277.61

277.61

277.61

277.61

314.59

314.59

314.59

15.42

15.42

15.42

15.42

15.42

15.42

15.42

15.42

15.42

15.42

40.34
184.88

40.34
184.88

40.34
221.85

40.34
221.85

40.34
221.85

40.34
221.85

40.34
221.85

40.34
258.83

40.34
258.83

40.34
258.83

AUTOMVILES
CAMIONETAS
CAMION 2E

BENEFICIOS POR COSTOS DE OPERACIN VEHICULAR CON PROYECTO PARA TRFICO GENERADO
EN MILES DE SOLES A PRECIOS SOCIALES
ALTERNATIVA N 02

TIPO DE VEHCULO 2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

TRAFICO GENERADO

14.83

14.83

14.83

14.83

14.83

14.83

14.83

14.83

14.83

14.83

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14.83

14.83

14.83

14.83

14.83

14.83

14.83

14.83

14.83

14.83

AUTOMVILES
CAMIONETAS
CAMION 2E

BENEFICIOS POR AHORRO DE COSTOS DE OPERACIN VEHICULAR


COSTO DE OPERACIN VEHICULAR
EN MILES DE SOLES A PRECIOS DE MERCADO

CON PROYECTO
AOS
0
1
2
3
4
5
6
7
8
9
10

SIN
PROYECTO
420.77
420.77
487.40
487.40
487.40
487.40
487.40
554.04
554.04
554.04

CON PROYECTO

ALTERNATIVA 1

ALTERNATIVA 2

TRAFICO NORMAL

TRAFICO NORMAL

394.23
394.23
459.49
459.49
459.49
459.49
459.49
524.74
524.74
524.74

240.64
240.64
277.61
277.61
277.61
277.61
277.61
314.59
314.59
314.59

BENEFICIOS INCREMENTALES (OPERACIN VEHICULAR)


EN MILES DE SOLES A PRECIOS DE MERCADO

ALTERNATIVA 1
AOS
0
1
2
3
4
5
6
7
8
9
10

NORMAL

GENERADO

26.54
26.54
27.92
27.92
27.92
27.92
27.92
29.30
29.30
29.30

0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69

ALTERNATIVA 2
TOTAL
0.00
27.23
27.23
28.61
28.61
28.61
28.61
28.61
30.00
30.00
30.00

NORMAL

GENERADO

180.13
180.13
209.79
209.79
209.79
209.79
209.79
239.45
239.45
239.45

14.83
14.83
14.83
14.83
14.83
14.83
14.83
14.83
14.83
14.83

TOTAL
0.00
194.96
194.96
224.62
224.62
224.62
224.62
224.62
254.28
254.28
254.28

...BENEFICIO INCREMENTAL = BENEFICIO COV POR TRFICO NORMAL + BENEFICIO COV POR TRFICO
GENERADO
...BENEFICIO COV POR TRFICO GENERADO = 50% DEL AHORRO EN COV A PARTIR DE LOS MODULARES

PRESUPUESTO DE OBRA
ALTERNATIVA N 01
PROYECTO: Mejoramiento de la Carretera El Guayao - Cruce La Samana
UBICACION: Distrito La Esperanza - Provincia Santa Cruz - Cajamarca
FECHA: Mayo del 2007
ITEM

DESCRIPCIN

UND

CANT

P.U

PARCIAL

1.00

OBRAS PROVISIONALES

1.01

Cartel de Obra

UND

1.00

500.00

500.00

1.02

Campamento

M2

50.00

35.94

1,797.00

2.00

TRABAJOS PRELIMINARES

2.01

Movilizacin y Desmovilizacin

GLB

1.00

9,671.00

9,671.00

2.02

Trazo y Replanteo

KM

22.53

659.81

14,862.22

HA

2.25

320.00

720.00

2.03

Roce y Limpieza

3.00

EXPLANACIONES

3.01

Corte en Material Suelto

M3

32,500.00

1.86

60,450.00

3.02

Corte en roca suelta con


maquinaria

M3

4,200.00

8.07

33,894.00

3.03

Corte en Roca Fija

M3

620.00

16.79

10,409.80

3.04

Perfilado de Subrasante Zonas de


Corte

M2

18,000.00

0.82

14,760.00

3.05

Relleno

M3

3,000.00

6.96

20,880.00

3.06

Eliminacin a Botadero (Dm = 5 Km)

M3

12,000.00

7.48

89,760.00

4.00

PAVIMENTO

4.01

Perfilado y Compactacin de
Subrasante

1.00

83,362.50

.
M2

83,362.50
-

5.00

DRENAJE Y OBRAS DE ARTE

5.01

Construccin de cunetas de base


sin revestir

ML

22,500.00

0.90

20,250.00

5.02

Construccin de badenes

M2

288.00

157.70

45,417.60

5.03

Construccin de Alcantarillas 36"

ML

60.00

380.00

22,800.00

6.00

SEALIZACIN

6.01

Postes Kilomtricos

UND

22.00

126.31

2,778.82

UND

15.00

229.45

3,441.75

GLB

1.00

2,200.00

2,200.00

6.02

Seales de Trnsito

7.00

VARIOS

7.02

Limpieza General de Obra

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

10%
10%

SUBTOTAL
IGV

19%

TOTAL PRESUPUESTO

RESUMEN DE LA INVERSIN

PRESUPUESTO DE OBRA
ELABORACIN DE EXPEDIENTE TCNICO

TOTAL DE INVERSIN

TOTAL

2,297.00

25,253.22

230,153.80

3000
1575

83,362.50

88,467.60

6,220.57
2,200.00
437,954.69
43,795.47
43,795.47
525,545.63
99,853.67
625,399.30

625,399.30
12,507.99
637,907.28

PRESUPUESTO DE OBRA
ALTERNATIVA N 01
PROYECTO: Mejoramiento de la Carretera El Guayao - Miraflores
UBICACION: Distrito La Esperanza - Provincia Santa Cruz - Cajamarca
FECHA: Abril del 2007
ITEM

DESCRIPCIN

UND

1.00

OBRAS PROVISIONALES

1.01

Cartel de Obra

1.02

Campamento

2.00

TRABAJOS PRELIMINARES

2.01

Movilizacin y Desmovilizacin

2.02

Trazo y Replanteo

2.03

Roce y Limpieza

3.00

EXPLANACIONES

3.01

Corte en Material Suelto


Corte en roca suelta con
maquinaria
Corte en Roca Fija

3.02
3.03
3.04
3.05

Perfilado de Subrasante Zonas de


Corte

4.02

Relleno
Eliminacin a Botadero (Dm = 5
Km)
PAVIMENTO
Perfilado y Compactacin de
Subrasante
Afirmado (E=0.175m)

5.00

DRENAJE Y OBRAS DE ARTE

3.06
4.00
4.01

CANT

P.U

PARCIAL

UND

1.00

500.00

500.00

M2

50.00

35.94

1,797.00

GLB

1.00

9,671.00

9,671.00

KM

22.53

659.81

14,862.22

HA

2.25

320.00

720.00

M3

32,500.00

1.86

60,450.00

M3

4,200.00

8.07

33,894.00

M3

620.00

16.79

10,409.80

M2

18,000.00

0.82

14,760.00

M3

3,000.00

6.96

20,880.00

M3

12,000.00

7.48

89,760.00

M2

83,362.50

1.00

83,362.50

M3

13,515.00

17.76

240,026.40

ML

22,500.00

0.90

20,250.00

5.02

M2

288.00

157.70

45,417.60

5.03

Construccin de Alcantarillas 36"

ML

60.00

380.00

22,800.00

6.00

SEALIZACIN

6.01

Postes Kilomtricos

UND

22.00

126.31

2,778.82

6.02

Seales de Trnsito

UND

15.00

229.45

3,441.75

7.00

VARIOS

7.02

Limpieza General de Obra

GLB

1.00

3,200.00

3,200.00

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

25,253.22

230,153.80

323,388.90

88,467.60

6,220.57
3,200.00
678,981.09

10%

67,898.11

10%

67,898.11

SUBTOTAL
IGV

2,297.00

Construccin de cunetas de base


sin revestir
Construccin de badenes

5.01

TOTAL

814,777.31
19%

154,807.69

TOTAL PRESUPUESTO

969,585.00

RESUMEN DE LA INVERSIN
PRESUPUESTO DE OBRA
ELABORACIN DE EXPEDIENTE TCNICO

TOTAL DE INVERSIN

969,585.00
24,239.62
993,824.62

INVERSIN A PRECIOS SOCIALES


COSTOS A PRECIOS DE MERCADO
PRESUPUESTO
ALTERNATIVA 1
Costo de Inversin S/.
637,907.28

ALTERNATIVA 2
993,824.62

PRESUPUESTO
Costo de Inversin S/.

ALTERNATIVA 2
785,121.45

FACTOR DE CONVERSIN = 0.79

ALTERNATIVA 1
503,946.75

COSTO DE MANTENIMIENTO VIAL


SITUACIN SIN PROYECTO OPTIMIZADA
PARTIDA
UND
CANT
P.U
Limpieza General
kM
4.00
17.11
M3
3.00
2.20
Lipieza de derrumbes y huaycos
Encauzamiento de Curso de Aguas
M3
20.00
2.20
Mantenimiento Rutinario - S/km-ao

119.04

SITUACIN CON PROYECTO: ALTERNATIVA N 01


PARTIDA
UND
CANT
P.U
Roce
Limpieza General
Limpieza de Derrumbes y Huaycos
Encauzamiento de Curso de Aguas

M2
KM
M3
M3

200.00
4.00
3.00
20.00

Bacheo
M3
6.00
Reposicin de Afirmado
M3
0.00
Desencalaminado
KM
3.60
Limpieza de Cunetas
ML
500.00
Limpieza de Alcantarillas
UND
0.60
Mantenimiento de Muro
M3
0.20
Mantenimiento de Puentes
M3
5.00
TOTAL - S/./ Km-ao
Mantenimiento Rutinario - S/km-ao
Mantenimiento Rutinario con Bacheo - S/km-ao
Mantenimiento Rutinario con Bacheo y Reposicin de Afirmado -

PARTIDA

0.30
17.11
2.20
2.20
15.00

10.00
74.30
0.55
215.00
54.00
15.00

M2
KM
M3
M3

200.00
4.00
3.00
20.00

Bacheo
M3
5.00
Reposicin de Afirmado
M3
10.00
Desencalaminado
KM
3.00
Limpieza de Cunetas
ML
500.00
Limpieza de Alcantarillas
UND
0.60
Mantenimiento de Muro
M3
0.44
Mantenimiento de Puentes
M3
5.00
TOTAL - S/./ Km-ao
Mantenimiento Rutinario - S/km-ao
Mantenimiento Rutinario con Bacheo - S/km-ao
Mantenimiento Rutinario con Bacheo y Reposicin de Afirmado -

PARCIAL
60.00
68.44
6.60
44.00
90.00
0.00
267.48
275.00
129.00
10.80
75.00
1026.32
179.04
269.04

S/km-ao 1026.32

SITUACIN CON PROYECTO: ALTERNATIVA N 02


UND
CANT
P.U

Roce
Limpieza General
Limpieza de Derrumbes y Huaycos
Encauzamiento de Curso de Aguas

PARCIAL
68.44
6.60
44.00

0.30
17.11
2.20
2.20
15.00

18.00
74.30
0.55
215.00
54.00
15.00

PARCIAL
60.00
68.44
6.60
44.00
75.00
180.00
222.90
275.00
129.00
23.76
75.00
1159.70
179.04
254.04

S/km-ao 1159.70

COSTOS DE INVERSIN Y MANTENIMIENTO SEGN ALTERNATIVA


EN MILES DE SOLES A PRECIOS DE MERCADO
L=

22.53

Km

CON PROYECTO
ALTERNATIVA
ALTERNATIVA 1
BASE
INVERSIN
MANTEN
0
0.00
503.95
1
2.01
3.02
2
2.01
3.02
3
2.01
4.55
4
2.01
3.02
5
2.01
17.34
6
2.01
4.55
7
2.01
3.02
8
2.01
3.02
9
2.01
4.55
10
2.01
-33.06
SIN INCLUIR VALOR RESIDUAL
17.34
AOS

CON PROYECTO
ALTERNATIVA 2
INVERSIN
MANTEN
785.12
3.02
3.02
4.29
3.02
19.59
4.29
3.02
3.02
4.29
-58.92
19.59

FACTOR DE CORRECCION PARA COSTOS DE MANTENIMIENTO = 0.75


COSTOS INCREMENTALES POR MANTENIMIENTO
EN MILES DE SOLES EN PRECIOS SOCIALES

AOS

ALTERNATIVA 1

ALTERNATIVA 2

0
1
2
3
4
5
6
7
8
9
10

503.95
1.01
1.01
2.53
1.01
15.33
2.53
1.01
1.01
2.53
-35.07
17.34

785.12
1.01
1.01
2.28
1.01
17.58
2.28
1.01
1.01
2.28
-60.93
19.59

EVALUACIN ECONMICA
EN MILES DE SOLES
A PRECIOS DE MERCADO

ALTERNATIVA N 01

AO

INVERSIN

0
1
2
3
4
5
6
7
8
9
10

503.95

TASA DE DESCUENTO : 11%

COSTO DE

BENEFICIOS

FLUJO

MANTENIMIENTO

AHORRO COV

NETO

1.01
1.01
2.53
1.01
15.33
2.53
1.01
1.01
2.53
-35.07

0.00
27.23
27.23
28.61
28.61
28.61
28.61
28.61
30.00
30.00
30.00

-503.95
26.21
26.21
26.08
27.60
13.28
26.08
27.60
28.98
27.46
65.06

V.A.N =
T.I.R =
B/C=

-S/. 340.46
-7.88%
0.33

ALTERNATIVA N 02

AO

INVERSIN

0
1
2
3
4
5
6
7
8
9
10

785.12

TASA DE DESCUENTO : 11%

COSTO DE

BENEFICIOS

FLUJO

MANTENIMIENTO

AHORRO COV

NETO

1.01
1.01
2.28
1.01
17.58
2.28
1.01
1.01
2.28
-60.93

0.00
194.96
194.96
224.62
224.62
224.62
224.62
224.62
254.28
254.28
254.28

-785.12
193.95
193.95
222.34
223.61
207.04
222.34
223.61
253.27
252.00
315.21

V.A.N =
T.I.R =
B/C=

S/. 525.76
24.32%
1.67

ANALISIS DE SENSIBILIDAD
(Diversas Alternativas)

1. Mencionar las variables de costos y beneficios ms importantes.


ALTERNATIVA 1
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
503.95
0.00
0.00
-503.95

ALTERNATIVA 2
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2003
785.12
0.00
0.00
-785.12

2008

2009

2010

2011

2012

2009

2010

2011

2012

2013

1.01
27.23
26.21

1.01
27.23
26.21

2.53
28.61
26.08

1.01
28.61
27.60

15.33
28.61
13.28

2.53
28.61
26.08

1.01
28.61
27.60

1.01
30.00
28.98

2.53
30.00
27.46

-35.07
30.00
65.06

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

1.01
194.96
193.95

1.01
194.96
193.95

2.28
224.62
222.34

1.01
224.62
223.61

17.58
224.62
207.04

2.28
224.62
222.34

1.01
224.62
223.61

1.01
254.28
253.27

2.28
254.28
252.00

-60.93
254.28
315.21

ANALISIS DE SENSIBILIDAD
(Diversas Alternativas)
2. Reestimar el VAN a precios privados y a precios sociales, sobre la base de simulaciones de las variables de costos y beneficios ms importantes:
ALTERNATIVA 1
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
604.74
0.00
0.00
-604.74

ALTERNATIVA 2
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
942.15
0.00
0.00
-942.15

ALTERNATIVA 1
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
503.95
0.00
0.00
-503.95

ALTERNATIVA 2
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
785.12
0.00
0.00
-785.12

2008

INVERSIN (+20%)
2009
2010
2011

2012

2013

2014

2015

2016

2017

1.01
27.23
26.21

1.01
27.23
26.21

15.33
28.61
13.28

2.53
28.61
26.08

1.01
28.61
27.60

1.01
30.00
28.98

2.53
30.00
27.46

-35.07
30.00
65.06

2008

INVERSIN (+20%)
2009
2010
2011

2012

2013

2014

2015

2016

2017

17.58
224.62
207.04

2.28
224.62
222.34

1.01
224.62
223.61

1.01
254.28
253.27

2.28
254.28
252.00

-60.93
254.28
315.21

1.01
194.96
193.95

1.01
194.96
193.95

2.53
28.61
26.08

2.28
224.62
222.34

1.01
28.61
27.60

1.01
224.62
223.61

2008

BENEFICIOS (-10%)
2009
2010
2011

2012

2013

2014

2015

2016

2017

1.01
24.50
23.49

1.01
24.50
23.49

15.33
25.75
10.42

2.53
25.75
23.22

1.01
25.75
24.74

1.01
27.00
25.98

2.53
27.00
24.46

-35.07
27.00
62.06

2008

BENEFICIOS (-10%)
2009
2010
2011

2012

2013

2014

2015

2016

2017

17.58
202.16
184.58

2.28
202.16
199.88

1.01
202.16
201.15

1.01
228.85
227.84

2.28
228.85
226.57

-60.93
228.85
289.78

1.01
175.47
174.45

1.01
175.47
174.45

2.53
25.75
23.22

2.28
202.16
199.88

1.01
25.75
24.74

1.01
202.16
201.15

ANALISIS DE SENSIBILIDAD
(Diversas Alternativas)

ALTERNATIVA 1
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
503.95
0.00
0.00
-503.95

ALTERNATIVA 2
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
785.12
0.00
0.00
-785.12

ALTERNATIVA 1
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
503.95
0.00
0.00
-503.95

ALTERNATIVA 2
Inversiones
Costos Incrementales
Beneficios Incrementales
Beneficio Neto Total

2007
785.12
0.00
0.00
-785.12

COSTOS (+10%) Y BENEFICIOS (-10%)


2008
2009
2010
2011
2012

2013

2014

2015

2016

2017

1.11
24.50
23.39

1.11
24.50
23.39

2.79
25.75
22.96

1.11
25.75
24.64

16.86
25.75
8.89

2.79
25.75
22.96

1.11
25.75
24.64

1.11
27.00
25.88

2.79
27.00
24.21

-38.57
27.00
65.57

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

1.11
175.47
174.35

1.11
175.47
174.35

2.51
202.16
199.65

1.11
202.16
201.04

19.34
202.16
182.82

2.51
202.16
199.65

1.11
202.16
201.04

1.11
228.85
227.74

2.51
228.85
226.34

-67.02
228.85
295.88

COSTOS (+20%) Y BENEFICIOS (-20%)


2008
2009
2010
2011
2012

2013

2014

2015

2016

2017

1.22
21.78
20.57

3.04
22.89
19.85

1.22
22.89
21.67

1.22
24.00
22.78

3.04
24.00
20.96

-42.08
24.00
66.08

2013

2014

2015

2016

2017

2.74
179.70
176.96

1.22
179.70
178.48

1.22
203.42
202.21

2.74
203.42
200.69

-73.12
203.42
276.54

1.22
21.78
20.57

3.04
22.89
19.85

1.22
22.89
21.67

18.39
22.89
4.50

COSTOS (+20%) Y BENEFICIOS (-20%)


2008
2009
2010
2011
2012
1.22
155.97
154.75

1.22
155.97
154.75

2.74
179.70
176.96

1.22
179.70
178.48

21.10
179.70
158.60

ANALISIS DE SENSIBILIDAD
(Diversas Alternativas)
ALTERNATIVA N 01
Variaciones porcentuales
VAN
en la variable 1
S/.

TIR
%

B/C

Inversin (+20%)

-441.25

-10.24%

0.28

Beneficios (-10%)

-357.24

-9.14%

0.30

Costos (+10%), Beneficios (-10%)

-357.67

-9.03%

0.30

Costos (+20%), Beneficios (-20%)

-374.87

-10.21%

0.26

ALTERNATIVA N 02
Variaciones porcentuales
VAN
en la variable 1
S/.

TIR
%

B/C

Inversin (+20%)

368.74

19.10%

1.39

Beneficios (-10%)

395.06

21.22%

1.51

Costos (+10%), Beneficios (-10%)

395.45

21.21%

1.51

Costos (+20%), Beneficios (-20%)

265.15

17.99%

1.34

FORMATO 5
COSTOS INCREMENTALES PARA ALTERNATIVA N 01
En Miles de Soles a Precios Sociales
PERIODO
RUBRO
A) COSTOS DE INVERSION
1. Intangibles
2. Inversin en Activos Fijos
3. Gastos Preoperativos
4. Capital de Trabajo inicial
5. Imprevistos
6. Valor Residual (-)

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

503.95
9.88
494.07

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-50.39

-50.39

B) COSTOS DE OPERACIN Y
MANTENIMIENTO
C) TOTAL COSTOS CON PROYECTO
(A + B)
D) COSTOS DE OPERACIN Y
MANTENIMIENTO SIN PROYECTO
F) TOTAL COSTOS INCREMENTALES
(C - D)

1.01

1.01

2.53

1.01

15.33

2.53

1.01

1.01

2.53

-35.07

503.95

1.01

1.01

2.53

1.01

15.33

2.53

1.01

1.01

2.53

-85.46

0.00

2.01

2.01

2.01

2.01

2.01

2.01

2.01

2.01

2.01

2.01

503.95

-1.00

-1.00

0.52

-1.00

13.32

0.52

-1.00

-1.00

0.52

-87.47

OBSERVACIONES
Intangibles: Saneamiento de Tierras, Estudios Complementarios de Ingeniera, Expedientes Tcnicos,
franquicias, permisos, entre otros.
Inversin en Activos Fijos: obras civiles, maquinarias y equipo, terrenos, entre otros.

FORMATO 5
COSTOS INCREMENTALES PARA ALTERNATIVA N 02
En Miles de Soles a Precios Sociales
PERIODO
RUBRO
A) COSTOS DE INVERSION
1. Intangibles
2. Inversin en Activos Fijos
3. Gastos Preoperativos
4. Capital de Trabajo inicial
5. Imprevistos
6. Valor Residual (-)

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

785.12
19.15
765.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-78.51

-78.51

B) COSTOS DE OPERACIN Y
MANTENIMIENTO
C) TOTAL COSTOS CON PROYECTO
(A + B)
D) COSTOS DE OPERACIN Y
MANTENIMIENTO SIN PROYECTO
F) TOTAL COSTOS INCREMENTALES
(C - D)

1.01

1.01

2.28

1.01

17.58

2.28

1.01

1.01

2.28

-60.93

785.12

1.01

1.01

2.28

1.01

17.58

2.28

1.01

1.01

2.28

-139.44

0.00

2.01

2.01

2.01

2.01

2.01

2.01

2.01

2.01

2.01

2.01

785.12

-1.00

-1.00

0.27

-1.00

15.57

0.27

-1.00

-1.00

0.27

-141.45

OBSERVACIONES
Intangibles: Saneamiento de Tierras, Estudios Complementarios de Ingeniera, Expedientes Tcnicos,
franquicias, permisos, entre otros.
Inversin en Activos Fijos: obras civiles, maquinarias y equipo, terrenos, entre otros.

FORMATO 6
BENEFICIOS INCREMENTALES PARA ALTERNATIVA N 01
(En Miles de Soles a Precios de Mercado)
Beneficios Totales
1.- Situacin con Proyecto

2007*

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

0.00

27.23

27.23

28.61

28.61

28.61

28.61

28.61

30.00

30.00

30.00

27.23

27.23

28.61

28.61

28.61

28.61

28.61

30.00

30.00

30.00

2.- Situacin sin Proyecto

3.- Beneficios Incrementales


(1) - (2)
(*) Corresponde al primer ao de generacin de beneficios.

FORMATO 6
BENEFICIOS INCREMENTALES PARA ALTERNATIVA N 02
(En Miles de Soles a Precios de Mercado)
Beneficios Totales
1.- Situacin con Proyecto

2007*

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

0.00

194.96

194.96

224.62

224.62

224.62

224.62

224.62

254.28

254.28

254.28

194.96

194.96

224.62

224.62

224.62

224.62

224.62

254.28

254.28

254.28

2.- Situacin sin Proyecto

3.- Beneficios Incrementales


(1) - (2)
(*) Corresponde al primer ao de generacin de beneficios.

FORMATO 7
VALOR ACTUAL DE BENEFICIOS NETOS PARA CADA ALTERNATIVA
(En Miles de Soles a Precios de Mercado)
Beneficios Netos Totales

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

1.- Beneficios Incrementales


ALTERNATIVA N 01

0.00

27.23

27.23

28.61

28.61

28.61

28.61

28.61

30.00

30.00

30.00

ALTERNATIVA N 02

0.00

194.96

194.96

224.62

224.62

224.62

224.62

224.62

254.28

254.28

254.28

ALTERNATIVA N 01

503.95

-1.00

-1.00

0.52

-1.00

13.32

0.52

-1.00

-1.00

0.52

-87.47

ALTERNATIVA N 02

785.12

-1.00

-1.00

0.27

-1.00

15.57

0.27

-1.00

-1.00

0.27

-141.45

2.- Costos Incrementales

3.- Beneficios Netos Totales


ALTERNATIVA N 01

-503.95

28.22

28.22

28.09

29.61

15.30

28.09

29.61

30.99

29.47

117.47

ALTERNATIVA N 02

-785.12

195.96

195.96

224.35

225.62

209.05

224.35

225.62

255.28

254.01

395.74

ALTERNATIVAS

VAN (11%)

TIR

ALTERNATIVA N 01

-S/.310.87

-4.58%

ALTERNATIVA N 02

S/.565.25

24.94%

FORMATO 9
ANLISIS DE SENSIBILIDAD PRELIMINAR
(Diversas Alternativas a Precios de Mercado)

ANLISIS DE SENSIBILIDAD
CARRETERA EL GUAYAO - CRUCE LA SAMANA
Segn Alternativa

ALTERNATIVA

INVERSIN

BENEFICIOS

COSTOS (+10%)

COSTOS (+20%)

(+20%)

(-10%)

BENEFICIOS (-10%)

BENEFICIOS (-20%)

-441.25
-10.24%
0.28

-357.24
-9.14%
0.30

-357.67
-9.03%
0.30

-374.87
-10.21%
0.26

368.74
19.10%
1.39

395.06
21.22%
1.51

395.45
21.21%
1.51

265.15
17.99%
1.34

ALTERNATIVA N 01
VAN (Miles S/.)
TIR (%)
B/C

ALTERNATIVA N 02
VAN (Miles S/.)
TIR (%)
B/C