CV Andr Durand
French, 60 years old

Project Engineer
EDUCATION & TRAINING

2010

Training GIES level 1 & 2 Training ATEX.

2007

Training safety HSE 3 TOTAL GABON.


Training safety RSES TOTAL GABON.

1994

Training safety GIES level 2 ATSI Vitrolles

1974

BTS Piping boiler making in Marseille.

1972

BT Piping boiler making in L'Isle-sur-la-Sorgue.

1970

BEP Piping boiler making in L'Isle-sur-la-Sorgue.


PROFESSIONAL EXPERIENCE

09/17/20
12 to
10/31/20
12

11/14/20
11 to
07/31/20
12

Coordinator of works
Freelance for FOSELEV INDUSTRIE
Shutdown unit site Naphta chimie Lavra Martigues
Taps work
Piping and boiler work
Maintenance works column, furnace, exchanger

Scaffolding, insulation work


Painting work (sandblasting, painting)
High pressure cleaning work
Project manager
Consultant for SESI CONGO (Subsidiary Foure Lagadec)
Work revamping of four channels of raw processing site Proser TOTA
L CONGO Djeno
Works in general contractor (financial, technical, safety,
15 rue Louis Blriot 92500 RUEIL-MALMAISON

www.aliasol.com, code NAF 741G, 479 937 484 00034 RCS NANTERRE
SARL au capital de 110 000 euros

quality)
Replace equipment
Testing equipment requalification
Repairs equipment
Piping works
Maintenance works on drums, columns, exchangers, air cooler
Works instrumentation
Painting works
HP cleaning works
Scaffolding works
Insulation works
Refractory works
Budget 10 BE
a scaffolding company, a insulation company , a scaffolding
company, a sandblasting paint company, a XRAY company ,a
refractory company,a piping company, a cleaning company,
lifting heavy transportation.
Staff consists of a coordinator to work, four foremen,
two preparation man, a scheduler, a man work
permit, a secretary

09/12/20
11 to
11/04/20
11
Stop
productio
n units
by
PETROPL
US no
work to
archieve

Project manager
Freelance for VEOLIA SODI
Unit shutdown maintenance MDU / PDU PETROPLUS Petit
Couronne Rouen
Works in general contractor (financial, technical, safety,
quality)
Replace equipment
Testing equipment requalification
Repairs equipment
Piping works
Maintenance works on drums, columns, exchangers, air cooler
Instrument works
Painting works
HP cleaning works

07/27/20
11 to
09/09/20
11

Project Director
Freelance for Technip
Project ACCES at ADISSEO Commentary
Installation of an effluent treatment unit
Civil works
Structural works and drums, columns, exchangers, pumps
installation
Piping, insulation works
Instrument works
Responsible design office
Responsible planning, costs, Quality, safety
Project manager

01/03/20

15 rue Louis Blriot 92500 RUEIL-MALMAISON

www.aliasol.com, code NAF 741G, 479 937 484 00034 RCS NANTERRE
SARL au capital de 110 000 euros

11 to
06/28/11

10/07/20
10 to
11/06/20
10

06/25/20
10 to
09/26/20
10

01/04/20
10 to
03/27/20
10

01/11/20
07 to
12/31/20
09

Freelance for Four Lagadec


Reforming unit shutdown maintenance GPN Nangis
Works in general contractor (financial, technical, safety,
quality)
Replace of 207 tubes furnaces
Testing equipment requalification
Piping work (Steel alloy P5,P22,Manaurite 900B,Stainless
steel)
Work surface treatment ( paint thermo sensitive)

Asbestos removal work ovens


Work of refractory
Maintenance work of equipment columns, reactors, drums,e
xchangers
Commissioning
MATIS for DEGREMONT
Monitoring the installation sludge treatment
Checked pipes from PID
Prepared isometric instrumentation
Realized hydraulic tests
Finishing achievement punch list
Construction Coordinator Yard
ANOTECH for TECHNIP GHANA
Project Jubilee 2010 prefabrication jumpers
Followed contractors (prefabrication, painting, lifting)
Validation weld quality prepare
Validation hydraulic tests
Followed sea fastening
Consulting Project manager
STREAM OIL HOLDINGS Port Gentil GABON
Handing over in a position to function for production and connection
of an offshore oil rig oil platform Dore Marine
Determination of work to be realized
Estimate of the costs
Establishment of the tender documents of the intervening
companies
Choice of the companies (piping, Instrumentation, wire line,
plungers)
Planning of work of the various companies
Followed of the works
Project manager
Contracted by ONSTREAM ( PETROGAS WORLDWIDE SERVICES S.A.)
TOTAL GABON Port Gentil
Maintenance works and project on sectors offshore of TORPILLE and
GRONDIN
Determination with the developer and the inspection of the
maintenance to be realized
Planning for determination of the lacks to be produced
Estimation and budgeting to be realized
15 rue Louis Blriot 92500 RUEIL-MALMAISON

www.aliasol.com, code NAF 741G, 479 937 484 00034 RCS NANTERRE
SARL au capital de 110 000 euros

Estimation of the cost, of delay for maintenance works,


project, connecting of well
Management of the studies
Launch of AO
Planning of the works
Choices of companies
Organized by the teams of supervision
Prefabrication on the ground POG
Management and follow-up of the works is in hiding and sea
Project manager
Company SODI
SHELL Petit Couronne France
Shut down LUBES 2006 Unit DSV MDU1 & 2 PDU
Works in the general company
Estimation of project following documents SHELL
Preparation of the files of works, specifications and
procedures techniques and files repairs of devices, isometric
of piping.
Definition of the works of companies and consultation
( FOURE LAGADEC,KAEFER WANNER, LASSARAT ,ENDEL,
OPTEOR, AGRIANDRE )
Planning of the works in integral the works nine of piping and
the maintenance works.
Purchase of the material of piping and of repair the internal of
columns
Budget 3 BE realized in the 5 weeks of the shut down
Staff of piloting consisted of 4 coordinators of works,
supervisors Echaf / Calo, metal industry, instrumentation,
paint, assembly, cleaning, 1 planner , 6 HSE , 2 assistants
piping, 2 cost controller, 1 person in charge quality.
Project manager
Company ABB
RHODIA Chalamp , CPCU Saint Ouen
Works in the general company
Works of shutdown unity OLONE
Preparation of the files of works, specifications and technical
procedures.
Definition of the works of companies, consultation of
companies and determination of the reserved companies
Planning of the works in integral the works nine piping and
the maintenance works.
Followed prefabrication of the piping, the locksmithery,
support age
Budget 6,5 BE realized in 2 times per year preparation 3
months and 4 weeks of realization
Staff consisted of supervisors Echaf / Calo, metal industry,
instrumentation, paint, assembly, civil engineering, lifting, 1
planner, 2 HSE, 4 assistants piping, 1 cost controller, 1 person

2005 /
2007

2003 /
2005

15 rue Louis Blriot 92500 RUEIL-MALMAISON

www.aliasol.com, code NAF 741G, 479 937 484 00034 RCS NANTERRE
SARL au capital de 110 000 euros

1995 /
2003

in charge quality.
Works on thermal boilers CPCU
Study before project with BE to equip boilers in the coal of
burners gas
Budget 1,5 BE realized study 6 months and 3 on-site months
The works were realized in common ABB and CNIM
Staff consisted of a foreman metal industry, works foremen
instrumentation electricity, controllers CND, 2 assistants, 1
planner.
Project manager
Company ENTREPOSE
Etude company and calculation of works of piping, maintenance on
sites petrochemical TOTAL , BP , SHELL , RHODIA , ELF ATOCHEM ,
AIR LIQUIDE MONTELL , ARCO , COPENOR , ESSO
Account manager of realization of the works of piping
Holy revamping unit VAPO ELF ATOCHEM Avold
Installation of a sphere and a connecting AIR LIQUIDE Fos sur
Mer
Revamping unit VAPO COPENOR Dunkerque
Revamping unit VAPO MONTELL Aubette
Restoration SOUFRE 2 TOTAL La Mde
Revamping unit STYRENE et AROMATIQUE ELF ATOCHEM
Gonfreville lOrcher
Prefabrication and assembly of piping SHELL Petit Couronne
NAPHTACHIMIE Lavra RHODIA Belle Etoile ARCO Fos sur Mer
For every realization :
Management of the studies of the pipings and supportage,
creation of the isometric
Purchase of the material of piping and links
Management of the preparation of files
Management of the planning of the works of the
prefabrication in the on-site assembly
Consultation of companies Scaffold, insulating, paint, CND
Management of the on-site realization

1993 /
1995

Foreman
Company ORTEC
Study and figuring of the shutdown maintenance on sites
petrochemical ELF Lacq , SHELL Petit Couronne , ELF ATOCHEM
Gonfreville et Carling , BP Dunkerque et Lavra
Planning of the works in general maintenance on software
MS Project et Artmis
Foreman unit DSV SHELL , Styrne ELF ATOCHEM , Glycol
NAPHTACHIMIE Lavra , Soufre et Sulfreen ELF Lacq

1991 /
1992

Superintendent
Company ENTREPOSE
Realized of the shutdown refinery NNPC Port Harcourt KRPC Kaduna
15 rue Louis Blriot 92500 RUEIL-MALMAISON

www.aliasol.com, code NAF 741G, 479 937 484 00034 RCS NANTERRE
SARL au capital de 110 000 euros

1989 /
1991

1988 /
1989

1980 /
1988

1977 /
1979
1975 /
1977

NIGERIA
Preparation of the works to be realized on devices following
the demands Inspection
Budgetary estimation of the works
Quantitative estimation of the material of replacement,
consultation of the suppliers and the repatriation of the
material on NIGERIA
Planning of the works
Supervisor of the works made by companies and the hand of
work local except the specific works and at risks made by
expatriates
Management of the safety on the interventions at risks in
particular on the unit Alkilation
Supervisor
Company COGEMI
Preparer and supervisor of the piping works
Supervisor and follow-up of the costs IM 90 ESSO Fos sur Mer
Supervisor of works on the furnace SHELL Cressier SWISS
Preparare and planning on software PRAXIPERT of the
shutdown SHELL Berre lEtang
Supervisor and follow-up of the costs IM 91 ESSO Fos sur Mer
Preparer supervisor
Company FOSTER WHEELER
Revamping unit STYRENE ELF ATOCHEM Gonfreville lOrcher
supervisor PONTICELLI et SPIE BATIGNOLE
Revamping unit FCC ESSO Port Jrme supervisor SITUB
replacement of the reactor
Works foreman
Company ALSTHOM ATLANTIQUE
Construction of power plants EDF Cruas et Saint Alban
Assembly in machinery room of the turbines of the alternator
the sechor and connecting of the pipings vapor HP on kegs
Construction of a thermic power plant WANKIE ZIMBABWE
Works foreman
Company TEUB
Assembly of piping in power plant for stored ENTREPOSE ,
BOCCARD site of DAMPIERRE , CHINON , BLAYAIS
Team leader
Company SITMAN
Work of assembly piping for JULLIN AIR LIQUIDE Anterwerpen
Work of assembly piping for FOURE LAGADEC ANNABA
ALGERIA
Work of assembly piping for SPIE BATIGNOLE BP Lavra

SOFTWARES
15 rue Louis Blriot 92500 RUEIL-MALMAISON

www.aliasol.com, code NAF 741G, 479 937 484 00034 RCS NANTERRE
SARL au capital de 110 000 euros

Excel, Word, Access, MS Project, Shurtrack, Artemis


LANGUAGES SKILLS

French : Mother tongue


English : Fluent

15 rue Louis Blriot 92500 RUEIL-MALMAISON

www.aliasol.com, code NAF 741G, 479 937 484 00034 RCS NANTERRE
SARL au capital de 110 000 euros

Anda mungkin juga menyukai