T.V.D. TrueVerticalDepth
Height
TVD
Youhavetoconsidertheverticalheight ordepthofthefluidcolumn,the
shapeoftheholedoesntmatter.
TheDrillermustknowtrueverticaldepth(TVD)measurements.
PressureHydrostatic,Ph=Mudwt.x0.052xTVD
HydrostaticPressure
6240psi
7800psi
5616psi
6100psiPf
6058psi
WHY dowelosethePrimaryWellControl?
Becausethepressureinthewellborebecomeslessthanthe
pressureintheformation,dueto:
FailuretoFillTheHoleProperlyWhileTripping
Swabbing/Surging Mudproperties,Pullingspeed,AnnulusClearance
Drillingintozonesofknown pressurewithMudWeighttoolow
Drillingintounexpectedabnormalformationpressure
LostCirculation
InsufficientMudWeight enoughtodrill,butnottotrip
Accidentaldilutionofdrillingfluids
Weightingmaterial(barite)settlingout
ThemainruleofWellControlGame
WELLCONTROL
KeeptheBottomHolePressure
(BHP)slightlyhigherthanPore
Pressureinordertohavethefull
controlofthewell.
WellControlPrinciples
WellControlcanbedefinedunder2maincategories:
Primary WellControl:istheuseofthefluidtopreventthe
influxofformationfluidintothewellbore.
Secondary WellControl:istheuseoftheBOPandKillMud
tocontrolthewell,ifPrimaryWCcannotbemaintained.
NoFillUpExercise
Consequence of no filling-up while triping out
How many stands of dry DP can you POOH, before the
overbalance is lost ?
(no fill-up)
Well Data:
TVD
Hole diameter
Mud Weight
Formation Gradient
Drill Pipe Diameter
Drill Pipe Stand Length
Casing Diameter
Capacities
Drill Pipe Total Displaceme
Drill Pipe Capacity
Open Hole Capacity
Casing Capacity
2
2
3
4
5
10000 ft
8 1/2 "
12,6 ppg
0,64 psi/ft
5"
90 ft
9 5/8 "
0,02538bbl/ft
0,01745bbl/ft
0,07030bbl/ft
0,07340bbl/ft
Well Data:
- TVD:
10,000 ft
- Mud Weight:
12.6 ppg
- Formation Gradient:
0.64 psi/ft
0.01745 bbl/ft
Consequence
How many stand
overbalance is lo
Well Data:
- 1 stand:
TVD 10000
ft
TVD 3048
m
Hole diameter
8 "1/2
Hole diameter
8,5
"
Mud Weight
12,6
ppg
Mud Weight
1,5098
SG
Formation
0,64
psi/ft
Gradient
Formation
0,1448
bar/m
Gradient
Drill Pipe5"Diameter
Drill Pipe5"Diameter
Drill Pipe90
ft
Stand Length Drill Pipe
27,432
mStand Length
Casing Diameter
9 "5/8
Casing Diameter
9,625
"
Capacities
Capacities
Drill Pip0,02538
bbl/ft
Drill Pi13,238
l/m
Drill Pipe
0,01745
bbl/ft
Capacity
Drill Pipe
9,1019
l/m
Capacity
Open Hole
0,07030
bbl/ft
Capacity
Open Hole
36,669
l/m
Capacity
Casing Capacity
0,07340
bbl/ft
Casing Capacity
13,238
l/m
90 ft
ANSW
1We can write
2The hydrostat
The missing m
OverBalance p
0,00793
bbl/ft
DisplacementDP M 4,1363
l/m 4,1363
3 DP Metal
6400
psi
Pore pressure
441,42
bar 441,42
4 Pore pressure
6552
psi pressure Bottom451,18
bar 451,91
5 Bottom Hole
15,2
bbl
8 Empty Volume
ft
9 Lengt 1915
152
psi
6 OverBalance
ft
7 Equiv 232
OverBalance
9,754
bar 10,687
Equiv 65,9
m 70,711
Empty2144
Volume
l 2414,7
Length518
of
m Drill Pipe
10
Number
18,9
stand
of stand
Num 21sta
0.0703 bbl/ft
0.0734 bbl/ft
coef 0,052
pouce 25,4
mm
pound0,4536
bar 1,019367992
kgf
bbl 158,984
l
ft
0,3048
m
psi 0,070308141
kgf/cm2
ppg 0,119828816
SG
psi/ft0,226287027
bar/m
bbl/ft
521,6010499
l/m
gal 3,7854
l
Secondaire
psi 0,068972286
bar
psi/ft0,230669753
kgf/cm2/m