TITLE
A
A
REV. DESCRIPTION
4/8/2014
DATE
AY
PRPD
ARA/ SK
CKD
GRK/ TP
APPD.
SL/MKG/AKB
APPD.
(PEM/PM)
RF/YSY
APPD.
(DPD/PD)
REV.
Doc. No.:
Q-6183-053-J01
Sht.
Of
11
PROJECT:
JOB No:
CLIENT:
DOC. No:
REV NO.
SL. No.
Remarks
SUMMARY
1.0
GENERAL INFORMATION
1.1
1.1
1.2
Ambient/Design Ambient.
1.2
1.3
Manufacturing Location
Vendor to Specify
1.4
Yes/ No
yes
2.0
Vendor to Specify
20 years
Design, engineering, procurement, manufacture, assembly, inspection, testing at 3.) 8 Meter high floodlighting pole (One
manufacturer works, supply and delivery with sea worthy packing of Lighting Poles floodlights)
as per requisition.
4.) 8 Meter high floodlighting pole (Two
floodlights)
5.) 8 Meter high floodlighting pole (Three
floodlights)
3.0
TECHNICAL REQUIREMENT
CONSTRUCTIONAL CHARACTERISTICS
3.1
3.2
3.3
3.4
3.5
Material of Construction.
Galvanizing Thickness as per BS EN ISO 1461.
Hardware (like nuts, bolts etc).
Provision for supply cables to route to lighting luminaire.
Slotted holes with rubber grommet for cable entry to the luminaire as per requirement
shown in Installation drawings.
3.6
Earth Terminal.
3.7
3.8
4.0
4.1
4.2
10 Meters
As per Manufacturers standard
4.3
4.4
4.5
4.6
4.7
4.8
4.9
Bottom Diameter
Top Diameter
Weight in kgs.
Steel Grade for the offered Poles
Base Plate material
Stiffner for Base plate
As
As
As
As
As
As
5.0
5.1
5.2
8 Meters
As per Manufacturers standard
5.3
5.4
5.5
5.6
5.7
5.8
5.9
Bottom Diameter
Top Diameter
Weight in kgs.
Steel Grade for the offered Poles
Base Plate material
Stiffner for Base plate
As
As
As
As
As
As
6.0
6.1
6.2
6.3
8 Meters
As per Manufacturers standard
As per Manufacturers standard
6.4
6.5
6.6
6.7
6.8
6.9
6.10
Bottom Diameter
Top Diameter
Weight in kgs.
Steel Grade for the offered Poles
Base Plate material
Stiffner for Base plate
As
As
As
As
As
As
7.0
7.1
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
Yes
Yes
As per our standard Accessories
Provided
Rubber Gromment is not in our scope of
supply
As per our submitted Drawings.
Included
As per our technical submitals
Complied
3mm
Shaft : 355N/mm; Base Plate : 265
N/mm & Anchor Bolt : 265 N/mm
241 mm
118 mm
Aprox. 215 kg
St52-3
St44-2
Yes
Complied
3mm
Shaft : 355N/mm; Base Plate : 265 N/mm &
Anchor Bolt : 265 N/mm
190mm
90mm
Aprox. 150 kg
St52-3
St44-2
Yes
Complied
4mm
included
Shaft : 355N/mm; Base Plate : 265 N/mm &
Anchor Bolt : 265 N/mm
190mm
90mm
Aprox. 180 kg
St52-3
St44-2
Yes
8 Meters
Page 2 of 3
252859134.xlsx.ms_office
BB-Evaluation summary
PROJECT:
JOB No:
CLIENT:
DOC. No:
REV NO.
SL. No.
Remarks
SUMMARY
7.2
Pole thickness.
4mm
7.3
Two way bracket with mounting disc and fitting accessories for floodlight mounting.
included
7.4
7.5
7.6
7.7
7.8
7.9
7.10
Bottom Diameter
Top Diameter
Weight in kgs.
Steel Grade for the offered Poles
Base Plate material
Stiffner for Base plate
As
As
As
As
As
As
8.0
8.1
8.2
8 Meters
As per Manufacturers standard
4mm
8.3
Three way bracket with mounting disc and fitting accessories for floodlight mounting.
included
8.4
8.5
8.6
8.7
8.8
8.9
8.10
Bottom Diameter
Top Diameter
Weight in kgs.
Steel Grade for the offered Poles
Base Plate material
Stiffner for Base plate
As
As
As
As
As
As
9.0
9.1
Required
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11
Required
Required
Required
Required
Required
Required
Required
Required
Required
Required
Complied
Not in our scope
Noted
Noted
Noted
Complied
Noted
Noted
Noted
Noted
As
As
As
As
per
per
per
per
per
per
per
per
per
per
per
per
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
Manufacturers
10.0
10.1
Level IV
10.2
Required
10.3
Required
10.4
Certificate of conformity
Required
11.0
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
standard
per
per
per
per
our
our
our
our
11.1
Required
11.2
Required
Complied
As per our Internal Q.C Procudure
Required
Required
Required
Required
Required
SDRL to be submitted
As per our QC procedure
Complied
Complied
Complied
To be agreed upon your order
confirmation
12.0
DOCUMENTATION
12.1
12.2
12.3
12.4
12.5
13.0
SCHEDULE
13.1
Delivery Period
Vendor to Specify
14.0
--
15.0
TECHNICAL ACCEPTANCE
Acceptable
Page 3 of 3
252859134.xlsx.ms_office
BB-Evaluation summary