6) Discussion of critical design issues, including but not limited to, flowline

stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.

"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions

d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "

2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.

10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.

7) Preliminary stability reports are to be submitted. Tenderer shall at minimum


propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph

c) Tenderer's alternative proposal


d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to

be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne

ctor systems, etc.


b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL

ETs, anodes, field joints, horizontal connection system, etc.)


2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO

MPANY engagement activities (specific review meetings, etc.). As a minimum, the


flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w

ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI

S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app

licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.

"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
Material Design Basis Memorandum of the JOB SPECIFICA
S DOCUMENTS, Attachment G5
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.

11) A preliminary listing of constructability issues related to the PIP flowline


s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga

tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation

f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta

nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications

c) Tenderer's listing of proposed in-house or subcontractor's material specifica


tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,

etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.

9) Description of the sensitivities of soil condition assumptions on the design


of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design

team or design subcontractor with relevant experience in pipeline design and th


e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:

a) Specification deviation details


b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo

logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:

a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
Material Design Basis Memorandum of the JOB SPECIFICA
S DOCUMENTS, Attachment G5
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets

Tenderer shall provide the following:


1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.

8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline

stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to

GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena

nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials

1) Tenderer shall confirm its compliance with Section G


DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste

m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum

propose a self-stable pipeline


according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal

d) Basis, reasons, or justification for deviation


e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"

4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.

b) Applicable Global Practices (GP), Project-specific specifications, and other


manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)

2) Preliminary spoolbase layout drawing, including identified pipe storage areas


, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the

flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti

nent calculations, modeling / analysis methodology and software to be used, and


potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA

TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)

e) Intended materials service, for both fatigue and non-fatigue applications


f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur

ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
Material Design Basis Memorandum of the JOB SPECIFICA
S DOCUMENTS, Attachment G5
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline

s foreseen by Tenderer and potential solutions.


"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness

es are within Tenderer's experience and vessel capability/capacity for installat


ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history

g) Vendors used for product manufacture"


6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal

.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica

tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.

3) Data sheets and properties of the key components "


2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design

of the PIP flowline system.


10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th

e respective analysis to perform the work for COMPANY review.


7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details

b) Applicable page, section, or paragraph


c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.

g) Column for pre-production meeting requirements and attendance by COMPANY (to


be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath

odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
Material Design Basis Memorandum of the JOB SPECIFICA
S DOCUMENTS, Attachment G5
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:

1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL


ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third

-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta

bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
DESIGN BASIS DOCUMENTS,
1) Tenderer shall confirm its compliance with Section G
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application

s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI


S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,
Attachment G4 Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,

forming, heat treatment, welding, non-destructive examination [NDE], etc. as app


licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5
Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"
6) Discussion of critical design issues, including but not limited to, flowline
stability; spans; upheaval buckling; thermal and pressure expansion, lateral sta
bility; and walking during installation, testing, and life of field. Analysis w
ork scopes for evaluating the critical issues shall be provided, including perti
nent calculations, modeling / analysis methodology and software to be used, and
potential mitigation techniques to be employed. Tenderer shall propose a design
team or design subcontractor with relevant experience in pipeline design and th
e respective analysis to perform the work for COMPANY review.
7) Preliminary stability reports are to be submitted. Tenderer shall at minimum
propose a self-stable pipeline
according to Section G DESIGN BASIS DOCUMENTS of
the JOB SPECIFICATION utilizing a thick-walled outer pipe as the primary mitiga
tion, ensuring all insulation requirements are met, and pipe sizes and thickness
es are within Tenderer's experience and vessel capability/capacity for installat
ion.
8) Tenderer shall discuss the QA/QC and audit requirements of engineering, third
-party verification, and any effort required from the Tenderer to accommodate CO
MPANY engagement activities (specific review meetings, etc.). As a minimum, the
flowline stability analysis, thermal modeling and ECA for reeling and installat
ion shall require third-party engineering verification.
9) Description of the sensitivities of soil condition assumptions on the design
of the PIP flowline system.
10) Discussion of any tests Tenderer plans to perform for the PIP flowline syste
m, even for proven technology, including details of FAT, EFAT and FIT programs f
or FLETs, and connection systems.
11) A preliminary listing of constructability issues related to the PIP flowline
s foreseen by Tenderer and potential solutions.
"2.3.2.2. Drawings and Data Sheets
Tenderer shall provide the following:
1) Preliminary drawings for all major equipment (PIP cross-section, bulkhead, FL
ETs, anodes, field joints, horizontal connection system, etc.)
2) Preliminary spoolbase layout drawing, including identified pipe storage areas
, welding/coating/inspection stations, pipe stalk storage areas, spooling areas,
etc.
3) Data sheets and properties of the key components "
2.3.2.3. Materials
1) Tenderer shall confirm its compliance with Section G
DESIGN BASIS DOCUMENTS,

Attachment G4
Material Design Basis Memorandum of the JOB SPECIFICATION.
"2) Tenderer shall submit to COMPANY a matrix of all material types to be procur
ed for the scope of supply inclusive of the following details and how the propos
ed materials will conform to Attachment G4:
a) Line pipe, CRA materials, PIP bulkheads, insulation and coating systems, cath
odic protection systems, FLET structural and process materials, horizontal conne
ctor systems, etc.
b) Applicable Global Practices (GP), Project-specific specifications, and other
manufacturing specifications
c) Tenderer's listing of proposed in-house or subcontractor's material specifica
tions
d) Proposed suppliers including their sub-suppliers for all PIP system appurtena
nces (to include all details of the supply chain for raw materials, extrusions,
forming, heat treatment, welding, non-destructive examination [NDE], etc. as app
licable)
e) Intended materials service, for both fatigue and non-fatigue applications
f) Column for proposed component Criticality Rating based on GP 20-01-04 methodo
logy.
g) Column for pre-production meeting requirements and attendance by COMPANY (to
be confirmed by COMPANY)"
4) Tenderer shall include with its submission the proposed welding processes. F
or girth welds, Tenderer shall include with its submission the weld flaw accepta
nce criteria and flaw sizes used as the basis for Tenderer's Commercial Proposal
.
"8) Tenderer shall include in the Technical Proposal any proposed deviations to
GP 29-01-31 (Forgings for Fatigue and Non-Fatigue Subsea and Surface Application
s) or other GPs or Project Design Specifications listed in Section G DESIGN BASI
S DOCUMENTS, Attachment G5 Material Design Basis Memorandum of the JOB SPECIFICA
TION. Where a deviation is proposed, Tenderer shall submit the following minimu
m information for COMPANY review and consideration:
a) Specification deviation details
b) Applicable page, section, or paragraph
c) Tenderer's alternative proposal
d) Basis, reasons, or justification for deviation
e) Perceived benefits associated with Tenderer's proposed deviation
f) Field history
g) Vendors used for product manufacture"