Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 1

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

BI-10-10007_Recovery Schedule as of Ma
BI-10-10007
MILESTONE
1.0 ENGINEERING
ENGINEER

00
01
1.1
1.2
1.3
1.4
1.5
1.6

Contract Award
Kick-Off Meeting
Moblization - First Phase Completed
Site Surveys Completed
Ain Dar WIP-1 HVAC Analysis Comp
30% SCADA, RTU and Instrumentat
60% SCADA, RTU and Instrumentat
100% SCADA, RTU and Instrumenta

2.0 PROCUREMENT
PROCURE
2.1 SCADA, 638 RTU Systems, and Instrument

2.1.1
2.1.2
2.1.3
2.1.4

All Purchase Orders Placed


50% Materials Shipped
All Materials Shipped
All Materials Delivered to Work Site

2.2 Communication
Communic

2.2.1
2.2.2
2.2.3

All Purchase Orders Placed


All Materials Shipped
All Materials Delivered to Work Site

2.3 Power and Facilities (Solar Power System)

2.3.1
2.3.2
2.3.3

All Purchase Orders Placed


All Materials Shipped
All Materials Delivered to Work Site

2.4 Monopole

2.4.1
2.4.2
2.4.3

All Purchase Orders Placed


All Materials Shipped
All Materials Delivered to Work Site

2.5 All Factory Acceptance Test Completed

SIEMENS

BL Project
Finish

Finish

1143 14-Oct-12

30-Sep-15 14-Oct-12 A 30-Sep-15

1143 14-Oct-12

30-Sep-15 14-Oct-12 A 30-Sep-15

593
0
0
0
0
0
0
0
0
596
596
0
0
0
0
415
0
0
0
380
0
0
0
353
0
0
0
0

14-Oct-12

26-Apr-14
14-Oct-12
05-Nov-12
18-Dec-12
11-May-13
02-Mar-13
07-Apr-13
11-May-13
26-Apr-14
17-Jun-13 03-Jan-15
17-Jun-13 03-Jan-15
17-Jun-13
26-Apr-14
26-May-14
03-Jan-15
06-Jul-13
03-Aug-14
06-Jul-13
14-Jul-14
03-Aug-14
15-Jul-13
07-Jul-14
15-Jul-13
21-Jun-14
07-Jul-14
26-Jun-13 24-May-14
26-Jun-13
27-Apr-14
24-May-14
02-Aug-14 02-Aug-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

14-Oct-12 A 26-Apr-14
14-Oct-12 A
05-Nov-12
18-Dec-12 A
11-May-13
02-Mar-13 A
07-Apr-13 A
11-May-13
26-Apr-14
17-Jun-13 A 03-Jan-15
17-Jun-13 A 03-Jan-15
17-Jun-13 A
26-Apr-14
26-May-14
03-Jan-15
06-Jul-13 A 03-Aug-14
06-Jul-13 A
14-Jul-14
03-Aug-14
15-Jul-13 A 07-Jul-14
15-Jul-13 A
21-Jun-14
07-Jul-14
26-Jun-13 A 24-May-14
26-Jun-13 A
27-Apr-14
24-May-14
02-Aug-14 02-Aug-14
Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 2

Contract No.: 6600029175


BI-10-10007
Activity ID

2.5.1

Activity Name

Original BL Project
Duration Start

All Factory Acceptance Tests Comple

3.0 CONSTRU
CONSTRUCTION
3.1 Mobilization
Mobilizatio - Second Phase Completed

3.1

Mobilzation - Second Phase

3.2 Fencing and


an Civil

3.2.1
3.2.2
3.2.3
3.2.4
3.2.5

20 % Well Sites Construction Comple


40 % Well Sites Construction Comple
60 % Well Sites Construction Comple
80 % Well Sites Construction Comple
100 % Well Sites Construction Comp

3.3 Well Site Instrumentation,


In
RTU, Communication and

3.3.1
3.3.2
3.3.3
3.3.4
3.3.5

20 % Well Sites Construction Comple


40 % Well Sites Construction Comple
60 % Well Sites Construction Comple
80 % Well Sites Construction Comple
100 % Well Sites Construction Comp

3.4 SCADA Sys


System

3.4.1

SCADA System Installation Complete

3.5 Master Base


Bas Stations

3.5.1

Master Base Stations Installation Co

3.6 Transmission
Transmissi
Connectivity Complete

3.6.1

Transmission Connectivity Complete

4.0 COMMISSI
COMMISSIONING
4.1 Well Site Instrumentation,
In
RTU, Communication and

4.1.1
4.1.2
4.1.3
4.1.4
4.1.5

20 % Well Sites Commissioning Com


40 % Well Sites Commissioning Com
60 % Well Sites Commissioning Com
80 % Well Sites Commissioning Com
100 % Well Sites Commissioning Co

4.2 SCADA Sys


System

4.2.1

SCADA System SAT with 20 % RTU

SIEMENS

0
733
0
0
303
0
0
0
0
0
300
0
0
0
0
0
0
0
0
0
0
0
483
303
0
0
0
0
0
278
0

04-Jul-13
04-Jul-13
13-Aug-14

18-Aug-14

24-Aug-14
06-Jul-14
21-Sep-14
26-Jun-14
28-Aug-14

09-Oct-14

BL Project
Finish

02-Aug-14
27-May-15
04-Jul-13
04-Jul-13
25-May-15
13-Aug-14
23-Nov-14
21-Jan-15
10-Mar-15
25-May-15
27-May-15
18-Aug-14
10-Dec-14
22-Jan-15
15-Mar-15
27-May-15
24-Aug-14
24-Aug-14
06-Jul-14
06-Jul-14
21-Sep-14
21-Sep-14
30-Sep-15
09-Jun-15
28-Aug-14
21-Dec-14
02-Feb-15
24-Mar-15
09-Jun-15
25-Jun-15
09-Oct-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

Finish

04-Jul-13 A
04-Jul-13 A
13-Aug-14

18-Aug-14

24-Aug-14
06-Jul-14
21-Sep-14
26-Jun-14
28-Aug-14

09-Oct-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

02-Aug-14
27-May-15
04-Jul-13 A
04-Jul-13 A
25-May-15
13-Aug-14
23-Nov-14
21-Jan-15
10-Mar-15
25-May-15
27-May-15
18-Aug-14
10-Dec-14
22-Jan-15
15-Mar-15
27-May-15
24-Aug-14
24-Aug-14
06-Jul-14
06-Jul-14
21-Sep-14
21-Sep-14
30-Sep-15
09-Jun-15
28-Aug-14
21-Dec-14
02-Feb-15
24-Mar-15
09-Jun-15
25-Jun-15
09-Oct-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 3

Contract No.: 6600029175


BI-10-10007
Activity ID

4.2.2

Activity Name

Original BL Project
Duration Start

SCADA System Commissioning 100

4.3 Master Base


Bas Station

4.3.1
4.3.2

Master Base Stations SAT Complete


Master Base Stations 100% Commis

4.4 Schedule C
Completion Date (Final System Acceptance)

4.4.1

Schedule Complete Date (Final Syst

PROJECT E
EXECUTION
ENGINEERING & DESIGN PHASE
Mobilization - First Phase

E0001
E0002
E0003
E0004
E0005

Mobilization
Engineering Kick-Off Meeting (ACEC)
Prepare Deliverables List and Projec
Engineering Kick-Off Meeting (WP)
Prepare Deliverables List and Projec

Site Surveys C
Completed
Abqaiq, Aindar
Ainda and Shedgum - 199 Injection Wells (Team

E0006
E0007
E0008

Preparation and Approval of Survey


Site Surveys, Field Verification and D
Prepare and Submittal of Site Surve

Haradh, and H
Hawiyah - 168 Injection Wells (Team 2)

E0009
E0010
E0011

Preparation and Approval of Survey


Site Surveys, Field Verification and D
Prepare and Submittal of Site Surve

Uthmaniyah - 271 Injection Wells (Team 3 and Team 4)

E0012
E0013
E0014

Preparation and Approval of Survey


Site Surveys, Field Verification and D
Prepare and Submittal of Site Surve

RF Engineering
Engineerin Survey in Master Stations

E0015
E0016
E0017

Preparation and Approval of Survey


Site Surveys, Check Facility Configu
Prepare and Submittal of Site Surve

SIEMENS

0
20 26-Jun-14
0
0
0 30-Sep-15
0
1121 06-Nov-12
394
110
37
1
20
1
7
150
99
15
58
58
96
15
58
58
96
15
58
58
30
5
10
11

06-Nov-12
06-Nov-12
06-Nov-12
22-Dec-12
22-Dec-12
09-Feb-13
09-Feb-13
23-Dec-12
23-Dec-12
23-Dec-12
02-Jan-13
16-Jan-13
26-Dec-12
26-Dec-12
09-Jan-13
17-Jan-13
30-Dec-12
30-Dec-12
13-Jan-13
21-Jan-13
10-Feb-13
10-Feb-13
16-Feb-13
25-Feb-13

BL Project
Finish

25-Jun-15
15-Jul-14
26-Jun-14
15-Jul-14
30-Sep-15
30-Sep-15
30-Sep-15

10-Nov-13
16-Feb-13
18-Dec-12
22-Dec-12
13-Jan-13
09-Feb-13
16-Feb-13
11-May-13
24-Mar-13
08-Jan-13
10-Mar-13
24-Mar-13
25-Mar-13
12-Jan-13
17-Mar-13
25-Mar-13
28-Mar-13
15-Jan-13
20-Mar-13
28-Mar-13
09-Mar-13
14-Feb-13
26-Feb-13
09-Mar-13

13-May-14
16-Feb-13 A
18-Dec-12 A
22-Dec-12 A
13-Jan-13 A
09-Feb-13 A
16-Feb-13 A
11-May-13
24-Mar-13 A
08-Jan-13 A
10-Mar-13 A
24-Mar-13 A
25-Mar-13 A
12-Jan-13 A
17-Mar-13 A
25-Mar-13 A
28-Mar-13 A
15-Jan-13 A
20-Mar-13 A
28-Mar-13 A
09-Mar-13 A
14-Feb-13 A
26-Feb-13 A
09-Mar-13 A

Milestone

Actual Work

% Complete

Remaining Work

Summary

Baseline Milestone

Finish

25-Jun-15
15-Jul-14
26-Jun-14
26-Jun-14
15-Jul-14
30-Sep-15 30-Sep-15
30-Sep-15
30-Sep-15 06-Nov-12

Project Baseline Bar

Critical Remaining Work

Start

06-Nov-12
06-Nov-12
06-Nov-12
22-Dec-12 A
22-Dec-12 A
09-Feb-13 A
09-Feb-13 A
23-Dec-12 A
23-Dec-12 A
23-Dec-12 A
02-Jan-13 A
16-Jan-13 A
26-Dec-12 A
26-Dec-12 A
09-Jan-13 A
17-Jan-13 A
30-Dec-12 A
30-Dec-12 A
13-Jan-13 A
21-Jan-13 A
10-Feb-13 A
10-Feb-13 A
16-Feb-13 A
25-Feb-13 A

2013
O N D J F M AM J J A S

2014
N D J FMA

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

2015
J J A SO N D J F M AM J J A S

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

2016
NDJ F

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 4

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

RF Engineerin
Engineering Survey in Well Sites

E0018
E0019
E0020

Preparation and Approval of Survey


Site Surveys, Field Verification and D
Prepare and Submittal of Site Surve

30 % Engineering
Engineer
Design Package
30% Engineering
Engineer
Design

E0021
E0022
E0023
E0024
E0025
E0026
E0027
E0028
E0029

SCADA
RTU
Instrumentation
Electrical
Civil
Communication
Piping (Thermowells)
HVAC
RF Engineering

30% PMT Review


Rev

E0030
E0031
E0032
E0033

Preparation and Submittal


Aramco E-Review
30% Design Review Meeting
30% Approval

60% Prelimina
Preliminary Internal Review Design Package
60% Prelimina
Preliminary Internal Review Design Package

E0034
E0035
E0036
E0037
E0038
E0039
E0040
E0041
E0042

SCADA
RTU
Instrumentation
Electrical
Civil
Communication
Piping (Thermowells)
RF Engineering
60% Preliminary Internal Review Me

SIEMENS

67
23
23
24
102
50
40
40
40
40
40
36
40
14
18
52
11
24
1
0
70
70
48
48
48
48
48
48
48
48
1

BL Project
Finish

10-Mar-13
10-Mar-13
09-Apr-13
14-Apr-13
02-Jan-13
02-Jan-13
02-Jan-13
02-Jan-13
02-Jan-13
02-Jan-13
02-Jan-13
07-Jan-13
02-Jan-13
02-Feb-13
28-Jan-13
18-Feb-13
18-Feb-13
05-Mar-13
07-Apr-13

11-May-13
04-Apr-13
05-May-13
11-May-13
07-Apr-13
17-Feb-13
17-Feb-13
17-Feb-13
17-Feb-13
17-Feb-13
17-Feb-13
17-Feb-13
17-Feb-13
17-Feb-13
17-Feb-13
07-Apr-13
02-Mar-13
07-Apr-13
07-Apr-13
07-Apr-13
07-Mar-13 11-May-13
07-Mar-13 11-May-13
07-Mar-13 01-May-13
07-Mar-13 01-May-13
07-Mar-13 01-May-13
07-Mar-13 01-May-13
07-Mar-13 01-May-13
07-Mar-13 01-May-13
07-Mar-13 01-May-13
07-Mar-13 01-May-13
04-May-13 04-May-13

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

Finish

10-Mar-13 A
10-Mar-13 A
09-Apr-13 A
14-Apr-13 A
02-Jan-13 A
02-Jan-13 A
02-Jan-13 A
02-Jan-13 A
02-Jan-13 A
02-Jan-13 A
02-Jan-13 A
07-Jan-13 A
02-Jan-13 A
02-Feb-13 A
28-Jan-13 A
18-Feb-13 A
18-Feb-13 A
05-Mar-13 A
07-Apr-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
07-Mar-13 A
04-May-13

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

11-May-13
04-Apr-13 A
05-May-13
11-May-13
08-Apr-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
17-Feb-13 A
08-Apr-13 A
02-Mar-13 A
08-Apr-13 A
07-Apr-13 A
07-Apr-13 A
11-May-13
11-May-13
01-May-13
01-May-13
01-May-13
01-May-13
01-May-13
01-May-13
01-May-13
01-May-13
04-May-13

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 5

Contract No.: 6600029175


BI-10-10007
Activity ID

E0043

Activity Name

Original BL Project
Duration Start

60% Preliminary Civil Package (For R

90% Engineering
Engineeri
Design Package
90% Engineering
Engineer
CORE

E0044
E0045
E0046
E0047
E0048
E0049
E0050
E0051

Prepare & Submit 90% Civil Enginee


Prepare & Submit 90% SCADA Engi
Prepare & Submit 90% RTU Enginer
Prepare & Submit 90% Instrumentat
Prepare & Submit 90% Electrical De
Prepare & Submit 90% Piping (Therm
Aramco E-Review
90% CORE Approval (Design Review

Prepare and IIssue IFC - Site/Master Station (ACEC)

E0062
E0063
E0064
E0065
E0066
E0067
E0068
E0069

Issue & Approve IFC Drawing 1 (3 P


Issue & Approve IFC Drawing 2 (3 P
Issue & Approve IFC Drawing 3 (5 P
Issue & Approve IFC Drawing 4 (7 P
Issue & Approve IFC Drawing 5 (7 P
Issue & Approve IFC Drawing 6 (7 P
Issue & Approve IFC Drawing 7 (4 P
Issue & Approve IFC Drawing 11 Ma

90% RF Engin
Engineering - 11 Master Stations (WP)

E0075
E0076
E0077
E0078

Prepare & Submit 90% RF Engineer


Aramco E-Review
90% CORE Approval (Design Review
Issue & Approve IFC (11 Master Stat

PROCUREMENT PHASE
PROCUREME
Long Lead Ma
Materials
SCADA System
Syste

P00000
P00001
P00002

Preparation and Approval of Material


Issued RFQ (Non Siemens Materials)
Received Bids - Perform Technical &

SIEMENS

0
230
73
35
35
35
35
35
35
15
1
156
12
10
10
10
10
10
10
10
91
35
15
1
12
669
669
501
11
5
5

08-Apr-13
08-Apr-13
08-Apr-13
08-Apr-13
08-Apr-13
08-Apr-13
08-Apr-13
08-Apr-13
19-May-13
15-Jun-13
15-Jun-13
15-Jun-13
08-Jul-13
15-Jul-13
22-Jul-13
28-Oct-13
05-Aug-13
12-Aug-13
19-Aug-13
08-Apr-13
08-Apr-13
19-May-13
15-Jun-13
15-Jun-13
11-Apr-13
11-Apr-13
22-Apr-13
23-Nov-13
22-Apr-13
15-May-13

BL Project
Finish

11-May-13
10-Nov-13
15-Jun-13
18-May-13
18-May-13
18-May-13
18-May-13
18-May-13
18-May-13
08-Jun-13
15-Jun-13
10-Nov-13
01-Jul-13
22-Jul-13
29-Jul-13
04-Aug-13
10-Nov-13
18-Aug-13
25-Aug-13
01-Sep-13
01-Jul-13
18-May-13
08-Jun-13
15-Jun-13
01-Jul-13
03-Jan-15
03-Jan-15
07-Aug-14
04-Dec-13
27-Apr-13
20-May-13

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

Finish

08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
19-May-13
15-Jun-13 A
15-Jun-13 A
15-Jun-13 A
08-Jul-13 A
15-Jul-13 A
22-Jul-13 A
29-Jul-13 A
05-Aug-13
12-Aug-13
19-Aug-13
08-Apr-13 A
08-Apr-13 A
19-May-13
01-Oct-13 A
15-Jun-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
08-Apr-13 A
22-Apr-13 A
15-May-13

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

11-May-13
13-May-14
15-Jun-13 A
18-May-13
18-May-13
18-May-13
18-May-13
18-May-13
18-May-13
08-Jun-13 A
15-Jun-13 A
31-Dec-13 A
24-Oct-13 A
24-Oct-13 A
24-Oct-13 A
14-Dec-13 A
14-Dec-13 A
31-Dec-13 A
31-Dec-13 A
28-Nov-13
13-May-14
18-May-13
08-Jun-13 A
03-Oct-13 A
13-May-14
03-Jan-15
03-Jan-15
07-Aug-14
21-Apr-13 A
27-Apr-13 A
20-May-13

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 6

Contract No.: 6600029175


BI-10-10007
Activity ID

P00003
P00004
P00005
P00006
P00007
P00008
P00009

Activity Name

Original BL Project
Duration Start

Select Vendor and Issued PO


Issued NMR 601
Issued NMR 602
Fabrication & Inspection of Material /
Delivery of Material
Delivery of Material to Site
Received Remaining NMR's

RTU (Siemens)

P00010
P00011
P00012
P00013
P00014
P00015
P00016
P00017
P00018
P00019
P00020
P00021
P00022
P00023
P00024
P00025
P00026
P00027

Preparation and Approval of Material


Issued RFQ (Non Siemens Materials)
Received Bids - Perform Technical &
Select Vendor and Issued PO
Issued NMR 601
Issued NMR 602
Fabrication & Inspection of Material /
Delivery of Material (33%) Will be do
Delivery of Material (66%)
Delivery of Material (100%)
Delivery of 40 RTU's to Site
Delivery of 80 RTU's to Site
Delivery of 80 RTU's to Site
Delivery of 80 RTU's to Site
Delivery of 80 RTU's to Site
Delivery of 80 RTU's to Site
Delivery of 104 RTU's to Site
Received Remaining NMR's

RTU Cabinets

P00028
P00029
P00030

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &

SIEMENS

5
5
5
20
8
6
5
657
11
5
5
5
5
5
47
5
8
5
25
25
25
25
25
25
25
5
399
11
5
5

08-Jun-13
13-Jun-13
18-Jul-13
14-Dec-13
30-Jan-14
02-Aug-14
15-Feb-14
22-Apr-13
23-Nov-13
22-Apr-13
15-May-13
08-Jun-13
13-Jun-13
18-Jul-13
23-Nov-13
21-Dec-13
30-Jan-14
02-Apr-14
08-Jun-14
07-Jul-14
09-Aug-14
07-Sep-14
08-Oct-14
06-Nov-14
06-Dec-14
08-Apr-14
09-May-13
23-Nov-13
09-May-13
15-May-13

BL Project
Finish

Start

12-Jun-13
18-Jun-13
23-Jul-13
05-Jan-14
08-Feb-14
07-Aug-14
19-Feb-14
03-Jan-15
04-Dec-13
27-Apr-13
20-May-13
12-Jun-13
18-Jun-13
23-Jul-13
15-Jan-14
25-Dec-13
08-Feb-14
07-Apr-14
06-Jul-14
07-Aug-14
06-Sep-14
07-Oct-14
05-Nov-14
04-Dec-14
03-Jan-15
13-Apr-14
18-May-14
04-Dec-13
14-May-13
20-May-13

08-Jun-13 A
13-Jun-13 A
18-Jul-13 A
14-Dec-13 A
30-Jan-14 A
02-Aug-14
15-Feb-14 A
08-Apr-13 A
08-Apr-13 A
22-Apr-13 A
15-May-13
08-Jun-13 A
13-Jun-13 A
18-Jul-13 A
20-Oct-13 A
21-Dec-13 A
30-Jan-14 A
02-Apr-14 A
08-Jun-14
07-Jul-14
09-Aug-14
07-Sep-14
08-Oct-14
06-Nov-14
06-Dec-14
08-Apr-14 A
25-Apr-13 A
25-Apr-13 A
09-May-13
15-May-13

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

16-Jun-13 A
18-Jun-13 A
21-Apr-14 A
18-May-14
27-May-14
07-Aug-14
08-Jun-14
03-Jan-15
21-Apr-13 A
27-Apr-13 A
20-May-13
12-Jun-13 A
18-Jun-13 A
21-Apr-14 A
19-Dec-13 A
25-Dec-13 A
08-Feb-14 A
07-Apr-14 A
06-Jul-14
07-Aug-14
06-Sep-14
07-Oct-14
05-Nov-14
04-Dec-14
03-Jan-15
12-May-14
24-Jun-14
08-May-13
14-May-13
20-May-13

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 7

Contract No.: 6600029175


BI-10-10007
Activity ID

P00031
P00032
P00033
P00034
P00035
P00036
P00037

Activity Name

Original BL Project
Duration Start

Select Vendor and Issued PO


Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (33%) Will be do
Delivery of Material (66%)
Delivery of Material (100%)
Received Remaining NMR's

Console/ Furniture
Furn

P00038
P00039
P00040
P00041
P00042
P00043
P00044
P00046

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material
Received Remaining NMR's

UHF Radio an
and Antenna

P00047
P00048
P00049
P00050
P00051
P00052
P00053
P00054
P00055
P00056
P00057

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Receive 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material - 11 Master Stati
Delivery of Material (50% for Well ) W
Delivery of Material (100% for Well S
Received Remaining NMR's

Solar System Batteries

P00058
P00059

Preparation and Approval of Material


Issued RFQ

SIEMENS

5
5
30
13
5
13
5
443
11
5
5
5
5
30
8
5
444
9
5
5
5
5
5
64
11
11
40
5
417
9
5

08-Jun-13
23-Jun-13
01-Jan-14
11-Feb-14
24-Mar-14
28-Apr-14
13-May-14
11-Apr-13
23-Nov-13
11-Apr-13
27-Apr-13
12-Jun-13
18-Jul-13
01-Jan-14
11-May-14
26-May-14
17-Jun-13
23-Nov-13
17-Jun-13
24-Jun-13
01-Jul-13
07-Jul-13
13-Aug-13
23-Nov-13
05-Apr-14
05-Apr-14
15-May-14
05-Aug-14
17-Jun-13
23-Nov-13
17-Jun-13

BL Project
Finish

Start

12-Jun-13
27-Jun-13
04-Feb-14
25-Feb-14
29-Mar-14
12-May-14
18-May-14
31-May-14
04-Dec-13
16-Apr-13
01-May-13
17-Jun-13
23-Jul-13
04-Feb-14
19-May-14
31-May-14
10-Aug-14
02-Dec-13
22-Jun-13
29-Jun-13
06-Jul-13
11-Jul-13
18-Aug-13
04-Feb-14
16-Apr-14
16-Apr-14
30-Jun-14
10-Aug-14
13-Jul-14
02-Dec-13
22-Jun-13

08-Jun-13 A
23-Jun-13 A
01-Jan-14 A
11-Feb-14 A
24-Mar-14 A
24-Apr-14 A
26-Apr-14 A
25-Apr-13 A
25-Apr-13 A
09-May-13
15-May-13
13-Jul-13 A
18-Jul-13 A
01-Jan-14 A
11-May-14
26-May-14
29-May-13
29-May-13
17-Jun-13 A
24-Jun-13 A
14-Jul-13 A
04-Aug-13
13-Aug-13
30-Sep-13
05-Apr-14 A
05-Apr-14 A
23-Apr-14 A
05-Aug-14
29-May-13
29-May-13
17-Jun-13 A

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

12-Jun-13 A
31-Dec-13 A
30-Apr-14
15-May-14
26-May-14
18-Jun-14
24-Jun-14
31-May-14
08-May-13
14-May-13
20-May-13
18-Jul-13 A
18-Jul-13 A
06-May-14
19-May-14
31-May-14
10-Aug-14
09-Jun-13 A
22-Jun-13 A
29-Jun-13 A
18-Jul-13 A
08-Aug-13
13-Aug-13
30-Sep-13
03-Jun-14
03-Jun-14
03-Aug-14
10-Aug-14
13-Jul-14
09-Jun-13 A
22-Jun-13 A

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 8

Contract No.: 6600029175


BI-10-10007
Activity ID

P00060
P00061
P00062
P00063
P00064
P00065
P00066
P00067

Activity Name

Original BL Project
Duration Start

Received Bids - Perform Technical &


Select Vendor and Issued PO
Receive 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50% for Well Si
Delivery of Material (100% for Well S
Received Remaining NMR's

Solar Panels

P00068
P00069
P00070
P00071
P00072
P00073
P00074
P00075
P00076
P00077

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Receive 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%)
Delivery of Material (100%)
Received Remaining NMR's

Battery Bank Enclosure

P00078
P00079
P00080
P00081
P00082
P00083
P00084
P00085
P00086
P00087

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Receive 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%)
Delivery of Material (100%)
Received Remaining NMR's

Pressure Transmitter
Tran

SIEMENS

5
5
5
5
44
18
30
5
417
9
5
5
5
5
5
50
5
30
5
386
13
5
5
5
5
5
50
5
5
5
398

24-Jun-13
06-Jul-13
13-Jul-13
12-Nov-13
01-Jan-14
03-Jun-14
03-Jun-14
08-Jul-14
17-Jun-13
23-Nov-13
17-Jun-13
29-Jun-13
10-Jul-13
22-Jul-13
12-Nov-13
01-Jan-14
03-Jun-14
03-Jun-14
08-Jul-14
17-Jun-13
23-Nov-13
17-Jun-13
29-Jun-13
10-Jul-13
22-Jul-13
19-Nov-13
01-Jan-14
03-Jun-14
03-Jun-14
09-Jun-14
09-May-13

BL Project
Finish

Start

29-Jun-13
10-Jul-13
17-Jul-13
17-Nov-13
20-Feb-14
23-Jun-14
07-Jul-14
13-Jul-14
13-Jul-14
02-Dec-13
22-Jun-13
03-Jul-13
15-Jul-13
27-Jul-13
17-Nov-13
27-Feb-14
08-Jun-14
07-Jul-14
13-Jul-14
14-Jun-14
07-Dec-13
22-Jun-13
03-Jul-13
15-Jul-13
27-Jul-13
24-Nov-13
27-Feb-14
08-Jun-14
08-Jun-14
14-Jun-14
17-May-14

24-Jun-13 A
25-Jul-13 A
13-Jul-13 A
29-Oct-13 A
01-Jan-14 A
03-Jun-14
03-Jun-14
08-Jul-14
29-May-13
29-May-13
17-Jun-13 A
29-Jun-13 A
25-Jul-13 A
22-Jul-13 A
12-Nov-13
01-Jan-14 A
03-Jun-14
03-Jun-14
08-Jul-14
01-Jun-13 A
01-Jun-13 A
17-Jun-13 A
29-Jun-13 A
10-Jul-13 A
22-Jul-13 A
19-Nov-13
01-Jan-14 A
03-Jun-14
03-Jun-14
09-Jun-14
25-Apr-13 A

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

29-Jun-13 A
29-Jul-13 A
28-Oct-13 A
29-Oct-13 A
02-Jun-14
23-Jun-14
07-Jul-14
13-Jul-14
13-Jul-14
09-Jun-13 A
22-Jun-13 A
03-Jul-13 A
29-Jul-13 A
28-Oct-13 A
12-Nov-13
02-Jun-14
08-Jun-14
07-Jul-14
13-Jul-14
14-Jun-14
16-Jun-13 A
22-Jun-13 A
03-Jul-13 A
15-Jul-13 A
28-Oct-13 A
19-Nov-13
02-Jun-14
08-Jun-14
08-Jun-14
14-Jun-14
17-May-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 9

Contract No.: 6600029175


BI-10-10007
Activity ID

P00089
P00090
P00091
P00092
P00093
P00094
P00095
P00096
P00097
P00098

Activity Name

Original BL Project
Duration Start

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Receive 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%) Will be do
Delivery of Material (100%)
Received Remaining NMR's

RTD

P00099
P00100
P00101
P00102
P00103
P00104
P00105
P00106
P00107
P00109

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Receive 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%) Will be do
Delivery of Material (100%)
Received Remaining NMR's

Differential Pressure
Pr
Transmitter

P00110
P00111
P00112
P00113
P00114
P00115
P00116
P00117

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Receive 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%) Will be do

SIEMENS

11
5
5
5
5
14
50
15
5
5
394
11
5
5
5
5
14
50
14
5
5
400
1
5
5
5
5
14
89
15

23-Nov-13
09-May-13
15-May-13
13-Jun-13
25-Jun-13
26-Oct-13
10-Nov-13
03-Mar-14
06-May-14
12-May-14
09-May-13
23-Nov-13
09-May-13
15-May-13
13-Jun-13
25-Jun-13
26-Oct-13
01-Jan-14
05-Mar-14
08-May-14
08-May-14
14-May-13
23-Nov-13
14-May-13
20-May-13
18-Jun-13
30-Jun-13
26-Oct-13
17-Nov-13
10-Mar-14

BL Project
Finish

Start

04-Dec-13
14-May-13
20-May-13
18-Jun-13
30-Jun-13
10-Nov-13
06-Jan-14
19-Mar-14
11-May-14
17-May-14
13-May-14
04-Dec-13
14-May-13
20-May-13
18-Jun-13
30-Jun-13
10-Nov-13
27-Feb-14
20-Mar-14
13-May-14
13-May-14
24-May-14
23-Nov-13
19-May-13
25-May-13
23-Jun-13
04-Jul-13
10-Nov-13
27-Feb-14
26-Mar-14

25-Apr-13 A
09-May-13
15-May-13
26-Sep-13
25-Jun-13 A
26-Oct-13 A
10-Nov-13
03-Mar-14 A
06-May-14
22-Apr-14 A
25-Apr-13 A
25-Apr-13 A
09-May-13
15-May-13
26-Sep-13
25-Jun-13 A
26-Oct-13 A
01-Jan-14 A
05-Mar-14 A
24-Apr-14 A
08-May-14
28-Apr-13 A
28-Apr-13 A
14-May-13
20-May-13
26-Sep-13
30-Jun-13 A
26-Oct-13 A
17-Nov-13
10-Mar-14 A

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

08-May-13
14-May-13
20-May-13
30-Sep-13
30-Jun-13 A
31-Dec-13 A
22-Feb-14 A
19-Mar-14 A
11-May-14
17-May-14
13-May-14
08-May-13
14-May-13
20-May-13
30-Sep-13
30-Jun-13 A
31-Dec-13 A
27-Feb-14 A
20-Mar-14 A
08-May-14
13-May-14
24-May-14
12-May-13
19-May-13
25-May-13
30-Sep-13
04-Jul-13 A
31-Dec-13 A
27-Feb-14 A
26-Mar-14 A

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 10

Contract No.: 6600029175


BI-10-10007
Activity ID

P00118
P00119

Activity Name

Original BL Project
Duration Start

Delivery of Material (100%)


Received Remaining NMR's

Remote Monitoring
Moni
Unit (RMU) and Antenna

P00120
P00121
P00122
P00123
P00124
P00125
P00126
P00127
P00128
P00129

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Received 1st set of Vendor Data - NM
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%) Will be do
Delivery of Material (100%)
Received Remaining NMR's

Monopoles

P00130
P00131
P00132
P00133
P00134
P00135
P00136
P00137
P00138

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%)
Delivery of Material (100%)
Received Remaining NMR's

Piping (Thermowells)
(Therm

P00139
P00140
P00141
P00142
P00143
P00144
P00145

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Certified Vendor Data - NMR 602
Fabrication & Inspection of Material /
Delivery of Material (50%)

SIEMENS

5
5
360
15
5
5
5
5
12
45
22
15
5
406
13
5
5
5
5
45
13
43
5
516
16
5
5
10
5
65
19

13-May-14
19-May-14
20-May-13
23-Nov-13
20-May-13
01-Jun-13
12-Jun-13
17-Jul-13
19-Oct-13
28-Nov-13
01-Feb-14
25-Mar-14
17-Apr-14
20-May-13
23-Nov-13
20-May-13
01-Jun-13
18-Jun-13
21-Jul-13
23-Nov-13
30-Jan-14
05-Apr-14
31-May-14
26-May-13
23-Nov-13
26-May-13
18-Jun-13
24-Jun-13
19-Oct-13
14-Dec-13
10-Jul-14

BL Project
Finish

Start

18-May-14
24-May-14
22-Apr-14
09-Dec-13
25-May-13
05-Jun-13
17-Jun-13
22-Jul-13
31-Oct-13
19-Jan-14
25-Feb-14
10-Apr-14
22-Apr-14
04-Jun-14
07-Dec-13
25-May-13
05-Jun-13
23-Jun-13
25-Jul-13
13-Jan-14
13-Feb-14
24-May-14
04-Jun-14
27-Sep-14
10-Dec-13
30-May-13
23-Jun-13
04-Jul-13
23-Oct-13
26-Feb-14
04-Aug-14

13-May-14
22-Apr-14 A
01-May-13
01-May-13
20-May-13
01-Jun-13 A
12-Jun-13 A
20-Aug-13
19-Oct-13 A
28-Nov-13
01-Feb-14 A
25-Mar-14 A
17-Apr-14 A
01-May-13
01-May-13
20-May-13
01-Jun-13 A
10-Jul-13 A
21-Jul-13 A
23-Nov-13
30-Jan-14 A
05-Apr-14 A
26-Apr-14 A
05-May-13
05-May-13
26-May-13
18-Jun-13 A
25-Sep-13
19-Oct-13 A
14-Dec-13 A
10-Jul-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

18-May-14
24-May-14
30-Apr-14
19-May-13
25-May-13
05-Jun-13 A
18-Jul-13 A
30-Aug-13
25-Nov-13
28-Nov-13
01-Feb-14 A
10-Apr-14 A
30-Apr-14
04-Jun-14
16-May-13
25-May-13
05-Jun-13 A
14-Jul-13 A
20-Nov-13
15-Jan-14 A
27-Apr-14
24-May-14
04-Jun-14
27-Sep-14
23-May-13
30-May-13
23-Jun-13 A
30-Sep-13
12-Dec-13 A
09-Jul-14
04-Aug-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 11

Contract No.: 6600029175


BI-10-10007
Activity ID

P00146
P00147

Activity Name

Original BL Project
Duration Start

Delivery of Material (100%)


Received Remaining NMR's

Aramco-Suppl
Aramco-Supplied
Materials
Instrument Cable
C

P00148

Delivery of Material

Grounding Cable
C

P00149

Delivery of Material

Instrument Ju
Junction Box

P00150

Delivery of Material

All Factory Acc


Acceptance Tests Completed

E00151
E00152
E00153
E00154

FAT for 10% RTU


I-FAT for RTU
I-FAT for SCADA
Aramco Review & Approval

CONSTRUCTION and COMMISSIONING PHASE


CONSTRUCTI
Mobilization
Temporary Fa
Facilities in Abqaiq

C1376
C1377

Provision of Main Office Facilities in


Office Ready for PMT/Siemens to M

Temporary Fa
Facilities in Hawiyah

C1378
C1379

Provision of Main Office Facilities in


Office Ready for PMT/Siemens to M

Construction Materials
M
Cables/Wiring/Conduit (Supplied by Construction Cont
Cables/Wiring

P0102b
P0103
P0104
P0105
P0106
P0106a
P0107

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Received Certified Vendor Data
Fabrication & Inspection of Material /
Delivery of Material (1st Batch)

SIEMENS

28
5
11
6
5
6
5
6
5
68
10
5
24
1
956
285
75
50
10
260
50
5
706
526
1
5
5
5
5
20
5

18-Aug-14
20-Sep-14
19-May-14
19-May-14
19-May-14
21-May-14
21-May-14
24-May-14
24-May-14
27-May-14
27-May-14
27-May-14
01-Jul-14
02-Aug-14
09-Apr-13
09-Apr-13
09-Apr-13
09-Apr-13
06-Jun-13
02-May-13
02-May-13
28-Dec-13
20-May-13
26-Oct-13
14-Dec-13
26-Oct-13
10-Nov-13
21-Nov-13
07-Dec-13
14-Dec-13
11-Jan-14

BL Project
Finish

Start

18-Sep-14
27-Sep-14
28-May-14
24-May-14
24-May-14
26-May-14
26-May-14
28-May-14
28-May-14
02-Aug-14
07-Jun-14
02-Jun-14
28-Jul-14
02-Aug-14
30-Sep-15
01-Jan-14
17-Jun-13
05-Jun-13
17-Jun-13
01-Jan-14
29-Jun-13
01-Jan-14
17-Mar-15
05-Mar-15
14-Dec-13
30-Oct-13
14-Nov-13
26-Nov-13
11-Dec-13
05-Jan-14
15-Jan-14

18-Aug-14
20-Sep-14
19-May-14
19-May-14
19-May-14
21-May-14
21-May-14
24-May-14
24-May-14
27-May-14
27-May-14
27-May-14
01-Jul-14
02-Aug-14
09-Apr-13 A
09-Apr-13 A
09-Apr-13 A
09-Apr-13 A
06-Jun-13 A
02-May-13
02-May-13
28-Dec-13 A
01-May-13
10-Aug-13
10-Aug-13
26-Oct-13 A
10-Nov-13
21-Nov-13
07-Dec-13 A
14-Dec-13 A
11-Jan-14 A

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

18-Sep-14
27-Sep-14
28-May-14
24-May-14
24-May-14
26-May-14
26-May-14
28-May-14
28-May-14
02-Aug-14
07-Jun-14
02-Jun-14
28-Jul-14
02-Aug-14
30-Sep-15
01-Jan-14 A
06-Oct-13 A
05-Jun-13 A
06-Oct-13 A
01-Jan-14 A
26-Dec-13 A
01-Jan-14 A
17-Mar-15
05-Mar-15
24-Oct-13 A
30-Oct-13 A
14-Nov-13
26-Nov-13
11-Dec-13 A
18-May-14
24-May-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 12

Contract No.: 6600029175


BI-10-10007
Activity ID

P0107B
P0107C
P0107D
P0108
P0109

Activity Name

Original BL Project
Duration Start

Delivery of Material (2nd Batch)


Delivery of Material (3rd Batch)
Delivery of Material (4th Batch)
Delivery of Material (5th Batch))
Received Remaining NMR's

Fence (Suppl
(Supplied by Construction Contractor)

P0109a
P0110
P0111
P0112
P0113
P0113a
P0114
P0114B
P0114C
P0114D
P0115
P0116

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Received Certified Vendor Data
Fabrication & Inspection of Material /
Delivery of Material (1st Batch)
Delivery of Material (2nd Batch)
Delivery of material (3rd Batch)
Delivery of Material (4th Batch)
Delivery of Material (5th Batch)
Received Remaining NMR's

Shelter/ Sunshade
Suns
(Supplied by Construction Contracto

P0116a
P0124
P0125
P0126
P0127
P0128
P0128B
P0128C
P0128D
P0129
P0130

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Received Certified Vendor Data
Delivery of Material (1st Batch)
Delivery of Material (2nd Batch)
Delivery of Material (3rd Batch)
Delivery of Material (4th Batch)
Delivery of Material (5th Batch)
Received Remaining NMR's

Precast Foun
Foundation (Supplied by Construction Contrac

SIEMENS

5
5
5
5
5
700
11
5
5
5
5
30
5
5
5
5
5
5
700
1
5
5
5
5
5
5
5
5
5
5
700

30-Aug-14
22-Nov-14
25-Jan-15
23-Feb-15
01-Mar-15
26-May-13
14-Dec-13
26-May-13
10-Jun-13
26-Oct-13
10-Nov-13
15-Dec-13
07-Jan-14
04-Sep-14
27-Nov-14
11-Feb-15
07-Mar-15
12-Mar-15
20-May-13
14-Dec-13
20-May-13
06-Jun-13
24-Jun-13
30-Jun-13
11-Jan-14
30-Aug-14
22-Nov-14
05-Feb-15
01-Mar-15
07-Mar-15
20-May-13

BL Project
Finish

Start

03-Sep-14
26-Nov-14
29-Jan-15
28-Feb-15
05-Mar-15
17-Mar-15
25-Dec-13
30-May-13
15-Jun-13
30-Oct-13
14-Nov-13
18-Jan-14
12-Jan-14
09-Sep-14
02-Dec-14
16-Feb-15
11-Mar-15
17-Mar-15
11-Mar-15
14-Dec-13
25-May-13
11-Jun-13
29-Jun-13
04-Jul-13
15-Jan-14
03-Sep-14
26-Nov-14
10-Feb-15
05-Mar-15
11-Mar-15
11-Mar-15

30-Aug-14
22-Nov-14
25-Jan-15
23-Feb-15
01-Mar-15
09-May-13
09-May-13
26-May-13
10-Jun-13 A
26-Oct-13 A
10-Nov-13
20-Nov-13
07-Jan-14 A
04-Sep-14
27-Nov-14
11-Feb-15
07-Mar-15
12-Mar-15
05-May-13
05-May-13
20-May-13
06-Jun-13 A
25-Sep-13
03-Oct-13 A
11-Jan-14 A
30-Aug-14
22-Nov-14
05-Feb-15
01-Mar-15
07-Mar-15
01-May-13

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

03-Sep-14
26-Nov-14
29-Jan-15
28-Feb-15
05-Mar-15
17-Mar-15
22-May-13
30-May-13
15-Jun-13 A
30-Oct-13 A
14-Nov-13
12-May-14
18-May-14
09-Sep-14
02-Dec-14
16-Feb-15
11-Mar-15
17-Mar-15
11-Mar-15
16-May-13
25-May-13
11-Jun-13 A
30-Sep-13
10-Oct-13 A
30-Apr-14
03-Sep-14
26-Nov-14
10-Feb-15
05-Mar-15
11-Mar-15
11-Mar-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 13

Contract No.: 6600029175


BI-10-10007
Activity ID

P0130a
P0131
P0132
P0133
P0134
P0135
P0135B
P0135C
P0135D
P0136
P0137

Activity Name

Original BL Project
Duration Start

Preparation and Approval of Material


Issued RFQ
Received Bids - Perform Technical &
Select Vendor and Issued PO
Received Certified Vendor Data
Delivery of Material (1st Batch)
Delivery of Material (2nd Batch)
Delivery of Material (3rd Batch)
Delivery of Material (4th Batch)
Delivery of Material (5th Batch)
Received All NMR's

Pre-Fabrication
Fabrication o
of Pre-cast Foundatons

C1380
C1426
C1427
C1428
C1429
C1430
C1431
C1432
C1433
C1434
C1435
C1436
C1437

Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of
Fabrication of

Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast
Pre-cast

Foundation (6
Foundation (1
Foundation (3
Foundation (2
Foundation (5
Foundation (5
Foundation (5
Foundation (6
Foundation (5
Foundation (5
Foundation (5
Foundation (5
Foundation (5

RTU Shelter/I
Shelter/Instrument Stands

C1381

Fabrication of RTU Shelter and Instru

Well Sites(Grand
Sites(Gra
Total 638 Wells)
Area 1(Total 1
134 Wells) - NBC
Uthmaniyah Lower Part (134 Wells)

SIEMENS

1
5
30
12
5
5
5
5
5
5
5
441
441
25
25
25
25
25
25
25
25
25
25
25
25
25
130
104
540
437
437

14-Dec-13
20-May-13
26-May-13
26-Oct-13
11-Nov-13
14-Jan-14
30-Aug-14
22-Nov-14
05-Feb-15
01-Mar-15
07-Mar-15
15-Dec-13
15-Dec-13
15-Dec-13
26-Apr-14
18-May-14
11-Jun-14
05-Jul-14
28-Jul-14
24-Aug-14
16-Sep-14
12-Oct-14
04-Nov-14
27-Nov-14
21-Dec-14
13-Jan-15
18-Dec-13
18-Dec-13
15-Jan-14
15-Jan-14
15-Jan-14

BL Project
Finish

Start

14-Dec-13
25-May-13
29-Jun-13
07-Nov-13
16-Nov-13
19-Jan-14
03-Sep-14
26-Nov-14
10-Feb-15
05-Mar-15
11-Mar-15
05-Feb-15
05-Feb-15
12-Jan-14
18-May-14
11-Jun-14
05-Jul-14
28-Jul-14
24-Aug-14
16-Sep-14
12-Oct-14
04-Nov-14
27-Nov-14
21-Dec-14
13-Jan-15
05-Feb-15
17-Apr-14
17-Apr-14
09-Jun-15
04-Mar-15
04-Mar-15

01-May-13
20-May-13
26-May-13
26-Oct-13 A
11-Nov-13 A
14-Jan-14 A
30-Aug-14
22-Nov-14
05-Feb-15
01-Mar-15
07-Mar-15
15-Dec-13 A
15-Dec-13 A
15-Dec-13 A
26-Apr-14
18-May-14
11-Jun-14
05-Jul-14
28-Jul-14
24-Aug-14
16-Sep-14
12-Oct-14
04-Nov-14
27-Nov-14
21-Dec-14
13-Jan-15
18-Dec-13 A
18-Dec-13 A
20-Jan-14 A
20-Jan-14 A
20-Jan-14 A

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

15-May-13
25-May-13
29-Jun-13 A
07-Nov-13
16-Nov-13
30-Apr-14
03-Sep-14
26-Nov-14
10-Feb-15
05-Mar-15
11-Mar-15
05-Feb-15
05-Feb-15
24-Apr-14 A
18-May-14
11-Jun-14
05-Jul-14
28-Jul-14
24-Aug-14
16-Sep-14
12-Oct-14
04-Nov-14
27-Nov-14
21-Dec-14
13-Jan-15
05-Feb-15
27-Aug-14
27-Aug-14
09-Jun-15
04-Mar-15
04-Mar-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 14

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Well 1 to 2
Fencing & Civil Works

C0001
C0002
C0003
C0004
C0005
C0006
C0007

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0008
C0009
C0010
C0011

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0012
C0013
C0014
C0015
C0016
C0017
C0018

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 3 to 10
Fencing & Civil Works

C0019
C0020
C0021
C0022
C0023
C0024
C0025

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

SIEMENS

205
54
4
4
5
5
7
4
4
29
6
2
2
2
11
2
2
2
3
4
7
0
165
24
3
2
4
5
7
4
4

15-Jan-14
15-Jan-14
15-Jan-14
21-Jan-14
30-Jan-14
04-Feb-14
20-Feb-14
27-Feb-14
03-Mar-14
18-Jun-14
18-Jun-14
10-Jul-14
12-Jul-14
13-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
19-Jul-14
19-Jul-14
26-Feb-14
26-Feb-14
26-Feb-14
02-Mar-14
02-Mar-14
02-Mar-14
06-Mar-14
13-Mar-14
17-Mar-14

BL Project
Finish

Start

24-Jul-14
05-Mar-14
18-Jan-14
23-Jan-14
03-Feb-14
08-Feb-14
26-Feb-14
02-Mar-14
05-Mar-14
15-Jul-14
24-Jun-14
12-Jul-14
14-Jul-14
15-Jul-14
24-Jul-14
17-Jul-14
17-Jul-14
17-Jul-14
19-Jul-14
21-Jul-14
24-Jul-14
21-Jul-14
03-Aug-14
19-Mar-14
01-Mar-14
03-Mar-14
04-Mar-14
05-Mar-14
12-Mar-14
16-Mar-14
19-Mar-14

20-Jan-14 A
20-Jan-14 A
20-Jan-14 A
21-Jan-14 A
30-Jan-14 A
04-Feb-14 A
20-Feb-14 A
27-Feb-14 A
03-Mar-14 A
18-Jun-14
18-Jun-14
10-Jul-14
12-Jul-14
13-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
19-Jul-14
19-Jul-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
02-Mar-14 A
02-Mar-14 A
02-Mar-14 A
06-Mar-14 A
13-Mar-14 A
17-Mar-14 A

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

24-Jul-14
24-Jun-14
22-Jan-14 A
23-Jan-14 A
03-Feb-14 A
02-Jun-14
18-Jun-14
22-Jun-14
24-Jun-14
15-Jul-14
24-Jun-14
12-Jul-14
14-Jul-14
15-Jul-14
24-Jul-14
17-Jul-14
17-Jul-14
17-Jul-14
19-Jul-14
21-Jul-14
24-Jul-14
21-Jul-14
03-Aug-14
15-Jul-14
01-Mar-14 A
03-Mar-14 A
28-Jun-14
02-Jul-14
09-Jul-14
12-Jul-14
15-Jul-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 15

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Well Site Instrumentation,


In
RTU, Communication & Po

C0026
C0027
C0028
C0029

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0030
C0031
C0032
C0033
C0034
C0035
C0036

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 11 to 23
Fencing & Civil Works

C0037
C0038
C0039
C0040
C0041
C0042
C0043

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0044
C0045
C0046
C0047

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0048
C0049
C0050

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios

SIEMENS

19
6
2
2
2
11
2
2
2
3
4
7
0
168
149
4
4
5
5
7
3
4
12
6
2
2
2
11
2
2
2

02-Jul-14
02-Jul-14
15-Jul-14
17-Jul-14
19-Jul-14
20-Jul-14
20-Jul-14
20-Jul-14
20-Jul-14
20-Jul-14
23-Jul-14
23-Jul-14
20-Mar-14
20-Mar-14
20-Mar-14
24-Mar-14
24-Mar-14
29-Mar-14
27-Jul-14
06-Aug-14
13-Apr-14
06-Aug-14
06-Aug-14
12-Aug-14
14-Aug-14
16-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14

BL Project
Finish

Start

20-Jul-14
08-Jul-14
17-Jul-14
19-Jul-14
20-Jul-14
03-Aug-14
22-Jul-14
22-Jul-14
22-Jul-14
23-Jul-14
27-Jul-14
03-Aug-14
27-Jul-14
27-Aug-14
10-Aug-14
23-Mar-14
26-Mar-14
27-Mar-14
01-Apr-14
06-Aug-14
10-Aug-14
15-Apr-14
17-Aug-14
12-Aug-14
14-Aug-14
17-Aug-14
17-Aug-14
27-Aug-14
19-Aug-14
19-Aug-14
19-Aug-14

02-Jul-14
02-Jul-14
15-Jul-14
17-Jul-14
19-Jul-14
20-Jul-14
20-Jul-14
20-Jul-14
20-Jul-14
20-Jul-14
23-Jul-14
23-Jul-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

20-Mar-14 A
20-Mar-14 A
20-Mar-14 A
24-Mar-14 A
24-Mar-14 A
29-Mar-14 A
27-Jul-14
06-Aug-14
13-Apr-14 A
06-Aug-14
06-Aug-14
12-Aug-14
14-Aug-14
16-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

20-Jul-14
08-Jul-14
17-Jul-14
19-Jul-14
20-Jul-14
03-Aug-14
22-Jul-14
22-Jul-14
22-Jul-14
23-Jul-14
27-Jul-14
03-Aug-14
27-Jul-14
27-Aug-14
12-Aug-14
19-Jul-14
26-Mar-14 A
22-Jul-14
27-Jul-14
06-Aug-14
10-Aug-14
12-Aug-14
17-Aug-14
12-Aug-14
14-Aug-14
17-Aug-14
17-Aug-14
27-Aug-14
19-Aug-14
19-Aug-14
19-Aug-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 16

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0051
C0052
C0053
C0054

Original BL Project
Duration Start

Loop Check to RTU & Pre-SAT RTU


Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 24 to 4
45
Fencing & Civil Works

C0055
C0056
C0057
C0058
C0059
C0060
C0061

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0062
C0063
C0064
C0065

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0066
C0067
C0068
C0069
C0070
C0071
C0072

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 46 to 53
Fencing & Civil Works

C0073
C0074
C0075

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R

SIEMENS

3
4
7
0
159
144
4
4
5
5
7
3
3
11
6
2
2
2
11
2
2
2
3
3
7
0
132
21
2
3
3

BL Project
Finish

Milestone

Actual Work

% Complete

Remaining Work

Summary

Baseline Milestone

Finish

18-Aug-14 20-Aug-14 18-Aug-14


20-Aug-14 24-Aug-14 20-Aug-14
20-Aug-14 27-Aug-14 20-Aug-14
24-Aug-14
22-Apr-14 21-Sep-14 22-Apr-14 A
22-Apr-14 07-Sep-14 22-Apr-14 A
22-Apr-14 24-Apr-14 22-Apr-14 A
26-Apr-14 28-Apr-14 24-Apr-14 A
26-Apr-14 29-Apr-14 24-Apr-14 A
30-Apr-14 04-May-14 24-Apr-14 A
24-Aug-14 31-Aug-14 24-Aug-14
31-Aug-14 03-Sep-14 31-Aug-14
03-Sep-14 07-Sep-14 03-Sep-14
31-Aug-14 10-Sep-14 31-Aug-14
31-Aug-14 06-Sep-14 31-Aug-14
06-Sep-14 08-Sep-14 06-Sep-14
08-Sep-14 09-Sep-14 08-Sep-14
08-Sep-14 10-Sep-14 08-Sep-14
10-Sep-14 21-Sep-14 10-Sep-14
10-Sep-14 13-Sep-14 10-Sep-14
10-Sep-14 13-Sep-14 10-Sep-14
10-Sep-14 13-Sep-14 10-Sep-14
10-Sep-14 14-Sep-14 10-Sep-14
14-Sep-14 17-Sep-14 14-Sep-14
14-Sep-14 21-Sep-14 14-Sep-14
17-Sep-14
31-May-14 07-Oct-14 31-May-14
31-May-14 21-Jun-14 31-May-14
31-May-14 02-Jun-14 31-May-14
02-Jun-14 05-Jun-14 02-Jun-14
02-Jun-14 05-Jun-14 02-Jun-14

Project Baseline Bar

Critical Remaining Work

Start

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

20-Aug-14
24-Aug-14
27-Aug-14
24-Aug-14
21-Sep-14
07-Sep-14
16-Aug-14
19-Aug-14
20-Aug-14
24-Aug-14
31-Aug-14
03-Sep-14
07-Sep-14
10-Sep-14
06-Sep-14
08-Sep-14
09-Sep-14
10-Sep-14
21-Sep-14
13-Sep-14
13-Sep-14
13-Sep-14
14-Sep-14
17-Sep-14
21-Sep-14
17-Sep-14
07-Oct-14
21-Jun-14
02-Jun-14
05-Jun-14
05-Jun-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 17

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0076
C0077
C0078
C0079

Original BL Project
Duration Start

Backfill and Compaction


Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0080
C0081
C0082
C0083

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0084
C0085
C0086
C0087
C0088
C0089
C0090

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 54 to 63
Fencing & Civil Works

C0091
C0092
C0093
C0094
C0095
C0096
C0097

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0098
C0099
C0100
C0101

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

SIEMENS

3
6
3
3
9
3
2
2
2
11
2
2
2
3
4
7
0
117
22
2
3
3
3
6
3
3
9
4
2
2
2

05-Jun-14
09-Jun-14
14-Jun-14
17-Jun-14
17-Sep-14
17-Sep-14
21-Sep-14
22-Sep-14
23-Sep-14
28-Sep-14
28-Sep-14
28-Sep-14
28-Sep-14
28-Sep-14
01-Oct-14
01-Oct-14
30-Jun-14
30-Jun-14
30-Jun-14
01-Jul-14
01-Jul-14
05-Jul-14
08-Jul-14
14-Jul-14
16-Jul-14
05-Oct-14
05-Oct-14
07-Oct-14
09-Oct-14
11-Oct-14

BL Project
Finish

Start

08-Jun-14
14-Jun-14
17-Jun-14
21-Jun-14
28-Sep-14
21-Sep-14
22-Sep-14
27-Sep-14
28-Sep-14
07-Oct-14
30-Sep-14
30-Sep-14
30-Sep-14
01-Oct-14
04-Oct-14
07-Oct-14
04-Oct-14
22-Oct-14
20-Jul-14
01-Jul-14
05-Jul-14
05-Jul-14
08-Jul-14
14-Jul-14
16-Jul-14
20-Jul-14
13-Oct-14
07-Oct-14
09-Oct-14
12-Oct-14
13-Oct-14

05-Jun-14
09-Jun-14
14-Jun-14
17-Jun-14
17-Sep-14
17-Sep-14
21-Sep-14
22-Sep-14
23-Sep-14
28-Sep-14
28-Sep-14
28-Sep-14
28-Sep-14
28-Sep-14
01-Oct-14
01-Oct-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

30-Jun-14
30-Jun-14
30-Jun-14
01-Jul-14
01-Jul-14
05-Jul-14
08-Jul-14
14-Jul-14
16-Jul-14
05-Oct-14
05-Oct-14
07-Oct-14
09-Oct-14
11-Oct-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

08-Jun-14
14-Jun-14
17-Jun-14
21-Jun-14
28-Sep-14
21-Sep-14
22-Sep-14
27-Sep-14
28-Sep-14
07-Oct-14
30-Sep-14
30-Sep-14
30-Sep-14
01-Oct-14
04-Oct-14
07-Oct-14
04-Oct-14
22-Oct-14
20-Jul-14
01-Jul-14
05-Jul-14
05-Jul-14
08-Jul-14
14-Jul-14
16-Jul-14
20-Jul-14
13-Oct-14
07-Oct-14
09-Oct-14
12-Oct-14
13-Oct-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 18

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Pre-Commissioning
Pre-Comm

C0102
C0103
C0104
C0105
C0106
C0107
C0108

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 64 to 71
Fencing & Civil Works

C0109
C0110
C0111
C0112
C0113
C0114
C0115

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0116
C0117
C0118
C0119

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0120
C0121
C0122
C0123
C0124
C0125
C0126

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 72 to 81

SIEMENS

11
2
2
2
4
3
7
0
102
22
2
3
3
3
6
3
3
9
3
2
2
2
11
2
2
2
3
3
7
0
85

13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
15-Oct-14
15-Oct-14
28-Jul-14
28-Jul-14
28-Jul-14
03-Aug-14
03-Aug-14
06-Aug-14
09-Aug-14
14-Aug-14
18-Aug-14
19-Oct-14
19-Oct-14
22-Oct-14
25-Oct-14
26-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
30-Oct-14
30-Oct-14
31-Aug-14

BL Project
Finish

Start

22-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
15-Oct-14
19-Oct-14
22-Oct-14
19-Oct-14
06-Nov-14
20-Aug-14
03-Aug-14
06-Aug-14
06-Aug-14
09-Aug-14
14-Aug-14
18-Aug-14
20-Aug-14
27-Oct-14
22-Oct-14
25-Oct-14
27-Oct-14
27-Oct-14
06-Nov-14
29-Oct-14
29-Oct-14
29-Oct-14
30-Oct-14
03-Nov-14
06-Nov-14
03-Nov-14
20-Nov-14

13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
13-Oct-14
15-Oct-14
15-Oct-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

28-Jul-14
28-Jul-14
28-Jul-14
03-Aug-14
03-Aug-14
06-Aug-14
09-Aug-14
14-Aug-14
18-Aug-14
19-Oct-14
19-Oct-14
22-Oct-14
25-Oct-14
26-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
27-Oct-14
30-Oct-14
30-Oct-14
31-Aug-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

22-Oct-14
14-Oct-14
14-Oct-14
14-Oct-14
15-Oct-14
19-Oct-14
22-Oct-14
19-Oct-14
06-Nov-14
20-Aug-14
03-Aug-14
06-Aug-14
06-Aug-14
09-Aug-14
14-Aug-14
18-Aug-14
20-Aug-14
27-Oct-14
22-Oct-14
25-Oct-14
27-Oct-14
27-Oct-14
06-Nov-14
29-Oct-14
29-Oct-14
29-Oct-14
30-Oct-14
03-Nov-14
06-Nov-14
03-Nov-14
20-Nov-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 19

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Fencing & Civil Works

C0127
C0128
C0129
C0130
C0131
C0132
C0133

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0134
C0135
C0136
C0137

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0138
C0139
C0140
C0141
C0142
C0143
C0144

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 82 to 91
Fencing & Civil Works

C0145
C0146
C0147
C0148
C0149
C0150
C0151

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

SIEMENS

22
2
3
3
3
6
3
3
9
3
2
2
2
11
2
2
2
3
4
7
0
72
22
2
3
3
3
6
3
3
9

31-Aug-14
31-Aug-14
02-Sep-14
02-Sep-14
06-Sep-14
08-Sep-14
14-Sep-14
17-Sep-14
03-Nov-14
03-Nov-14
06-Nov-14
09-Nov-14
09-Nov-14
11-Nov-14
11-Nov-14
11-Nov-14
11-Nov-14
11-Nov-14
15-Nov-14
15-Nov-14
30-Sep-14
30-Sep-14
30-Sep-14
02-Oct-14
02-Oct-14
05-Oct-14
08-Oct-14
14-Oct-14
18-Oct-14
18-Nov-14

BL Project
Finish

Start

21-Sep-14
02-Sep-14
06-Sep-14
06-Sep-14
08-Sep-14
14-Sep-14
17-Sep-14
21-Sep-14
11-Nov-14
06-Nov-14
08-Nov-14
10-Nov-14
11-Nov-14
20-Nov-14
13-Nov-14
13-Nov-14
13-Nov-14
15-Nov-14
17-Nov-14
20-Nov-14
17-Nov-14
06-Dec-14
20-Oct-14
02-Oct-14
05-Oct-14
05-Oct-14
08-Oct-14
14-Oct-14
18-Oct-14
20-Oct-14
26-Nov-14

31-Aug-14
31-Aug-14
02-Sep-14
02-Sep-14
06-Sep-14
08-Sep-14
14-Sep-14
17-Sep-14
03-Nov-14
03-Nov-14
06-Nov-14
09-Nov-14
09-Nov-14
11-Nov-14
11-Nov-14
11-Nov-14
11-Nov-14
11-Nov-14
15-Nov-14
15-Nov-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

30-Sep-14
30-Sep-14
30-Sep-14
02-Oct-14
02-Oct-14
05-Oct-14
08-Oct-14
14-Oct-14
18-Oct-14
18-Nov-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

21-Sep-14
02-Sep-14
06-Sep-14
06-Sep-14
08-Sep-14
14-Sep-14
17-Sep-14
21-Sep-14
11-Nov-14
06-Nov-14
08-Nov-14
10-Nov-14
11-Nov-14
20-Nov-14
13-Nov-14
13-Nov-14
13-Nov-14
15-Nov-14
17-Nov-14
20-Nov-14
17-Nov-14
06-Dec-14
20-Oct-14
02-Oct-14
05-Oct-14
05-Oct-14
08-Oct-14
14-Oct-14
18-Oct-14
20-Oct-14
26-Nov-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 20

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0152
C0153
C0154
C0155

Original BL Project
Duration Start

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0156
C0157
C0158
C0159
C0160
C0161
C0162

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 92 to 1
101
Fencing & Civil Works

C0163
C0164
C0165
C0166
C0167
C0168
C0169

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0170
C0171
C0172
C0173

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0174
C0175
C0176
C0177

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU

SIEMENS

4
2
2
2
11
2
2
2
3
3
7
0
55
25
2
3
3
4
6
3
3
9
3
2
2
2
11
2
2
2
3

18-Nov-14
22-Nov-14
23-Nov-14
24-Nov-14
26-Nov-14
26-Nov-14
26-Nov-14
26-Nov-14
26-Nov-14
30-Nov-14
30-Nov-14
30-Oct-14
30-Oct-14
30-Oct-14
02-Nov-14
05-Nov-14
08-Nov-14
11-Nov-14
17-Nov-14
20-Nov-14
03-Dec-14
03-Dec-14
06-Dec-14
08-Dec-14
09-Dec-14
10-Dec-14
10-Dec-14
10-Dec-14
10-Dec-14
10-Dec-14

BL Project
Finish

Start

20-Nov-14
23-Nov-14
25-Nov-14
26-Nov-14
06-Dec-14
27-Nov-14
27-Nov-14
27-Nov-14
29-Nov-14
02-Dec-14
06-Dec-14
02-Dec-14
21-Dec-14
23-Nov-14
02-Nov-14
05-Nov-14
08-Nov-14
11-Nov-14
17-Nov-14
19-Nov-14
23-Nov-14
10-Dec-14
06-Dec-14
08-Dec-14
10-Dec-14
10-Dec-14
21-Dec-14
13-Dec-14
13-Dec-14
13-Dec-14
14-Dec-14

18-Nov-14
22-Nov-14
23-Nov-14
24-Nov-14
26-Nov-14
26-Nov-14
26-Nov-14
26-Nov-14
26-Nov-14
30-Nov-14
30-Nov-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

30-Oct-14
30-Oct-14
30-Oct-14
02-Nov-14
05-Nov-14
08-Nov-14
11-Nov-14
17-Nov-14
20-Nov-14
03-Dec-14
03-Dec-14
06-Dec-14
08-Dec-14
09-Dec-14
10-Dec-14
10-Dec-14
10-Dec-14
10-Dec-14
10-Dec-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

20-Nov-14
23-Nov-14
25-Nov-14
26-Nov-14
06-Dec-14
27-Nov-14
27-Nov-14
27-Nov-14
29-Nov-14
02-Dec-14
06-Dec-14
02-Dec-14
21-Dec-14
23-Nov-14
02-Nov-14
05-Nov-14
08-Nov-14
11-Nov-14
17-Nov-14
19-Nov-14
23-Nov-14
10-Dec-14
06-Dec-14
08-Dec-14
10-Dec-14
10-Dec-14
21-Dec-14
13-Dec-14
13-Dec-14
13-Dec-14
14-Dec-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 21

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0178
C0179
C0180

Original BL Project
Duration Start

Clear EIL Yes Items


Clear EIL No Items
PMCC

Well 102 to 111


Fencing & Civil Works

C0181
C0182
C0183
C0184
C0185
C0186
C0187

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0188
C0189
C0190
C0191

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0192
C0193
C0194
C0195
C0196
C0197
C0198

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 112 to 121


Fencing & Civil Works

C0199
C0200
C0201
C0202

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction

SIEMENS

3
7
0
39
22
2
3
3
3
6
4
3
9
3
2
2
2
11
2
2
2
4
3
7
0
34
22
2
3
3
3

BL Project
Finish

14-Dec-14
14-Dec-14

17-Dec-14
21-Dec-14
17-Dec-14
30-Nov-14 05-Jan-15
30-Nov-14 20-Dec-14
30-Nov-14 02-Dec-14
02-Dec-14 04-Dec-14
02-Dec-14 04-Dec-14
04-Dec-14 08-Dec-14
08-Dec-14 14-Dec-14
14-Dec-14 16-Dec-14
17-Dec-14 20-Dec-14
17-Dec-14 25-Dec-14
17-Dec-14 21-Dec-14
21-Dec-14 23-Dec-14
23-Dec-14 24-Dec-14
23-Dec-14 25-Dec-14
25-Dec-14 05-Jan-15
25-Dec-14 28-Dec-14
25-Dec-14 28-Dec-14
25-Dec-14 28-Dec-14
25-Dec-14 29-Dec-14
29-Dec-14 01-Jan-15
29-Dec-14 05-Jan-15
01-Jan-15
28-Dec-14 28-Jan-15
28-Dec-14 17-Jan-15
28-Dec-14 29-Dec-14
29-Dec-14 01-Jan-15
29-Dec-14 01-Jan-15
01-Jan-15 05-Jan-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

Finish

14-Dec-14
14-Dec-14
30-Nov-14
30-Nov-14
30-Nov-14
02-Dec-14
02-Dec-14
04-Dec-14
08-Dec-14
14-Dec-14
17-Dec-14
17-Dec-14
17-Dec-14
21-Dec-14
23-Dec-14
23-Dec-14
25-Dec-14
25-Dec-14
25-Dec-14
25-Dec-14
25-Dec-14
29-Dec-14
29-Dec-14
28-Dec-14
28-Dec-14
28-Dec-14
29-Dec-14
29-Dec-14
01-Jan-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

17-Dec-14
21-Dec-14
17-Dec-14
05-Jan-15
20-Dec-14
02-Dec-14
04-Dec-14
04-Dec-14
08-Dec-14
14-Dec-14
16-Dec-14
20-Dec-14
25-Dec-14
21-Dec-14
23-Dec-14
24-Dec-14
25-Dec-14
05-Jan-15
28-Dec-14
28-Dec-14
28-Dec-14
29-Dec-14
01-Jan-15
05-Jan-15
01-Jan-15
28-Jan-15
17-Jan-15
29-Dec-14
01-Jan-15
01-Jan-15
05-Jan-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 22

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0203
C0204
C0205

Original BL Project
Duration Start

Installation of RTU Shed, Monople a


Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0206
C0207
C0208
C0209

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0210
C0211
C0212
C0213
C0214
C0215
C0216

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 122 to 128


Fencing & Civil Works

C0217
C0218
C0219
C0220
C0221
C0222
C0223

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0224
C0225
C0226
C0227

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

SIEMENS

6
3
3
9
3
2
2
2
11
2
2
2
3
3
7
0
34
22
2
3
3
4
6
3
3
9
3
2
2
2
11

05-Jan-15
11-Jan-15
13-Jan-15
11-Jan-15
11-Jan-15
13-Jan-15
15-Jan-15
17-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
21-Jan-15
21-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
20-Jan-15
20-Jan-15
24-Jan-15
27-Jan-15
01-Feb-15
04-Feb-15
01-Feb-15
01-Feb-15
04-Feb-15
07-Feb-15
08-Feb-15
09-Feb-15

BL Project
Finish

Start

10-Jan-15
13-Jan-15
17-Jan-15
18-Jan-15
13-Jan-15
15-Jan-15
18-Jan-15
18-Jan-15
28-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
21-Jan-15
25-Jan-15
28-Jan-15
25-Jan-15
19-Feb-15
08-Feb-15
20-Jan-15
24-Jan-15
24-Jan-15
27-Jan-15
01-Feb-15
04-Feb-15
08-Feb-15
09-Feb-15
04-Feb-15
07-Feb-15
09-Feb-15
09-Feb-15
19-Feb-15

05-Jan-15
11-Jan-15
13-Jan-15
11-Jan-15
11-Jan-15
13-Jan-15
15-Jan-15
17-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
19-Jan-15
21-Jan-15
21-Jan-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

19-Jan-15
19-Jan-15
19-Jan-15
20-Jan-15
20-Jan-15
24-Jan-15
27-Jan-15
01-Feb-15
04-Feb-15
01-Feb-15
01-Feb-15
04-Feb-15
07-Feb-15
08-Feb-15
09-Feb-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

10-Jan-15
13-Jan-15
17-Jan-15
18-Jan-15
13-Jan-15
15-Jan-15
18-Jan-15
18-Jan-15
28-Jan-15
20-Jan-15
20-Jan-15
20-Jan-15
21-Jan-15
25-Jan-15
28-Jan-15
25-Jan-15
19-Feb-15
08-Feb-15
20-Jan-15
24-Jan-15
24-Jan-15
27-Jan-15
01-Feb-15
04-Feb-15
08-Feb-15
09-Feb-15
04-Feb-15
07-Feb-15
09-Feb-15
09-Feb-15
19-Feb-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 23

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0228
C0229
C0230
C0231
C0232
C0233
C0234

Original BL Project
Duration Start

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 129 to 134


Fencing & Civil Works

C0235
C0236
C0237
C0238
C0239
C0240
C0241

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0242
C0243
C0244
C0245

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0246
C0247
C0248
C0249
C0250
C0251
C0252

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Area 2 (Total 1
169 Wells) - AMAM
Haradh/Hawiyah
Haradh/Haw

SIEMENS

2
2
2
3
4
7
0
24
14
2
2
2
2
3
2
2
9
4
2
2
2
6
1
1
1
1
3
5
0
368
368

09-Feb-15
09-Feb-15
09-Feb-15
09-Feb-15
12-Feb-15
12-Feb-15
09-Feb-15
09-Feb-15
09-Feb-15
11-Feb-15
11-Feb-15
14-Feb-15
16-Feb-15
18-Feb-15
21-Feb-15
18-Feb-15
18-Feb-15
22-Feb-15
24-Feb-15
25-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
28-Feb-15
28-Feb-15
24-Jun-14
24-Jun-14

BL Project
Finish

Start

11-Feb-15
11-Feb-15
11-Feb-15
12-Feb-15
16-Feb-15
19-Feb-15
16-Feb-15
04-Mar-15
23-Feb-15
11-Feb-15
14-Feb-15
14-Feb-15
16-Feb-15
18-Feb-15
21-Feb-15
23-Feb-15
26-Feb-15
22-Feb-15
24-Feb-15
25-Feb-15
26-Feb-15
04-Mar-15
28-Feb-15
28-Feb-15
28-Feb-15
28-Feb-15
03-Mar-15
04-Mar-15
03-Mar-15
09-Jun-15
09-Jun-15

09-Feb-15
09-Feb-15
09-Feb-15
09-Feb-15
12-Feb-15
12-Feb-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

09-Feb-15
09-Feb-15
09-Feb-15
11-Feb-15
11-Feb-15
14-Feb-15
16-Feb-15
18-Feb-15
21-Feb-15
18-Feb-15
18-Feb-15
22-Feb-15
24-Feb-15
25-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
28-Feb-15
28-Feb-15
24-Jun-14
24-Jun-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

11-Feb-15
11-Feb-15
11-Feb-15
12-Feb-15
16-Feb-15
19-Feb-15
16-Feb-15
04-Mar-15
23-Feb-15
11-Feb-15
14-Feb-15
14-Feb-15
16-Feb-15
18-Feb-15
21-Feb-15
23-Feb-15
26-Feb-15
22-Feb-15
24-Feb-15
25-Feb-15
26-Feb-15
04-Mar-15
28-Feb-15
28-Feb-15
28-Feb-15
28-Feb-15
03-Mar-15
04-Mar-15
03-Mar-15
09-Jun-15
09-Jun-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 24

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Well 1 to 5
Fencing & Civil Works

C1002
C1003
C1004
C1005
C1006
C1007
C1008

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0991
C0992
C0993
C0994

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0995
C0996
C0997
C0998
C0999
C1000
C1001

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 6 to 10
Fencing & Civil Works

C0941
C0942
C0943
C0944
C0945
C0946
C0947

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

SIEMENS

56
22
2
3
3
3
6
3
3
24
4
2
2
2
11
2
2
2
4
3
7
0
38
22
2
4
4
3
6
4
3

24-Jun-14
24-Jun-14
24-Jun-14
26-Jun-14
26-Jun-14
30-Jun-14
03-Jul-14
08-Jul-14
12-Jul-14
15-Jul-14
15-Jul-14
04-Aug-14
06-Aug-14
07-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
12-Aug-14
12-Aug-14
26-Jul-14
26-Jul-14
26-Jul-14
28-Jul-14
28-Jul-14
04-Aug-14
07-Aug-14
12-Aug-14
16-Aug-14

BL Project
Finish

Start

19-Aug-14
15-Jul-14
26-Jun-14
30-Jun-14
30-Jun-14
02-Jul-14
08-Jul-14
12-Jul-14
15-Jul-14
10-Aug-14
17-Jul-14
06-Aug-14
09-Aug-14
10-Aug-14
19-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14
16-Aug-14
02-Sep-14
19-Aug-14
28-Jul-14
04-Aug-14
04-Aug-14
06-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14

24-Jun-14
24-Jun-14
24-Jun-14
26-Jun-14
26-Jun-14
30-Jun-14
03-Jul-14
08-Jul-14
12-Jul-14
15-Jul-14
15-Jul-14
04-Aug-14
06-Aug-14
07-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
12-Aug-14
12-Aug-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

26-Jul-14
26-Jul-14
26-Jul-14
28-Jul-14
28-Jul-14
04-Aug-14
07-Aug-14
12-Aug-14
16-Aug-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

19-Aug-14
15-Jul-14
26-Jun-14
30-Jun-14
30-Jun-14
02-Jul-14
08-Jul-14
12-Jul-14
15-Jul-14
10-Aug-14
17-Jul-14
06-Aug-14
09-Aug-14
10-Aug-14
19-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14
16-Aug-14
02-Sep-14
19-Aug-14
28-Jul-14
04-Aug-14
04-Aug-14
06-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 25

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Well Site Instrumentation,


In
RTU, Communication & Po

C0937
C0938
C0939
C0940

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0948
C0949
C0950
C0951
C0952
C0953
C0954

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 11 to 20
Fencing & Civil Works

C0977
C0978
C0979
C0980
C0981
C0982
C0983

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0973
C0974
C0975
C0976

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0984
C0985
C0986

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios

SIEMENS

12
4
2
2
2
11
2
2
2
3
3
7
0
38
22
2
3
3
4
6
3
3
12
3
2
2
2
11
2
2
2

12-Aug-14
12-Aug-14
19-Aug-14
20-Aug-14
21-Aug-14
24-Aug-14
24-Aug-14
24-Aug-14
24-Aug-14
24-Aug-14
27-Aug-14
27-Aug-14
30-Aug-14
30-Aug-14
30-Aug-14
01-Sep-14
01-Sep-14
04-Sep-14
08-Sep-14
13-Sep-14
16-Sep-14
13-Sep-14
13-Sep-14
20-Sep-14
21-Sep-14
22-Sep-14
27-Sep-14
27-Sep-14
27-Sep-14
27-Sep-14

BL Project
Finish

Start

24-Aug-14
16-Aug-14
20-Aug-14
23-Aug-14
24-Aug-14
02-Sep-14
26-Aug-14
26-Aug-14
26-Aug-14
27-Aug-14
30-Aug-14
02-Sep-14
30-Aug-14
06-Oct-14
20-Sep-14
01-Sep-14
04-Sep-14
04-Sep-14
07-Sep-14
13-Sep-14
16-Sep-14
20-Sep-14
27-Sep-14
16-Sep-14
21-Sep-14
23-Sep-14
27-Sep-14
06-Oct-14
29-Sep-14
29-Sep-14
29-Sep-14

12-Aug-14
12-Aug-14
19-Aug-14
20-Aug-14
21-Aug-14
24-Aug-14
24-Aug-14
24-Aug-14
24-Aug-14
24-Aug-14
27-Aug-14
27-Aug-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

30-Aug-14
30-Aug-14
30-Aug-14
01-Sep-14
01-Sep-14
04-Sep-14
08-Sep-14
13-Sep-14
16-Sep-14
13-Sep-14
13-Sep-14
20-Sep-14
21-Sep-14
22-Sep-14
27-Sep-14
27-Sep-14
27-Sep-14
27-Sep-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

24-Aug-14
16-Aug-14
20-Aug-14
23-Aug-14
24-Aug-14
02-Sep-14
26-Aug-14
26-Aug-14
26-Aug-14
27-Aug-14
30-Aug-14
02-Sep-14
30-Aug-14
06-Oct-14
20-Sep-14
01-Sep-14
04-Sep-14
04-Sep-14
07-Sep-14
13-Sep-14
16-Sep-14
20-Sep-14
27-Sep-14
16-Sep-14
21-Sep-14
23-Sep-14
27-Sep-14
06-Oct-14
29-Sep-14
29-Sep-14
29-Sep-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 26

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0987
C0988
C0989
C0990

Original BL Project
Duration Start

Loop Check to RTU & Pre-SAT RTU


Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 21 to 34
Fencing & Civil Works

C0919
C0920
C0921
C0922
C0923
C0924
C0925

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0933
C0934
C0935
C0936

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0926
C0927
C0928
C0929
C0930
C0931
C0932

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 35 to 48
Fencing & Civil Works

C1013
C1014
C1015

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R

SIEMENS

3
4
7
0
34
22
2
3
3
3
6
4
3
9
4
2
2
2
11
2
2
2
4
3
7
0
34
22
2
3
3

BL Project
Finish

Milestone

Actual Work

% Complete

Remaining Work

Summary

Baseline Milestone

Finish

27-Sep-14 30-Sep-14 27-Sep-14


30-Sep-14 02-Oct-14 30-Sep-14
30-Sep-14 06-Oct-14 30-Sep-14
02-Oct-14
30-Sep-14 01-Nov-14 30-Sep-14
30-Sep-14 20-Oct-14 30-Sep-14
30-Sep-14 02-Oct-14 30-Sep-14
02-Oct-14 05-Oct-14 02-Oct-14
02-Oct-14 05-Oct-14 02-Oct-14
05-Oct-14 08-Oct-14 05-Oct-14
08-Oct-14 14-Oct-14 08-Oct-14
14-Oct-14 16-Oct-14 14-Oct-14
18-Oct-14 20-Oct-14 18-Oct-14
14-Oct-14 22-Oct-14 14-Oct-14
14-Oct-14 16-Oct-14 14-Oct-14
18-Oct-14 19-Oct-14 18-Oct-14
19-Oct-14 21-Oct-14 19-Oct-14
20-Oct-14 22-Oct-14 20-Oct-14
22-Oct-14 01-Nov-14 22-Oct-14
22-Oct-14 23-Oct-14 22-Oct-14
22-Oct-14 23-Oct-14 22-Oct-14
22-Oct-14 23-Oct-14 22-Oct-14
22-Oct-14 25-Oct-14 22-Oct-14
26-Oct-14 28-Oct-14 26-Oct-14
26-Oct-14 01-Nov-14 26-Oct-14
28-Oct-14
30-Oct-14 01-Dec-14 30-Oct-14
30-Oct-14 19-Nov-14 30-Oct-14
30-Oct-14 02-Nov-14 30-Oct-14
02-Nov-14 04-Nov-14 02-Nov-14
02-Nov-14 04-Nov-14 02-Nov-14

Project Baseline Bar

Critical Remaining Work

Start

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

30-Sep-14
02-Oct-14
06-Oct-14
02-Oct-14
01-Nov-14
20-Oct-14
02-Oct-14
05-Oct-14
05-Oct-14
08-Oct-14
14-Oct-14
16-Oct-14
20-Oct-14
22-Oct-14
16-Oct-14
19-Oct-14
21-Oct-14
22-Oct-14
01-Nov-14
23-Oct-14
23-Oct-14
23-Oct-14
25-Oct-14
28-Oct-14
01-Nov-14
28-Oct-14
01-Dec-14
19-Nov-14
02-Nov-14
04-Nov-14
04-Nov-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 27

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C1016
C1017
C1018
C1019

Original BL Project
Duration Start

Backfill and Compaction


Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1009
C1010
C1011
C1012

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C1020
C1021
C1022
C1023
C1024
C1025
C1026

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 49 to 66
Fencing & Civil Works

C1067
C1068
C1069
C1070
C1071
C1072
C1073

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1063
C1064
C1065
C1066

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

SIEMENS

4
6
3
3
9
3
2
2
2
11
2
2
2
3
4
7
0
34
22
2
3
3
3
6
4
3
9
4
2
2
2

BL Project
Finish

04-Nov-14
08-Nov-14
13-Nov-14
17-Nov-14
13-Nov-14
13-Nov-14
17-Nov-14
18-Nov-14
19-Nov-14
22-Nov-14
22-Nov-14
22-Nov-14
22-Nov-14
22-Nov-14
25-Nov-14
25-Nov-14

08-Nov-14
13-Nov-14
17-Nov-14
19-Nov-14
22-Nov-14
17-Nov-14
18-Nov-14
20-Nov-14
22-Nov-14
01-Dec-14
23-Nov-14
23-Nov-14
23-Nov-14
24-Nov-14
27-Nov-14
01-Dec-14
27-Nov-14
30-Nov-14 31-Dec-14
30-Nov-14 20-Dec-14
30-Nov-14 02-Dec-14
02-Dec-14 06-Dec-14
02-Dec-14 06-Dec-14
06-Dec-14 08-Dec-14
08-Dec-14 14-Dec-14
14-Dec-14 17-Dec-14
17-Dec-14 20-Dec-14
14-Dec-14 22-Dec-14
14-Dec-14 17-Dec-14
17-Dec-14 18-Dec-14
20-Dec-14 21-Dec-14
20-Dec-14 22-Dec-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

Finish

04-Nov-14
08-Nov-14
13-Nov-14
17-Nov-14
13-Nov-14
13-Nov-14
17-Nov-14
18-Nov-14
19-Nov-14
22-Nov-14
22-Nov-14
22-Nov-14
22-Nov-14
22-Nov-14
25-Nov-14
25-Nov-14
30-Nov-14
30-Nov-14
30-Nov-14
02-Dec-14
02-Dec-14
06-Dec-14
08-Dec-14
14-Dec-14
17-Dec-14
14-Dec-14
14-Dec-14
17-Dec-14
20-Dec-14
20-Dec-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

08-Nov-14
13-Nov-14
17-Nov-14
19-Nov-14
22-Nov-14
17-Nov-14
18-Nov-14
20-Nov-14
22-Nov-14
01-Dec-14
23-Nov-14
23-Nov-14
23-Nov-14
24-Nov-14
27-Nov-14
01-Dec-14
27-Nov-14
31-Dec-14
20-Dec-14
02-Dec-14
06-Dec-14
06-Dec-14
08-Dec-14
14-Dec-14
17-Dec-14
20-Dec-14
22-Dec-14
17-Dec-14
18-Dec-14
21-Dec-14
22-Dec-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 28

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Pre-Commissioning
Pre-Comm

C1074
C1075
C1076
C1077
C1078
C1079
C1080

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 67 to 84
Fencing & Civil Works

C1085
C1086
C1087
C1088
C1089
C1090
C1091

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1081
C1082
C1083
C1084

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C1092
C1093
C1094
C1095
C1096
C1097
C1098

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 85 to 1
104

SIEMENS

11
2
2
2
3
3
7
0
34
22
2
3
3
4
6
3
4
9
3
2
2
2
11
2
2
2
3
4
7
0
34

22-Dec-14
22-Dec-14
22-Dec-14
22-Dec-14
22-Dec-14
25-Dec-14
25-Dec-14
31-Dec-14
31-Dec-14
31-Dec-14
03-Jan-15
03-Jan-15
06-Jan-15
08-Jan-15
14-Jan-15
18-Jan-15
14-Jan-15
14-Jan-15
18-Jan-15
20-Jan-15
20-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
26-Jan-15
26-Jan-15
31-Jan-15

BL Project
Finish

Start

31-Dec-14
24-Dec-14
24-Dec-14
24-Dec-14
25-Dec-14
28-Dec-14
31-Dec-14
28-Dec-14
01-Feb-15
20-Jan-15
03-Jan-15
05-Jan-15
05-Jan-15
08-Jan-15
14-Jan-15
18-Jan-15
20-Jan-15
22-Jan-15
18-Jan-15
19-Jan-15
21-Jan-15
22-Jan-15
01-Feb-15
25-Jan-15
25-Jan-15
25-Jan-15
26-Jan-15
28-Jan-15
01-Feb-15
28-Jan-15
04-Mar-15

22-Dec-14
22-Dec-14
22-Dec-14
22-Dec-14
22-Dec-14
25-Dec-14
25-Dec-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

31-Dec-14
31-Dec-14
31-Dec-14
03-Jan-15
03-Jan-15
06-Jan-15
08-Jan-15
14-Jan-15
18-Jan-15
14-Jan-15
14-Jan-15
18-Jan-15
20-Jan-15
20-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
22-Jan-15
26-Jan-15
26-Jan-15
31-Jan-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

31-Dec-14
24-Dec-14
24-Dec-14
24-Dec-14
25-Dec-14
28-Dec-14
31-Dec-14
28-Dec-14
01-Feb-15
20-Jan-15
03-Jan-15
05-Jan-15
05-Jan-15
08-Jan-15
14-Jan-15
18-Jan-15
20-Jan-15
22-Jan-15
18-Jan-15
19-Jan-15
21-Jan-15
22-Jan-15
01-Feb-15
25-Jan-15
25-Jan-15
25-Jan-15
26-Jan-15
28-Jan-15
01-Feb-15
28-Jan-15
04-Mar-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 29

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Fencing & Civil Works

C1031
C1032
C1033
C1034
C1035
C1036
C1037

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1027
C1028
C1029
C1030

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C1038
C1039
C1040
C1041
C1042
C1043
C1044

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 105 to 124


Fencing & Civil Works

C0912
C0913
C0914
C0915
C0916
C0917
C0918

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

SIEMENS

22
2
3
3
3
6
3
3
9
3
2
2
2
11
2
2
2
3
3
7
0
34
22
2
4
4
3
6
3
4
9

31-Jan-15
31-Jan-15
02-Feb-15
02-Feb-15
05-Feb-15
09-Feb-15
14-Feb-15
17-Feb-15
14-Feb-15
14-Feb-15
17-Feb-15
19-Feb-15
21-Feb-15
22-Feb-15
22-Feb-15
22-Feb-15
22-Feb-15
22-Feb-15
25-Feb-15
25-Feb-15
28-Feb-15
28-Feb-15
28-Feb-15
02-Mar-15
02-Mar-15
05-Mar-15
08-Mar-15
14-Mar-15
17-Mar-15
14-Mar-15

BL Project
Finish

Start

21-Feb-15
02-Feb-15
05-Feb-15
05-Feb-15
08-Feb-15
14-Feb-15
17-Feb-15
21-Feb-15
22-Feb-15
17-Feb-15
19-Feb-15
21-Feb-15
22-Feb-15
04-Mar-15
24-Feb-15
24-Feb-15
24-Feb-15
25-Feb-15
01-Mar-15
04-Mar-15
01-Mar-15
31-Mar-15
19-Mar-15
02-Mar-15
05-Mar-15
05-Mar-15
08-Mar-15
14-Mar-15
17-Mar-15
19-Mar-15
22-Mar-15

31-Jan-15
31-Jan-15
02-Feb-15
02-Feb-15
05-Feb-15
09-Feb-15
14-Feb-15
17-Feb-15
14-Feb-15
14-Feb-15
17-Feb-15
19-Feb-15
21-Feb-15
22-Feb-15
22-Feb-15
22-Feb-15
22-Feb-15
22-Feb-15
25-Feb-15
25-Feb-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

28-Feb-15
28-Feb-15
28-Feb-15
02-Mar-15
02-Mar-15
05-Mar-15
08-Mar-15
14-Mar-15
17-Mar-15
14-Mar-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

21-Feb-15
02-Feb-15
05-Feb-15
05-Feb-15
08-Feb-15
14-Feb-15
17-Feb-15
21-Feb-15
22-Feb-15
17-Feb-15
19-Feb-15
21-Feb-15
22-Feb-15
04-Mar-15
24-Feb-15
24-Feb-15
24-Feb-15
25-Feb-15
01-Mar-15
04-Mar-15
01-Mar-15
31-Mar-15
19-Mar-15
02-Mar-15
05-Mar-15
05-Mar-15
08-Mar-15
14-Mar-15
17-Mar-15
19-Mar-15
22-Mar-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 30

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0908
C0909
C0910
C0911

Original BL Project
Duration Start

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0901
C0902
C0903
C0904
C0905
C0906
C0907

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 125 to 146


Fencing & Civil Works

C0959
C0960
C0961
C0962
C0963
C0964
C0965

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0955
C0956
C0957
C0958

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0966
C0967
C0968
C0969

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU

SIEMENS

3
2
2
2
11
2
2
2
3
4
7
0
34
22
2
3
3
3
6
3
3
9
3
2
2
2
11
2
2
2
3

14-Mar-15
17-Mar-15
19-Mar-15
19-Mar-15
22-Mar-15
22-Mar-15
22-Mar-15
22-Mar-15
22-Mar-15
25-Mar-15
25-Mar-15
31-Mar-15
31-Mar-15
31-Mar-15
02-Apr-15
02-Apr-15
06-Apr-15
08-Apr-15
14-Apr-15
18-Apr-15
14-Apr-15
14-Apr-15
18-Apr-15
19-Apr-15
20-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15

BL Project
Finish

Start

17-Mar-15
18-Mar-15
21-Mar-15
22-Mar-15
31-Mar-15
24-Mar-15
24-Mar-15
24-Mar-15
25-Mar-15
28-Mar-15
31-Mar-15
28-Mar-15
02-May-15
20-Apr-15
02-Apr-15
05-Apr-15
05-Apr-15
08-Apr-15
14-Apr-15
18-Apr-15
20-Apr-15
22-Apr-15
18-Apr-15
19-Apr-15
21-Apr-15
22-Apr-15
02-May-15
25-Apr-15
25-Apr-15
25-Apr-15
26-Apr-15

14-Mar-15
17-Mar-15
19-Mar-15
19-Mar-15
22-Mar-15
22-Mar-15
22-Mar-15
22-Mar-15
22-Mar-15
25-Mar-15
25-Mar-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

31-Mar-15
31-Mar-15
31-Mar-15
02-Apr-15
02-Apr-15
06-Apr-15
08-Apr-15
14-Apr-15
18-Apr-15
14-Apr-15
14-Apr-15
18-Apr-15
19-Apr-15
20-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

17-Mar-15
18-Mar-15
21-Mar-15
22-Mar-15
31-Mar-15
24-Mar-15
24-Mar-15
24-Mar-15
25-Mar-15
28-Mar-15
31-Mar-15
28-Mar-15
02-May-15
20-Apr-15
02-Apr-15
05-Apr-15
05-Apr-15
08-Apr-15
14-Apr-15
18-Apr-15
20-Apr-15
22-Apr-15
18-Apr-15
19-Apr-15
21-Apr-15
22-Apr-15
02-May-15
25-Apr-15
25-Apr-15
25-Apr-15
26-Apr-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 31

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0970
C0971
C0972

Original BL Project
Duration Start

Clear EIL Yes Items


Clear EIL No Items
PMCC

Well 147 to 169


Fencing & Civil Works

C1056
C1057
C1058
C1059
C1060
C1061
C1062

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1052
C1053
C1054
C1055

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C1045
C1046
C1047
C1048
C1049
C1050
C1051

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Area 3 (Total 1
163 Wells) - Siemens
Uthmaniyah/Shedgum
Uthmaniyah/
Well 1 to 8
Fencing & Civil Works

C0649
C0650

Excavation/Trench Foundation and F


Laying of Cables

SIEMENS

3
7
0
43
27
3
5
4
4
7
5
4
12
5
3
3
3
13
3
3
3
5
4
8
0
258
258
122
48
2
4

26-Apr-15
26-Apr-15
29-Apr-15
29-Apr-15
29-Apr-15
03-May-15
03-May-15
06-May-15
10-May-15
17-May-15
21-May-15
17-May-15
17-May-15
21-May-15
24-May-15
25-May-15
27-May-15
27-May-15
27-May-15
27-May-15
27-May-15
01-Jun-15
01-Jun-15
24-Apr-14
24-Apr-14
24-Apr-14
24-Apr-14
24-Apr-14
21-May-14

BL Project
Finish

Start

28-Apr-15
02-May-15
28-Apr-15
09-Jun-15
25-May-15
03-May-15
06-May-15
06-May-15
10-May-15
17-May-15
21-May-15
25-May-15
27-May-15
21-May-15
24-May-15
27-May-15
27-May-15
09-Jun-15
31-May-15
31-May-15
31-May-15
01-Jun-15
06-Jun-15
09-Jun-15
06-Jun-15
27-Dec-14
27-Dec-14
19-Aug-14
08-Jun-14
26-Apr-14
24-May-14

26-Apr-15
26-Apr-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

29-Apr-15
29-Apr-15
29-Apr-15
03-May-15
03-May-15
06-May-15
10-May-15
17-May-15
21-May-15
17-May-15
17-May-15
21-May-15
24-May-15
25-May-15
27-May-15
27-May-15
27-May-15
27-May-15
27-May-15
01-Jun-15
01-Jun-15
24-Apr-14 A
24-Apr-14 A
24-Apr-14 A
24-Apr-14 A
24-Apr-14 A
26-Apr-14 A

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

28-Apr-15
02-May-15
28-Apr-15
09-Jun-15
25-May-15
03-May-15
06-May-15
06-May-15
10-May-15
17-May-15
21-May-15
25-May-15
27-May-15
21-May-15
24-May-15
27-May-15
27-May-15
09-Jun-15
31-May-15
31-May-15
31-May-15
01-Jun-15
06-Jun-15
09-Jun-15
06-Jun-15
27-Dec-14
27-Dec-14
19-Aug-14
08-Jun-14
20-May-14
24-May-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 32

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0651
C0652
C0653
C0654
C0655

Original BL Project
Duration Start

Installation of Pre-cast Foundation (R


Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0656
C0657
C0658
C0659

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0660
C0661
C0662
C0663
C0664
C0665
C0666

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 9 to 23
Fencing & Civil Works

C0667
C0668
C0669
C0670
C0671
C0672
C0673

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0674
C0675
C0676

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments

SIEMENS

3
3
6
4
3
47
3
2
2
2
11
2
2
2
4
3
7
0
62
22
2
3
3
4
6
3
4
36
3
2
2

BL Project
Finish

20-May-14
24-May-14
27-May-14
02-Jun-14
04-Jun-14
23-Jun-14
23-Jun-14
04-Aug-14
06-Aug-14
07-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
12-Aug-14
12-Aug-14

24-May-14
27-May-14
01-Jun-14
04-Jun-14
08-Jun-14
10-Aug-14
26-Jun-14
06-Aug-14
09-Aug-14
10-Aug-14
19-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14
16-Aug-14
19-Jun-14 19-Aug-14
19-Jun-14 09-Jul-14
19-Jun-14 21-Jun-14
21-Jun-14 24-Jun-14
21-Jun-14 24-Jun-14
24-Jun-14 28-Jun-14
28-Jun-14 02-Jul-14
03-Jul-14
06-Jul-14
06-Jul-14
09-Jul-14
03-Jul-14
10-Aug-14
03-Jul-14
06-Jul-14
04-Aug-14 06-Aug-14
06-Aug-14 09-Aug-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

Finish

20-May-14
24-May-14
27-May-14
02-Jun-14
04-Jun-14
23-Jun-14
23-Jun-14
04-Aug-14
06-Aug-14
07-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
12-Aug-14
12-Aug-14
19-Jun-14
19-Jun-14
19-Jun-14
21-Jun-14
21-Jun-14
24-Jun-14
28-Jun-14
03-Jul-14
06-Jul-14
03-Jul-14
03-Jul-14
04-Aug-14
06-Aug-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

24-May-14
27-May-14
01-Jun-14
04-Jun-14
08-Jun-14
10-Aug-14
26-Jun-14
06-Aug-14
09-Aug-14
10-Aug-14
19-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14
16-Aug-14
19-Aug-14
09-Jul-14
21-Jun-14
24-Jun-14
24-Jun-14
28-Jun-14
02-Jul-14
06-Jul-14
09-Jul-14
10-Aug-14
06-Jul-14
06-Aug-14
09-Aug-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 33

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0677

Original BL Project
Duration Start

Change over of Instruments

Pre-Commissioning
Pre-Comm

C0678
C0679
C0680
C0681
C0682
C0683
C0684

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 24 to 38
Fencing & Civil Works

C0685
C0686
C0687
C0688
C0689
C0690
C0691

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0692
C0693
C0694
C0695

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0696
C0697
C0698
C0699
C0700
C0701
C0702

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

SIEMENS

2
11
2
2
2
4
3
7
0
38
22
2
3
3
3
6
3
3
12
3
2
2
2
11
2
2
2
3
3
7
0

07-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
12-Aug-14
12-Aug-14
21-Jul-14
21-Jul-14
21-Jul-14
22-Jul-14
22-Jul-14
26-Jul-14
02-Aug-14
07-Aug-14
10-Aug-14
07-Aug-14
07-Aug-14
13-Aug-14
16-Aug-14
17-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
21-Aug-14
21-Aug-14

BL Project
Finish

Start

10-Aug-14
19-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14
16-Aug-14
28-Aug-14
13-Aug-14
22-Jul-14
26-Jul-14
26-Jul-14
02-Aug-14
07-Aug-14
10-Aug-14
13-Aug-14
18-Aug-14
10-Aug-14
16-Aug-14
17-Aug-14
18-Aug-14
28-Aug-14
20-Aug-14
20-Aug-14
20-Aug-14
21-Aug-14
25-Aug-14
28-Aug-14
25-Aug-14

07-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
10-Aug-14
12-Aug-14
12-Aug-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

21-Jul-14
21-Jul-14
21-Jul-14
22-Jul-14
22-Jul-14
26-Jul-14
02-Aug-14
07-Aug-14
10-Aug-14
07-Aug-14
07-Aug-14
13-Aug-14
16-Aug-14
17-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
21-Aug-14
21-Aug-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

10-Aug-14
19-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
16-Aug-14
19-Aug-14
16-Aug-14
28-Aug-14
13-Aug-14
22-Jul-14
26-Jul-14
26-Jul-14
02-Aug-14
07-Aug-14
10-Aug-14
13-Aug-14
18-Aug-14
10-Aug-14
16-Aug-14
17-Aug-14
18-Aug-14
28-Aug-14
20-Aug-14
20-Aug-14
20-Aug-14
21-Aug-14
25-Aug-14
28-Aug-14
25-Aug-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 34

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Well 39 to 68
Fencing & Civil Works

C0703
C0704
C0705
C0706
C0707
C0708
C0709

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0710
C0711
C0712
C0713

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0714
C0715
C0716
C0717
C0718
C0719
C0720

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 69 to 98
Fencing & Civil Works

C0721
C0722
C0723
C0724
C0725
C0726
C0727

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

SIEMENS

34
22
2
4
4
3
6
3
4
9
3
2
2
2
11
2
2
2
3
4
7
0
34
22
2
3
3
3
6
3
3

25-Aug-14
25-Aug-14
25-Aug-14
26-Aug-14
26-Aug-14
30-Aug-14
02-Sep-14
08-Sep-14
10-Sep-14
08-Sep-14
08-Sep-14
10-Sep-14
13-Sep-14
14-Sep-14
16-Sep-14
16-Sep-14
16-Sep-14
16-Sep-14
16-Sep-14
18-Sep-14
18-Sep-14
28-Sep-14
28-Sep-14
28-Sep-14
29-Sep-14
29-Sep-14
02-Oct-14
06-Oct-14
12-Oct-14
14-Oct-14

BL Project
Finish

Start

28-Sep-14
14-Sep-14
26-Aug-14
30-Aug-14
30-Aug-14
02-Sep-14
07-Sep-14
10-Sep-14
14-Sep-14
15-Sep-14
10-Sep-14
13-Sep-14
15-Sep-14
15-Sep-14
28-Sep-14
17-Sep-14
17-Sep-14
17-Sep-14
18-Sep-14
22-Sep-14
28-Sep-14
22-Sep-14
29-Oct-14
18-Oct-14
29-Sep-14
02-Oct-14
02-Oct-14
06-Oct-14
11-Oct-14
14-Oct-14
18-Oct-14

25-Aug-14
25-Aug-14
25-Aug-14
26-Aug-14
26-Aug-14
30-Aug-14
02-Sep-14
08-Sep-14
10-Sep-14
08-Sep-14
08-Sep-14
10-Sep-14
13-Sep-14
14-Sep-14
16-Sep-14
16-Sep-14
16-Sep-14
16-Sep-14
16-Sep-14
18-Sep-14
18-Sep-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

28-Sep-14
28-Sep-14
28-Sep-14
29-Sep-14
29-Sep-14
02-Oct-14
06-Oct-14
12-Oct-14
14-Oct-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

28-Sep-14
14-Sep-14
26-Aug-14
30-Aug-14
30-Aug-14
02-Sep-14
07-Sep-14
10-Sep-14
14-Sep-14
15-Sep-14
10-Sep-14
13-Sep-14
15-Sep-14
15-Sep-14
28-Sep-14
17-Sep-14
17-Sep-14
17-Sep-14
18-Sep-14
22-Sep-14
28-Sep-14
22-Sep-14
29-Oct-14
18-Oct-14
29-Sep-14
02-Oct-14
02-Oct-14
06-Oct-14
11-Oct-14
14-Oct-14
18-Oct-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 35

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

Original BL Project
Duration Start

Well Site Instrumentation,


In
RTU, Communication & Po

C0728
C0729
C0730
C0731

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0732
C0733
C0734
C0735
C0736
C0737
C0738

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 99 to 1
130
Fencing & Civil Works

C0739
C0740
C0741
C0742
C0743
C0744
C0745

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0746
C0747
C0748
C0749

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0750
C0751
C0752

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios

SIEMENS

9
3
2
2
2
11
2
2
2
3
3
7
0
34
22
2
4
4
3
6
3
4
9
3
2
2
2
11
2
2
2

12-Oct-14
12-Oct-14
14-Oct-14
16-Oct-14
18-Oct-14
20-Oct-14
20-Oct-14
20-Oct-14
20-Oct-14
20-Oct-14
22-Oct-14
22-Oct-14
25-Oct-14
25-Oct-14
25-Oct-14
26-Oct-14
26-Oct-14
29-Oct-14
02-Nov-14
06-Nov-14
10-Nov-14
06-Nov-14
06-Nov-14
10-Nov-14
12-Nov-14
13-Nov-14
15-Nov-14
15-Nov-14
15-Nov-14
15-Nov-14

BL Project
Finish

Start

19-Oct-14
14-Oct-14
16-Oct-14
19-Oct-14
19-Oct-14
29-Oct-14
21-Oct-14
21-Oct-14
21-Oct-14
22-Oct-14
26-Oct-14
29-Oct-14
26-Oct-14
25-Nov-14
13-Nov-14
26-Oct-14
29-Oct-14
29-Oct-14
02-Nov-14
06-Nov-14
10-Nov-14
13-Nov-14
15-Nov-14
10-Nov-14
12-Nov-14
15-Nov-14
15-Nov-14
25-Nov-14
17-Nov-14
17-Nov-14
17-Nov-14

12-Oct-14
12-Oct-14
14-Oct-14
16-Oct-14
18-Oct-14
20-Oct-14
20-Oct-14
20-Oct-14
20-Oct-14
20-Oct-14
22-Oct-14
22-Oct-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

25-Oct-14
25-Oct-14
25-Oct-14
26-Oct-14
26-Oct-14
29-Oct-14
02-Nov-14
06-Nov-14
10-Nov-14
06-Nov-14
06-Nov-14
10-Nov-14
12-Nov-14
13-Nov-14
15-Nov-14
15-Nov-14
15-Nov-14
15-Nov-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

19-Oct-14
14-Oct-14
16-Oct-14
19-Oct-14
19-Oct-14
29-Oct-14
21-Oct-14
21-Oct-14
21-Oct-14
22-Oct-14
26-Oct-14
29-Oct-14
26-Oct-14
25-Nov-14
13-Nov-14
26-Oct-14
29-Oct-14
29-Oct-14
02-Nov-14
06-Nov-14
10-Nov-14
13-Nov-14
15-Nov-14
10-Nov-14
12-Nov-14
15-Nov-14
15-Nov-14
25-Nov-14
17-Nov-14
17-Nov-14
17-Nov-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 36

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0753
C0754
C0755
C0756

Original BL Project
Duration Start

Loop Check to RTU & Pre-SAT RTU


Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 131 to 163


Fencing & Civil Works

C0757
C0758
C0759
C0760
C0761
C0762
C0763

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0764
C0765
C0766
C0767

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0768
C0769
C0770
C0771
C0772
C0773
C0774

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Area 4 - (Tota
(Total 172 Wells) Siemens
Aindar/Shedgum/Abqaiq
Aindar/Shed
Well 1 to 10
Fencing & Civil Works

C0271

Excavation/Trench Foundation and F

SIEMENS

4
3
7
0
34
22
2
3
3
3
6
3
3
9
3
2
2
2
11
2
2
2
3
3
7
0
523
523
205
54
4

BL Project
Finish

Milestone

Actual Work

% Complete

Remaining Work

Summary

Baseline Milestone

Finish

15-Nov-14 18-Nov-14 15-Nov-14


18-Nov-14 22-Nov-14 18-Nov-14
18-Nov-14 25-Nov-14 18-Nov-14
22-Nov-14
25-Nov-14 27-Dec-14 25-Nov-14
25-Nov-14 15-Dec-14 25-Nov-14
25-Nov-14 26-Nov-14 25-Nov-14
26-Nov-14 30-Nov-14 26-Nov-14
26-Nov-14 30-Nov-14 26-Nov-14
30-Nov-14 03-Dec-14 30-Nov-14
03-Dec-14 08-Dec-14 03-Dec-14
08-Dec-14 11-Dec-14 08-Dec-14
11-Dec-14 15-Dec-14 11-Dec-14
08-Dec-14 16-Dec-14 08-Dec-14
08-Dec-14 11-Dec-14 08-Dec-14
11-Dec-14 14-Dec-14 11-Dec-14
14-Dec-14 16-Dec-14 14-Dec-14
15-Dec-14 16-Dec-14 15-Dec-14
16-Dec-14 27-Dec-14 16-Dec-14
16-Dec-14 18-Dec-14 16-Dec-14
16-Dec-14 18-Dec-14 16-Dec-14
16-Dec-14 18-Dec-14 16-Dec-14
16-Dec-14 20-Dec-14 16-Dec-14
20-Dec-14 23-Dec-14 20-Dec-14
20-Dec-14 27-Dec-14 20-Dec-14
23-Dec-14
15-Jan-14 24-May-15 20-Jan-14 A
15-Jan-14 24-May-15 20-Jan-14 A
15-Jan-14 24-Jul-14
20-Jan-14 A
15-Jan-14 05-Mar-14 20-Jan-14 A
15-Jan-14 18-Jan-14 20-Jan-14 A

Project Baseline Bar

Critical Remaining Work

Start

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

18-Nov-14
22-Nov-14
25-Nov-14
22-Nov-14
27-Dec-14
15-Dec-14
26-Nov-14
30-Nov-14
30-Nov-14
03-Dec-14
08-Dec-14
11-Dec-14
15-Dec-14
16-Dec-14
11-Dec-14
14-Dec-14
16-Dec-14
16-Dec-14
27-Dec-14
18-Dec-14
18-Dec-14
18-Dec-14
20-Dec-14
23-Dec-14
27-Dec-14
23-Dec-14
24-May-15
24-May-15
24-Jul-14
30-Jun-14
22-Jan-14 A

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 37

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0272
C0273
C0274
C0275
C0276
C0277

Original BL Project
Duration Start

Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0285
C0286
C0287
C0288

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0278
C0279
C0280
C0281
C0282
C0283
C0284

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 11 to 17
Fencing & Civil Works

C0253
C0254
C0255
C0256
C0257
C0258
C0259

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0267
C0268

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu

SIEMENS

4
5
5
7
4
4
22
6
2
2
2
11
2
2
2
3
4
7
0
167
24
3
2
4
5
7
4
4
14
6
2

21-Jan-14
30-Jan-14
04-Feb-14
20-Feb-14
27-Feb-14
03-Mar-14
24-Jun-14
24-Jun-14
10-Jul-14
12-Jul-14
13-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
19-Jul-14
19-Jul-14
26-Feb-14
26-Feb-14
26-Feb-14
02-Mar-14
02-Mar-14
02-Mar-14
06-Mar-14
13-Mar-14
17-Mar-14
07-Jul-14
07-Jul-14
16-Jul-14

BL Project
Finish

Start

23-Jan-14
03-Feb-14
08-Feb-14
26-Feb-14
02-Mar-14
05-Mar-14
15-Jul-14
30-Jun-14
12-Jul-14
14-Jul-14
15-Jul-14
24-Jul-14
17-Jul-14
17-Jul-14
17-Jul-14
19-Jul-14
21-Jul-14
24-Jul-14
21-Jul-14
04-Aug-14
19-Mar-14
01-Mar-14
03-Mar-14
04-Mar-14
05-Mar-14
12-Mar-14
16-Mar-14
19-Mar-14
21-Jul-14
13-Jul-14
17-Jul-14

21-Jan-14 A
30-Jan-14 A
04-Feb-14 A
20-Feb-14 A
27-Feb-14 A
03-Mar-14 A
24-Jun-14
24-Jun-14
10-Jul-14
12-Jul-14
13-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
15-Jul-14
19-Jul-14
19-Jul-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

26-Feb-14 A
26-Feb-14 A
26-Feb-14 A
02-Mar-14 A
02-Mar-14 A
02-Mar-14 A
06-Mar-14 A
13-Mar-14 A
17-Mar-14 A
07-Jul-14
07-Jul-14
16-Jul-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

23-Jan-14 A
03-Feb-14 A
15-Jun-14
25-Jun-14
28-Jun-14
30-Jun-14
15-Jul-14
30-Jun-14
12-Jul-14
14-Jul-14
15-Jul-14
24-Jul-14
17-Jul-14
17-Jul-14
17-Jul-14
19-Jul-14
21-Jul-14
24-Jul-14
21-Jul-14
04-Aug-14
13-Jul-14
05-Jul-14
06-Jul-14
06-Jul-14
06-Jul-14
06-Jul-14
12-Jul-14
13-Jul-14
21-Jul-14
13-Jul-14
17-Jul-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 38

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0269
C0270

Original BL Project
Duration Start

Wiring Check of Instruments


Change over of Instruments

Pre-Commissioning
Pre-Comm

C0260
C0261
C0262
C0263
C0264
C0265
C0266

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 18 to 47
Fencing & Civil Works

C1401
C1402
C1403
C1404
C1405
C1406
C1407

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1390
C1391
C1392
C1393

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C1394
C1395
C1396
C1397
C1398
C1399

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items

SIEMENS

2
2
11
3
3
3
4
4
8
0
32
22
2
3
3
3
6
4
3
5
3
2
2
2
11
2
2
2
3
4
7

17-Jul-14
19-Jul-14
21-Jul-14
21-Jul-14
21-Jul-14
21-Jul-14
21-Jul-14
24-Jul-14
24-Jul-14
16-Dec-14
16-Dec-14
16-Dec-14
18-Dec-14
18-Dec-14
22-Dec-14
25-Dec-14
30-Dec-14
03-Jan-15
30-Dec-14
30-Dec-14
30-Dec-14
01-Jan-15
03-Jan-15
06-Jan-15
06-Jan-15
06-Jan-15
06-Jan-15
06-Jan-15
10-Jan-15
10-Jan-15

BL Project
Finish

Start

20-Jul-14
21-Jul-14
04-Aug-14
23-Jul-14
23-Jul-14
23-Jul-14
24-Jul-14
28-Jul-14
04-Aug-14
28-Jul-14
15-Jan-15
06-Jan-15
18-Dec-14
22-Dec-14
22-Dec-14
25-Dec-14
30-Dec-14
03-Jan-15
06-Jan-15
05-Jan-15
03-Jan-15
01-Jan-15
04-Jan-15
05-Jan-15
15-Jan-15
07-Jan-15
07-Jan-15
07-Jan-15
08-Jan-15
12-Jan-15
15-Jan-15

17-Jul-14
19-Jul-14
21-Jul-14
21-Jul-14
21-Jul-14
21-Jul-14
21-Jul-14
24-Jul-14
24-Jul-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

16-Dec-14
16-Dec-14
16-Dec-14
18-Dec-14
18-Dec-14
22-Dec-14
25-Dec-14
30-Dec-14
03-Jan-15
30-Dec-14
30-Dec-14
30-Dec-14
01-Jan-15
03-Jan-15
06-Jan-15
06-Jan-15
06-Jan-15
06-Jan-15
06-Jan-15
10-Jan-15
10-Jan-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

20-Jul-14
21-Jul-14
04-Aug-14
23-Jul-14
23-Jul-14
23-Jul-14
24-Jul-14
28-Jul-14
04-Aug-14
28-Jul-14
15-Jan-15
06-Jan-15
18-Dec-14
22-Dec-14
22-Dec-14
25-Dec-14
30-Dec-14
03-Jan-15
06-Jan-15
05-Jan-15
03-Jan-15
01-Jan-15
04-Jan-15
05-Jan-15
15-Jan-15
07-Jan-15
07-Jan-15
07-Jan-15
08-Jan-15
12-Jan-15
15-Jan-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 39

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C1400

Original BL Project
Duration Start

PMCC

Well 48 to 77
Fencing & Civil Works

C0887
C0888
C0889
C0890
C0891
C0892
C0893

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0883
C0884
C0885
C0886

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0894
C0895
C0896
C0897
C0898
C0899
C0900

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 78 to 1
108
Fencing & Civil Works

C1290
C1308
C1372
C1373
C1374
C1375

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence

SIEMENS

0
38
22
2
3
3
3
6
3
3
12
3
2
2
2
11
2
2
2
4
3
7
0
38
22
2
3
3
4
6
3

17-Jan-15
17-Jan-15
17-Jan-15
19-Jan-15
19-Jan-15
22-Jan-15
26-Jan-15
31-Jan-15
03-Feb-15
31-Jan-15
31-Jan-15
07-Feb-15
08-Feb-15
09-Feb-15
11-Feb-15
11-Feb-15
11-Feb-15
11-Feb-15
11-Feb-15
15-Feb-15
15-Feb-15
17-Feb-15
17-Feb-15
17-Feb-15
19-Feb-15
19-Feb-15
23-Feb-15
26-Feb-15
03-Mar-15

BL Project
Finish

12-Jan-15
21-Feb-15
07-Feb-15
19-Jan-15
22-Jan-15
22-Jan-15
25-Jan-15
31-Jan-15
03-Feb-15
07-Feb-15
11-Feb-15
03-Feb-15
08-Feb-15
10-Feb-15
11-Feb-15
21-Feb-15
14-Feb-15
14-Feb-15
14-Feb-15
15-Feb-15
17-Feb-15
21-Feb-15
17-Feb-15
24-Mar-15
10-Mar-15
19-Feb-15
23-Feb-15
23-Feb-15
25-Feb-15
03-Mar-15
07-Mar-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Start

Finish

17-Jan-15
17-Jan-15
17-Jan-15
19-Jan-15
19-Jan-15
22-Jan-15
26-Jan-15
31-Jan-15
03-Feb-15
31-Jan-15
31-Jan-15
07-Feb-15
08-Feb-15
09-Feb-15
11-Feb-15
11-Feb-15
11-Feb-15
11-Feb-15
11-Feb-15
15-Feb-15
15-Feb-15
17-Feb-15
17-Feb-15
17-Feb-15
19-Feb-15
19-Feb-15
23-Feb-15
26-Feb-15
03-Mar-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

12-Jan-15
21-Feb-15
07-Feb-15
19-Jan-15
22-Jan-15
22-Jan-15
25-Jan-15
31-Jan-15
03-Feb-15
07-Feb-15
11-Feb-15
03-Feb-15
08-Feb-15
10-Feb-15
11-Feb-15
21-Feb-15
14-Feb-15
14-Feb-15
14-Feb-15
15-Feb-15
17-Feb-15
21-Feb-15
17-Feb-15
24-Mar-15
10-Mar-15
19-Feb-15
23-Feb-15
23-Feb-15
25-Feb-15
03-Mar-15
07-Mar-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 40

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C1382

Original BL Project
Duration Start

Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1260
C1276
C1288
C1289

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C1383
C1384
C1385
C1386
C1387
C1388
C1389

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 109 to 140


Fencing & Civil Works

C0865
C0866
C0867
C0868
C0869
C0870
C0871

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C0879
C0880
C0881
C0882

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C0872
C0873

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries

SIEMENS

4
12
3
2
2
2
11
2
2
2
4
3
7
0
34
22
2
4
4
3
6
4
3
9
4
2
2
2
11
2
2

07-Mar-15
03-Mar-15
03-Mar-15
10-Mar-15
11-Mar-15
12-Mar-15
15-Mar-15
15-Mar-15
15-Mar-15
15-Mar-15
15-Mar-15
18-Mar-15
18-Mar-15
21-Mar-15
21-Mar-15
21-Mar-15
23-Mar-15
23-Mar-15
26-Mar-15
30-Mar-15
04-Apr-15
07-Apr-15
04-Apr-15
04-Apr-15
07-Apr-15
09-Apr-15
11-Apr-15
12-Apr-15
12-Apr-15
12-Apr-15

BL Project
Finish

Start

10-Mar-15
15-Mar-15
07-Mar-15
11-Mar-15
14-Mar-15
15-Mar-15
24-Mar-15
17-Mar-15
17-Mar-15
17-Mar-15
18-Mar-15
21-Mar-15
24-Mar-15
21-Mar-15
22-Apr-15
11-Apr-15
23-Mar-15
26-Mar-15
26-Mar-15
29-Mar-15
04-Apr-15
07-Apr-15
11-Apr-15
12-Apr-15
07-Apr-15
09-Apr-15
11-Apr-15
12-Apr-15
22-Apr-15
14-Apr-15
14-Apr-15

07-Mar-15
03-Mar-15
03-Mar-15
10-Mar-15
11-Mar-15
12-Mar-15
15-Mar-15
15-Mar-15
15-Mar-15
15-Mar-15
15-Mar-15
18-Mar-15
18-Mar-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

21-Mar-15
21-Mar-15
21-Mar-15
23-Mar-15
23-Mar-15
26-Mar-15
30-Mar-15
04-Apr-15
07-Apr-15
04-Apr-15
04-Apr-15
07-Apr-15
09-Apr-15
11-Apr-15
12-Apr-15
12-Apr-15
12-Apr-15

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

10-Mar-15
15-Mar-15
07-Mar-15
11-Mar-15
14-Mar-15
15-Mar-15
24-Mar-15
17-Mar-15
17-Mar-15
17-Mar-15
18-Mar-15
21-Mar-15
24-Mar-15
21-Mar-15
22-Apr-15
11-Apr-15
23-Mar-15
26-Mar-15
26-Mar-15
29-Mar-15
04-Apr-15
07-Apr-15
11-Apr-15
12-Apr-15
07-Apr-15
09-Apr-15
11-Apr-15
12-Apr-15
22-Apr-15
14-Apr-15
14-Apr-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 41

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C0874
C0875
C0876
C0877
C0878

Original BL Project
Duration Start

Testing Remot e Radios


Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

Well 141 to 172


Fencing & Civil Works

C1412
C1413
C1414
C1415
C1416
C1417
C1418

Excavation/Trench Foundation and F


Laying of Cables
Installation of Pre-cast Foundation (R
Backfill and Compaction
Installation of RTU Shed, Monople a
Preparation of Marl Pad within Fence
Installation of Earthing Grid

Well Site Instrumentation,


In
RTU, Communication & Po

C1408
C1409
C1410
C1411

Electrical Installation (Electrical Powe


Pre-installation of Instrument and Tu
Wiring Check of Instruments
Change over of Instruments

Pre-Commissioning
Pre-Comm

C1419
C1420
C1421
C1422
C1423
C1424
C1425

Wiring Check of Instruments to RTU


Testing of Solar Panel and Bat erries
Testing Remot e Radios
Loop Check to RTU & Pre-SAT RTU
Clear EIL Yes Items
Clear EIL No Items
PMCC

SCADA System
SCADA System
Syste Installation
Ain Dar WIPWIP-1 Digital Room

C1225

Preparation for Installation of SCADA

SIEMENS

2
4
3
7
0
34
22
2
3
3
3
6
3
3
9
3
2
2
2
11
2
2
2
3
3
7
0
350
25
25
6

12-Apr-15
12-Apr-15
15-Apr-15
15-Apr-15
21-Apr-15
21-Apr-15
21-Apr-15
23-Apr-15
23-Apr-15
27-Apr-15
30-Apr-15
05-May-15
09-May-15
05-May-15
05-May-15
09-May-15
11-May-15
12-May-15
13-May-15
13-May-15
13-May-15
13-May-15
13-May-15
17-May-15
17-May-15
02-Aug-14
02-Aug-14
02-Aug-14
02-Aug-14

BL Project
Finish

Start

14-Apr-15
15-Apr-15
19-Apr-15
22-Apr-15
19-Apr-15
24-May-15
12-May-15
23-Apr-15
27-Apr-15
27-Apr-15
29-Apr-15
05-May-15
09-May-15
12-May-15
13-May-15
09-May-15
11-May-15
12-May-15
13-May-15
24-May-15
16-May-15
16-May-15
16-May-15
17-May-15
20-May-15
24-May-15
20-May-15
25-Jun-15
24-Aug-14
24-Aug-14
07-Aug-14

12-Apr-15
12-Apr-15
15-Apr-15
15-Apr-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

21-Apr-15
21-Apr-15
21-Apr-15
23-Apr-15
23-Apr-15
27-Apr-15
30-Apr-15
05-May-15
09-May-15
05-May-15
05-May-15
09-May-15
11-May-15
12-May-15
13-May-15
13-May-15
13-May-15
13-May-15
13-May-15
17-May-15
17-May-15
02-Aug-14
02-Aug-14
02-Aug-14
02-Aug-14

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

14-Apr-15
15-Apr-15
19-Apr-15
22-Apr-15
19-Apr-15
24-May-15
12-May-15
23-Apr-15
27-Apr-15
27-Apr-15
29-Apr-15
05-May-15
09-May-15
12-May-15
13-May-15
09-May-15
11-May-15
12-May-15
13-May-15
24-May-15
16-May-15
16-May-15
16-May-15
17-May-15
20-May-15
24-May-15
20-May-15
25-Jun-15
24-Aug-14
24-Aug-14
07-Aug-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 42

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C1226
C1227
C1228
C1229
C1230
C1231
C1232

Original BL Project
Duration Start

Installation of Console Furniture for E


Installation of Console Furniture for O
Installation of SCADA Server
Installation of PI Server/NMS Server
Installation of Report Printers Network
Wiring and Cabling for SCADA
Power and Grounding

Mubaraz Pro
Production Engineerng Room

C1233
C1234
C1235
C1236

Installation of Console Furniture for O


Installation of Report Printers Network
Wiring and Cabling for Workstations
Power and Grounding

Udhailiyah P
Producton Engineering Room

C1237
C1238
C1239
C1240

Installation of Console Furniture for O


Installation of Report Printers Network
Wiring and Cabling for Workstations
Power and Grounding

SCADA System
Syste Commissioning w/ RTU's
Area 1 (134 Wells)
W

C1241
C1242
C1243
C1244
C1245
C1246
C1247
C1248
C1249
C1250
C1251
C1252

I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT

SIEMENS

&
&
&
&
&
&
&
&
&
&
&
&

CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest

with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT

2
2
3
3
3
1
2
7
1
3
3
2
7
1
3
3
2
325
217
10
10
10
10
10
10
10
10
10
10
10
10

09-Aug-14
09-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
23-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
12-Aug-14
16-Aug-14
18-Aug-14
18-Aug-14
19-Aug-14
19-Aug-14
23-Aug-14
25-Aug-14
25-Aug-14
25-Aug-14
06-Sep-14
17-Sep-14
29-Sep-14
14-Oct-14
28-Oct-14
12-Nov-14
27-Nov-14
11-Dec-14
27-Dec-14
11-Jan-15
03-Feb-15

BL Project
Finish

Start

10-Aug-14
10-Aug-14
13-Aug-14
13-Aug-14
13-Aug-14
11-Aug-14
24-Aug-14
17-Aug-14
11-Aug-14
14-Aug-14
14-Aug-14
17-Aug-14
24-Aug-14
18-Aug-14
21-Aug-14
21-Aug-14
24-Aug-14
25-Jun-15
17-Mar-15
04-Sep-14
16-Sep-14
30-Sep-14
09-Oct-14
25-Oct-14
09-Nov-14
24-Nov-14
08-Dec-14
23-Dec-14
07-Jan-15
21-Jan-15
15-Feb-15

09-Aug-14
09-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
11-Aug-14
23-Aug-14
11-Aug-14
11-Aug-14
12-Aug-14
12-Aug-14
16-Aug-14
18-Aug-14
18-Aug-14
19-Aug-14
19-Aug-14
23-Aug-14
25-Aug-14
25-Aug-14
25-Aug-14
06-Sep-14
17-Sep-14
29-Sep-14
14-Oct-14
28-Oct-14
12-Nov-14
27-Nov-14
11-Dec-14
27-Dec-14
11-Jan-15
03-Feb-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

10-Aug-14
10-Aug-14
13-Aug-14
13-Aug-14
13-Aug-14
11-Aug-14
24-Aug-14
17-Aug-14
11-Aug-14
14-Aug-14
14-Aug-14
17-Aug-14
24-Aug-14
18-Aug-14
21-Aug-14
21-Aug-14
24-Aug-14
25-Jun-15
17-Mar-15
04-Sep-14
16-Sep-14
30-Sep-14
09-Oct-14
25-Oct-14
09-Nov-14
24-Nov-14
08-Dec-14
23-Dec-14
07-Jan-15
21-Jan-15
15-Feb-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 43

Contract No.: 6600029175


BI-10-10007
Activity ID

Activity Name

C1253
C1254

Original BL Project
Duration Start

I-SAT & CommissioningTest with RT


I-SAT & CommissioningTest with RT

Area 2 (169 Wells)


W

C1255
C1256
C1257
C1258
C1259
C1261
C1262
C1263
C1264
C1265
C1266

I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT

&
&
&
&
&
&
&
&
&
&
&

CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest

with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT
with RT

&
&
&
&
&
&
&

CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest

with RT
with RT
with RT
with RT
with RT
with RT
with RT

&
&
&
&
&
&
&

CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest
CommissioningTest

with RT
with RT
with RT
with RT
with RT
with RT
with RT

Area 3 (163 Wells)


W

C1277
C1278
C1279
C1280
C1281
C1282
C1283

I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT

Area 4 (155 Wells)


W

C1291
C1292
C1293
C1295
C1296
C1297
C1298

I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT
I-SAT

Transmission Connectivity

SIEMENS

10
4
324
10
10
10
10
10
10
10
10
10
10
10
148
10
10
10
10
10
10
10
308
10
10
10
10
10
10
10
30

25-Feb-15
12-Mar-15
25-Aug-14
25-Aug-14
09-Sep-14
13-Oct-14
06-Nov-14
07-Dec-14
07-Jan-15
08-Feb-15
10-Mar-15
07-Apr-15
09-May-15
15-Jun-15
25-Aug-14
25-Aug-14
06-Sep-14
17-Sep-14
04-Oct-14
04-Nov-14
01-Dec-14
01-Jan-15
25-Aug-14
25-Aug-14
06-Sep-14
21-Jan-15
28-Feb-15
31-Mar-15
28-Apr-15
30-May-15
25-Aug-14

BL Project
Finish

Start

09-Mar-15
17-Mar-15
25-Jun-15
06-Sep-14
20-Sep-14
23-Oct-14
18-Nov-14
18-Dec-14
18-Jan-15
18-Feb-15
22-Mar-15
18-Apr-15
19-May-15
25-Jun-15
13-Jan-15
06-Sep-14
17-Sep-14
01-Oct-14
15-Oct-14
16-Nov-14
13-Dec-14
13-Jan-15
10-Jun-15
04-Sep-14
16-Sep-14
02-Feb-15
10-Mar-15
11-Apr-15
10-May-15
10-Jun-15
21-Sep-14

25-Feb-15
12-Mar-15
25-Aug-14
25-Aug-14
09-Sep-14
13-Oct-14
06-Nov-14
07-Dec-14
07-Jan-15
08-Feb-15
10-Mar-15
07-Apr-15
09-May-15
15-Jun-15
25-Aug-14
25-Aug-14
06-Sep-14
17-Sep-14
04-Oct-14
04-Nov-14
01-Dec-14
01-Jan-15
25-Aug-14
25-Aug-14
06-Sep-14
21-Jan-15
28-Feb-15
31-Mar-15
28-Apr-15
30-May-15
25-Aug-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

09-Mar-15
17-Mar-15
25-Jun-15
06-Sep-14
20-Sep-14
23-Oct-14
18-Nov-14
18-Dec-14
18-Jan-15
18-Feb-15
22-Mar-15
18-Apr-15
19-May-15
25-Jun-15
13-Jan-15
06-Sep-14
17-Sep-14
01-Oct-14
15-Oct-14
16-Nov-14
13-Dec-14
13-Jan-15
10-Jun-15
04-Sep-14
16-Sep-14
02-Feb-15
10-Mar-15
11-Apr-15
10-May-15
10-Jun-15
21-Sep-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 44

Contract No.: 6600029175


BI-10-10007
Activity ID

C1309
C1310
C1311

Activity Name

Original BL Project
Duration Start

Connectivity between the Master Rad


Connectivity between the SCADA Se
Connectivity between SCADA Serve

Master Base S
Stations Installation
Abqaiq Gosp - 3 Communication

C1312
C1313
C1314
C1315
C1316

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Abqaiq Alternate
Altern
Communication

C1317
C1318
C1319
C1320
C1321

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Shedgum IBPS
IBP Communication

C1322
C1323
C1324
C1325
C1326

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Aindar Gosp - 2 Communication

C1327
C1328
C1329
C1330
C1331

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Shedgum Co
Communication

C1332
C1333

Preparation for Installation of Comm


Installation of WAN Master Radio

SIEMENS

8
8
8
41
15
1
2
2
2
2
15
1
2
2
2
2
15
1
2
2
2
3
15
1
2
2
2
3
15
1
2

25-Aug-14
03-Sep-14
13-Sep-14
08-Jun-14
08-Jun-14
08-Jun-14
09-Jun-14
11-Jun-14
11-Jun-14
19-Jun-14
08-Jun-14
08-Jun-14
09-Jun-14
09-Jun-14
11-Jun-14
19-Jun-14
14-Jun-14
14-Jun-14
15-Jun-14
17-Jun-14
17-Jun-14
24-Jun-14
14-Jun-14
14-Jun-14
15-Jun-14
17-Jun-14
17-Jun-14
24-Jun-14
19-Jun-14
19-Jun-14
21-Jun-14

BL Project
Finish

Start

02-Sep-14
11-Sep-14
21-Sep-14
15-Jul-14
21-Jun-14
08-Jun-14
10-Jun-14
12-Jun-14
12-Jun-14
21-Jun-14
21-Jun-14
08-Jun-14
10-Jun-14
10-Jun-14
12-Jun-14
21-Jun-14
26-Jun-14
14-Jun-14
16-Jun-14
18-Jun-14
18-Jun-14
26-Jun-14
26-Jun-14
14-Jun-14
16-Jun-14
18-Jun-14
18-Jun-14
26-Jun-14
02-Jul-14
19-Jun-14
22-Jun-14

25-Aug-14
03-Sep-14
13-Sep-14
08-Jun-14
08-Jun-14
08-Jun-14
09-Jun-14
11-Jun-14
11-Jun-14
19-Jun-14
08-Jun-14
08-Jun-14
09-Jun-14
09-Jun-14
11-Jun-14
19-Jun-14
14-Jun-14
14-Jun-14
15-Jun-14
17-Jun-14
17-Jun-14
24-Jun-14
14-Jun-14
14-Jun-14
15-Jun-14
17-Jun-14
17-Jun-14
24-Jun-14
19-Jun-14
19-Jun-14
21-Jun-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

02-Sep-14
11-Sep-14
21-Sep-14
15-Jul-14
21-Jun-14
08-Jun-14
10-Jun-14
12-Jun-14
12-Jun-14
21-Jun-14
21-Jun-14
08-Jun-14
10-Jun-14
10-Jun-14
12-Jun-14
21-Jun-14
26-Jun-14
14-Jun-14
16-Jun-14
18-Jun-14
18-Jun-14
26-Jun-14
26-Jun-14
14-Jun-14
16-Jun-14
18-Jun-14
18-Jun-14
26-Jun-14
02-Jul-14
19-Jun-14
22-Jun-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 45

Contract No.: 6600029175


BI-10-10007
Activity ID

C1334
C1335
C1336

Activity Name

Original BL Project
Duration Start

RFS OMNI Antenna Installation for M


Electrical Works Includiing Earthing S
SAT

Uthmaniyah Gosp
G
- 7 Communication

C1337
C1338
C1339
C1340
C1341

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Uthmaniyah WIP
W - 5 Communication

C1342
C1343
C1344
C1345
C1346

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Substation 61 Communication

C1347
C1348
C1349
C1350
C1351

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Udhailiyah Communication
Co

C1352
C1353
C1354
C1355
C1356

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Hawiyah CWI
CWIP Communication

C1357
C1358
C1359

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M

SIEMENS

2
2
3
15
1
2
2
2
3
16
1
2
2
2
3
16
1
2
2
2
3
15
1
2
2
2
3
15
1
2
2

23-Jun-14
23-Jun-14
30-Jun-14
19-Jun-14
19-Jun-14
21-Jun-14
23-Jun-14
23-Jun-14
30-Jun-14
25-Jun-14
25-Jun-14
26-Jun-14
29-Jun-14
29-Jun-14
07-Jul-14
25-Jun-14
25-Jun-14
26-Jun-14
29-Jun-14
29-Jun-14
07-Jul-14
01-Jul-14
01-Jul-14
02-Jul-14
05-Jul-14
05-Jul-14
12-Jul-14
01-Jul-14
01-Jul-14
02-Jul-14
05-Jul-14

BL Project
Finish

Start

24-Jun-14
24-Jun-14
02-Jul-14
02-Jul-14
19-Jun-14
22-Jun-14
24-Jun-14
24-Jun-14
02-Jul-14
09-Jul-14
25-Jun-14
28-Jun-14
30-Jun-14
30-Jun-14
09-Jul-14
09-Jul-14
25-Jun-14
28-Jun-14
30-Jun-14
30-Jun-14
09-Jul-14
14-Jul-14
01-Jul-14
03-Jul-14
06-Jul-14
06-Jul-14
14-Jul-14
14-Jul-14
01-Jul-14
03-Jul-14
06-Jul-14

23-Jun-14
23-Jun-14
30-Jun-14
19-Jun-14
19-Jun-14
21-Jun-14
23-Jun-14
23-Jun-14
30-Jun-14
25-Jun-14
25-Jun-14
26-Jun-14
29-Jun-14
29-Jun-14
07-Jul-14
25-Jun-14
25-Jun-14
26-Jun-14
29-Jun-14
29-Jun-14
07-Jul-14
01-Jul-14
01-Jul-14
02-Jul-14
05-Jul-14
05-Jul-14
12-Jul-14
01-Jul-14
01-Jul-14
02-Jul-14
05-Jul-14

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

24-Jun-14
24-Jun-14
02-Jul-14
02-Jul-14
19-Jun-14
22-Jun-14
24-Jun-14
24-Jun-14
02-Jul-14
09-Jul-14
25-Jun-14
28-Jun-14
30-Jun-14
30-Jun-14
09-Jul-14
09-Jul-14
25-Jun-14
28-Jun-14
30-Jun-14
30-Jun-14
09-Jul-14
14-Jul-14
01-Jul-14
03-Jul-14
06-Jul-14
06-Jul-14
14-Jul-14
14-Jul-14
01-Jul-14
03-Jul-14
06-Jul-14

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT
ETT

Project Schedule

DATA ACQUISITION SYSTEM FOR SAOO WATER INJECTION WELLS

Page 46

Contract No.: 6600029175


BI-10-10007
Activity ID

C1360
C1361

Activity Name

Original BL Project
Duration Start

Electrical Works Includiing Earthing S


SAT

Haradh Gosp - 1 Communication

C1362
C1363
C1364
C1365
C1366

Preparation for Installation of Comm


Installation of WAN Master Radio
RFS OMNI Antenna Installation for M
Electrical Works Includiing Earthing S
SAT

Schedule Completion
Com
Date (Final System Acceptance)

C1367
C1368
C1369
C1370
C1371

100% Completion for Construction, R


Equipment Manuals Delivered
As-built Drawings Completed
System Design Manual Delivered
Completed System Performance Test

SIEMENS

2
3
16
1
2
2
2
3
99
15
5
30
4
25

05-Jul-14
12-Jul-14
01-Jul-14
01-Jul-14
02-Jul-14
05-Jul-14
05-Jul-14
13-Jul-14
27-Jun-15
27-Jun-15
14-Jul-15
22-Jul-15
26-Aug-15
31-Aug-15

BL Project
Finish

Start

06-Jul-14
14-Jul-14
15-Jul-14
01-Jul-14
03-Jul-14
06-Jul-14
06-Jul-14
15-Jul-14
30-Sep-15
13-Jul-15
21-Jul-15
25-Aug-15
30-Aug-15
30-Sep-15

05-Jul-14
12-Jul-14
01-Jul-14
01-Jul-14
02-Jul-14
05-Jul-14
05-Jul-14
13-Jul-14
27-Jun-15
27-Jun-15
14-Jul-15
22-Jul-15
26-Aug-15
31-Aug-15

Project Baseline Bar

Milestone

Actual Work

% Complete

Remaining Work

Summary

Critical Remaining Work


Baseline Milestone

Finish

2013
O N D J F M AM J J A S

2014
N D J FMA

2015
J J A SO N D J F M AM J J A S

2016
NDJ F

06-Jul-14
14-Jul-14
15-Jul-14
01-Jul-14
03-Jul-14
06-Jul-14
06-Jul-14
15-Jul-14
30-Sep-15
13-Jul-15
21-Jul-15
25-Aug-15
30-Aug-15
30-Sep-15

Date
25-Nov-12
Siemens Document No. SL-Ghawar-D-20-0009 15-Dec-12
11-May-13
21-Dec-13

Revision
Checked
Revision 00
Revision 01
Revision 02 CBW
Revision 03 AJN

Approved
ETT
ETT
ETT