SPECIFICATION NO PLD-105
FOR
FORGED STEEL FLANGES
REVISION-ONE
11/8/1364
SECTION
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
DESCRIPTION
SCOPE
CODES AND STANDARDS
ORDERING DATA
DIMENSIONS
GOVERNING STANDARDS
FLANGE FACING
MATERIAL
TRANSITION PIECES
WELDING
INSPECTION AND TESTING
REPORTS AND CERTIFICATES AND DOCUMENTS
MARKING
PAGE
1-0
2-0
3-0
SCOPE
1-1
1-2
2-2
ORDERING DATA
3-1
4-0
DIMENSIONS
4-1
5-0
6-0
GOVERNING STANDARD
5-1
a)
b)
c)
FLANGE FACINGS
6-1
7-0
MATERIAL
7-1
7-2
CE C
Mn Si Cr Mo Ni Cu
0.40%
6
16
7-3
7-4
b)
8-0
TRANSITION PIECES
8-1
8-2
8-3
9-0
WELDING
Shop welding of transition piece to flange hub shall be in
accordance with the ASME Boiler and Pressure
Vessel Code, sections VIII and IX and BS-1515
part 1 as summarized hereunder.
9-1
9-2
9-3
9-4
9-5
9-6
9-7
10-0
11-0
10-1
10-2
10-3
12-0
Certificate of manufacture.
Weld procedure of manufacture.
Certified reports giving chemical analysis and
physical properties of steel.
Stress relieve and heat treatment certificates.
Nondestructive test certificates.
Catalogs
Manufacturing centficate
MARKING
12-1
12-2
pieces.
13-0
13-1