Anda di halaman 1dari 19

List of SAP Status Codes

SAP Status Codes and Descriptions


Status Code
CRTD
REL
MSCP
MSPT
AVAC
ESTC
PRT
PPRT
CNF
PCNF
CPCK
DLV
DLT
PCST
NCMP
PRC
ISSD
NHFD
GEN1
GEN2
GEN3
GEN4
OPL1
OPL2
OPL3
OPL4
SFMT
SETC
DSEX
MLTL
MLBL
MLDI
CNC
SORL
SOPR
SOCF
UMGP
CONI
PREL
LKD
TECO
CLSD
ORSP

Description
Created
Released
Capacity shortage
Material shortage
Availability control active
Estimated costs
Printed
Part printed
Confirmed
Partially confirmed
Capacity checked
Delivered
Deletion indicator
Product costed
Not completed
Pre-costed
Goods issued
Ntwk header: final delivery
General list 1 printed
General list 2 printed
General list 3 printed
General list 4 printed
Activity list 1 printed
Activity list 2 printed
Activity list 3 printed
Activity list 4 printed
Settlement fields maintained
Settlement rule created
Date set by external system
Multi-level: Top level
Multi-level: Bottom level
Multi-level: Dummy info record
Costs not current
Subordinate order released
Subordinate order printed
Subordinate order confirmed
Rescheduled
Configuration incomplete
Partially released
Locked
Technically completed
Closed
Open reservations posted

STND
MILE
MCNF
ACAS
MSCP
RELR
VCAL
NDAT
CSPS
PLCS
PLLK
DDLK
BMLK
AALK
MDLK
APPR
BUDG
OSNO
NOPO
NOPR
ORAS
NOCO
NOPT
PDLV
WDFL
DLFL
NOLV
COL1
COL2
COL3
COL4
RESA
PRL1
PRL2
PRL3
PRL4
NBDT
NFDT
GMCO
CFCO
SPCF
SCNF
ISBD
RVPS
MSPR
RVPL
FNBL

Standard confirmation
Milestone confirmation
Manually confirmed
Activity account assignment
Capacity shortage
Release rejected
Variances calculated
Rescheduling (Actl.) required
Costs posted
Planned costs
Planning locked
Date definition locked
Budget management locked
Account assignment locked
Master data locked
Approved
Budgeted
Outstanding notification
Notification postponed
Notification in process
Order assigned
Notification completed
Notification printed
Partially delivered
Withdrawal failed
Deletion Flag
Transaction LVMS not permitted
Component list 1 printed
Component list 2 printed
Component list 3 printed
Component list 4 printed
Results analysis carried out
PRT list 1 printed
PRT list 2 printed
PRT list 3 printed
PRT list 4 printed
Rescheduling required (Basic)
Rescheduling required (Frcst)
Goods movement in coll. order
Confirmation in coll. order
Sub-operation partially conf.
Sub-operation finally conf.
Insufficient budgeting
Revenue posted
PRT shortage
Revenue planned
Final billing

CRTE
AVLB
INST
EHIS
SETM
SCNF
SUST
SUIR
SUFN
PRST
PRIR
PRFN
TDST
TDIR
TDFN
COMO
PRTO
CSER
ASEQ
DSPT
NTUP
ACTV
RACR
ACLO
NOLO
RESI
COMM
COPA
CANC
RTAP
THRD
GRLO
PROP
UNOC
RENT
CRES
RELS
CLOS
GRFL
IFSL
SOLD
PURI
PURC
PSLD
DEMO
PDEM
ERUI

Created
Available
Installed
Entered historically
Settlemt rule created manually
Summary confirm. carried out
Setup started
Setup interrupted
Setup finished
Processing started
Processing interrupted
Processing finished
Teardown started
Teardown interrupted
Teardown finished
Components for object
PRTs for object
Error in cost calculation
Allocated to superior equipt
Scheduled
Dates are not updated
Active
Rental agreements created
Active lease-outs
No lease-outs
Residential Rental Agrmt
Commercial Contract
Comm. provisional agrmnt
Canceled
Rent adjustments planned
Utilized by third parties
Used by group with LO
For own use
Unoccupied
Intended for rent
Created (Standard WBS)
Released (Standard WBS)
Closed (Standard WBS)
Goods receipt failed
Intended for sale
Sold
Intended for purchase
Purchased
Partially sold
Demolition
Partially demolished
Economic ruin

PECR
POCR
BTRD
DIVI
PDIV
INMD
SECD
IFPF
PORT
TSOS
TSRL
TSCO
TSSC
OSTS
ATCO
NOTI
NOTE
DEFR
AUC
Cost
Cstd
FUAC
ARNB
ORD
SHPT
PREP
REJC
NPRT
CRAB
ILNC
AUSS
ESTO
SLOR
EDEL
ESER
ECUS
EINS
ELOK
ETRA
EAUS
HUAS
PIAC
PAOR
PREQ
CHCR
SPRQ
LTIN

Partial economic ruin


Printout of changes required
Block transaction data
Division declaration
Partial division declaration
Inspection made
Security deposit paid out
Intended for portfolio
In portfolio
Task Outstanding
Task Released
Task Completed
Task successful
Outstanding task(s) exist(s)
All Tasks Completed
Notification (internal)
Notification (external)
Defects Recording
Asset in construction exists
To be costed
Costed
Follow-up action completed
Notif. blocked by archiving
Created from sales order
Created from shipment doc.
Prepared
Rejected
PRT not ready for use
Control Recipe Discarded
Inspection lot not created
Scrap determined
In the warehouse
Assigned in sales order
Assigned in delivery note
Assigned in service contract
At customer site
In Review
Locked
In transport
From warehouse
Handling Unit Assigned
Inventory Active
Insp. completion w/o confirm.
Plan/specific. required
Characterist. must be created
Quantity posting required
Long-term inspection

PASG
CCTD
CALC
QLCH
SKIP
PRSI
PRII
INSP
RREC
DEF
SSAP
STIC
ICCO
UD
SPST
SPCO
STUP
QLUP
IRUP
LTCA
ARBL
ARCH
REO3
REO2
REO1
SUB
IRCH
MCAN
MSUB
MtoO
NoMP
HCNF
CPIS
NOPR
NOCP
NOTR
CRCR
NCHK
NSCH
SPLT
PSPL
ASGN
PTAS
PTDS
ERTR
ITAA
CECR

Plan/specification assigned
Insp. characteristics created
Sample calculated
Quality level relevant
Skip lot
Sample drawing instr. printed
Inspection instruction printed
Inspection active
Results confirmed
Defects were recorded
Object created
Short-term insp. completed
All inspections completed
Usage decision has been made
Stock posting started
Stock posting completed
Statistics updated
Quality level updated
Quality info record updated
Lot canceled
Blocked for Archiving
Lot archived
Lot detail data deleted
Lot sample data deleted
Charact. + operations deleted
Transmit to subsystem
Q-info record changed
Lot marked for cancellation
Marked for subsystem
Make-to-order production
No make-to-order prod.
Order header confirmed
Confirmation issued components
No PRTs
No material components
No trigger points
Control recipe created
Not checked
Not scheduled (forecast dates)
Split
Partially split
Assigned
Partially assigned
Partially dispatched
Error creating transfer reqmnt
Item account assignment
Check ECR

CHKD
ECRA
ECOP
ECPC
ECCF
ECCM
ECOR
ECIR
CCO1
CCO2
CCO3
CCOB
CCOI
CCOA
CCOF
CRFI
CCPO
CCFO
WCRE
SUPF
PPF
TDPF
BLLS
EXLS
CCSL
CCUL
ORRQ
ORAC
ORTE
ILAS
ICHA
QMDA
BREQ
BASG
VACT
VACE
CAPP
CLAS
CLQM
CUGT
FKTF
RCKP
CTCM
RAOC
RAWO
UDRE
SRPC

ECR Checked
ECR Approved
ECO to be processed
ECO partially confirmed
ECO confirmed
ECO completed
ECO released
Object: insp. req. for ECR
Object: change possible
Object: change not necessary
Object: change not possible
Object: to be processed
Object: in preparation
Object: change completed
Object: change released
Control recipe finished
All objects checked
All objects released
Work center until release
Setup partially finished
Processing partially finished
Teardown partially finished
Boycott list
Export control
Locked for system changes
Locked for user changes
Order record required
Order record archived
Order record terminated
Inspection lot assigned
Planned InspCharacs. allocated
QM data recorded
Batch assignment required
Batch assigned
Var. activity partial conf.
Var. activity final. conf.
CAPP calculated
Complete Classification
Shortterm Classification
Copy attribute analysis
Error when processing function
Confirmation with personal ID
Certif.confirmation missing
RA data in object currency
RA data w/o object currency
Usage decision reset
Secondary resource part confd

SRCF
VOBJ
ZUOD
REJT
ICPL
PERR
CHER
ILOR
NAVD
CONC
FTC2
FTC3
FTC4
TPA
INAC
GMPS
APG
APGS
APRC
APNG
PIGN
APRS
OPGN
GBST
GBTS
BBGT
BUG
BRFL
AKNI
AKNO
AO01
AO02
AO03
MACM
ASSB
ECOC
CCRD
CBLK
SETT
CHKD
FAPP
MCRD
RBMS
MSPL
REJD
DEPS
NEWQ

Secondary resource confirmed


Subobject exists
Assigned
ECR Rejected
ECO incomplete
ECO: processing errors
Object: errors in change
Insp.lot cntd in order record
Not available at request date
Collect. order dates not curr.
Control: Embargo
Control: Missing master data
Control: Permission
Transfer prices for agreements
Object Deactivated
Goods movement posted
Approval granted
Single approval granted
Based on approved recipe
Approval not granted
Process instructions generated
Approval withdrawn
Operation generated
Confirmed
Counterconfirmed
Accounted
Exercised
Expired
Knocked in
Knocked out
Availability check error
Do availability check
Delivery groups present
Material committed
Assembly lock
ECO complete
Case created
Case blocked for settlement
Settled
Tested
For approval
Measure created
Replaced by measure
Planning for task
Rejected
Depreciation simulation avail.
New quantity calculation

USED
STRD
APRV
PROG
CROK
LBPR
FMAI
BCRQ
BASC
SIG1
SIG2
SIG3
SIG4
POAR
APIP
EOPD
EODL
BRAR
SOAS
LOLK
SERM
BNAS
IREP
TREP
REPA
BDRQ
BDMD
BRRQ
NOCH
CEFF
MADJ
RlNe
QUCR
QUAC
INVD
PTBL
CGFB
REPR
PCMN
PCC
ITG
BTG
PTAG
ETG
BUG
EUG
BTUG

Phys. sample no longer exists


Sample was stored
Approved
Progress confirmation (MST)
Certificate receipt confirmed
Label printed
FM account assignmt incomplete
Order to be handled in batches
Batch assignment complete
One dig. signature missing
Two dig. signatures missing
Three dig. signatures missing
Four dig. signatures missing
Part objects archived
Based on approved insp. plan
Ext. operatn partly delivered
External operation delivered
Batch record archived
Sales order assigned
Lot locked for batch record
SerialNo maintenance required
Batch not assigned
Under repair
Partially repaired
Repaired
Business decision required
Business decision made
Batch record required
Changes forbidden
Effectivity parameter copied
Manual adjustment necessary
Release in network taken place
Quotation created
Quotation accepted
Invoiced
partially billed
Confirm./goods mvmnt forbidden
Repairs processing
Production campaign
Product cost collector used
Inital tagging status
Tag
Tag printed
Tagged
Untag
Untagged
Untag Temporarily

ETUG
LBNP
RET
CNOK
CCOK
PAGE
ADVS
CONF
WCM
MANC
CANC
PRTA
DNEW
UNT
EXEC
WOCO
PROC
TENT
TEST
BLTC
PTST
VBCR
VBAP
VBPA
VBAR
VBPC
VBDE
VBAW
CR
CO
LO
RE
HUM
CONX
CHNG
POST
HI
AC
IC
OP
IP
CL
DE
IPEX
DLEX
FINV
REVS

Temporarily Untagged
Label not printed
Return
Credit limit check invalid
Credit limit check successful
Paging occurs
Advance shipment occurred
Conflict
Work Clearance Management
Mat.availability not checked
Capacity avail.not checked
PRT availability not checked
New dummy quantity calculation
Untaggable
Released for execution
Work completed
Processing
Temporary entry
Test cycle
Block technical completion
Test tag printed
Batch record created
Batch record approved
Batch rec. partially approved
Batch record archived
Batch rec. partially archived
Batch rec. contains deviations
Batch rec.: new version exists
Created
Conference
Locked
Released
Handling units assigned
Fix configuration
Change mode
Postscript
Historical
Active
Inactive
Created
In Process
Closed
Data Entered
In Process Outside EH&S
Deleted Outside EH&S
Further Investigation
Reversed

PO
ACPT
ONHO
EXTS
NMAT
SPLT
CSPL
UNCO
CRTC
ADRJ
MISM
NOME
PTME
MERR
SUPP
QUOT
QUBP
SLBP
QUVC
SLVC
SPTT
QADJ
PHEX
WHSE
PLND
LOAD
UNLD
PPCm
LOCK
WGHD
RESV
PPGI
PPSC
PSTD
DLTD
SGPR
APRQ
APOK
APRF
CMSP
CANG
CBER
CABG
CPER
CBRE
CBAS
CFVE

Posted
Order accepted
On Hold
Changed by external system
No material components
Split
Created by splitting
Ref. object under construction
From created to tech.completed
Automatic deletion rejected
Mismeasurement
No Measurement
Partial Measurement
Measurement Results Recorded
Supplement
No material components
Assigned in quote (bump)
Assigned in order (bump)
Assigned in quote (vers. chg.)
Assigned in order (vers. chg.)
License split
Operation Quantities Adjusted
Physically Exists
In Warehouse
Planned
Loaded
Unloaded
PPPI complete
Locked
Weighed
Reserved for PP
PPPI reservation for GI post.
PPPI sequence checked
Goods Issue Posted
Deleted
Visually Checked
Approval: Required
Approval: OK
Approval: Refused
CM: Object locked
CM: Created
CM: Baselining allowed
CM: Object closed
CM: Process allowed
CM: Baseline requested
Baselined (fixed)
Released for distribution

DRCT
NACO
INIV
INVE
OWNS
RRA
SEPO
ASIM
AORD
AVER
AKUE
AZUR
GZBE
GZER
AZAE
AZST
DELD
EXPD
INIT
AFIX
FIXD
ROLL
PREM
IRAD
NOTG
AANG
IP
FR
RLRQ
RLRJ
MKOS
EXPL
NC
RE
IOPN
IINP
ICMP
ICLK
IPLK
IICA
IOIN
IINP
IACT
PROT
PWP
VAL
MOBI

SU for Directly Assigned Costs


No Automatic Confirmation
In Inventory
Physically Inventoried
Owner Settlement
Relevant to Results Analysis
Separate Order
Simulation
Order
Contract
Notice
To be settled
To be confirmed
Counterconfirmation required
Changed
Reversed
Deleted
Expired
Initial
Fixing
Fixing executed
Rollover
Premature Settlement
Interest rate adjustment
Notice Given
Offer
In Process
For Release
Release Required
Release rejected
Cost Collector Created
External Conv.of Planned Order
Noncritical Change
Released
IS-T: Opened
IS-T: Being processed
IS-T: Completed
IS-T: Complete lock
IS-T: Partial lock
IS-T: Item cancelled
IS-T: Operations interruption
IS-T: Being processed
IS-T: Active
Operational protection
Work permit printed
Valuated
Data on Mobile Device

PUSH
PACC
PREJ
PEXP
PRST
PPRJ
SIGA
CMSI
XSpr
XSez
XSgn
IRAE
IRAC
IRAR
AFWD
WCDR
WCDC
WCDP
RSRV
NEWQ
NOPR
MADJ
EXPR
QUIT
DELF
ARCH
FLEX
EXKU

OREL
OCOM
OASS
OINF
OREJ
OACC
OCUS
BLKE
BLKW
CDEN
CGBL
CCOM
CDEL
ARCR
DelA
DELT

Push Effected
Push Accepted
Push Rejected
Push Maximum Time Expired
Push Reset
Push Partially Rejected
Signature Attached
Case Marked Suppl. Invoice
Control recipe created
Control recipe in process
XStep Generated
Int. rate adjustment executed
Int. rate adjustment changed
Int. Rate Adjustment Reversed
Maturity of forward
WEC: Date Adjustment Requested
WEC: Date Adjustment Completed
WEC: Date Adjustment Pending
Reserved
New
In Process
Completed
External Processing
Confirmed
Deletion indicator
Blocked for Archiving
Specifications Assigned
External Processing Customer
1100 Can be archived
1101 Archived
1102 Can be deleted
Released
Completed
Assigned
Informed
Rejected
Accepted
At customer site
Blocked (Error)
Blocked (Warning)
Flagged for Archiving
Locked
Do Not Contact
Marked for deletion
Can be archived
Archived
Deleted

LOCK
PARC
INAC
NREL
Pld
Rqst
App
Rej
Act
Obsl
MvtC
AM00
AM01
AM02
AM03
AM04
AM05
AM06
AM07
AM08
AM09
AM10
AM11
AM12
AM13
AM14
AM15
AM16
AM17
AM18
AM19
AM20
AM21
AM22
AM23
AM24
SDVC
SDVY
SDVN
PLAN
APPL
RELE
APPR
LOCK
DELP
DELA
OBSO

Locked
To archive
Inactive
Not Released
Planned
Requested
Approved
Rejected
Active
Obsolete
Reused Order
Being Created
In Process
Released
Completed
Locked
To Be Archived
Archived
To Be Approved
Rejected
Approved
Deletion Flag
Canceled
Unplanned Audit(s)
Question List(s) Assigned
Download Completed
Confirmed
Report Created
Signature Provided
Outstanding Actions
Actions Completed
Completed w. Outstanding Actns
Created
Outstanding
Forced Completion
Valuation Executed
Changeable copy to be checked
Copy checked - OK
Copy checked - not OK
Planned
Requested
Released by Material Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete

REJE
APLA
AAPP
AAPR
ALOC
AOBS
AREJ
DPLA
DAPP
DREL
DAPR
DLOC
DDLP
DDLA
DOBS
DREJ
EPLA
EAPP
EREL
EAPR
ELOC
EDLP
EDLA
EOBS
EREJ
FPLA
FAPP
FREL
FAPR
FLOC
FDLP
FDLA
FOBS
FREJ
GPLA
GAPP
GAPR
GREJ
GOBS
GLOC
HPLA
HAPP
HAPR
HREJ
HACT
HOBS
CNEW

Rejected
Planned
Requested
Approved
Locked
Obsolete
Rejected
Planned
Requested
Released by Material Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete
Rejected
Planned
Requested
Released by Material Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete
Rejected
Planned
Requested
Released by Material Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete
Rejected
Planned
Requested
Approved
Rejected
Obsolete
Locked
Planned
Requested
Approved
Rejected
Active
Obsolete
In Process

CREL
CLOC
CINC
CDIS
ARCV
NEW
DECL
EXPO
PLOR
MRCP
PROR
RESU
RECF
CLOS
JOB
CONV
QMCL
CHGD
FFUE
FHNC
IHNC
GMDR
GMPR
GMAP
GMAW
GMCL
GMCX
GMCA
Rcp0
Rcp1
Rcp2
Rcp3
Rcp4
Rcp5
Rcp6
SPEC
CONT
RESL
CSPT
MRGM
MRGS
RSTR
RWRK
SPL
SPTM
NEWO
RELO

Released
Locked
Inconsistent
Distributable
To Archive
Trial Created
Trial Definition Closed
Trial Data Exported
Planned Order Assigned
Master Recipe Generated
Process Order Assigned
Results Entered/Imported
Results Confirmed
Trial Closed
Background Processing
Trial Converted
QM Planning Closed
Creation of Change Docs Active
From Follow-Up Entry
From History New Construction
In History New Construction
Initial draft
Proposal
Application
Award
Closing
Closed
Cancelled
In process
Processing Closed
Rejected
Released
Released for Scope
Inactive
Obsolete
RE:Spec home
RE:Contingency order
RE: Re-Sell to new customer
Process Order Created by Split
Process order was merged
Process order merged an order
Restart
Rework Insert
Process Order was Split
Process Order Split Multiple
New/In Process
Released

CLOS
DIST
NEW
Act
REL
CHK
END
NEWR
ACCE
REVI
CLOR
CREA
CGAT
CGMN
INPR
CMTD
DELD
HOLD
CBEX
CMOB
CMBG
MEBS
ORCR
OCRR
TBUS
MDCI
MDCU
MDFL
NUSD
BLFA
DFRD
COCE
CPCE
MDRQ
DOCC
COMP
CACL
INPC
XR01
XR02
XR03
XR04
XR05
XR06
XR07
XR20
XR21

Completed
Distributable
New
Active
Released
For Checking
Completed
ECR Processible
ECR Approved
ECR Rejected
ECR Completed
New IP-Data
Changed in Revision
System Status : Change Manual
System Status : Inprocess
System Status : Completed
Deleted in Revision
System Status : Hold
CM: Baseline exploded
CM: Baseline obsolet
CM: Background processing
MEB-Controlled
Order created by MEB
Order creation required
To be Used
Master Data Creation Initiated
Master Data Created / Updated
Master Data Creation Failed
Not Used
Set Archive Indicator
Deferred
Completion Certified
Completion Partially Certified
Meas. Doc. Creation Required
Document Created
Completed
Cancelled
In Process
In Process
Rejected
Release for Test
Released
Obsolete
Flagged for Archiving
Archived
Approved
Discarded

XR40
UPNW
UPSV
UPRL
UPSD
UPRC
UPAP
UPRJ
UPER
UPPO
UPIN
UPSP
UPSE
INTR
CKIN
LOST
LOPF
LOCM
ULST
ULPF
ULCO
MVPR
WEPR
AVWE
AVLO
AVUL
AVMO
AVCO
WACR
WALO
WACS
crea
actv
lega
inac
calc
WADL
LRCL
PRCS
liqi
liqd
OFRJ
RELF
INIT
IBDE
IBIN
IB04

Current Signature Process


Created
Saved
Released
Distributed
Received
Approved
Rejected
Errors found
Updated
Partially Posted
Partially Sent
Error Sending Data
In transit
Checked in
Load started
Load partly finished
Load complete
Unload started
Unload Partly finished
Unload complete
Move process
Weigh process
Available for weight
Available for load
Available for unload
Available for move
Available to check-out
WA-PRO: Created
WA-PRO: Locked
WA-PRO: Closed
Created
Active
Legally Active
Inactive
Calculation Relevant
WA-PRO: To Be Deleted
Land Register Closed
Parcel Ceased to Exist
In Liquidation
Liquidated
Rejected
Release Forbidden
Initial Status
Deletion flag
Deactivate
Avail.

IB05
CRE
SREL
CANL
CCIN
CCAK
CCLO
CCDL
CCAR
INIT
DRFT
REVW
REWK
IP
OPEN
RSLV
CLSD
REAS
VLDT
SBMT
Test
ATCL
SHIP
TVER
KLAU
MDIP
MDCP
MDTC
OINA
OACT
DFS
Asgd
VNE
VMSG
VVAK
VEST
VI
VCHG
VREL
VLCK
VPRO
VARC
VEPL
VINT
VaCh
VNVP
RINA

Avail.
Service Entry Sheet created
Service Entry Sheet released
Service Entry Sheet cancelled
new
Released
Blocked
Logically Deleted
Ready for Archiving
New
Draft
Review
Rework
In Process
Open
Resolved
Closed
Reassessment
Validated
Submitted
In Process
Auto Closed
Shipping taken place
Partial Shipping
Clinical Order Created
Basic Med. Doc. in Process
Basic Med. Doc. Complete
Basic Med. Doc. to Be Checked
Inactive
Active
Deletion flag set
Allocated
Value does not exist
Value missing
Valid value
Value was estimated
Value implausible
Value entered/changed manually
Value has been released
Value is locked
Value is protected
Value was activated
Value was extrapolated
Value was interpolated
Val. Manually Chngd Externally
Version Not In Validity Period
Route Inactive

RACT
DFLS
DINS
RIPR
HANG
HPLN
HAUS
HCOP
HLVM
PANG
PAUS
PPZM
PNZM
PZUR
PABG
PLST
PBEH
PBCH
HLKZ

Route Active
Deletion Flag Set
Deletion Indicator Set
Route in Processing
Waste Disposal Order Created
Waste Disposal Order Planned
Waste Disposal Order Output
CO Posting
Deletion Flag for WDO Header
WDO Item Created
WDO Item Output
Positive Confirmation
Negative Confirmation
WDO Item Postponed
WDO Item Billed
Debit Memo Request Generated
Container Transport
Container Del/Remove/Replace.
Deletion Flag for WDO Header

Anda mungkin juga menyukai