Cluster Water Distribution System of 97 Villages of Ladnu Tehsil under JICA assisted RRWS & FMP
(Nagaur) Including Village Distribution & IEC Activities, Package-8(CDS-5)

JOB Ref. No. : LE130287


NAME

SHAH TECHNICAL CONSULTANT INDIA LIMITED

TITLE :

SIGN

DATE

DSGN

SR

SR

23.10.13

CHKD

BRJ

BRJ

23.10.13

APPD

PBK

PBK

23.10.13

Hydraulic calculations for cluster distribution system


ESR -FIRWASI

DOC./DRG. No.
1

3 0 2 8 7 - M -

RELEASED FOR

W S - W S - H C - 1 0 3

PRELIMINARY

INFORMATION

APPROVAL

SIZE

REV.

A4

CONSTRUCTION

LARSEN & TOUBRO LIMITED


ECC Division EDRC
TENDER

Work for cluster distribution system of 97 villages of Ladnu


PROJECT Tehsil under JICA assisted RRWS & FMP (Nagaur) Project ,

130287-M-WS-WS-HC-1031

Package-8(CDS-5)

Hydraulic calculations for cluster distribution DESIGNED CHECKED


SUBJECT
system
BRJ
SR
ESR - FIRWASI

APPROVED

DATE
23.10.13
R-1
PAGE

PBK

Software used
Epanet 2.0
Based on Hazen william formula
C- Coefficient of friction = 140 for uPVC, 135 for DI pipes
Peak factor = 3
uPVC pipes Finsh internal diameters as under are used :
90 mm having FID = 82.6 mm
110 mm having FID = 101.4 mm
125 mm having FID = 115.0 mm
140 mm having FID = 129.0 mm

LARSEN & TOUBRO LIMITED

160 mm having FID = 147.4 mm


180 mm having FID = 166.0 mm
225 mm having FID = 207. 8 mm
Pipe material - for outlet pipes from ESR.
Ductile iron pipes as per IS 8329:2000
Lining and Coating
Internal cement moratr lining as per Appendix B of IS 8329
External bitumen coating as per Appendix C of IS 8329

pipe material - for distribution system


uPVC class -3
Top of pipe has been considered on an average 1 m below ground.
Terminal pressure - min. 10 mtr.
Terminal pressure at critical nodes are kept equal to 10 mtr + Fitting losses 10% .
SYSTEM DESIGNED ON THE YEAR 2045 WATER DEMAND
Elevations are based on actual field survey carried out by M/s L & T Construction
References
Bid Document Volume-II
Bid Document Volume-III

LARSEN & TOUBRO LIMITED


Construction Division EDRC
DATE

TENDER
PROJECT

SUBJECT

23.10.13

130287-M-WS-WS-HC-1031
Hydraulic calculations for cluster
distribution system
ESR - FIRWASI

DESIGNED
SR

R-1

CHECKED

APPROVED

BRJ

PBK

PAGE

Cluster Distribution System Details


DESIGN YEAR 2045
VILLAGE

DEMAND IN
LPS

RL

TERMINAL PRESSURE IN MTR.

FIRWASI ESR

353.941

18.00

JUNCTION

353.941

17.60

JUNCTION 1

354.24

12.67

FIRWASI

354.24

2.972

12.54

LACHHADI

346.386

1.604

14.44

DEVRA

352.504

0.337

18.22

HUSSINPURA

346.265

1.42

11.29

PIPE LENGTH DETAILS


FROM

TO

LENGTH IN
MTR.
TYPE OF PIPE

PIPE DIAMETER

FIRWASI ESR

JUNCTION

50

DI

150

JUNCTION

JUNCTION 1

621

uPVC

160

20

uPVC

125

JUNCTION 1

FIRWASI

JUNCTION 1

LACHHADI

3268

uPVC

125

JUNCTION

DEVRA

1350

uPVC

90

JUNCTION

HUSSINPURA

2929

uPVC

110