INTRODUCTION:
People Still Mills (PSM) is the only facility of its kind in Pakistan engaged in the
development and productions of alloys and special steels.
PLANTS:
We have different plants in PSM that are labeled as Shops.
Q-Shop:
Also known as Electrical Shop. It comprises of two sections
Control Centre:
Control Centre is based on Relay Logic mechanism which controls
the speed and Process Flow of “Production Plant” through
contactors and inverters.
Control Panels:
Control Panels are used to derive and control the speed of the motors
placed inside the control room and are connected to the Bar Rolling
placed inside the Production Plant.
Transformer:
A 3-Phase step down transformer having power rating of 500 KVA
is used to reduce the voltage level coming from main supply to 3.3
KV.
Motors:
AC and DC motors of different ratings are used to drive the Bar
Rollings.
We have 3 main motors in control room.
5
- Wound Motor:
a) Cage Motor:
20 KW, no slipping and fixed speed.
Is used to push the steel Bars into the Gas Furnace where steels
are heated to a Red Hot temperature.
b) Wound Motor:
22 KW and variable speed.
And is used to pull out the steel Bars from Gas Furnace for
reshaping
Crains:
Are used to lift and carry large and heavy objects, such as steel Bars.
motors etc..
In production plant we have 4 Crains and each one is further consists of
Control Room, Control Panel, 2 Induction Motors, Junction Box,
Resistance Box, Windings and Limit etc..
Gas Furnace:
Steel Bars are heated at very temperature inside the furnace by
injecting very hot gases, so that they are easily reshaped when passes
through Bar Rollings.
Bar Rollings:
The steel Bars which just come out of the gas furnace are passed
through Bar Rollings about 6-7 times so that the required shape is obtained.
In production plant we have a no. of Bar Rollings. All these processes of
passing steel bars through Bar Rollings and cutting the extra size of steel
bars are controlled by a person inside the control room in the production
plant.
7
Testing of Transformer:
P = √3 V I Cosα
Came out about 46A, which is greater than the required full load
current for driving the motor.
Hence this Trans. is now ready for use on the Crain to drive the
motor (500V).
Installation of Crain:
8
Control room:
The whole mechanism (movement) of Crain is controlled from
control room.
Control panel:
It is used to ON and OFF the motor, control the speed and the
voltage level of the motor and the values of resistance in the resistance box.
Resistance box:
It contains different values of resistors, and the speed of motor is
changed by selecting different resistance in resistance box through cables.
Junction box:
All the windings those are used on the Crain for connection were
terminated in the junction box.
Limit:
Limit is used to stop the load from lifting above a certain height
(level).
Cables:
9
Wound motors:
Were used to drive the Crain, the Rolling placed on the Crain and
are also used to lift the load. These motors are driven by transformers.
Transformers:
Two transformers of different ratings were used to drive the motor
those were placed on the Crain.