MEJORAMIENTO PLAZA SANTA MARA

COMUNA DE SANTA MARIA

M3
PROPUESTA PBLICA N62/2013
DEPARAMENTO TCNICO

ESTADO DE
PAGO N 5

67,116,291

COSTOS Y PRESUPUESTOS

TEM

DESIGNACIN

UN.

1.
1.1

Obras Preliminares.
Replanteo, trazado y niveles .

m2

CANT.

9,535.0

Ejec. Anterior
E.P.

TOTAL

9,801,980

9,535

9,801,980
2.
2.1
2.1.1
2.1.2
2.1.3

Obra de Construccin de Oden y Vestidores


en piso zcalo.
Obra Gruesa.
Excavaciones .
Cama de ripio e=0,07 m.
Base estabilizada granular e=0,30 compactada
.
Polietileno e=0,2 mm.
Hormign .
Emplantillado espesor 5 cm H-15 .
Hormign de Losa de fundacin ( 0,30).
Hormign muros Zcalos .
Hormign de losa de entrepiso e=0,15 .
Hormign escalas y gradas.
Hormign pilares primer piso ODEON.
Impermeabilizante asfaltico.
Enfierradura A6342H.
Enfierraduras fundacin.
Enfierraduras de pilares .
Enfierradura losa entre piso .
Enfierraduras de pilares superiores .
Enfierraduras de escala y gradas
Moldaje .
Moldaje losa entre piso oden .
Moldaje escaleras y gradas .
Moldajes muro .
Moldaje pilares .
Estructura metlica Oden Baranda.
Pasamano Raul 1/2 caa Raul.
Balaustros perfil 20x20x2 cada 0,12 L=83cm.
Pletina 200x200x10mm.
Pia de fierro forjado decorativa uno por
medio.
Pilares Tubos D=4" e=3mm 16,80 ml.
Cubierta octogonal Tubos D=4" e=3mm 64,4
ml.
Perfiles de distribucin canales 80x40x3 38 ml.

Avance
Anterior E.P
($)

Ejec Anterior
E.P.
(%)

9,801,980

Avance
Presente E.P
($)

Ejec. Presente
E.P.

100%
100%

9,801,980

Ejec Presente
E.P.
(%)
0

Total Ejecutado
(cantidad)

Total Ejecutado
($)

0%
0%

9,535

Avance Total
%

9,801,980
9,801,980

100%
100%

m3
m2
m2

48.0
21.0
22.0

488,736
43,113
147,004

48
21

488,736
43,113

100%
100%

0
0

0
0

0%
0%

48
21

488,736
43,113

100%
100%

22

147,004

100%

0%

22

147,004

100%

m2

21.0

38,703

21

38,703

100%

m3
m3
m3
m3
m3
m3
m2

1.6
6.3
7.1
3.6
1.5
2.0
48.0

196,768
1,208,485
1,402,868
603,313
251,381
335,174
246,528

100%
100%
0%
0%
0%
0%
0%

2
6
0
0
0
0
0

196,768
1,208,485
0
0
0
0
0

kg
kg
kg
kg
kg

106.0
112.2
184.4
103.0
103.0

249,630
264,231
434,262
242,565
242,565

106
112
0
0
0

249,630
264,231
0
0
0

100%
100%
0%
0%
0%

212
112
0
0
0

499,260
264,231
0
0
0

m2
m2
m2
m2

21.0
4.4
23.4
16.0

395,955
82,962
441,207
301,680

0
0
12
0

0
0
220,604
0

0%
0%
50%
0%

0
0
12
0

0
0
220,604
0

ml
kg
kg
un

21.4
162.0
28.3
65.0

861,222
658,692
115,068
2,597,660

0
0
0

0
0
0

0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

38,703

196,768
1,208,485
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
249,630
0
0
0
0
0
0
0
0
0
0
0
0
0

21

2
6
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
106
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

100%
0%
100%
100%
0%
0%
0%
0%
0%
0%
200%
100%
0%
0%
0%
0%
0%
0%
50%
0%
0%
0%
0%
0%

0%

0%

0%

kg
kg

136.0
417.0

552,976
1,695,522

0%

0%

0%

0%

0%

0%

kg

149.0

605,834

0%

0%

0%

Anillo central D=16" e= 5mm , L= 1m .


Panel separador camarines estructura tipo
metalcom.
Terminacin de pisos y vestidores , Oden .
Pisos baldosa cermica antideslizante 33x33.

kg
m2

50.0
11.3

203,300
842,099

0%

0%

0%

0%

0%

0%

0%

m2

38.0

859,332

m2
m2

18.0
12.8

572,076
948,467

2.6.4

Terminacin de peldaos.
Terminacin tabique Vestidores ( planchas
fibrocemento 8 mm. por ambos lados) .
Terminacin Muros Exterior y basamento pilar.

m2

18.0

229,212

2.7
2.7.1
2.7.2
2.7.3

Pintura .
Pintura y antioxido elemento metlicos .
Pintura muros .
Barniz en pasamanos y ventanas de madera .

m2
m2
m2

80.0
64.0
12.0

829,600
467,328
109,116

0
0

2.7.4
2.7.5

Pintura puertas .
Terminacin cielos vestidores , Yeso y pintura .

m2
m2

16.0
20.0

106,848
153,820

2.8
2.8.1

Revestimiento de Cubierta y Cielo .


Placa de cubierta Terciado contrachapeado
12 mm .
Sello de agua lluvia , Fieltro asfaltico 15 lbs .
Tejuela asfltica .
Cortagotera agua lluvia.

2.1.4
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.2.7
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.5
2.5.1
2.5.2
2.5.3
2.5.4
2.5.5
2.5.6
2.5.7
2.5.8
2.5.9
2.6
2.6.1
2.6.2
2.6.3

2.8.2
2.8.3
2.8.4

m2

56.0

793,968

m2
m2
ml

56.0
56.0
18.4

301,672
1,119,888
154,744

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0
0

0%
0%

0
0
0

0
0
0

0%
0%
0%

0
0

0
0

0%
0%
0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

2.8.5
2.9
2.9.1
2.9.2
2.9.3
2.9.4
2.9.5
2.9.6
2.9.7
2.9.8
2.10
2.10.1

Limatesa .
Puertas y ventanas incluye cortagoteras y
alfeizar.
Puertas y marcos interiores de madera .
Puerta exterior reja metlica .
Ventanas arco de madera fijas .
Ventanas arco de madera abatibles .
Chapas de puertas interiores.
Chapas de puerta exterior .
Cornisas y guardapolvos de madera .
Mobiliario en Obra .

ml

un
un
un
un
un
un
ml
un

21.6

2.0
1.0
2.0
4.0
2.0
1.0
64.0
5.0

181,656

171,164
414,815
122,184
325,044
123,908
101,954
721,856
1,785,940

2.12.3
2.12.4
2.12.5
2.12.6
2.13
2.13.1
2.13.2
2.13.3
2.13.4

AGUAS LLUVIAS, ODEON.


Canaleta prefabricada c/rejilla galvanizada
(ULMA SELF - 200).
PVC 160mm.
Cmara (H=2,6 m.).
Pozo de absorcin, ODEON.
Gravilla 1 1/2".
Estanque de drenaje (resistencia mnima 26
TON).
Geotextil tipo G-20.
Arena gruesa y limpia.
ODEON SUPERFICIAL (A.LL)
Canaleta prefabricada c/rejilla galvanizada
(ULMA SELF-200).
Canaleta prefabricada c/rejilla galvanizada
(ULMA DOMO).
PVC 160mm.
PVC 180mm. C-4 Ranurado.
Cmara.
Cmara reparticin de drenes.
Cancha de infiltracin.
Gravilla 1 1/2".
Geotextil tipo Fisiva G-20.
Grava tamao mximo 2".
Relleno natural.

3.
3.1

Elctrico Odeon Y Proscenio.


Canalizacin subterrnea, conduit PVC 40mm.

ml

95.0

631,085

3.2

Suministro e instalacin de tubera PVC 32mm.

ml

100.0

283,200

3.3
3.4

Conductor XTU n10 AWG.


Interruptor termomagnetico monofsico hasta
40 A.
Barra cooperweld 5/8 x 1,5 mts. (incluye prensa
y conductor desnudo de 25mm).
Poste cometida empalme.
Tablero intemperie para empalme monofsico
autosoportado, tipo AM-1105, incluye
elementos de control (interruptor, diferencial,
celda fotoelctrica con base).
Fluorescente compacto sobrepuesto.
Canalizaciones centros alumbrado pvc 20mm.

ml
un

220.0
5.0

636,460
132,465

un

2.0

30,556

un
un

1.0
1.0

164,786
45,786

un
ml

2.0
6.0

79,916
16,116

Cableado centros alumbrado THHN 14 AWG


2,5mm.
Interruptor 9/12.
Canalizaciones centro enchufes pvc 20mm.
Cableado centros enchufes THHN 14 AWG
2,5mm.
Gabinete metlico monoblock
(500x400x200mm) para TDA, incluye elementos
de control y proteccin (ITM, diferencia,
interruptores de control, contactor).

ml

6.0

16,764

un
ml
ml

2.0
8.0
8.0

25,486
21,488
25,552

un

1.0

182,342

Proyector 100 W HM.


Enchufes normales dobles .

un
un

2.10.2
2.10.3
2.11
2.11.1
2.11.2
2.11.3
2.11.4
2.12
2.12.1
2.12.2

3.6
3.7

3.8
3.9
3.10
3.11
3.12
3.13
3.14

3.15
3.16

4.1.2

Construccin Modulo Turismo.


Obra gruesa Modulo.
Movimientos de tierra.
Excavaciones.
Escarpes .
Relleno granular e= 15 cm. Compactado
proctor 95%.
Hormign .

0%

0%

0%
0%

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

ml

1.0

46,540

0%

0%

0%

ml
un

15.0
1.0

202,395
423,914

0
0

0
0

0%
0%

24,135
1,049,117

0%

0%
0%
0%
0%

0
0

1.0
4.5

0
0
0
0

0
0

m3
m3

0
0
0
0

0%
0%
0%
0%

0%

0%

0%

m2
m2

20.0
16.0

42,400
54,416

0
0

0
0

0%
0%

0
0
0

0
0
0

0%
0%
0%

0
0

0
0

0%
0%
0%

ml

7.5

349,050

0%

0%

0%

ml

4.0

195,900

0%

0%

0%

ml
ml
un
un

28.0
7.3
4.0
1.0

461,804
132,867
748,600
959,144

0
0
0
0

0
0
0
0

0%
0%
0%
0%

48,270
93,600
781,200
159,816

0
0
0
0

0
0
0
0

0
0
24
8

0
0
781,200
159,816

2,857,274

0%
0%
0%
0%
9%

1,190,646

0%
0%
0%
0%
0%
0%
0%
100%
100%
4%

0
0
0
0

2.0
30.0
24.0
8.0

0
0
0
0
0
0
0
781,200
159,816

0
0
0
0

m3
m2
m3
m3

0
0
0
0
0
0
0
24
8

4,047,920

0%
0%
0%
0%
0%
0%
0%
100%
100%
13%

4.0
8.0

181,552
119,272

95

631,085

100%

0%

95

631,085

100%

100

283,200

100%

0%

100

283,200

100%

220

636,460

100%

0%

220

636,460

100%

0%

0%

0%

30,556

100%

0%

30,556

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0
0

0
0

0%
0%

0
0

0
0

0%
0%

0
0

0
0

0%
0%

0%

0%

0%

0%

0%

0%

0
0

0
0

0%
0%

0
0

0
0

0%
0%

0
0

0
0

1,581,301

61%

0%

1,581,301

0%
0%
61%

1
0

12,218
3,695

100%
100%

0
0

0
0

0%
0%

1
0

12,218
3,695

100%
100%

0%

4,795

100%

4,795

100%

2,592,826
4.
4.1
4.1.1
4.1.1.1
4.1.1.2
4.1.1.3

0%

0
0
0
0
0
0
0
0

32,117,263

3.5

m3
m3
m3

1.2
0.3
0.2

12,218
3,695
4,795

0%

4.1.2.1
4.1.2.2
4.1.2.3
4.1.2.4
4.1.2.5
4.1.2.6
4.1.2.7
4.1.2.8
4.1.3
4.1.3.1
4.1.3.2
4.1.3.3
4.1.3.4
4.1.3.5
4.1.3.6
4.1.3.7
4.1.3.8
4.2
4.2.1
4.2.2
4.2.3
4.3
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
4.4
4.5
4.5.1
4.5.2
4.5.3
4.5.4
4.5.5
4.5.6
4.5.7

Emplantillado 5 cm. H-15 .


Hormign Radier e=8 cm.
Hormign Sobrecimiento.
Hormign Fundacin corrida .
Moldajes Sobrecimiento.
Fe 10.
Fe 6.
Anclajes de 0,80 m.
Estructura metlica .
Estructura principal Perfil cuadrado 75x75x3 mm
47,25 ml
Soleras Perfil canal 100x50x3 mm 86 ml.
Estructura segundaria Perfil cuadrado 50x50x3
mm 263,2ml.
Estructura cubierta Perfil rectngulo 50x30x3
mm 123ml.
Complemento estructura Perfil rectngulo
40x20x2 mm 144,15 ml.
Placas de apoyo .
Pletina atiezadora .
Tubo d= 4" SCH 40.
Terminaciones Modulo Turismo.
Terminacin de Piso cermico 33x33.
Revestimiento Tabique Intermedio.
Terminaciones Estructuras Metlicas.
Cubierta.
Terciado contrachapado 9 mm de cielo.
Terciado contrachapado 12 mm de cubierta.

m3
m2
m3
m3
m2
kg
kg
un

0.1
9.0
0.3
2.2
2.5
28.0
11.0
13.0

11,930
229,302
47,276
346,691
39,140
65,940
25,905
354,536

kg

66.0

268,356

kg
kg

82.0
278.0

333,412
1,130,348

kg

85.2

346,423

kg

51.0

207,366

kg
kg
kg

32.0
2.3
3.1

m2
m2
m2

fieltro asfaltico 15 lbs .


Tejuela asfltica .
Cortagotera agua lluvia.
Canales de agua lluvia y bajadas zinc alum
0,35mm. espesor
Aislacin
fisiterm 120x50x5 cm.
Mueble en Obra (camarines).
Puertas y Ventanas.
Marcos de puertas de madera .
Marco y ventanas de aluminio .
Puertas Mdulos .
Chapas de puertas interiores.
Celosa.
Pinturas antioxido resina sinttica con dos
manos de distinto color.
Pintura esmalte sinttico dos manos (
estructura a la vista ) .

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

130,112
9,352
12,602

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

8.5
4.5
5.0

192,219
332,784
52,745

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

m2
m2

9.5
8.8

112,927
131,164

0%

0%

0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

m2
m2
ml
ml

9.5
9.5
3.0
9.0

51,177
189,981
25,230
75,276

8.5
1.0

70,440
403,050

0
0
0
0
0
0

0%
0%
0%
0%
0%
0%

0
0
0
0
0
0

0
0
0
0
0
0

0%
0%
0%
0%
0%
0%

0
0
0
0
0
0

0
0
0
0
0
0

0%
0%
0%
0%

m2
gl

0
0
0
0
0
0

un
m2
un
un
un
m2

1.0
9.6
1.0
1.0
1.0
12.0

13,029
981,974
60,738
60,954
8,305
112,440

0
0
0
0
0

0
0
0
0
0

0%
0%
0%
0%
0%

0
0
0
0
0

0
0
0
0
0

0%
0%
0%
0%
0%

0
0
0
0
0

0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

m2

4.0

29,756

0%

0%

0%

15,913

0%

4,795

0%

20,708

0%

0%

0%

0%

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%

6,483,588
5.
5.1
5.2
5.3
5.4
5.5
5.6
5.6.1
5.6.2
5.6.3
5.6.4

Aguas Lluvias.
Canaleta prefabricada c/rejilla galvanizada
(ULMA DOMO).
PVC 110mm.
PVC 180mm. C-4 Ranurado.
Cmara.
Cmara reparticin de drenes.
Cancha de infiltracin.
Gravilla 1 1/2".
Geotextil tipo Fisiva G-20.
Grava tamao mximo 2".
Relleno natural.

6.
6.1

Elctrico Mdulos
Canalizacin subterrnea, conduit PVC 40mm.

ml

8.0

53,144

6.2

Suministro e instalacin de tubera PVC 32mm.

ml

25.0

62,875

6.3
6.4

Conductor XTU n10 AWG.


Interruptor termomagnetico monofsico hasta
40 A.
Barra cooperweld 5/8 x 1,5 mts. (incluye prensa
y conductor desnudo de 25mm).
Poste cometida empalme.
Gabinete autosoportado intemperie trifsico,
incluye elementos de proteccin y control.

ml
un

50.0
5.0

194,650
118,155

un

2.0

30,558

un
un

1.0
1.0

170,420
179,900

6.8
6.9

Fluorescente compacto sobrepuesto.


Canalizaciones centros alumbrado pvc 20mm.

un
ml

8.0
8.0

318,992
19,664

6.10

Cableado centros alumbrado THHN 14 AWG


2,5mm.

ml

8.0

22,352

ml

4.0

187,900

ml
ml
un
un

20.0
6.0
1.0
1.0

96,260
103,206
189,150
959,144

m3
m2
m3
m3

1.5
35.0
19.0
6.0

36,204
74,200
539,448
89,862
2,275,374

6.5
6.6
6.7

53,144

100%

0%

53,144

13

31,438

50%

0%

13

31,438

50%

50

194,650

100%

0%

50

194,650

100%

0%

0%

0%

30,558

100%

0%

30,558

100%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

6.11
6.12
6.13
6.14

6.15
6.16
6.17

Interruptor 9/12.
Canalizaciones centro enchufes pvc 20mm.
Cableado centros enchufes THHN 14 AWG
2,5mm.
Gabinete metlico monoblock
(300x200x160mm) para TDA, incluye elementos
de control y proteccin (ITM, diferencia,
interruptores de control, contactor).

un
ml
ml

5.0
2.0
2.0

56,790
5,372
7,588

un

2.0

367,964

Remarcador monofsico.
Caja de empalme monofsico.
Interruptor termomagnetico trifsico hasta 30A.

un
un
un

2.0
2.0
1.0

185,882
75,282
23,923

0
0

0
0

0%
0%

0
0

0
0

0%
0%

0
0

0
0

0%
0%

0%

0%

0%

0%

0%

0%

0
0

0
0

0%
0%

0
0

0
0

0%
0%

0
0

0
0

0%
0%

0%

0%

0%

309,790

16%

8
66
0
0
0
0

81,456
710,688
0
0
0
0

100%
100%
0%
0%
0%
0%

0
0
0
0
0
0

0
0
0
0
0
0

0%
0%
0%
0%
0%
0%

0%

0%

0
0
0

0
0
0

0%
0%
0%

0
0
0
0

0%

0%

1,893,511
7.
7.1
7.1.1
7.1.1.1
7.1.1.2
7.1.1.3
7.1.1.4
7.1.1.5
7.1.2
7.1.2.1
7.1.2.2
7.1.2.3
7.1.2.4
7.1.2.5
7.1.3
7.1.3.1
7.1.3.2
7.1.3.3
7.1.3.4
7.1.3.5
7.2
7.2.1
7.2.2
7.2.3
7.2.4
7.2.5
7.3
7.3.1
7.3.2
7.3.3
7.3.4
7.3.5
7.3.6
7.4
7.4.1
7.4.2
7.4.3
7.4.4
7.4.5
7.4.6
7.4.7
7.4.8
7.4.9
7.4.10
7.4.11
7.4.12
7.5
7.5.1
7.5.1.1
7.5.1.2
7.5.1.3
7.5.1.4
7.5.1.5

Servicios Higinicos Pblicos y Bodega (1,5


mdulos).
Obra gruesa.
Movimientos de tierra.
Excavaciones.
Escarpes .
Relleno estabilizado e=10 cm.
Colchonetas fisiter 80mm. aislacin .
Moldajes viga de fundacin 30x15 cm.
Hormign .
Hormign Poyos de fundacin 40x40x40 cm H20.
Hormign cadena de fundacin 15X30cm H20.
Hormign Radier e=8 cm.
Acero de pilares.
Muros de albailera confinada .
Estructura metlica .
Pilares Estructura metlica perfil canal 150x50x3
mm 66 ml.
Cubierta perfil cuadrado 50x50x3 mm 92,31ml.
Estructura segundaria cubierta perfil rectngulo
50x30x3 mm 101ml.
Aleros , perfil rectngulo 40x20x2 mm 144,15
ml.
Cadena de coronacin canal 150x50x3 mm.
Terminaciones BAO.
Terminacin de Piso cermico 33x33.
Terminacin Interior de Muro.
Terminacin Exterior de Muro.
Tabiquera de SSHH.
Terminacin Estructura Metlica de Muro y
Cubierta.
Revestimiento de Cielo, Cubierta y Aislacin
Trmica.
Terciado contrachapado 9 mm de cielo.
Terciado contrachapado 12 mm de cubierta.
Fieltro asfaltico 15 lbs .
Cubierta Tejuela asfltica .
Cortagotera agua lluvia.
Aislacin fisiterm .
Puertas y Ventanas.
Puertas .
Marcos de puertas de madera .
Marco y ventanas de aluminio .
Puertas bodega.
Bisagras puertas interiores .
Bisagras puerta metlica .
Bisagra y cerrojos ventanas .
Chapas de puertas interiores.
Chapas de puerta exterior .
Celosa.
Pinturas antioxido resina sinttica con dos
manos de distinto color.
Pintura esmalte sinttico dos manos (estructura
a la vista).
Especialidades.
Instalaciones de agua potable.
Conexin a matriz y medidor existente.
Replanteo .
Excavacin ramales (a mano) .
Cama y Relleno arena envolvente tubera,
compactado .
Relleno compactado .

0%

309,790

16%

8
66
0
0
0
0

81,456
710,688
0
0
0
0

100%
100%
0%
0%
0%
0%

0%

0%

0%

0%

0
0
0
0

0%
0%
0%
0%

0
0
0

0
0
0

0%
0%
0%
0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0
0
0
0
0
0

0%
0%
0%
0%
0%
0%

0
0
0
0

0
0
0
0

0%
0%
0%
0%
0%
0%

0%

m3
m2
m2
m2
m2

8.0
66.0
6.0
56.0
16.0

81,456
710,688
15,186
1,072,568
266,496

m3

1.3

165,863

m3

1.3

243,863

m2
kg
m2

24.0
30.0
81.4

535,008
100,650
5,635,078

kg

501.0

2,037,066

kg

480.0

1,951,680

kg

426.0

1,732,116

kg

350.0

1,423,100

kg

192.0

780,672

0%

m2
m2
m2
m2
m2

21.0
81.4
81.4
16.0
28.0

453,894
1,726,738
1,220,105
1,186,560
207,256

0
0
0
0

0
0
0
0

0%
0%
0%
0%

0
0
0
0
0
0

0%

0%

0%

m2
m2

21.0
21.0

289,695
324,219

0%

0%

0%

0%

0%

0%

m2
m2
ml
m2

21.0
21.0
12.0
21.0

134,127
419,958
100,920
174,027

0
0
0
0

0
0
0
0

0%
0%
0%
0%

191,115
60,116
326,880
59,373
112,965
33,978
80,843
304,770
223,908
58,135
622,200

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0

3.0
4.0
18.0
1.0
15.0
3.0
7.0
5.0
2.0
7.0
60.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0

un
un
m2
un
un
un
un
un
un
un
m2

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

m2

20.0

144,780

0%

0%

0%

0
0
0
0
0

0%
0%
0%
0%
0%

0
80
14

0
314,800
138,475

0%
0%
0%
100%
80%

un
m2
m3
m3

1.0
80.0
17.0
4.0

910,805
314,800
173,094
104,084

0
80
14

0
314,800
138,475

0%
100%
80%

0
0
0
0
0

0%

0%

0%

m3

15.0

299,655

0%

0%

0%

7.5.1.6
7.5.1.7
7.5.1.8
7.5.1.9
7.5.1.10
7.5.1.11
7.5.1.12
7.5.1.13
7.5.1.14
7.5.1.15
7.5.1.16
7.5.1.17
7.5.1.18
7.5.2
7.5.2.1
7.5.2.2
7.5.2.3
7.5.2.4

Prov. e inst. caera PPR L d=40mm.


Prov. e inst. caera PPR L d=32mm.
Prov. e inst. caera PPR L d=20mm.
Prov. e inst. caera Cu L d=32mm.
Prov. e inst. caera Cu L d=25mm.
Prov. e inst. caera Cu L d=20mm.
Prov. e inst. caera Cu L d=13mm.
Prov. e inst. gabinete de red hmeda.
Conexin PPR-Cu.
Prov e inst Llp 25mm .
Prov e inst Llp 20mm campana cromada.
Prov e inst Llp 13mm campana cromada.
Prov. e inst. Llj 20mm c/llp20mm.
Instalaciones de Alcantarillado.
Excavacin ramales y cmaras(a mano) .
Cama y Relleno arena envolvente tubera.
Relleno compactado.
Provisin e inst. tubera PVC-S blanco 110 mm.

ml
ml
ml
ml
ml
ml
ml
un
un
un
un
un
un

18.0
8.0
45.0
6.0
6.0
15.0
30.0
1.0
3.0
1.0
7.0
17.0
1.0

73,062
31,424
159,345
227,664
98,244
182,400
299,670
493,212
66,177
33,559
212,765
414,018
25,303

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

m3
m3
m3
ml

42.0
12.0
32.0
95.0

427,644
241,452
543,264
475,760

0
0
0

0
0
0

7.5.2.5

Provisin e inst. tubera PVC-S blanco 75 mm.

ml

36.0

167,364

7.5.2.6

Provisin e inst. tubera PVC-S blanco 50 mm.

ml

18.0

64,998

7.5.2.7

Provisin e inst. tubera PVC-S blanco 40 mm.

ml

18.0

78,192

7.5.2.8
7.5.2.9
7.5.2.10
7.5.2.11
7.5.2.12
7.5.2.13
7.5.2.14
7.5.2.15
7.5.2.16

Piletas piso.
Centros de Artefactos.
C.I h<1.00 m /con tapa normal.
C.I h<1.60 m /con tapa normal.
Conexin a colector.
Excavacin.
Demolicin de calzada.
Demolicin de acera.
Retiro y reposicin de soleras tipo A pintadas
amarillas.
Relleno compactado.
Base estabilizada 60-80% e=15 cm.
Calzada HCV e=15 cm.
Base estabilizada para acera.
Acera HC e= 7 cm.
Artefactos y accesorios.
Artefactos sanitarios wc.
Lavamanos.
Lavacopas.
Urinarios.
Portarrollos.
Barras metlicas para bao de minusvlidos.

un
un
un
un
un
m3
m2
m2
ml

3.0
20.0
5.0
1.0
1.0
76.0
25.0
13.0
3.0

m3
m2
m2
m2
m2

Canales de agua lluvia y bajadas zinc alum


0,35mm. Espesor.

7.5.2.17
7.5.2.18
7.5.2.19
7.5.2.20
7.5.2.21
7.5.3
7.5.3.1
7.5.3.2
7.5.3.3
7.5.3.4
7.5.3.5
7.5.3.6
7.5.3.7

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

68,409
218,560
212,135
43,186
758,739
697,832
221,700
108,914
60,777

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

76.0
25.0
25.0
13.0
13.0

1,594,252
85,675
641,625
25,662
228,787

0
0
0
0
0

0
0
0
0
0

0%
0%
0%
0%
0%

677,592
629,370
1,010,185
219,236
73,549
71,256

0
0
0
0
0

0
0
0
0
0

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0

6.0
7.0
5.0
2.0
7.0
4.0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

un
un
un
un
un
ml

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

ml

66.0

538,824

0%

0%

0%

1,245,419

3%

0%

1,245,419

3%

15
15
1
143
1
21
0
0
0
0
0

2,560,725
1,284,045
40,614
282,711
420,943
202,004
0
0
0
0
0

100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%

0
0
0
0
0
0
99
6
33

0
0
0
0
0
0
2,373,723
143,862
52,206

0%
0%
0%
0%
0%
0%
100%
100%
50%

15
15
1
143
1
22
99
6
33

2,560,725
1,284,045
40,614
282,711
420,943
202,004
2,373,723
143,862
52,206

100%
100%
100%
100%
100%
100%
100%
100%
50%

12

1,891,044

100%

12

1,891,044

100%

0%

0%

0%

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
145
0
0
4
0

0
0
0
0
0
0
341,475
0
0
502,016
0

0%
0%
0%
0%
0%
0%
100%
0%
0%
100%
0%

0
0
0
0
0
0
145
0
0
4
0

0
0
0
0
0
0
341,475
0
0
502,016
0

0%
0%
0%
0%
0%
0%
100%
0%
0%
100%
0%

39,512,272
8.
8.1
8.1.1
8.1.2
8.1.3
8.1.4
8.1.5
8.1.6
8.1.7
8.1.8
8.1.9
8.2
8.2.1
8.2.2
8.2.3
8.2.4
8.3
8.3.1
8.3.2
8.4
8.4.1
8.4.2
8.4.3
8.4.4
8.4.5

Reubicacin de 2 estatuas y un proscenio .


Demolicin.
Demolicin de kiosco.
Demolicin de proscenio sur.
Demolicin de murete proscenio sur.
Retiro de csped.
Desmonte y ubicacin de estatua .
Excavaciones.
Relleno granular .
Estabilizado compactado.
Polietileno aislacin .
Hormign .
Hormign losa de fundacin .
Hormign sobrecimiento y muros de
contencin .
Hormign bases estatuas .
Hormign escalas y gradas .
Moldajes .
Moldajes sobrecimientos .
Moldaje bases .
Enfierradura.
Enfierraduras de sobrecimientos armados .
Enfierradura de bases estatuas .
Baldosas color rojo BCR .
Anclaje de banderas .
Detalles de cantera .

m2
m2
m3
m2
un
m3
m3
m3
m2

15.0
15.0
0.5
143.0
1.0
22.0
99.0
6.0
66.0

2,560,725
1,284,045
40,614
282,711
420,943
202,004
2,373,723
143,862
104,412

m3
m3

12.0
13.5

1,891,044
2,153,088

un
m3

2.0
2.2

406,976
334,011

m2
m2

90.0
12.0

1,409,040
187,872

kg
kg
m2
un
m2

145.0
84.0
62.0
4.0
42.0

341,475
197,820
1,985,984
502,016
1,679,538

8.4.6
8.4.7

Pinturas antioxido resina sinttica con dos


manos de distinto color.
Pintura esmalte sinttico dos manos (estructura
a la vista ) .

m2

60.0

802,200

m2

20.0

148,780

0%

0%

0%

0%

0%

4,791,042

25%

5,304,326

27%

10,095,368

52%

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%

0%

0%

0%

0%

0%
0%

0%
0%

0%
0%

1,400

12,201,000

100%

0%

1,400

12,201,000

100%

2,887

25,160,641

95%

0%

2,887

25,160,641

95%

0
1,440

0
7,087,680

0%
100%

0
0

0
0

0%
0%

0
1,440

0
7,087,680

0%
100%

896

10,912,636

100%

0%

896

10,912,636

100%

0%

19,452,883
9.
9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.7.1
9.7.2
9.7.3
9.7.4
9.7.5
9.8
9.9
9.10

Construccin de 4 sombreadero.
Excavaciones.
Hormign poyos de fundaciones .
Enfierraduras de anclaje .
Moldajes sobrecimientos .
Pino cepillado 1x5".
Pino aserrado 1x4".
Estructura metlica .
Perfil canal 125x50x3 mm 174,24 ml.
Perfil rectang.100x50x3 mm 86,40 ml.
Perfil rectngulo 70x30x3 mm 69 ml.
Perfil rectngulo 30x20x2 mm 216 ml.
Perfil cuadrado 100x100x3 mm 2,5 ml.
Pinturas antioxido resina sinttica con dos
manos de distinto color.
Pintura esmalte sinttico dos manos (
estructura a la vista ) .
Madera pino cepillada barnizada de 6x2".

m3
m3
kg
m2
ml
ml

12.0
7.2
88.0
48.0
214.0
144.0

122,184
918,626
207,240
703,488
1,801,666
746,496

kg
kg
kg
kg
kg
m2

928.0
407.0
808.0
309.0
24.0
60.0

3,773,248
1,654,862
3,285,328
1,256,394
97,584
622,200

m2

20.0

148,780

ml

87.0

963,612
16,301,708

10.
10.1
10.1.1
10.1.2
10.1.3
10.1.4
10.1.5
10.2
10.2.1

Reposicin de pavimentos.
Demolicin.
Demolicin de pavimentos de hormign
existentes .
Demolicin de pavimentos de baldosa
existentes .
Rebaje de soleras .
Demolicin de Solerillas existentes .
Excavacin en Corte y Transporte a Botadero .

10.3.13
10.3.14
10.4
10.4.1
10.4.2
10.5

Base estabilizada .
Base estabilizada para aceras hormign CBR
60% e= 0,10.
Base estabilizada para Solerillas CBR 60% e=
0,10.
Piso veredas .
Bal. Microv. relieve pulidas 30 x 30 cm, cinco
listones color crema.
Bal. Microv. relieve pulidas 30 x 30 cm ,16 panes
color rojo.
Bald. microv. relieve pulidas 30 x 30 cm , 16
panes color beige .
Bald. microv. relieve pulidas 30 x 30 cm , 16
panes color negro .
Bal. microv. relieve pulidas 30 x 30 cm ,cinco
listones color negro .
Bal. Microv. MINVU tctil 1 40 x 40 color negro
.
Bal. microvibradas MINVU tctil 0 40 x 40 color
amarillo.
Radieres afinados con color incorporado color
ocre.
Radieres afinados con color incorporado color
ocre oscuro.
Adoquines de piedra de seccin de 10x20x12
gris .
Entablado machihembrado.
Sendero de palmetas de hormign 40x40
(incluye base gravilla y mortero).
Sendero de troncos.
Sendero de cortezas.
Gravilla.
Colocacin Solerillas.
Cama de maicillo e=10cm.
Ensayes de Laboratorio.

11.

Mejoramiento de bancas, retiro y reposicin .

11.1
11.2

Retiro de 56 bancas.
Restauracin de bancas existentes (madera y
pintura).
Retiro y reposicin de piezas de madera
daadas.
Reparacin sistemas de uniones madera
estructura .

10.2.2
10.3
10.3.1
10.3.2
10.3.3
10.3.4
10.3.5
10.3.6
10.3.7
10.3.8
10.3.9
10.3.10
10.3.11
10.3.12

m2

1,400.0

12,201,000

m2

3,039.0

26,484,885

ml
ml
m3

18.0
1,440.0
895.8

319,716
7,087,680
10,912,636

m2

4,985.1

14,706,045

m2

288.0

643,104

m2

2,245.0

91,530,895

m2

670.0

27,316,570

m2

554.0

22,587,134

m2

452.3

18,440,723

m2

168.5

6,869,914

m2

250.0

9,343,000

11.2.2

0%

0%

997

2,941,209

20%

997

2,941,209

20%

115

257,242

40%

29

64,310

10%

144

321,552

50%

0%

0%

0%

180

7,322,472

8%

786

32,035,813

35%

965

39,358,285

43%

0%

0%

0%

0%

0%

0%

0%

181

7,376,289

40%

181

7,376,289

40%

0%

0%

0%

0%

100

3,737,200

40%

100

3,737,200

40%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

m2

17.0

635,324

m2

258.0

9,948,738

m2

258.0

9,948,738

m2

32.3

1,048,910

m2
m2

11.6
80.0

171,100
3,248,240

0%

0%

0%

0%

0%

0%

m2
m2

52.0
27.0

852,280
367,821

ml
m2
gl

1,440.6
930.0
1.0

16,316,236
3,319,170
867,827

0
0
0
576
372
0

0
0
0
6,526,494
1,327,668
347,131

0
0
0
288
0
0

0
0
0
3,263,247
0
260,348

0
0
0
9,789,742
1,327,668
607,479

49,678,417

0%
0%
0%
20%
0%
30%
17%

0
0
0
864
372
1

71,142,964

0%
0%
0%
40%
40%
40%
24%

120,821,381

0%
0%
0%
60%
40%
70%
41%

56

439,040

100%

0%

56

439,040

100%

14

461,966

30%

0%

14

461,966

30%

0%

0%

0%

295,167,686

11.2.1

0%

un

56.0

439,040

un

48.0

1,539,888

un

48.0

884,448

11.2.3
11.2.4
11.2.5
11.2.6
11.2.7
11.2.8

Reparacin estructura metlica .


Pintura de estructura metlica .
Pintura piezas de madera .
Reinstalacin bancas .
Hormign poyos de fundaciones .
Anclaje e instalacin bancas .

12.
12.1
12.2
12.3
12.4

Mejoramiento de basureros .
Retiro de basureros empotrados a pavimentos
a demoler .
Mejoramiento basureros existentes.
Suministro basureros .
Reinstalacin de basureros .

13.
13.1

Mejoramiento sector Juegos Infantiles,


Reparaciones Juegos infantiles (en terreno) .

13.2

Ejecucin cierros metlicos de proteccin de


juegos infantiles.

un
m2
m2
un
m3
gl

48.0
48.0
48.0
48.0
12.0
1.0

1,173,072
1,653,072
385,872
734,544
1,461,876
1,902,097

0
0
0
0
0
0

0
0
0
0
0
0

901,006

0%
0%
0%
0%
0%
0%
9%

95,946

100%

0
0
0

0
0
0

0%
0%
0%

95,946

9%

0%

0%

0%

50

299,700

100%

3
0
8
0
0
0
0
0

59,610
0
73,456
0
0
0
0
432,766

100%
0%
100%
0%
0%
0%
0%
16%

1
19
0
0

12,218
353,977
0
0

30%
30%
0%
0%

10,173,909

un

6.0

95,946

un
un
un

6.0
4.0
6.0

257,340
506,040
226,320
1,085,646

un

12.0

1,345,116

ml

101.0

7,842,145
9,187,261

14.
14.1
14.2
14.3
14.4
14.5
14.6
14.7
14.8

Reposicin de bebederos .
Suministro e instalacin de caeras PPR
hidrulico 20mm.
Llave PPR 20mm.
Suministro de Bebederos de agua.
Excavaciones .
Hormign poyos de fundaciones .
Anclaje e instalacin.
Instalacin de Bebederos de agua.
Pintura , antioxido y esmalte dos manos .

ml

50.0

299,700

un
un
m3
m3
un
un
m2

3.0
3.0
8.0
7.0
1.0
3.0
1.0

59,610
1,024,992
73,456
1,173,109
76,510
63,021
13,810
2,784,208

15.
15.1
15.2
15.3
15.4
15.5
15.6

Juegos de agua.
Excavaciones .
Instalacin caeras .
Instalacin impulsores .
canaleta de PVC con rejilla .
Sistema de recuperacin del agua y
recirculado .
Provisin e instalacin bomba Jacuzzi 1,5 HP.

15.7
15.8

Cmara .
Filtro BC-30 de 7,3 m3.

16.
16.1
16.2
16.3
16.4
16.5
16.5.1
16.5.2
16.6
16.6.1
16.6.2
16.6.3
16.6.4
16.7
16.7.1
16.7.2
16.8
16.8.1
16.8.2
16.8.3
16.8.4
16.8.5

Reposicin y mejoramiento reas verdes.


Retiro sectores daados .
Retiro de troncos y races .
Poda de mantencin en sectores de postes de
iluminacin .
Extraccin arboles .
Especies arbreas.
Liquidmbar.
Quillaja
Especies vegetales enredaderas.
Buganvilea rojo-fucsia.
Flor de la pluma.
Jazmn.
Parthenocissus.
Especies vegetales herbceas.
Resiembra de csped con trbol.
Siembra de csped de alto trafico.
Especies vegetales arbustivas.
Bos.
Lavanda.
Blanca Nieves.
La sevillana.
Gazania.

Mejoramiento sistema de riego.


Excavacin ramales (a mano).
Cama y Relleno arena envolvente tubera,
compactado.

0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%

0
0
0
0
0
0
70

901,006

0%
0%
0%
0%
0%
0%
9%

0%

95,946

100%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%

95,946

0%
0%
0%
9%

0%

0%

0%

0%

0%

0%

0%

50

299,700

100%

0
0
0
0
0
0
0

0
0
0
0
0
0
0

3
0
8
0
0
0
0
61

59,610
0
73,456
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%

432,766

100%
0%
100%
0%
0%
0%
0%
16%

0
0
0
0

0
0
0
0

0%
0%
0%
0%

1
19
0
0

12,218
353,977
0
0

30%
30%
0%
0%

0%

0%

0%

0%

0%

0%

0
0

0
0

0%
0%

0
0

0
0

0%

20

366,195

0%
0%
5%

34
14

274,754
487,662

100%
100%

m3
ml
un
ml
un

4.0
62.0
8.0
18.0
1.0

40,728
1,179,922
572,032
854,280
1,777,845

un

1.0

1,084,227

un
un

2.0
1.0

646,038
823,805

0
0

0
0

0%
0%

6,978,877

366,195

5%

274,754
487,662

100%
100%

0
0

0
0

0%
0%

0
0
0
0
0
0

m2
un
m2

34.0
14.0
48.0

274,754
487,662
741,072

34
14
0

0%

0%

0%

un

16.0

548,640

16

548,640

100%

1,157,670
756,216

0
0

0
0

0%
0%

0
0

0
0

un
un
un
un

6.0
6.0
6.0
6.0

98,742
105,912
75,960
83,982

0
0
0
0

0
0
0
0

0%
0%
0%
0%

0
0
0
0

0
0
0
0

m2
m2

2,083.0
423.0

10,287,937
2,081,160

0
0

0
0

0%
0%

0
0

0
0

un
un
un
un
un

164.0
218.0
48.0
196.0
2,000.0

1,136,356
1,227,340
991,728
4,013,296
1,852,000

0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0

1,311,056

0%
0%
0%
0%
0%
5%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

548,640

18.0
8.0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

16

un
un

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1,311,056

100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%

11

101,002

100%

0%

11

101,002

100%

54,854

70%

0%

54,854

70%

25,920,427
17.
17.1
17.2

0
0
0
0
0
0

m3
m3

11.0
3.0

101,002
78,363

17.3
17.4
17.5
17.6
17.7
17.8
17.9

Proteccin Hormign pobre.


Relleno compactado.
Prov. e inst. caera PPR L d=50mm a PPR d=20
mm.
Prov. e inst. regadores 13 mm.
Reubicacin de regadores 13mm.
Eliminacin de regadores 13 mm.
Conexin a red existente.

18.
18.1

Elctrico Alumbrado Pblico.


Canalizacin subterrnea, conduit PVC 40mm.

ml

1230.0

8,980,230

18.2

Suministro e instalacin de tubera PVC 32mm.

ml

1440.0

3,621,600

18.3

Poste tubular galvanizado 3" de 4,5 metros til


(toma superior).
Luminaria modelo venus WHM (incluye lamp.).

un

59.0

14,648,166

un

59.0

18,640,991

Conductor XTU n14 AWG.


Conductor XTU n10 AWG.
Barra cooperweld 5/8 x 1,5 mts. (incluye prensa
y conductor desnudo de 25mm).
Retiro de poste alto de alumbrado publico,
incluye traslado a bodega municipal.
Retiro de poste ornamental, incluye traslado a
bodega municipal.
Poste cometida empalme.
Tablero intemperie para empalme monofsico
autosoportado, tipo AM-1105, incluye
elementos de control (interruptor, diferencial,
celda fotoelctrica con base).
Contactor tripolar, bobina 220V.
Interruptor termomagnetico monofsico hasta
40A.

ml
ml
un

1000.0
4050.0
61.0

3,336,000
15,122,700
931,958

un

3.0

256,002

un

30.0

2,632,290

un
un

2.0
2.0

336,840
136,840

18.4
18.5
18.6
18.7
18.8
18.9
18.10
18.11

18.12
18.13

19.
19.1
19.2
19.3
19.4
19.5
19.6
19.7

20.
20.1
20.2
20.2.1
20.2.2
20.2.3
20.2.4
20.3
20.3.1
20.3.2
20.3.3
20.3.4
20.3.5
20.3.6
20.3.7
20.3.8
20.3.9
20.4
20.4.1
20.4.2
20.4.3
20.4.4
20.5
20.5.1
20.5.2
20.5.3

20.6

Mejoramiento sealtica y zonas de


estacionamiento.
Pintura paso cebra (8 zonas).
Retiro postes sealtica .
Excavacin postes sealtica .
Reinstalacin postes sealtica poyos de
Hormign .
Excavacin fundacin bicicletero .
Poyos de hormign Bicicletero.
Instalacin Bicicleteros 4 un.

Mejoramiento Paradero de Buses y Taxis.


Retiro de paradero existente.
Hormign .
Fundacin.
Basamentos.
Emplantillado.
Moldaje.
Estructura metlica.
Flanche de acero 200x200x5 mm.
Perfil canal 125x50x3 mm.
Perfil cuadrado 100x100x3 mm.
Perfil rectangular 100x50x3 mm.
Viga reparticin 70x30x3 mm.
Perfil rectangular 30x20x3 mm.
fe 10.
fe 6.
Anclajes fe 16 long= 0,5 m.
Maderas.
Pino cepillado 1x5".
Pino cepillado 1x4".
Pino cepillado y barnizado 6x2".
Cubierta Policarbonato.
Pinturas
Pinturas antioxido resina sinttica con dos
manos de distinto color.
Pintura esmalte sinttico dos manos (
estructura a la vista ) .
Barniz en pasamanos y ventanas de madera .

Aguas Lluvias Paradero.

m3
m3
ml

3.0
17.0
80.0

332,673
322,609
1,806,880

2
12

232,871
225,826

70%
70%

0
0

0
0

0%
0%

2
12

232,871
225,826

70%
70%

56

1,264,816

70%

0%

56

1,264,816

70%

un
un
un
un

26.0
56.0
51.0
2.0

1,416,428
1,413,888
634,389
283,218

0
56
51
0

0
1,413,888
634,389
0

0%
100%
100%
0%

0
0
0
0

0
0
0
0

0%
0%
0%
0%

0
56
51
0

0
1,413,888
634,389
0

6,389,450

3,927,646

61%

0%

179

3,927,646

0%
100%
100%
0%
61%

1,107

8,082,207

90%

0%

1,107

8,082,207

90%

1,296

3,259,440

90%

0%

1,296

3,259,440

90%

0%

18

4,394,450

30%

18

4,394,450

30%

0%

18

5,592,297

30%

18

5,592,297

30%

0
3,848

0
14,366,565

0%
95%

0
0

0
0

0%
0%

0
3,848

0
14,366,565

0%
95%

61

931,958

100%

0%

61

931,958

100%

256,002

100%

0%

256,002

100%

30

2,632,290

100%

0%

30

2,632,290

100%

336,840

100%

0%

336,840

100%

0%

0%

0%

96,860
1,394,229

0%

0%

0%

0%

0%

0%

70,134,706

29,865,302

43%

9,986,747

14%

39,852,049

57%

un
un

4.0
59.0

m2
un
m3
m3

90.0
4.0
0.3
0.3

1,542,510
169,092
2,755
47,276

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

0%

0%

0%

m3
un
un

0.8
4.0
4.0

7,986
687,776
1,670,064

0
0
0

0
0
0
0

0%
0%
0%
0%

0
0
0
0

0
0
0

0%
0%
0%
0%

0
0
0

4,127,459

0
0
0
0

0%
0%
0%
0%

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

505,030

100%

0
0
0
0

0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0
0
0
0

0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

un

1.0

505,030

505,030

100%

m3
m3
m3
m2

2.8
1.4
0.3
11.2

469,244
286,874
32,791
164,147

0
0
0
0

0
0
0
0

0%
0%
0%
0%

kg
kg
kg
kg
kg
kg
kg
kg
un

22.4
2,095.0
85.4
2,196.0
687.0
562.0
42.0
38.0
56.0

91,078
8,518,270
347,236
8,928,936
2,793,342
2,285,092
98,910
89,490
693,336

0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

0%
0%
0%
0%
0%
0%
0%
0%
0%

ml
ml
ml
m2

107.6
71.4
43.4
38.0

834,115
454,390
659,767
1,412,422

0
0
0
0

0
0
0
0

0%
0%
0%
0%

m2

60.0

682,200

0%

0%

0%

m2

20.0

148,780

0%

0%

0%

m2

12.0

109,116

0%

0%

0%

0
0

0
0

0%
0%

0%
0%

20.6.1
2.6.2
2.6.3
2.6.4
20.7
20.7.1
20.7.2
20.7.3
20.7.4

Canaleta prefabricada c/rejilla galvanizada


(ULMA SELF-200).
PVC 160mm.
PVC 180mm. C-4 Ranurado.
Cmara reparticin de drenes.
Cancha de infiltracin.
Gravilla 1 1/2".
Geotextil tipo Fisiva G-20.
Grava tamao mximo 2".
Relleno natural.

ml

7.0

297,780

0%

0%

0%

ml
ml
un

2.0
4.5
1.0

24,986
81,909
1,019,144

0
0
0

0
0
0

0%
0%
0%

48,270
46,640
536,800
89,885

0
0
0
0
0

0
0
0
0

0
0
0
0
0

0
0
0
0

505,030

0%
0%
0%
0%
2%

0%
0%
0%
0%
0%
0%
0%
0%
0%

0
0
0

2.0
22.0
16.0
5.0

0
0
0
0
0
0
0
0

0
0
0

m3
m2
m3
m3

0
0
0
0
0
0
0
0

505,030

0%
0%
0%
0%
0%
0%
0%
0%
2%

0%

0%

0%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

0
0
0

0
0
0

0%
0%
0%

0%

0%

0%

0%

0%

0%

4,091,953

0%

0%

0%

50%
50%

31,749,980
21.
21.1
21.2
21.3
21.4
21.5
21.6

22.
22.1

23.
23.1

Complemento juegos sector juvenil .


Excavacin poyos de hormign mesas de pin
pon y taca taca.
Hormign Poyos de anclaje .
Mesas de ping pong provisin.
Mesas de taca taca provisin .
Pinturas antioxido resina sinttica con dos
manos de distinto color.
Pintura esmalte sinttico dos manos (
estructura a la vista ) .

Entrega y Limpieza de la obra .


Aseo, desarme y entrega.

Partida de Ajuste.
Partida de Ajuste.

m3

0.5

5,091

m3
un
un
m2

0.5
2.0
2.0
60.0

63,794
2,626,070
626,038
622,200

m2

20.0

148,760

m2

un

9,600.0

20.0

TOTAL GENERAL $

9,513,600

3,840

3,805,440

40%

9,513,600

3,805,440

40%

20

0%

20

0%

607,736,587

132,956,070

960

951,360

10%

4,800

4,756,800

951,360

10%

4,800

4,756,800

0%

0%

0%
0%

200,072,361

32.92%

67,116,291

CUADRO DE PRECIOS COMPENSADOS


DEPARTAMENTO TCNICO
COSTOS Y PRESUPUESTOS
AHM.RPA.CSM.MGM.

Programa

: MEJORAMIENTO PLAZA SANTA MARA

Comuna

: SANTA MARA

Contratista

: INCOSS INGENIEROS CONTR. LTDA.

Monto Inversin

: PBLICA N 62/2013

Plazo Ejecucin
Propuesta
Resolucin

: 154 DIAS CORRIDOS


: N 5294 DEL 17/09/2013 EXENTA
: EXENTA N 5717 DEL 12 DE NOVIEMBRE DE 2012

RESUMEN
TEM

DESIGNACIN

1.
2.

Obras Preliminares.
Obra de Construccin de Oden y Vestidores en piso zcalo.

3.

Elctrico Odeon Y Proscenio.

4.

Construccin Modulo Turismo.

5.

Aguas Lluvias.

6.

Elctrico Mdulos

7.

Servicios Higinicos Pblicos y Bodega (1,5 mdulos).

8.

Reubicacin de 2 estatuas y un proscenio .

9.

Construccin de 4 sombreadero.

10.

Reposicin de pavimentos.

11.

Mejoramiento de bancas, retiro y reposicin .

12.

Mejoramiento de basureros .

13.

Mejoramiento sector Juegos Infantiles,

14.

Reposicin de bebederos .

15.

Juegos de agua.

16.

Reposicin y mejoramiento reas verdes.

17.

Mejoramiento sistema de riego.

18.

Elctrico Alumbrado Pblico.

19.

Mejoramiento sealtica y zonas de estacionamiento.

20.

Mejoramiento Paradero de Buses y Taxis.

21.

Complemento juegos sector juvenil .

22.

Entrega y Limpieza de la obra .

MONTO TOTAL INVERSIN IVA INCLUIDO

____________________________________

____________________________________

CONTRATISTA

COSTOS Y PRESUPUESTOS
SERVIU V REGIN VALPARASO

____________________________________
JEFE DEPARTAMENTO TCNICO
SERVIU V REGIN VALPARASO

#REF!

ENSADOS

MONTO
0
1,190,646
0
4,795
0
0
0
5,304,326
0
49,678,417
0
0
0
0
0
0

0
9,986,747
0
0
0
951,360
67,116,291

___________________

RESUPUESTOS

N VALPARASO