Agenda
Reviewstudyareaandmodelingconcepts
Overviewofalternatives
Reviewresultsofmodeling
Nextsteps

ProjectArea

HydraulicModelingConcepts

OverviewofAlternatives
Hydrologic(forfuturemeetings)
Alt2 StorageofwaterinLakeSwitzerland
Alt3 Vly/Emorybypass
Hydraulic(focusforthismeeting)
Alt1 Bridgereplacements
Alts4,5,6,7,8,9 Floodplaincreationor
enhancement

OverviewofAlternatives
1. BridgeReplacements
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.

EmoryBrookatMainStreet
EmoryBrookatWagnerAvenue
Vly CreekatMillStreet
Vly CreekatMainStreet
LittleRedKillatSnyderAvenue
LittleRedKillatMainStreet
LittleRedKillatBridgeStreet
BushKillCreekattheformerBridgeStreetbridge(subjectof
meetingsinJulyandAugust2014)
BushKillCreekatDepotStreet
BigRedKillatOldRoute28

OverviewofAlternatives
FloodplainCreation,Enhancement,etc.
4.
5.
6.

Upstreamarea(Emory/Vly confluence)
BridgeStreetareaofBushKill(topicofpreviousmeetings)
MiddleareaofBushKill(westendofWagnerAvenue,DepotStreet,
andlumberyards)
7. DownstreamareaofBushKill(alongRoute28)
DownstreamareaofBushKill+BigRedKill
8. Vly CreekatMillStreet
9. EmoryBrookatWagnerRoad
Mostalternativesarerelativelymodularanddontaffectoneanother

ReviewResultsofModeling

1540

Elevation (ft)

1530

1520

Plan: Duplicate Effective Emory

5/15/2014
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground

MainStreetBridge

1550

EB _Project_MMI

WagnerStreetBridge

ConfluencewithBushkill

1a.BridgeReplacement EmoryBrookatMainStreet

1510

1500

1000

2000
Main Channel Distance (ft)

3000

4000

ReviewResultsofModeling
1a.BridgeReplacement EmoryBrookatMainStreet
EB_Project_MMI

Plan: Duplicate Effective Emory

5/15/2014

EMO 09: Main Street


.06

.04

.06

1565

Legend
WS 500 YR

1560

WS 100 YR
WS 50 YR
WS 25 YR

1555
Elevation (ft)

WS 10 YR
Ground
1550

Ineff
Bank Sta

1545

1540

1535

50

100

150
Station (ft)

200

250

300

ReviewResultsofModeling
1a.BridgeReplacement EmoryBrookatMainStreet
Proposed
improvements

ReviewResultsofModeling
1a.BridgeReplacement EmoryBrookatMainStreet
Current
depths

ReviewResultsofModeling
1a.BridgeReplacement EmoryBrookatMainStreet
Depthsafter
bridge
replacement

ReviewResultsofModeling
4aand4b.FloodplainEnhancementatVly nearConfluence
MainStreetBridge

5/15/2014
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR

DamatLakeSwitzerland

1520

ConfluencewithBushkill

Elevation (ft)

1540

Plan: Corrected Effective VlyCreek Plan

MillStreetBridge

VlyCreek_MMI
1560

1500

500

1000

1500

2000

Main Channel Distance (ft)

2500

3000

3500

Ground

ReviewResultsofModeling
4aand4b.FloodplainEnhancementatVly nearConfluence
VlyCreek_MMI

Plan: Corrected E ffective VlyCreek Plan

5/15/2014

VLY_03X
.06

.045

.08

.045

.06

1530

Legend
WS 500 YR

1525

WS 100 YR
WS 50 YR
WS 25 YR

1520
Elevation (ft)

WS 10 YR
Ground
1515

Ineff
Bank Sta

1510

1505

1500

100

200

300

400
Station (ft)

Emory Brook

500

600

700

800

ReviewResultsofModeling
4aand4b.FloodplainEnhancementatVly nearConfluence

ReviewResultsofModeling
4a.FloodplainEnhancementatVly nearConfluence
Currentdepths

ReviewResultsofModeling
4a.FloodplainEnhancementatVly nearConfluence
Depthsafter
floodplain
project

ReviewResultsofModeling
4a.FloodplainEnhancementatConfluence
Comparisonof
inundated
areas
Motel100yr
WSEchanges
from1520.8to
1517.9andit
partlyleaves
theSFHA
School100yr
WSEchanges
from1515.2to
1513.4

ReviewResultsofModeling
4b.LargerFloodplainEnhancementatConfluence
Depthsafter
floodplain
project

ReviewResultsofModeling
4b.LargerFloodplainEnhancementatVly nearConfluence
Comparisonof
inundated
areas

ReviewResultsofModeling
6aand6b.FloodplainEnhancementnearDepotStreet
BushKill_MMI

Plan: E xisting Conditions B ushkill

5/15/2014
Legend
WS Q500
WS Q100
WS Q50

WS Q10

BridgeStreetConstriction

Ground

DepotStreet

Elevation (ft)

1480

WS Q25

Route28Bridge

1500

1460

1440

16000

18000

20000
Main Channel Distance (ft)

22000

24000

ReviewResultsofModeling
6aand6b.FloodplainEnhancementnearDepotStreet
BushKill_MMI

Plan: Existing Conditions Bushkill

5/15/2014

BUS_37X
.055

.045

.04

1485

.
0
5
5

Legend
WS Q500
WS Q100

1480

WS Q50

Elevation (ft)

WS Q25
WS Q10

1475

Ground
Ineff
Bank Sta

1470

Warehouses

1465

1460

100

200

300

400
Station (ft)

500

600

700

ReviewResultsofModeling
6aand6b.FloodplainEnhancementnearDepotStreet
BushKill_MMI

Plan: Existing Conditions Bushkill

5/15/2014

BUS 39: DEPOT STREET


.08

.035

.055

1495

Legend
WS Q500
WS Q100

1490

WS Q50

Elevation (ft)

WS Q25
WS Q10

1485

Ground
Ineff
Bank Sta

1480

1475

House
1470

100

200

300

400
Station (ft)

500

600

700

800

ReviewResultsofModeling
6aand6b.FloodplainEnhancementnearDepotStreet

ReviewResultsofModeling
6a.FloodplainEnhancementatDepotStreet
Currentdepths

ReviewResultsofModeling
6a.FloodplainEnhancementatDepotStreet
Depthsafter
floodplain
project

ReviewResultsofModeling
6a.FloodplainEnhancementatDepotStreet
Comparisonof
inundated
areas

ReviewResultsofModeling
6b.LargerFloodplainEnhancementatDepotStreet
Currentdepths

ReviewResultsofModeling
6b.LargerFloodplainEnhancementatDepotStreet
Depthsafter
floodplain
project

ReviewResultsofModeling
6b.LargerFloodplainEnhancementatDepotStreet
Comparisonof
inundated
areas
Homesatthe
westendof
Wagnerseea
100yrWSE
reductionfrom
1487.2to
1483.8

ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28

ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28
Currentdepths

ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28
Depthsafter
floodplain
project

ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28+BigRedKill
Current
inundation
area

ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28+BigRedKill
Currentdepths

ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28+BigRedKill
Depthsafter
floodplain
project
SelfStorage
100yrWSE
changesfrom
1473.4to
1472.5
Atnearby
homes,WSE
changesfrom
1458.0to
1457.0

ReviewResultsofModeling
7b.ExtensiveFloodplainEnhancementatOldRoute28

ReviewResultsofModeling
7b.ExtensiveFloodplainEnhancementatOldRoute28
Currentdepths

ReviewResultsofModeling
7b.ExtensiveFloodplainEnhancementatOldRoute28
Depthsafter
floodplain
project

ReviewResultsofModeling
8.FloodplainEnhancementatMillStreet
Needstobe
combinedwith
other
alternatives

ReviewResultsofModeling
Reminder:4a.FloodplainEnhancementatVly
Depthsafter
floodplain
project

ReviewResultsofModeling
8b+1d+4a
4aistheVly
floodplainwe
discussed
earlier
1distheMain
Streetbridge
Assumesthat
MillStreet
bridgeis
removed

ReviewResultsofModeling
8b+1d+4a
Comparisonof
inundated
areas
Motel100yr
WSEchanges
from1520.8to
1517.1andit
partlyleaves
theSFHA
School100yr
WSEchanges
from1515.2to
1513.4

ReviewResultsofModeling

1540

Elevation (ft)

1530

1520

Plan: Duplicate Effective Emory

5/15/2014
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground

MainStreetBridge

1550

EB _Project_MMI

WagnerStreetBridge

ConfluencewithBushkill

9.EmoryBrookfloodplain

1510

1500

1000

2000
Main Channel Distance (ft)

3000

4000

ReviewResultsofModeling
CrossSection1068 WagnerAvenueBridge PartofFloodplainisusedbyVly
CreekFloodwater
EB _Project_MMI

Plan: Duplicate E ffective Emory

5/15/2014

EMO 04: Wagner Avenue


.06

.04

.06
Legend

1525

WS 500 YR
WS 100 YR
WS 50 YR

1520

WS 25 YR
Elevation (ft)

WS 10 YR
Ground
1515

Ineff
Bank Sta

1510

1505
0

50

100
Station (ft)

150

200

ReviewResultsofModeling
9.EmoryBrookfloodplain
9aloneisnot
effectivedue
tobackwater
atWagnerRd
bridge
1breplacesthe
WagnerRd
bridge
4bistheVly
floodplainwe
discussed
earlier

ReviewResultsofModeling
9.EmoryBrookfloodplain
Currentdepths
9aloneisnot
effectivedue
tobackwater
atWagnerRd
bridge
1breplacesthe
WagnerRd
bridge
4bistheVly
floodplainwe
discussed
earlier

ReviewResultsofModeling
9.EmoryBrookfloodplain
Depthsafter
floodplain
project
Citgo100yr
WSEchanges
from1520.8to
1518.9andit
appearsto
shiftoutofthe
SFHA,although
floodingfrom
Vly maystill
affectit

ReviewResultsofModeling
LittleRedKill

NextSteps
Refinehydraulicalternativesthathavemerit
Evaluatehydrologicalternatives
Preliminarybenefitcostanalysis
Meettoreviewresults