Job Hazard Analysis Form

Work Order Details:


Work Order No.:
Work Order Description:

90008313

Revision:

30HICA-102 Valve leak test and repair

Summary of Scope:

Specific Requirements:

Non stock Material

External Resources

Potential Clash with Other Activities

Crane Required

Shipping

Shutdown

Permit Required

Work Order Only

Isolation Required

Signature

Date

Schedule:
Prepared by:

Review Required By:


Discipline (tick if required)

Comments

BSM (MM/MMH/MMT/MME/MMO)
HSSE

Technology
Mechanical Engineering
Instruments
Electrical
Operations Clearance Issuer
Fire & Hazard Inspector
Other: System Custodian

Binder Colour Coding:


Operations

Instruments

Electrical

Mechanical

IPS Rejuvenation Project Work Pack


Work Order Details:
Work Order No.:

90008313

Work Order Description:

30HICA-102 Valve leak test and repair

Revision:

Index:
1.

Schedule Control Sheet

2.

Gant chart of work order operations schedule

3.

Photographs of Equipment / Work Site

4.

Work Site Controls


a. Permit to Work
b. Job Hazard Analysis Sheet
c. Task Risk Assessment
d. Certificates (As Applicable)
i. Isolation
ii. Gas Test
iii. Vessel Entry
iv. De-Isolation for Test
v. Hot Work

5.

SAP Work Order

6.

Equipment Drawings

7.

Check Sheets

8.

Material Certification

9.

Reference Documentation

10. Work Order Close Out Report / Lesson Learnt

TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

Erect scaffolding

Shifting / Mobilize of
Scaffolding Material

Un-inspected
scaffolding material

Falling object

Injury to personnel.

Scaffolding
contractor
staff

CInc
ide
nt
ha
s
4 C

Action parties

#Secure the material


Civil supervisor
while shifting on
and Job
vehicle or trolley.
supervisor
# Shifting of the
scaffold clamps from
ground level to top
platform through lifting
bag with secured rope
only.
# Ensure that shifting
of the scffolding pipe
by one person at a time
on one staircase.

Injury to personnel

adjacent 3
work groups

me # Ensure that all


Civil supervisor
diu scaffolding material is and Job
m being inspected and
supervisor
tested by SMDS. ( civil
)

Injury to personnel

adjacent
work groups

me # Use basket or
diu appropriate bag for
m transporting small
items to / from height.

Injury to personnel

adjacent
work groups

Civil supervisor
and Job
supervisor

C me # Ensure items to be
Civil supervisor
diu hoisted up or down are and Job
m properly rigged and
supervisor
secured.
# Ensure the use of tag
line to control
movement of items
during hoisting.
# Ensure the use of
head protection.
#Barricade the area at
ground level when
work at height is in
progress
# Ensure the scaffold
supervisor is at site
supervising the works..
Ensure all hand tools
are secured during
work at height.
# Ensure a pre job
safety briefing on
dropped objects is
given to all workers
# Ensure no work is
conducted directly
below scaffolding
erection works

Unsuitable location

Obstruct access &


Work group
egress to work location

Unstable and Uneven


ground condition

Injury to personnel and Scaffolding


damage of property.
contractor
staff

Falling from height

C lo
w

List all controls


Required

lo # Ensure the exact


Civil supervisor
w scaffolding location
and Job
where possible before supervisor
the Turn Around and
perform site inspection
for any observation.

C- lo #Check and confirm


Inc w the footing of scaffold
ide
are rested on even
nt
concrete floor.
ha
#Ensure the use of
s
base plate.
oc
Conduct Toolbox talk
cur
before erection.
red
in
co
mp
an
y

Civil supervisor
and Job
supervisor

Injury to Personnel

Any staff
working on
the platform

C me #Check and ensure the Civil supervisor


diu use of inspected safety and Job
m harness with double
supervisor
lanyard and anchored
at a strong point.

Injury to Personnel

Work group

C me #Ensure 100% tie off


diu during shifting of
m personnel.

Civil supervisor
and Job
supervisor

Recovery Measures

# Communicate to
control room and shift
manager will activate
the emergency
response.

Action
parties

Severity

Population
at Risk

RESIDUAL RISK

Barriers

Likelihood
Risk
Rating

INITIAL RISK
Severity

Hazard Description &


Effect

Hazard / Risk
Consequence
Description

Likelihood
Risk
Rating

HAZARD
Job Steps

TRA/JHA NO.:
CREATED DATE:
NEXT REVIEW DATE:

90008313
REVISION: 0
30HICA-102 Valve leak test and repair
Majang, Michael Chai, Rudy, Paul Asam

WORK ORDER NUMBER:


WORK ORDER DESCRIPTION:
GROUP MEMBERS:

ALARP
(Y/N)

TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

Any staff
working on
the platform

Non compliance of the


procedure

Injury to Personnel

Any staff
working on
the platform

Civil supervisor
and Job
supervisor

Scaffolding
contractor
staff /
Company
staff
Scaffolding
contractor
staff /
Company
staff

c me # Follow the standard


diu prodedure of erection
m of scaffolding and work
at height.
D me # Ensure the use of
diu three point contacts
m while using the ladder.

Civil supervisor
and Job
supervisor

ALL STAFF

D me # Check and confirm


diu that scaffolding is
m certified safe for
access. Green tag(
Safe to use tag to be
display)
C lo # Stop the work
w immediately.

Field
operator

D me # Ensure that a valid


diu Permit to work is
m obtained for the job.
# Ensure the
depressurization and
draining is being done
as per operation
procedure.
# Ensure that CO is
less than 25 PPM and
Methane is less than
3% during draining and
depreesurization.
D me #Wear Disposable
diu coveralls when
m performing insulation
removal.
Disposable
D
Wear specific
type of
me
dust mask as
diu
prescribed by MSDS
m

Injury to personnel

Un-inspected scaffold. Injury to personnel

Foul weather

Injury to personnel.

Population
at Risk

Depressurize and cooling down

Expoure of CO, N2 and Injury to personnel.


traces of waxes.

Removal of insulation

Exposure to insulation

Chronic health
problems or skin
irritation

Insulation
contractors

Exposure to insulation

Chronic health
problems or skin
irritation

Insulation
contractors

Sharp edges of
removed cladding

Cuts to fingers/hands

Insulation
contractors

4
Access at height for
insulation
reinstatement

falling from height

falling object

Injury to personnel

Insulation
contractors

adjacent
work groups

Exposure to insulation

Injury to personnel

Fire hazard

Injury to personnel

Release of
Injury to personnel
uncontrolled instrument
air from tubing

List all controls


Required

lo # Ensure the
w scaffolding supervisor
is present during time
of erection.# Ensure
that scaffolding is
being erected as per
the work requirement.
# Ensure that
scaffolding is "fit for
purpose"

Action parties

Recovery Measures

Civil supervisor
and Job
supervisor

Civil supervisor
and Job
supervisor

Civil supervisor
and Job
supervisor
Field operator,
Panel man ans
AGT.

Civil supervisor / #Communicate to


Job supervisor control room and shift
manager will activate
Job supervisor the emergency

Ensure all insulation


Lo
contractors wear semi- Job supervisor
w
leather gloves
All insulation
B
contractors to wear
and tie off safety
Me
harness when
diu
Job supervisor
accessing scaffolding
m
which may require
working outside the
safe working platform
C me All hand tools to be
job supervisor
diu secured using a
m lanyard when working
at height
C
#All cladding/insulation
removed which will not
be reused to be
lowered to ground level
me
using secured rope.
diu
job supervisor
#All cladding to be
m
reused needs to be
tied to a secure anchor
point to prevent it being
blown off by wind

adjacent
work groups

adjacent
work groups

Instrument
staff and
contractor
staff

# All removed
job supervisor
insulation to be wet in
me water and placed in
diu plastic bag and remove
m from the location
immediately.
lo # Ensure the pressure
w is released fully before
disconnect the tube.
# Use of proper PPEs
during disconnection.
Safety goggles is
compulsory during
release the pressure.

Instrument
supervisor and
instrument
contractor

#Communicate to
control room and shift
manager will activate
the emergency
response.

Action
parties

Severity

Collapse of Scaffolding

Hazard / Risk
Consequence
Description

Likelihood
Risk
Rating

Inappropriate method
of erection

Hazard Description &


Effect

Fall from height

Removal of instrument parts

RESIDUAL RISK

Barriers

Severity

INITIAL RISK
Likelihood
Risk
Rating

HAZARD
Job Steps

TRA/JHA NO.:
CREATED DATE:
NEXT REVIEW DATE:

90008313
REVISION: 0
30HICA-102 Valve leak test and repair
Majang, Michael Chai, Rudy, Paul Asam

WORK ORDER NUMBER:


WORK ORDER DESCRIPTION:
GROUP MEMBERS:

ALARP
(Y/N)

TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

List all controls


Required

Action parties

Short circuit

Damage to property

Removal of heat tracing (EHT)

Live electrical cables

Electrocution

Electrical
contractor

Unbolting

Trap pressure/ Over


exertion

Injury to personnel

Mechanical
contractor
staff

2 C- lo # Ensure no trap
Job supervisor
Inc w pressure is in system.
ide
# Check and ensure
nt
right tools are used.
ha
# Check and ensure
s
the distance between
oc
the work platform and
cur
work is appropriate
red
(sufficient reach).
in
# Ensure the follow up
co
of " Bolting procedure".
mp
an
y

Bolt & Nut Jammed

Extra physical effort


required for work

Mechanical
contractor
staff

C- lo # Ensure no hot work


Inc w is used for removing
ide
jammed bolt and nut.
nt
# Adopt proper work
ha
posture.
s
# Use hacksaw for
oc
coldcut.
cur
red
in
co
mp
an
y

Falling blind /
bolts/tools

Injury to personnel or
damage of property

Mechanical
contractor
and
adjacent
work groups

C- Me #Conduct a pre job


Inc diu safety briefing.
ide m #Secure all hand tools
nt
# Cordon off the
ha
working area below.
s
# Ensure the no work
oc
is being carried out
cur
diredtly below the
red
Installation.
in
# Ensure no loose
co
object on the grating.
mp
Must be contained in
an
the container.
y

Used of WD40 &


Similar

Fire hazard

Contractor
staff

Unauthorised crane
entry without gas test

Injury to personnel and All staff


damage of property.

Crane arrangement

Non compliance/ Non


availability of lifting
plan

Injury to personnel and Mechanical


damage of property.
contractor
staff

Instrument
supervisor and
instrument
contractor
B me # Ensure a valid permit MME/53
diu to work is obtained for
m the job .
#Ensure electrical heat
tracing has been
isolated
# Ensure usage of
proper PPEs for the
job.

lo # Ensure that cable is


w isolated from
marshelling rack.

Job supervisor
Contractor
workers
Job Supervisor
Job Supervisor

lo Limit the amount of


w WD40 or similar at the
worksite and work
platform.
Check and ensure no
hot work in the vicinity.

C- me # Ensure every vehicle


Inc diu entry with permit to
ide m work and with gas test.
nt
#Ensure that crane is
ha
tested and certified by
s
SMDS.
oc
# Ensure that crane is
cur
approved with
red
inspection sticker.
in
co
mp
# Ensure that Lifting
plan is in place and
complied with
procedure if load is 1
Ton and above .
lo
# Ensure that lifting
2 C
w
plan is in place if any
blind lift/ obstrction lift
is there at any weight.

#Field Operator
and AGT
# Mechanical staff
and job supervisor

Mechanical
supervisor and
Job Supervisor

Recovery Measures

Action
parties

Severity

Population
at Risk

RESIDUAL RISK

Barriers

Likelihood
Risk
Rating

INITIAL RISK
Severity

Hazard Description &


Effect

Hazard / Risk
Consequence
Description

Likelihood
Risk
Rating

HAZARD
Job Steps

TRA/JHA NO.:
CREATED DATE:
NEXT REVIEW DATE:

90008313
REVISION: 0
30HICA-102 Valve leak test and repair
Majang, Michael Chai, Rudy, Paul Asam

WORK ORDER NUMBER:


WORK ORDER DESCRIPTION:
GROUP MEMBERS:

ALARP
(Y/N)

TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

Offset centre gravity

Uncontrolled lifting
opearation

Failure of cranne

me # Ensure the operation Mechanical


diu is carried out in a well- supervisor and
m coordinated manner.
Job Supervisor
# Ensure only
experienced crane
operator is used or
under close
supervision.
c
# Ensure the crane is
adjusted such that its
center of gravity is
directly below the hook
used.
# Ensure the lifting
plan is placed and
followed properly.

Damage of property
Mechanical
and Injury to personnel contractor
staff/
company
staff

Damage of property
Mechanical
and Injury to personnel contractor
staff/
company
staff
Delay to operation.
Mechanical
Injury to personnel.
contractor
Damage to property
staff/
company
staff

Toppling of crane

Overloading of crane

Failure of lifting gears


and applieances

me # Check and ensure a


diu qualified lifting
m supervisor is on site to
supervise the
operation.
me # Check and ensure
diu the crane used has
m valid certificate.
# Check and ensure
all safety devices of the
crane are functioning.
D
# Check and ensure
the daily inspection of
the crane is properly
carried out prior to the
rigging and lifting.

Damage of property
Mechanical
and Injury to personnel contractor
staff/
company
staff

Damage of property
Mechanical
and Injury to personnel contractor
staff/
company
staff

Damage of property
Mechanical
and Injury to personnel contractor
staff/
company
staff

List all controls


Required

Action parties

Mechanical
supervisor and
Job Supervisor

Mecchanical
supervisor and
Job Supervisor

# Check and ensure


Mecchanical
the capacity of the
supervisor and
crane used is sufficient Job Supervisor
for the operation.
# Check and ensure
all outriggers are fully
extended and secured
on solid ground.
# Check and ensure all
safety devices are
lo functioning and not
w bypassed.
# Check and ensure
the crane is operating
within its safe working
radius.
# Check and ensure
the crane is not
overloaded.

# Check and ensure


the crane has sufficient
capacity for the
lo
operation prior to
w
commencement of the
entire operation.

Mecchanical
supervisor and
Job Supervisor
C
and Crane
operator and
signal man and
qualified rigger
# Check and ensure all Mecchanical
lifting gears and lifting supervisor and
appliances used have Job Supervisor
valid certificates.
and Crane
# Check and ensure
operator and
the SWL of all lifting
signal man and
gears / appliances
qualified rigger
used can withstand the
load of the operation.
# Check and ensure all
lifting gears and lifting
appliances used have
Me no visible defects /
D diu damage.
m # Adopt appropriate
work position to
prevent being hurt by
the sling / shackle/
chain block fails.
# Ensure and check
that all safety lock is
available with good
condition at lifting
gears.

Recovery Measures

Action
parties

Severity

Population
at Risk

RESIDUAL RISK

Barriers

Likelihood
Risk
Rating

INITIAL RISK
Severity

Hazard Description &


Effect

Hazard / Risk
Consequence
Description

Likelihood
Risk
Rating

HAZARD
Job Steps

TRA/JHA NO.:
CREATED DATE:
NEXT REVIEW DATE:

90008313
REVISION: 0
30HICA-102 Valve leak test and repair
Majang, Michael Chai, Rudy, Paul Asam

WORK ORDER NUMBER:


WORK ORDER DESCRIPTION:
GROUP MEMBERS:

ALARP
(Y/N)

TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

Swinging of load

Damage of property
Mechanical
and Injury to personnel contractor
staff/
company
staff
3

Lifting

Communication
breakdown

Damage of property
Mechanical 3
and Injury to personnel contractor
staff/
company
staff

Foul weather

Poor Visibility / Lighting All staff


/ heavy wind speed.

Non compliance/ Non


availability of lifting
plan

Injury to personnel and Mechanical


damage of property.
& contractor
staff

Falling from lifting


beam

Injury to personnel and Mechanical


damage of property.
contractor
staff and job
supervisor
3

Obstruction during
removing of blind and
spade

Damage of property
Mechanical
and Injury to personnel contractor
staff and job
supervisor
Hit against moving the Injury to personnel
Mechanical
spade
contractor
staff and job
supervisor

CV removal
Blind off open end

Hit by falling objects


(bolts and nuts)

Injury to personnel

Pinch point

Injury to health

Falling blind /
bolts/tools

Injury to personnel or
damage of property

Mechanical
contractor
and
adjacent
Mechanical
staff and
contractor
staff
Mechanical
contractor
and
adjacent

List all controls


Required

me # Check and ensure


diu only qualified crane
m operator is used.
# Use tag lines to
control the load.
D
# Ensure that area is
barricaded and signage
posted to prevent
access to unauthorised
personnel.
D

me # Ensure only one


diu authorized lifting
m supervisor is giving
instructions.
# Use walkie-talkie for
verbal communication
(language used must
be understood by all
parties involved).
# Check and ensure
only qualified
signalman is used for
giving signals.
# Perform a pre-job
safety briefing to all
involved.

C lo
w

# To cease the lifting


operation under
controlled condition.

# Ensure that Lifting


plan is in place and
complied with
procedure if load is 1
lo Ton and above .
w # Ensure that lifting
plan is in place if any
blind lift/ obstrction lift
is there at any weight.

Action parties

Recovery Measures

Mecchanical
supervisor and
Job Supervisor
and Crane
operator and
signal man and
qualified rigger

Mecchanical
supervisor and
Job Supervisor
and Crane
operator and
signal man and
qualified rigger

Mechanical
supervisor and
Job Supervisor
and signal man
and qualified
rigger
Mechanical staff # Communicate to
and job supervisor control room and shift
manager will activate
the emergency
response.

# Ensure that condition Mechanical staff


of lifting beam is safe and job supervisor
for mounting the chain
block on the lifting
Me beam.
C diu # Ensure usage of
m proper slings during
lifting of CV on the
beam.

# Ensure and check


Me
that during removing of
C diu
CV all structures are
m
safe.
# Ensure the operation
is well coordinated and
Me controlled.
C diu # Perform pre Job
m safety meeting

# Please check aobove


step
#Barricade the area
below the work place
# Be away from trap
pressure.
#
Ensure Toolbox talk
is carried out for
specially for pinch
C Me point.
#Conduct a pre job
diu safety briefing.
m #Secure all hand tools
# Cordon off the
C Me
diu
m
C lo
w

Mechanical staff
and job supervisor

Mechanical staff
and job supervisor

Job supervisor

Job supervisor

Job supervisor
Contractor
workers
Job Supervisor

#Communicate to
control room and shift
manager will activate
the emergency

Action
parties

Severity

Population
at Risk

RESIDUAL RISK

Barriers

Likelihood
Risk
Rating

INITIAL RISK
Severity

Hazard Description &


Effect

Hazard / Risk
Consequence
Description

Likelihood
Risk
Rating

HAZARD
Job Steps

TRA/JHA NO.:
CREATED DATE:
NEXT REVIEW DATE:

90008313
REVISION: 0
30HICA-102 Valve leak test and repair
Majang, Michael Chai, Rudy, Paul Asam

WORK ORDER NUMBER:


WORK ORDER DESCRIPTION:
GROUP MEMBERS:

ALARP
(Y/N)

TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

Transport to workshop

List all controls


Required

D#Check with the person


Ha
in charge of the route
pp
to be used and road
en
closures if any.
s
# Check and ensure
se
the work areas are
ver
barricaded.
al
#Use signal man as
tim
and when required.
Me
es
#Check and ensure
per diu personnel are well
ye m clear of moving truck or
ar
forklift.
in
# Ensure during lifting
a
and road transportation
Co
in internal process road
mp
shall be guided by
an
operation.
y

Hit by truck, Forklift

Injury to personnel or
damage of property

Mechanical
contractor
staff /
Adjacent
work group.

Fire hazard due to


spark from vehicle

Injury to personnel or
damage of property

Mechanical
contractor
staff / Adjac
ent work
group.

C me # Ensure gas testing is Mechanical and


diu conducted by AGT
job supervisor
m prior to entry in process
road.

Un-inspected vehicle
entry

Injury to personnel or
damage of property

Mechanical
contractor
staff / Adjac
ent work
group.

Non complience of fire Injury to personnel or


permit
damage of property

Mechanical
contractor
staff / Adjac
ent work
group.

B me # Ensure the vehicle


diu has been inspected by
m MME/43 for spark
arrester.
# Ensure that all
vehicles have been
complied with
standard.
B me # Ensure fire permit is
diu in place for the vehicle
m movement.

Servicing & overhaul

# Seprate procedure
cover the risk

Transport to site

# See as above

Removal of blind

# See as above

Crane arrangement

# See as above

Lifting

# See as above

Mechanical and
job supervisor ,
Logistic
coordinator.

Mechanical and
job supervisor

Job supervisor
and Field operator

# See as above

Install CV
Bolting & torque

Action parties

Insufficient tightening
of bolt and nut

Affect the integrity of


equipment

Mecahnical
contractor
staff

Falling the blind /


bolts/tools

Injury to personnel

adjacent
work groups

Insufficient tightening
of bolt and nut

Affect the integrity of


equipment

Mechanical
staff and
contractor
staff

C#Ensure the use of


Inc
torque wrench (set at
ide
required torque) for
nt
tightening the bolts and
ha
lo nuts.
2 s
w # Ensure the
oc
compliance of bolting
cur
procedure.
red
in
co
C#Ensure the tools are
Inc
secured.
ide
#Barricade the
nt
underneath area if
ha
work at height is in
s
me progress.
oc
3
diu # Ensure the grating is
cur
m covered with
red
Tarpouline to prevent
in
the falling object.
co
mp
an
y
C#Ensure the use of
Inc
torque wrench (set at
ide
required torque) for
nt
tightening the bolts and
ha
lo nuts.
2 s
w # Ensure the
oc
compliance of bolting
cur
procedure.
red
in
co

Job supervisor

Mechanical staff
and Job
supervisor

job supervisor

Recovery Measures

Action
parties

Severity

Population
at Risk

RESIDUAL RISK

Barriers

Likelihood
Risk
Rating

INITIAL RISK
Severity

Hazard Description &


Effect

Hazard / Risk
Consequence
Description

Likelihood
Risk
Rating

HAZARD
Job Steps

TRA/JHA NO.:
CREATED DATE:
NEXT REVIEW DATE:

90008313
REVISION: 0
30HICA-102 Valve leak test and repair
Majang, Michael Chai, Rudy, Paul Asam

WORK ORDER NUMBER:


WORK ORDER DESCRIPTION:
GROUP MEMBERS:

ALARP
(Y/N)

TASK RISK ASSESSMENT / JOB HAZARD ANALYSIS

Install heat tracing (EHT)

Falling the blind /


bolts/tools

Injury to personnel

Mechanical
staff and
contractor
staff

Live electrical cables

Electrocution

Electrical
contractor

CInc
ide
nt
ha
s
oc
3
cur
red
in
co
mp
an
y
4 B

List all controls


Required

Action parties

#Ensure the tools are Mechanical


secured.
supervisor /Job
#Barricade the
supervisor
underneath area if
work at height is in
me progress.
diu # Ensure the grating is
m covered with
Tarpouline to prevent
the falling object.

me # Ensure a valid permit MME/53


diu to work is obtained for
m the job .
#Ensure electrical heat
tracing has been
isolated
# Ensure usage of
proper PPEs for the
job.

Install back instrument parts

# Seprate procedure
cover the risk

Install insulation

# Please follow the


job supervisor
above the " Removal of
Insulation step"
Damage of EHT
underneath the
cladding and
Electroculation

Injury to personnel

Insulator

lo # Ensure that in drill bit is


w provided with stopper to
prevent damage of EHT or
cable.
# Ensure tool box talk prior
to work.

Job supervisor

Recovery Measures

Action
parties

Severity

Population
at Risk

RESIDUAL RISK

Barriers

Likelihood
Risk
Rating

INITIAL RISK
Severity

Hazard Description &


Effect

Hazard / Risk
Consequence
Description

Likelihood
Risk
Rating

HAZARD
Job Steps

TRA/JHA NO.:
CREATED DATE:
NEXT REVIEW DATE:

90008313
REVISION: 0
30HICA-102 Valve leak test and repair
Majang, Michael Chai, Rudy, Paul Asam

WORK ORDER NUMBER:


WORK ORDER DESCRIPTION:
GROUP MEMBERS:

ALARP
(Y/N)

IPS Rejuvenation Project Work Pack


Work Order History:
Work Order No.:

90008313

Work Order Description:

30HICA-102 Valve leak test and repair

Revision: 0

Description Of Equipment As Found:

Activities Performed:

Equipment / Materials Used:

Testing / Calibration Results:

Condition Of Equipment Upon Completion:

Description Of Follow On Work: (Notification Numbers)

List Of Completed Attachments:

Prepared By:

Date:

Approved By:

Date:

Routine Work Order Validation Sheet


Note: Complete required information
1.

Work Order No.:

90008313

2.

Work Order Description:

30HICA-102 Valve leak test and repair

3.

Is Description adequate?

4.

Are Tag Numbers referenced and correct?

5. Procedure - required?
- attached?
- sufficient and correct?
6. Is the Shutdown Code correct?
7. Is the Responsibility Code correct?
8. Are additional resources required - e.g. Specialist?
9. Does the Routine require Special Tools or Equipment
10. Are Materials required - is there a BOM attached?
- are these adequate for the work being undertaken?
11. Special Lifting Equipment or Arrangements required?
12. Is Manhour allocation / estimate correct?
13. PMR amendment required: (attach separate sheet if necessary)
Z6 Type Notification Number(s) Raised:
14. Completed By:
Name & Signature

Date

Risk Assessment Matrix


CONSEQUENCE

INCREASING LIKELIHOOD

Severity

Has happened Has happened


in the
at SMDS or Has happened
Never heard of heard of in Organization
more than
more than
in industry
industry
or more than once per year once per year
once per year
in the
at SMDS
in the industry organization

People

Asset

Environment

Reputation

No health
effect/injury

No damage

No Effect

No impact

0A

0B

0C

0D

0E

Slight health
effect/injury

Slight Damage

Slight Effect

Slight impact

1A

1B

1C

1D

1E

Minor Damage

Minor Effect

Minor impact

2A

2B

2C

2D

2E

Localised Damage

Localised Effect

Considerable
impact

3A

3B

3C

3D

3E

Major Damage

Major Effect

National impact

4A

4B

4C

4D

4E

Massive Effect

International
impact

5A

5B

5C

5D

5E

Minor health
effect/injury
Major health
effect/injury

PTD* or 1 to 3
fatalities

Multiple fatalities Extensive Damage

*Permanent Total Disability

Risk Assessment Matrix Consequence - Category Definition


Harm to People

Environmental Effect

0 No injury or health effect

Slight injury or health effects not affecting work performance and not affecting daily
life activities. Examples: First aid cases and medical treatment cases. Exposure to
1
health hazards that give rise to noticable discomfort, mild irritation or transient effects
reversible after exposure stops.
Minor injury or health effects (Lost Time injury) - Affecting work performance, such as
restriction to activities (Restricted Work Case or Occupational Illness) or a need to
2
take a few days to fully recover (Lost Workday Case). Minor health effects, which are
reversible, e.g. skin irritation, food poisoning.
Major injury or health effects (including Permanent Partial Disability and Occupational
Illness). Affecting work performance in the longer term, such as a prolonged
3 absence from work. Irreversible health damage without loss of life, e.g. noise
induced hearing loss chronic back injuries, sensitisation, hand/arm vibration
syndrome, repetitive strain injury.
Permanent Total Disability or one to three fatalities - From an accident or
4 occupational illness. Irreversible health damage with serious disability or death, e.g.
corrosive burns, heat stroke, cancer (small exposed population)

Multiple fatalities - From an accident or occupational illness (e.g. chemical


asphyxiation or cancer (large exposed population)

Asset Damage and other Consequential Business Losses (100% costs, USD)

Impact of Reputation

0 Zero damage

1 Slight damage - No disruption to operation (costs less than 10,000)

2 Minor damage - Brief disruption (costs less than 100,000)

3 Local damage - Partial shutdown (can be restarted but costs up to 1,000,000)

4 Major damage - Partial operation loss (2 weeks shutdown costs up to 10,000,000)

Extensive damage - Substantial or total loss of operation (costs in excess of


10,000,000)

The figures in the tables above should not be combined for deriving the value of a human life!!

sequence - Category Definition


Environmental Effect
Zero effect - No environmental damage. No financial consequences.
Slight effect - Slight environment damage, within the fence and within the systems.
Negligible financial consequences.
Minor effect - Sufficiently large contamination or discharge to damage to attack the
environment, but no lasting effect. Single breaches of statutory or prescribed limit, or
single complaint.
Localised effect - Limited discharges affecting the neighbourhood and damaging the
environment. Repeated breaches of statutory or prescribed limit, or many
complaints.
Major effect - Severe environmental damage. The company is required to take
extensive measures to restore the damage environment. Extended breaches of
statutory or prescribed limit, or widespread nuisance.
Massive effect - Persistent severe environment damage or severe nuisance
extending over a large area. Loss of commercial, or recreational use or nature
conservancy resulting in major financial consequences for the company. Ongoing
breaches well above statutory or prescribed limits.
Impact of Reputation
Zero effect - No public awareness.

Slight impact - Public awareness may exist, but there is no public concern.