Suneel Aradhye
Sr VP and CIO
Essar Steel India Ltd
Agenda
Vertical integration
Strategic alliances
Entry of
International
companies
222 MoUs have been signed by various states such as Orissa, Jharkhand,
Chhattisgarh, Gujarat, Karnataka for planned capacity of about 276 MT
Investment in infrastructure, the largest consumer of steel, is expected to
be USD 1 trillion by 2017
The major players in the industry, such as Tata Steel and SAIL have
vertically integrated to secure raw materials
Tata Steel is self-sufficient in iron ore and coking coal supply; SAIL is self
sufficient in iron ore
Global players have entered into JVs with Indian steel majors as the
greenfield projects would have longer gestation
Sumitomo Metal has partnered with Bhushan Steel for technological and
marketing collaboration
SAIL has entered into a JV with POSCO to have FINEX technology at its
Bokaro plant
Attracted by the growth potential of the Indian steel industry, several global
steel players have been planning to enter the market
Arcelor Mittal and POSCO have planned mega greenfield projects at
various locations in India
Advantage India
Robust Demand
Demand supported by
growing robust domestic
market
Increasing Investments
2014E
Market Size:
USD 83 billion
Advantage
India
Policy support
Competitive advantage
India is among the top
producers of all forms of steel
in the world
2009
Market Size:
USD 33 billion
100%
Steel
Energy
100%
100%
Infrastructure
Services
MINING
PROJECTS
SHIPPING
METALS
PORTS**
BPO
14 MMTPA steel-making
capacity
5 MMTPA processing and
distribution capacity
375+ branded retail outlets under
Essar Hypermart
REAL ESTATE
Portfolio of approx. 16 mn sq. ft.
in residential, commercial and
mixed use projects
POWER
450 MT coal reserves
1,600 MW operational capacity
Growing to 4,500 MW by end of
2012 and 9,670 MW by 2014
CONCESSIONS
US$ 300 million road concession
from NHAI
Aims to create a US$ 4 billion
portfolio in the next 2-3 years
3,067 employees
US$ 19.45 bn revenue*
9,161 employees
US$ 6.24 bn revenue*
3,505 employees
US$ 2.37 bn revenue*
TELECOM SERVICES
GSM services in Kenya with 3
mn subscribers
1,200 branded retail outlets
under The MobileStore in India
61,108 employees
US$ 1.89 bn revenue*
Resources
Technology
Product
Reach
4 mtpa steelmaking
capacity at Algoma, N
Ontario, Canada (Blast
Furnace)
ROW
North America
India
Essar Steel
1 mtpa international
service center capacity
Indonesia
UK
UAE
Vietnam (Project)
Hot Rolled
(10.4 mtpa)
Gas
Cold Rolled
(2.5 mtpa)
Galvanized
(1.15mtpa)
Color
Coated
(0.4mtpa)
Processing &
Distribution
Centers
Iron Ore
Pellet/Sinter
IronMaking
Coal
SteelMaking
(14mtpa)
Hypermarts
Slab
Coke making
Resources
Plates
(2.0mtpa)
Captive pellet
production at Vizag
facility and Orissa
pellet project
End Customers
(5 mtpa)
Pipes
(0.6mtpa)
Distribution
Steel Production
Full range of flat rolled products,
including value-added products such as
HRPO, Cold Rolled, Galvanized. Color
Coated, Plate and Pipe
Operations span full value chain from raw materials to product distribution
10
Complex SKUs
Human Interventions
11
Pre condition
321 Characteristics
&Procedures
For HR Coil
HSM
HR COIL
Caster 1
V_HRCF
Dependencies
Precondition
Selection
Condition
Procedures
Actions
Constraints
CSP
Caster 2
Slabs
Standard Profile
Quality Profile
Service Centre
Profile
Stock Profile
Procedures &
Constraint
Net
Pricing
condition
Base Price
Dim Ex Price
Grd Ex Price
Market Extra
Process Extra
Material BOM
HRCF
HRCW
SLBNW
SLBW
Selection
Condition &
procedures
Task List
Packing
Rolling
Casting
Melting
Selection
Condition &
Procedures
12
SAP-VC Features
Defines all kind of products (Finished goods, WIP)
VC helped the Sales person to put together specifications for the Product and
ensure that the product can be produced from defined specifications
13
Value Proposition
Drastically reduced master data maintenance on a regular basis (reduced
from 90000 FG/WIP to 90)
Expert knowledge incorporated into the system to the extent possible
Standardization of processes and objectivity of decision making
subsequently less training (Standard VC setup with derived technical
inferences)
Order booking used to be a manual process with multiple documents and
at least three departments involved. The process is now extremely
simple and can be completed in 15 minutes max having known
customer needs clearly.
Challenges
Very significant time was invested in development of the Variant
Configurator.
14
Value Proposition
Removal of many non-value adding activities and documentation
Quicker response to Customers & Inquiry processing, thus reducing overall
cycle time
Simplified and standardized process
Challenges
Acceptance of new business practice was accepted after seeing benefits
Documentation of capability and its translation in Variant Configuration was
a challenge as knowledge was scattered across approx. 20+ people
Training on maintenance of Dependencies and Variant Configuration
15
Value Proposition
Increased visibility of due date and production status across the entire
production chain, available in one core system
Real time update of plan based on actual production and inventory level
Making SAP the core production order creation system ensures authentic
data, such as sales order, inventory status etc. which are readily available to
the planner
Challenges
User acceptance of the changes in practice and user interfaces
16
17
Upon carving out of Essar Steel Solution template, repeat roll outs have
become possible in a compressed time frame with equal robustness and
scalability due to Clearly laid down methodology while integrating the new landscape
with the existing one
Common product definition templates, data collection formats,
calculation schemas, configuration frameworks, unified numbering
schema and standardized testing methods
Visibility and estimation made available at the speed required to merge
the new Company at process level granularity
Unified processes in sales, production and quality areas are with
interfacing strategies using object oriented technology
Global consolidation in terms of reporting becomes possible from SAP
BI/BO due to the single client strategy
Consistent Quality of solution with a template approach.
18
Suggestions
Involvement of Metallurgists Major contributors in development of
VC
Be careful every mistake can prove dear
R&D efforts need to be considered to be taken up for development
as new product configuration can be time consuming
19
Q&A
20