COORDINATION.
GENERAL
1.1
INTRODUCTION
1.2
The design and installation of the Works shall comply with the latest relevant editions
and amendments of:
British Standards Specifications and Codes of Practice;
European Standards where appropriate;
Building Regulations;
Water Supply Regulations 1999;
NFPA Standard Specification for Fire Protetion Services;
Health and Safety at Work Act and all associated legislation and regulations;
CIBSE Guides and other associated publications
Electricity at Work Regulations 1989;
Standard Specification for Electrical Services (appended as part of this document);
BS7671 17th Edition IET Wiring Regulations (as currently amended);
The requirements of the local utility companies;
The requirements of the local fire authority;
1.3
COMMISSIONING
The commissioning process shall follow the agreed commissioning programme and take
into consideration any revisions found necessary during the course of the commissioning
period. Commissioning shall be clearly defined and the programe shall be agreed with by
the Witness.
Commissioning shall comply with Standard Specification requirements and latest relevant
editions and amendments of:
CIBSE
CIBSE
CIBSE
BSRIA
BSRIA
The ASC shall witness the commissioning of key system components and review all
commissioning data. He shall witness all commissioning and commissioning records.
Where deemed necessary, the ASC shall request further random commissioning checks
be carried out until the required system performance meets the requirements of this
specification.
Systems that are found not to comply with the requirements of the project specification
shall be re-submitted for witness and approval, once the non-compliance has been
rectified.
A review of the building services shall be carried out at the precommisssioning stage in
order to confirm the practicability that all systems are capable of being commissioned.
This review shall be carried out by the Contractor and his commissioning specialist subcontractor.
A record of these procedures and any reviews shall be made available to the ASC and
Consultant Engineer for comment.
1.4
SYSTEMS COMMISSIONING
1.4.1
SYSTEMS TO BE COMMISSIONED
1.4.1.1
2.
3.
Fans
4.
Pumps
5.
Piping Systems
6.
Ductwork Systems
7.
8.
Chemical Treatment
9.
2.
3.
Sump/Ejector Pumps
6.
7.
Fire Pump
2.
Wet Standpipe
3.
Fire Sprinkler
4.
Hydrants system
5.
6.
7.
8.
9.
10. Fire Water Tank and piping system including valves, high/low level, over
flow, metering, basin and circulation loop.
1.4.1.4
QUALIFICATIONS
A. The testing adjusting and balancing firm shall be certified by CSA. The testing and
balancing firm shall demonstrate technical proficiency by having passed the technical
certification tests as given by CSA. All balancing technicians involved by the testing
agency shall be trained and tested to CSA standards.
1.5.1
SUBMITTALS
Contractor shall prepare Prefunctional Checklists and Functional Performance
Test (FPT) procedures and execute and document results. All Prefunctional
Checklists and tests must be documented using specific, procedural forms in
Microsoft Word or Excel software developed for that purpose. Prior to testing,
Contractor shall submit those forms to the Witness.
Contractor shall provide Witness with documentation required for
Commissioning Work. At minimum, documentation shall include: Detailed
Start-up procedures, full sequences of operation, Operating and Maintenance
data, performance data and precommisssioning test procedures, Functional
Performance Test Procedures, control drawings, and details of Ownercontracted tests.
1.5.1.1
MEP SYSTEMS.
Contractor shall review and approve other relative documentation for impact on
FPTs of the systems:
Shop drawings and product submittal data related to systems or equipment to
be commissioned. The Subcontractor responsible for the FPT shall review and
incorporate comments from the Owner and A/E via the Contractor.
Incorporate manufacturers Start-up procedures with Prefunctional checklists.
Draft Test, Adjust and Balance (TAB) Reports: Review and provide comments
to Owner.
Factory Performance Test Reports: Review and compile all factory performance
data to assure that the data is complete prior to executing the FPTs.
Completed equipment Start-up certification forms along with the
manufacturers field or factory performance and Start-up test documentation:
Subcontractor performing the test will review the documentation prior to
commencing with the scheduled FPTs. Owner may require that system oneline diagrams and applicable Specification Section(s) be attached to the FPT
documentation.
3
Final TAB Reports: Subcontractor performing the test will review the
documentation prior to commencing with the scheduled FPTs.
Operating and Maintenance (O&M) information per requirements of the
Technical Specifications and Division 01 requirements: To validate adequacy
and completeness of the FPT, the Contractor shall ensure that the O&M manual
content, marked-up record Drawings and Specifications, component submittal
drawings, and other pertinent documents are available at the Project Site for
review.
1.5.1.2
ELECTRICAL SYSTEMS
Contractor shall prepare Prefunctional Checklists and Functional Performance
Test (FPT) procedures and execute and document results. All Prefunctional
Checklists and tests must be documented using specific, procedural forms in
Microsoft Word or Excel software developed for that purpose. Prior to testing,
Contractor shall submit those forms to the Owner for review and approval.
Contractor shall provide Witness with documentation required for
Commissioning work. At minimum, documentation shall include: Detailed
Start-up procedures, Full sequences of operation, Operating and Maintenance
data, Performance data, Functional Performance Test Procedures, Control
Drawings, and details of Owner-Contracted tests.
Contractor shall submit to Witness installation and checkout materials actually
shipped inside equipment and actual field checkout sheet forms used by factory
or field technicians.
Contractor shall review and approve other relative documentation for impact on
FPTs of the systems:
Shop Drawings and product submittal data related to systems or equipment to
be commissioned. Incorporate manufacturers Start-up procedures with
Prefunctional checklists.
Electrical Staturory Testing Reports: Review and provide comments to Witness.
Factory Test Reports: Review and compile all factory performance data to
assure that the data is complete prior to executing the FPTs.
Completed equipment Start-up certification forms along with the
manufacturers field or factory performance and Start-up test documentation:
Subcontractor performing the test will review the documentation prior to
commencing with the scheduled FPTs.
Final Reports: Subcontractor performing the test will review the documentation
prior to commencing with the scheduled FPTs.
Operating and Maintenance (O&M) information per requirements of the
Technical Specifications and Division 01 requirements: To validate adequacy
and completeness of the FPT, the Contractor shall ensure that the O&M manual
content, marked-up record Drawings and Specifications, component submittal
drawings, and other pertinent documents are available at the Project Site for
review.
2
2.1
STAGES.
PREPARATION PRECOMMISSIONING STAGE:
Provide additional requested documentation to the Witness, prior to O&M
manual submittals, for development of Prefunctional Checklist and Functional
Performance Tests procedures.
Typically, this will include detailed manufacturers installation and Start-up,
operating, troubleshooting and maintenance procedures, full details of any
Owner-contracted tests, full factory testing reports, if any, and full warranty
information, including all responsibilities of the Owner to keep the warranty in
force clearly identified.
With input from the BMS Provider, Clarify the operation and control of
commissioned equipment in areas where the Specifications BMS control
drawings, or equipment documentation are not sufficient for writing detailed
test procedures.
This information and data request may be made prior to normal submittals.
Prefunctional Checklists, Prefunctional Tests, and Start-up documents are the
normal procedure of ensuring that the mechanical, electrical, plumbing, and fire
protection system components are properly installed.
The Subcontractor in cooperation with the A/E and Contractor shall develop
Prefunctional Checklists and Prefunctional Tests during the Construction Phase.
Contractor shall prepare the Prefunctional Checklists using the manufacturers
and/or applicable codes and standards.
The Prefunctional Checklist form shall acknowledge that installation and Startup procedures were successfully adhered to and completely performed and
shall document relevant parameters (panel and equipment connections,
measured values, ground faults, trip settings, etc.). When indicated as
performing a checkout on multiple items or multiple procedure items,
Prefunctional Checklist forms shall itemize each individual item.
2.2
2.3
g. All tabulated data, motor amperage readings, valve tag verifications, and
other data required by Technical Specifications.
h. Where final balancing of a system or particular components of a system
are not specifically indicated to be performed by Owner's consultants,
Contractor shall provide final balancing and adjustments for operation
within specified tolerances prior to Functional Performance Test of such
system.
i.
j.
m. Review the Start-up documentation at the start of FPTs. Ensure that any
items indicated as outstanding in the Prefunctional Checklist is entered as
an Action Item and enter one if it is not. The Prefunctional Checklists and
Start-up tests/measurements shall be spot checked at the beginning of
8
2.4
PURPOSE OF ELECTRICAL
COMMISSSIONING TEST
FUNCTIONAL
PERFORMANCE
TEST.
optimal condition for occupancy and not simply relying on initial design
estimated settings.
U. Dynamic Graphics: The graphic for all components, systems, and areas
sampled and required to be represented by a graphic shall be checked
for adequacy and accuracy. Furthermore, when setpoints are required
to be adjustable, verify that they can be adjusted directly from the
graphic screen.
V. All interfaces between two systems or equipment of different
manufacturers must be checked for accuracy and functionality.
W. Contractor shall to the extent possible, load the heating and cooling
systems during initial FPTs to check the capacity of the building central
systems and initially optimize system settings. This will typically be
done using the preheat system to false load the cooling system. This
test will incorporate varying the load to check central systems response.
X. Crash Testing: Contractor shall analyze systems to identify possible
conditions where functionality may be compromised. Contractor shall
design non-destructive tests that will demonstrate either the automated
response to the conditions or so that team can identify the best method
for responding or fixing the condition. All tests and their findings shall
be documented in a Microsoft Excel spreadsheet.
2.5
Works testing of major items of plant and equipment is invaluable in insuring that they
are capable of meeting the specified requirements once delivered to site.
All testing shall be covered by job specific method statements, produced by the
Contractor and submitted to the Witness for comment, in good time, prior to the testing
taking place.
All testing shall be in accordance with the respective standards of manufacturers and
reference test procedures.
For off-site testing of any equipment a completed test certificate shall be provided. Tests
shall be authorised and signed and witnessed certificates shall be provided and included
in the Operating and Maintenance Manual.
2.6
Once on site and incorporated into the installed works, all major items of the plant shall
be subjected to the precommissioning and functional performance testing at the end of
the commissioning period, as identified in the project specification.
All testing shall be covered by job specific method statements, produced by the
Contractor and submitted to the the Witness for comment and approval, in good time,
prior to the testing taking place.
Signed and witnessed test certificates shall be provided for all on site tests, and shall be
included in the Operating and Maintenance Manual.
2.6.1
12
13
3
3.1
FOR
DEVELOPMENT
OF
PREFUNCTIONAL
Valves:
1. Operate all manual and automatic valves through their full stoke. Ensure
smooth operation through full stroke and appropriate sealing or shutoff.
2.
1.
Adjust faces of meters and gauges to proper angle for best visibility.
Mechanical Identification:
1. Verify that all valve tags, piping, duct, and equipment labeling corresponds
with the Drawings and indexes and meets requirements specified. Correct any
deficiencies for all piping and duct systems.
2. Adjusting: Relocate any mechanical identification device which has become
visually blocked by Work of this Division or other Divisions.
3. Cleaning: Clean the face of identification devices and glass frames of valve
charts.
D.
Mechanical Insulation:
1.
2.
Patch and repair all insulation that has been damaged after installation.
3.
Ensure the integrity of the vapor barrier around all cold surfaces.
E.
Piping:
a. Inspect all piping for proper installation, adequate support with appropriate
vibration isolation where applicable, and adequate isolation valves for required
service.
b. Flush and treat all piping as appropriate to the application and clean all
strainers.
c. Ensure that adequate drainage is provided at low points and venting is
provided at high points. Ensure that air is thoroughly removed from the
system as applicable.
d. Ensure that all piping is adequately supported and anchored to allow
expansion. As applicable, bump across the line pumps and inspect for
excessive pipe movement.
e. Pressure and/or leak test all applicable systems in accordance with
requirements in the applicable Specification Sections. Record pressure testing
results and certification that piping meets the Specification and submit with the
Prefunctional Checklist.
f.
Sterilize applicable piping systems as specified in Standars and Codes and
as required by regulatory authorities. Record the results of sterilization and all
parameters during this process and certify that the piping meets the
Specification. Include results with Prefunctional Checklist.
g. Submit test reports that document testing results and certification of
results with the Prefunctional Checklist.
h. Verify the operation of applicable safety relief valves, operating controls,
safety controls, etc. to ensure a safe installation. Document setting and actual
trip points of all such controls.
i.
Set and adjust fill, pressure, or level controls to the required setting.
j.
Compare installation with mark-up as-built Drawings to ensure the drawing
accuracy.
G.
AC Motors:
1.
a.
d. Measure voltage available to all phases at the time of initial connection and
after the motor has been placed in operation under load measure amps and
RPM.
e.
H.
5. Verify use of shielded cable where specified and check that shields have
been terminated properly.
6.
Verify grounding.
7.
8.
9.
10. Verify that factory test documentation is on file at the Project Site.
a. Starting procedures: Follow the manufacturers printed procedures with the
following as a minimum:
1) Ensure device and system that the drive is serving, is configured to
withstand the device operation specified as follows.
2) Verify, test and document safety circuits are active. Tag the safety circuit
termination at the VFD and safety device with the trip value.
3) Set all parameters required and verify all parameters have been
programmed consistently for all VFDs on the project. Coordinate with the BMS
relative to the interfaces (hard wired or software) and failure restart, status
interfaces, acceleration rates, feedback, alarm states etc.
4) Adjust the minimum voltage adjustment to enable starting but not to draw
excessive power at start.
5)
6)
9) Manually ramp fan speed from minimum to maximum and check for
excessive noise and vibration.
10) Identify any critical speeds to avoid and set these in the drive.
11) With the independent harmonic testing agency, check for acceptable
voltage and current distortion on the power system. Record the input and
output voltages and currents showing the harmonic content as a percentage of
the base frequency.
12) Measure and record overall efficiency at 50 percent, 75 percent, and 100
percent.
13) Record the motor terminal voltage.
14) Check operation prior to, during, and after a power outage to ensure
required sequences and system restart.
I.
3.
4. Verify discharge high limit controls are installed and functioning. Record
limit setpoint and operating parameters.
J.
Air Compressors:
4.
a.
b. Check that laboratory air compressor inlets are properly located for clean
air supply and that laboratory vacuum exhausts are properly located to prevent
contamination of public spaces.
c. Check that laboratory air compressor inlet filters and piping and laboratory
vacuum pump filters and discharge piping are clear.
d.
e.
f.
Check equipment vibration control supports and flexible pipe connectors
and that equipment is properly attached to substrate.
g.
h.
i.
j.
k.
l.
Check that all factory tests are filed at the Project Site.
m. Check that all documentation required for O&M and Start-up are filed at
the Project Site.
5. Starting Procedures: Follow the manufacturers printed procedures as a
minimum:
a.
Energize circuits.
d.
e.
f.
Adjust operating controls including pressure and vacuum settings per
direction of Owner.
g. Check operation prior to, during, and after a power outage to ensure
required sequences and system restart.
K.
Water Tank
2.
a.
b.
c. Ensure three (3) valve bypass, pressure gauges, and sample valve are
installed on the UV sterilizer and Pre and Final Filters.
d. Ensure isolation valves are installed throughout the system as required by
the Specifications.
e. Ensure that proper power source is provided and connected to the UV
sterilizer. Verify the BMS interface for on/off, high temperature alarm, and no
flow alarm.
f.
Enchure that each can be isolated for service, that each column is properly
secured to the frame, that the manual isolation valve is installed on the
common discharge header, that the resistivity monitor is installed and
connected to the BMS, and that the sample valve is provided.
g.
Verify that storage tank fill and level controls are installed and functional.
b.
c.
d.
Test the storage tank make-up and fill and associated alarming function.
e.
f.
Run system through all modes of operation and ensure that the controls,
alarms, and safeties are functional and properly adjusted.
g. Perform bacteria and Total Organic Content test as per applicable
Specification Section.
h. Test operation of system prior to, during, and after power outage to ensure
proper operation and system restart.
L.
Storage Tanks:
1. Inspect the tank for proper installation and support in conformance with
the manufacturers recommendations.
2. Verify that all required instrumentation is provided and installed in
accordance with the Contract Documents.
3. For pressurized tanks, pressure test the tanks per the requirements in the
applicable Specification Section and per the ASME Code where applicable.
4. Non-pressure Testing: Fill non-pressure water storage tanks to water
operating level to ensure structural integrity and freedom from leaks. Hold
water level for 2 hours with no drop in water level.
5. Repair leaks and defects with new materials and retest system until
satisfactory results are obtained.
6. Clean and disinfect water storage tanks for use with potable water systems
as specified in the respective Section.
7. Prepare and submit reports for all testing, purging, and disinfecting
activities.
8.
9.
Water Heaters:
Check for adequate steam supply and piping per manufacturers direction.
b.
e.
f.
g.
h. Test and adjust operating and safety controls. Replace damaged and
malfunctioning controls and equipment.
i.
N.
3.
c.
d.
e.
f.
Check equipment vibration control supports and flexible pipe connectors
and that equipment is properly attached to substrate.
g.
h. Check that safety valves have correct setting; greater than compressor
discharge pressure, but less than the pressure rating of system components.
i.
j.
k.
l.
Energize circuits.
b.
c.
d.
Verify air dryer is hardwired interlocked to prevent the compressor from
running unless the dryer is running.
e.
f.
g.
h.
O.
Hydronic Piping:
1.
7. Check air vents at high points of systems and determine if air vents are
installed and operating freely (automatic type) or to bleed air completely
(manual type).
8.
Set and coordinate automatic fill pressure and relief valve settings.
P.
1.
6.
Pumps:
1. Check suction line connections for tightness to avoid inducing air into the
pump.
2.
3.
4. Check motor for proper rotation. Rotation shall match direction of rotation
marked on pump casing.
5. Check that pump is free to rotate by hand. For pumps handling hot liquids,
pump shall be free to rotate with the pump hot and cold. If the pump is bound
or even drags slightly, do not operate the pump until the cause of the trouble is
determined and corrected.
6.
7.
8. Check that the proper overloads have been installed in the starter and that
overloads are the correct size.
9. Verify that the integrity of the vibration isolation is maintained throughout
the support and the piping connections.
10. Align pump within manufacturers recommended tolerances.
11. Ensure that all associated piping has been cleaned, tested and deareated.
12. Start the pump and check that all seal piping/installation is per
manufacturers instructions.
13. Check the general mechanical operation of the pump and motor.
14. Verify that all thermometers and gauges are installed, are clean and
undamaged, and are functional.
15. Verify that the check valve seal is appropriate for the application.
16. Check noise and vibration levels and ensure that they are within the
manufacturers recommended tolerances.
17. Check operating condition.
R.
Water Systems:
1.
4. Check that the each equipment is properly supported and restrained and
that it is installed with sufficient slope to the condensate outlet.
5. Start-up in accordance with manufacturer's Start-up instructions. Verify
high temperature cut out switch is set and hardwired interlocked to close all
valves on a trip. Test controls and demonstrate compliance with requirements.
Replace damaged or malfunctioning controls and equipment.
9. Record all parameters (flow, temperatures, pressures, etc.) and tests and
submit with Prefunctional Checklist Test form.
S.
Terminal Units:
4.
5.
Verify that the unit is installed per manufacturers instructions and details.
21
6.
7.
8. Check that the unit is properly labeled and/or a ceiling marker has been
provided for concealed terminal units.
9.
8. Ensure air inlet is free of obstructions. Start fans and ensure proper
rotation (as applicable). Measure and record motor amperage and voltage.
9.
10. Calibrate and adjust the airflow control parameters. Set applicable
minimum and maximum setpoints. Coordinate with the BAS provider as
necessary to obtain required flow parameters.
11. Check the heating device and control to ensure functionality and proper
installation. Check stroke and range on the valve and ensure that it closes and
seals tightly. Ensure the coils are undamaged, combed, and vented.
12. Ensure any hydronic heating elements are properly vented and that any
associated strainers are clean.
13. Verify the integrity of any vibration isolation devices.
14. Verify that thermostats or temperature sensors are in a proper location to
adequately represent space temperature. Verify temperature sensors not
scheduled to be installed are secured properly on the top of the unit
22
15. Temporary Closure: Verify VAV terminal units which are not scheduled to
operate are provided temporary closure of polyethylene film or other covering
that will prevent entrance of dust and debris unit is scheduled to operate
U.
Vacuum clean the fan wheel, fan cabinet, and entering air face of coils.
7.
Adjust and lubricate dampers and linkages for proper damper operation.
8. For field fabricated units, ensure the components are properly connected
within acceptable tolerances.
9.
Check that all sound attenuating devices are clean and properly installed.
10. Verify temperature sensing elements are secured properly with correct
support devices as recommended by manufacturer.
11. Verify any high static cut out switches are properly installed with copper
tubing, calibrated, tagged with trip set point, and wired.
12. Verify low temperature detection switches are hard wired interlocked to
turn off fan and close OA damper.
13. Seal all penetrations air tight and ensure access doors seat tightly.
Pressure tests the units to verify that they meet specified leakage.
14. Verify that the unit is secure on mountings and supporting devices and that
connections for piping, ductwork, and electrical are complete. Verify that proper
thermal overload protection is installed in motors, starters, and disconnects.
15. Ensure vibration isolation integrity is maintained throughout the air
handling unit installation and the connections to it.
16. Refer to AC Motors in this Section.
17. Refer to Fans in this Section.
18. Disconnect fan drive from motor, verify proper motor rotation direction,
and verify fan wheel free rotation and smooth bearing operation. Reconnect
fan drive system, align belts, and install belt guards.
19. Lubricate bearings, pulleys, belts, and other moving parts with factoryrecommended lubricants.
20. Comb coil fins.
21. Inspect coil piping connections and ensure that they are per the Contract
Documents. Validate that all thermometers, pressure gauges, test ports, and
balancing device connections are provided, accessible, and not plugged.
22. Install clean filters. Provide new filters at completion of Functional
Performance Tests.
23
23. Ensure that condensate drains properly and that the trap is adequate.
24. Stroke all valves and dampers to ensure free and full travel.
25. Pressure test units as required in the air handling unit Specification.
26. Refer to Division 25, BAS Commissioning, for procedures on starting
controls related to air handling units.
V.
Vacuum clean the fan wheel, fan cabinet, and entering air face of coils.
4.
Adjust and lubricate dampers and linkages for proper damper operation.
5. Verify that the unit is secure on mountings and supporting devices and that
connections for ductwork and electrical are complete. Verify that proper
thermal overload protection is installed in motors, starters, and disconnects.
6. Ensure that vibration isolation integrity is maintained with the fan
installation and connections to the fan.
7.
8. Properly align and tension all belts. Record tensioning parameters in the
Prefunctional Checklists.
9. Disconnect fan drive from motor, verify proper motor rotation direction,
and verify fan wheel free rotation and smooth bearing operation. Reconnect
fan drive system, align belts, and install belt guards.
10. Lubricate bearings, pulleys, belts, and other moving parts with factoryrecommended lubricants.
11. Stroke all dampers to ensure free and full travel.
12. Refer to CIBSE Code C for procedures on starting controls related to fans.
W. Air Cleaning:
1. Inspect installation and check for air leakage of unfiltered air while system
is operating.
2.
3.
4.
Metal Ductwork:
1.
Inspect all ductwork for damage and dents and correct any deficiencies.
2. Check ductwork system to ensure that all required dampers, vanes, access
doors, testing ports, and other appurtenances are required per the Contract
Documents.
3. Check all penetrations through building elements and ensure tightness and
integrity of fire ratings.
4. Leakage Tests: After each ductwork system is completed, test for
ductwork leakage in accordance with Standars and Codes.
24
Ductwork Accessories:
Install fusible links in fire dampers and adjust for proper action.
4.
5. Fire Damper Testing: Coordinate with the local authority. For every fire
damper, remove the fusible link and verify that the damper operates freely and
closes tightly. Reinstall the fusible link.
6. Cleaning: Clean factory-finished surfaces. Repair any marred or scratched
surfaces with manufacturer's touch-up paint.
3.2
25
4
4.1
FOR
DEVELOPMENT
OF
PREFUNCTIONAL
Thermographic Scanning:
Grounding Systems:
1.
D.
1.
a.
b.
c.
c.
d.
e.
E.
a.
b.
c.
Inspect grounding.
d.
c.
d.
e.
F.
a.
b.
c.
Inspect grounding.
c.
d.
e.
f.
Perform high voltage and low voltage winding and core resistance
measurements.
g. Check and confirm percentage of impedance is identical for all three
transformers comparing nameplates.
G.
a.
b.
c.
Inspect grounding.
d.
e.
f.
Check calibration/setting of protective devices from system coordination
study.
g.
c.
d.
e.
f.
g. Conduct operational voltage testing with line voltage from transformer only
and/or source feeder breaker open.
H.
a.
b.
Inspect grounding.
c.
d.
28
c.
I.
a.
b.
Inspect grounding.
c.
d.
e.
f.
g.
c. Conduct insulation resistance and over potential tests on each type of each
breaker element contacts, switchgear control wiring, breaker element control
wiring and each bus section.
d.
e.
f.
g.
h.
i.
Conduct operational/functional tests of protective relaying. Time-current
tests shall be conducted and trip points shall be set per Architect/Engineers
direction.
j.
1.
a.
29
c.
d.
K.
1.
a.
b.
c.
d. Conduct insulation resistance test on MCC busing, each type motor starter
unit (except for variable frequency drives), and each control circuit.
e. Conduct contact resistance and insulation resistance test of molded case
main and feeder circuit breakers.
L.
1.
a.
b.
c.
Inspect grounding.
1.
a.
30
c.
Review current readings for each panelboard to ensure loads are balanced.
d.
N.
1.
a.
c.
a.
b.
c.
d.
e.
f.
Ensure adequate access is provided to all panels and that documentation of
that panel is provided in it.
g.
Ensure all circuits for the loads are energized and ready for testing.
a. Test, calibrate, and set all digital and analog sensing, and actuating
devices.
1) Calibrate each instrumentation device by making a comparison between
the graphic display and the reading at the device, using an instrument
traceable to the National Bureau of Standards, which shall be at least twice as
accurate as the device to be calibrated (e.g., if field device is +/-0.5 percent
accurate, test equipment shall be +/-0.25 percent accurate over same range).
2) Record the measured value and displayed value for each device in the
Prefunctional Checklist.
3) Check each digital control point by making a comparison between the
control command at the control panel and the status of the controlled device.
4) Check each digital input point by making a comparison of the state of the
sensing device and the OI display.
5) Record the results for each device in the Building Automation System
Start-up checklist.
b. Verify operation of lighting controls (dimming, photo-control, regular
switching).
c.
Check loads on all breakers to ensure that the breaker is properly sized.
d.
e. For Operator Interfaces: Verify all elements on the graphics are functional
and properly bound to physical devices and/or virtual points and that hot links
or page jumps are functional and logical.
f.
g.
Verify the alarm printing and logging is functional and per requirements.
h.
P.
1.
a.
c.
Q.
a.
b.
e. Review height and locations of pull stations and visual alarms to comply
with ADA.
f.
Review that smoke and duct detectors are installed according to NFPA 90A.
g. Check that fire alarm system control panel is clear with no trouble or
ground faults.
h.
i.
1) Verify all elements on the graphics are functional and properly bound to
physical devices and/or virtual points and that hot links or page jumps are
functional and logical.
2)
3)
Verify the alarm printing and logging is functional and per requirements.
j.
R.
a.
b. Ensure the terminations are tight and all ancillary equipment completely
installed.
c.
d.
Energize Switch.
b.
e.
U.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k. Check and record engine oil level, radiator water level, and battery
electrolyte level.
l.
Piping System Tests: Complete system test in accordance with the
respective section.
m. Inspect the installation and access/clearance for service and maintenance
to ensure it meets the Project and manufacturers requirements.
n.
o.
p. Check that safety valves have correct setting; greater than compressor
discharge pressure, but not greater than pressure rating of system components.
q.
Check that all operating controls are set for initial safe operation.
34
35
5
5.1
5.2
COMMISSIONING PLAN
The Systems Commissioning Administrator (SCA) shall prepare a complete
commissioning plan that details the entire commissioning process for this
project. The plan shall include:
A. A narrative of the Systems Commissioning Administrator (SCA)s
responsibilities.
B. A roster of the commissioning team. Usually includes the administrator and
one representative form the owner, each contractor and subcontractor involved.
C. A preliminary commissioning schedule
D. Check sheets for each system and subsystem installation verification (FIV).
E. Check sheets for each system and subsystem operational performance test
(OPT). F. Check sheets for each system and subsystem functional performance
test (FPT). G. A narrative of the type and method of project communications.
PRE-SUBMITTAL REVIEW
Provide a pre-submittal review of all equipment and vendor submittals. Verify
that all submitted documentation meets or exceeds that of the design
documents. Furnish a submittal report to the design professional that details all
submittal deficiencies and areas of concern. The design professional will make
all decisions for approval of submittal data.
FIELD INSTALLATION VERIFICATION (FIV)
The Systems Commissioning Firm shall provide field installation inspection for
each system and subsystem covered in the scope of work for this project.
Provide an installation observation reports weekly to the General
Contractor/Construction Manager. The report shall cover any installation
deficiencies from plans and specifications. Provide a completed check sheet
verifying each system installation.
3OPERATIONAL PERFORMANCE TESTS (OPT)
The Systems Commissioning Firm shall provide Operational Performance Test
verification for each system and subsystem covered in the scope of work for
this project. Provide a completed check sheet verifying each system start up
and calibration
FUNCTIONAL PERFORMANCE TESTS (FPT)
36
37
B. Obtain and review shop drawings and submittals for installation criteria and
the required construction details, as they support and further define the
systems features.
C. The CSA Systems Commissioning Administrator (SCA) shall make general
inspections at the job site and shall review the following for configuration,
quality of construction, adherence to design requirements, and conformance
with shop drawings and submittal information. The Commissioner shall
periodically provide site observations to check the quality of general
construction as it pertains to the following:
1. Sewer lines - integrity, routing, grading, and backfill - installed per plans and
specifications.
2. Water lines integrity, routing, grading and backfill installed per plans and
specifications.
3. Electrical Feeders - integrity, routing, grading, and backfill - installed per
plans and specifications.
TESTS
A. Pressure Tests:
1. Sewer, Laboratory Waste and Vent Systems: Hydrostatically test the waste
and vent piping system. Apply pressure to 10 feet of water column for 60
minutes; no leakage allowed.
2. Water Systems - Potable & Non-Potable: Test the water piping with water to
a pressure to 100 psi for two hours. No decrease in pressure allowed. Provide a
pressure gauge with a shut off and bleeder valve at the Highest point to the
system tested. Inspect all joints in the system under test. The water system by
be tested as a whole or by sections.
3. Storm and Roof Drainage:
a. Hydrostatically test the waste and vent piping system. Apply pressure to 10
feet of water column for 60 minutes; no leakage allowed.
b. When freezing temperatures prevent testing with water, the test shall be
made with air.
A pressure of 10 psi shall be applied and maintained for 15 minutes without
loss of pressure. A mercury column gauge shall be used to register air pressure.
4 Electrical Systems Provide phase continuity test and other tests required by
local codes or authorities.
5. LAN cabling Provide a continuity and signal strength test.
5.4
Provide all observations and tests at a minimum the following equipment and
systems:
A. Prime Movers/Major Equipment:
1. AHU, FC, Fans, Pumps, Towers, Heat Exchangers, Chillers, and Boilers:
a) Condition of equipment as delivered/installed
b) Equipment data/compliance with specifications and shop drawings c)
Performance curves
d) Installation per design documents
B. Accessories:
1. Supply, Return, and Exhaust Air Systems:
a) Fire dampers/fit and integrity
b) Control dampers/fit and integrity c) Smoke dampers/fit and integrity d)
Isolation dampers/fit and integrity
2. Chilled, Hot, and Condenser Water Systems: a) Balance cocks/location and
accessibility b) Flow stations/location and accessibility
c) Strainers/location and accessibility and strainer mesh d) Isolation
valves/location and accessibility
e) Control valves/location and accessibility
3. Steam & Condensate Systems:
a) Traps/location and accessibility b) Drip legs and accessibility
c) Condensate return stations and accessibility d) Boiler feed systems
e) Deaerator systems
C. Distribution Systems:
1. Duct:
a) Size and configuration
b) Fittings/transitions and takeoffs
c) Seams and joints/integrity and sealing d) Hangers and bracing
e) Connections
f) Sealing/sealers and joints
g) Thickness per specifications/SMACNA standards
2. Pipe:
a) Size and configuration b) Fittings
c) Connections
d) Hangers and bracing
e) Materials per specifications
D. Terminal Units:
1. Air Terminal/Boxes:
a) Number, size, configuration per plans and specifications b) Balance dampers
(if applicable)
c) Controls components and configurations
d) Entrance and exit conditions per requirements
2. Coils:
39
40
Test and record Amps and Volts of all motors and electrical heat elements.
Test and record static pressure of discharge and return air.
Test and record static pressure loss across filters and coils.
Test and record all room and duct pressure transmitter control device set
points.
Balance and record all terminal box CFM, inlet & discharge static pressure,
maximum and minimum flow set point CFM. (l/s)
Balance and record all reheat coil CFM (l/s), discharge & inlet DB, and kW &
Voltage.
Balance and record all grille and register CFM. (Within 10% of design)
B. Provide copies of the certified balance report which will include all recorded
data as per certified balance procedures. Report shall include but not be limited
to the following:
Cover sheet indicating names of project, architect and engineer.
Certification form showing certificate number.
Instrument certification record.
Equipment forms showing manufacturer, model & serial number, motor data,
filter data, belt & pulley data.
Balance forms showing design data and final balance data.
Balance drawings showing location of all balanced devices with number
system referencing to the associated balance form.
HYDRONIC BALANCE
A. Adjust and balance all Hydronic systems to the design capacities in
accordance with the CSA procedural standard for testing, adjusting, and
balancing of Environmental Systems. Balance shall be, but not limited to the
following:
Test and record Amps, Volts and phase of all motors.
Balance and record all reheat coil GPM, balance valve set point, discharge &
inlet water pressure and temperature.
Balance and record all coil and Heat Exchanger GPM (l/s). Record balance
valve set point. Test and record inlet & outlet pressure and temperature.
Balance and record all pump flow, shut off head, discharge head, and suction
head.
Test and record Amps & Volts.
Test and record variable flow pump systems pressure set point and minimum
and maximum flow values.
B. Provide copies of the certified balance report which will include all recorded
data as per certified balance procedures. Report shall include but not be limited
to the following:
Cover sheet indicating names of project, architect and engineer.
Certification form showing certificate number.
Instrument certification record.
Equipment forms showing manufacturer, model & serial number, motor data,
filter data, belt & pulley data.
Balance forms showing design data and final balance data.
42
43
g) As Built Drawings.
5.5
TESTS
A. Acceptance Tests:
1. Flushing of Piping: Underground mains and lead-in connections to system
risers shall be flushed thoroughly before connection is made to sprinkler piping,
in order to remove foreign materials which may have entered the underground
during the course of the installation or which may have been present in existing
piping. The minimum rate of flow shall be not less than the water demand rate
of the system which is determined by the system design, or not less than that
necessary to provide a velocity of 10 feet per second (3 m/s), whichever is
greater. For all systems, the flushing operations shall be continued for a
sufficient time to ensure thorough cleaning. When planning the flushing
operations, consideration shall be given to disposal of the water issuing from
the test outlets.
B. Hydrostatic Tests:
1. All new systems including yard piping shall be hydrostatically tested at not
less than 200 psi (1380 kPa) pressure for two hours, or at 50 psi (345 kPa) in
excess of the maximum pressure, when the maximum pressure to be
maintained in the system is in excess of 150 psi (1035 kPa).
The test pressure shall be read from a gauge located at the low elevation point
of the individual system or portion of the system being tested.
Permissible Leakage: The inside sprinkler piping shall be installed in such a
manner that there will be no visible leakage when the system is subjected to
the hydrostatic pressure test. Refer to NFPA 24, Standard for the Installation of
Private Fire Service Mains and Their Appurtenances, for permissible leakage in
underground piping. The amount of leakage shall be measured by pumping
from a calibrated container.
2. Fire Department Connection: Piping between the check valve in the fire
department inlet pipe and the outside connection shall be tested in the same
manner as the balance of the system.
3. Corrosive Chemicals: Additives and corrosive chemicals, sodium silicate or
derivatives of sodium silicate, brine, or other corrosive chemicals shall not be
used for testing systems or stopping leaks.
4. Test Blanks: Whenever a test blank is used, it shall be of the self-indicating
type. Test blanks shall have red painted lugs protruding beyond the flange in
such a way as to clearly indicate their presence. The installer shall have all test
blanks numbered so as to keep track of their use and assure their removal
after the work is completed. .
C. Test of Dry-Pipe Systems:
1. Differential Dry-Pipe Valves: The clapper of a differential type dry-pipe valve
shall be held off its seat during any test in excess of 50 psi (345 kPa) to
prevent damaging the valve.
2. Air Test: In dry-pipe systems, an air pressure of 40 psi (276 kPa) shall be
pumped up, allowed to stand 24 hours, and all leaks that allow a loss of
pressure over 1-1/2 psi (10.4 kPa) for the 24 hours shall be stopped.
3. Operating Test of Dry-Pipe Valve: A working test of the dry-pipe valve alone
and with a quick- opening device, if installed, shall be made before acceptance
by opening the system test connection. Trip and water delivery times shall be
measured from the time the inspector's test connection is opened and shall be
recorded using the Contractor's Material and Test Certificate for Aboveground
Piping.
46
f) Clean Outs
g) Steam Traps & Pressure Reducing Stations
h) Eye wash stations
CLEANING Disinfection:
A. Observe disinfection of the water piping per the following manner procedures:
1. Clean and flush the water pipe with water until water at a remote tap is clear.
2. Fill the water systems with a solution containing 50 parts per million of
chlorine (minimum concentration). Allow the solution to stay in the water
system for 24 hours. Test the chlorine concentration at remote outlets to
ensure chlorine solution distributed throughout the system.
3. Flush the water system of the chlorine solution.
4. Allow clean water to stand in the system for 24 hours. Take a sample from a
remote tap for a bacteriological test.
5. Repeat steps I through 4 until a safe water system is obtained.
TESTS
A. Hot Water Heat Tracing:
1. Prior to start-up, with cold pipe, actuate circuit and verify total amp draw
return to length of installed cable.
2. Test the heater installed on the pipe prior to insulating with a 1,000-volt
direct current megger.
Minimum insulation resistance shall be 20 to 1000 megohms.
3. Temperature maintenance heater shall maintain 120 F (49 C) in the hot
water piping system as delivered at outlets. Hot water shall be available within
10 seconds under full flow conditions.
B. Pressure Tests:
1. Laboratory Waste and Vent Systems: Hydrostatically test the waste and vent
piping system.
Apply pressure to 10 feet of water (29.9 kPa) column for 60 minutes; no
leakage allowed.
2. Water Systems - Potable & Non-Potable: Test the water piping with water to
a pressure of 100 psi (690 kPa) for two hours. No decrease in pressure allowed.
Provide a pressure gauge with a shut off and bleeder valve at the Highest point
to the system tested. Inspect all joints in the system under test. The water
system by be tested as a whole or by sections.
3. Storm and Roof Drainage:
a. Hydrostatically test the waste and vent piping system. Apply pressure to 10
feet of water
(29.9 kPa) column for 60 minutes; no leakage allowed.
b. When freezing temperatures prevent testing with water, the test shall be
made with air. A pressure of 10 psi (69 kPa) shall be applied and maintained
for 15 minutes without loss of pressure.
4. Sanitary and Vent Systems:
a. Hydrostatically test the waste and vent piping system. Apply pressure to 10
feet of water
(29.9 kPa) column for 60 minutes; no leakage allowed.
48
b. When freezing temperatures prevent testing with water, the tests shall be
made with air. If tests are made with air, a pressure of 5 psi (34.5 kPa) shall
be applied and maintained 15 minutes.
C. Bacteriological Tests - Domestic Water Systems:
1. Have representative water samples taken and tested for a bacteriological
safe water supply system. Test the water samples for:
a. Presence of coliform.
b. HPC (Heterotrophic [Standard] Plate Count) test. c. Presence of
pseudomonas aeruginosa.
2. The test results must:
a. Show no colifom present.
b. Show a maximum of 200 organisms/ml by the HPC test. c. Show that
pseudomonas aeruginosa are not present.
3. If the tests exceed the limits specified, clean and test the water piping
system until acceptable results are obtained.
4. The bacteriological tests shall be performed shortly before the system is
accepted by the Owner. These bacteriological tests should be taken at various
remote locations. There should be a minimum of 10 locations for this project.
5.7
b) Check pressure differential on all floors between stairway and floor with
Magnehelics.
c) Check force to open door with pressurization fan on.
d) Check relief at top of stair: UBC states 1,500 cfm (750 l/s) exhaust quantity
(hood or rotating
vane anemometer required).
13. Elevator Testing:
a) Recall is tested with testing of elevator lobby smoke detectors. b) Test
fireman's service key (Phase II) on recalled elevators.
c) Override of elevator to fire f1oor with door close button function.
d) Take elevator to fire floor and push door open button with test of releaseof-button" to stop door opening at any time. Once door is fully open with
button depressed, door should stay open with release of button.
e) Emergency Power Operation: Turn off normal power and allow generator to
start and supply power to the building. Each car will return to primary floor.
Last car down will park with door open. Once all are down, transfer power to
car of choice with key switch on elevator control panel.
14. Fire Pump: Test all input signals from fire pump; Pump run, pump trouble,
generator run, generator trouble. Test pump start sequence from alarm
condition.
15. Emergency Power: Test all input signals from transfer switch, generator
and fuel system. Test generator start sequence through transfer switch.
5.8
a) Measure insulation resistance of each bus run phase-to-phase and phase-toground for one minute. Test voltage shall be 1,000 volts DC for equipment
rated 600 volts. Insulation resistance values shall be in accordance with the
manufacturer's specification or 100 megohms for 600-volt equipment when not
specified by the manufacturer.
b) Perform contact resistance tests on each connection point of uninsulated bus.
6. Circuit Breaker Electrical Test:
a) Contract Resistance shall be measured and be compared to adjacent poles
and similar breakers. Deviations of 50 percent or more shall be investigated.
a) Perform insulation resistance test pole-to-pole and from each pole to ground
with breaker closed and across open contacts of each phase. Test voltage shall
be 1,000 volts DC. Resistance valve shall not be less than 50 megohms.
b) Instantaneous pickup current shall be determined by run-up or pulse
method. Clearing times should be within four cycles or less. Current levels
should be within 20 percent of manufacturer's published values.
c) Time-current characteristic tests shall be performed by passing 300 percent
rated current through each pole separately. Trip times shall conform to
standars.
7. Ground Fault systems Test:
a) Inspect neutral main bonding connection to assure:
1. Zero sequence system is grounded upstream of sensor.
2. Ground strap sensing systems are grounded through sensing device.
3. Ground connection is made ahead of neutral disconnect link on zero
sequence sensing systems.
8. Inspect control power transformer to insure adequate capacity for system. a)
Monitor panels shall be manually operated for:
Trip test
No trip test
Non-automatic reset
b) Inspect core balance transformers for geometrical alignment about all
current carrying conductors.
c) Set pickups and time delay settings according to engineer's specification.
d) Insulation resistance test on system neutral with neutral-ground disconnects
removed.
Resistance shall be minimum 100 ohms preferably 1 megohms or greater.
e) Determine the relay pickup current by primary injection at the sensor and
operate the circuit interrupting device. Pickup currents shall be within 10
percent of device setting and in no case greater than 1,200 amperes.
f) The relay timing shall be tested by injecting 150 percent and 300 percent of
pickup current into sensor. Total trip time shall be electrically monitored. Relay
timing shall be in accordance with manufacturer's published time-current
characteristic curves but in no case longer than one second for fault currents
equal to or greater than 3,000 amperes.
g) System operation shall be tested at 57 percent of rated voltage.
h) Test zone interlock systems by simultaneous sensor current injector and
monitoring zone blocking function.
9. Transformer Tests - Dry Type:
53
5.9
5.10
Upon completion of the works the l Services Contractor shall provide Operating and
Maintenance Manuals.
A complete draft version of the O&M Manuals shall be issued to the Witness a minimum
of 4 weeks prior to Practical Completion, for comment. The O&M Manuals shall include a
complete set of "As Built" drawings that shall have been previously drawn up and had
any subsequent comments incorporated into the draft O&M Manual.
The completed O & M Manuals shall be provided in both hardback and compact disc (CD)
format. The As Fitted drawings shall be provided both on paper and on CD to preferably
the latest AutoCAD format but not earlier than version 14.
Three copies of the final document in hardback format shall be provided, and one set of
the Manual and As Fitted drawings shall be provided in CD format.
58
AS FITTED DRAWINGS
Four weeks prior to the end of the contract the Contractor shall hand to the Witness a
complete set of As Installed drawings. The record drawings must be completed within
14 days prior to practical completion and the following information shall be included:
(1)
A layout of lighting arrangements which shall include the location of
luminaires and switch
locations, their phasing and distribution board circuit
references;
(2)
A layout of all small power circuits indicating outlets and equipment, their
phasing and distribution board circuit references;
(3)
A distribution layout of all distribution boards and equipment, indicating their
phasing and circuit references together with routes of sub-main cabling;
(4)
A schematic and building layout of all fire and intruder alarm equipment,
indicating their
type, zoning and control;
(5)
A schematic and building layout of all mechanical systems including but not
limited to CWS,DHWS, ventilation, heating and plant room schematics detailing full
schedule of equipment.
(6)
All bonding and supplementary bonding conductors that have been installed.
(7)
Locations and routing of all, ventilation duct work and associated equipment.
(8)
Schematic drawings of mechanical control panels and associated field wiring
The Contractor shall also compile and hand to the Witness three copies of the operation
and maintenance manuals, 14 days prior to practical completion. These manuals shall
include all of the information detailed within the Standard Specification, with particular
regard to the following:
The Contractor shall produce as fitted drawings using the current version of the AutoCAD computer aided design package.
The Contractor shall submit draft copies of the required documentation for comment prior
to the required dates for final documentation and shall incorporate all comments required
by the Project Manager/Electrical Engineer into the final document issue.
59
BUILDING LOGBOOK
The Contractor shall be responsible for the derivation and compilation of the Building
Logbook. Unless agreed with the Witness the logbook will be the CIBSE Building Logbook.
TM31
The Engineer will furnish the Contractor with electronic copies of the contract documents
for design and supportive calculations where necessary for the Contractor to edit and
utilise as the basis for all information to be included within the document.
60
COMMISSIONING DOCUMENTATION
All documentation to be handed over to the Client shall be submitted to the Witness for
reviewl a minimum of one month prior to planned handover.
Any documentation found not to be in compliance with the agreed format and content
shall not be considered by the Witness for acceptance, unless changes have been
previously agreed in writing.
A second set of all witness tests and inspections shall be provided. This shall form part of
a separate report for the handover documentation, which shall form part of the contents
of the building logbook.
61
10
TRAINING
The training sessions shall be structured to the level of technical understanding held by
the Facilities and Building Maintenance staff and shall be to an agreed programme and
format.
The Witness shall review and comment on the content.
62
11
DEMONSTRATIONS
Provide for demonstrations of the new facilities for all systems referred to in this
specification to the technical witness staff. This is extended to include for the full
explanation of the installations technical details to the on-site maintenance staff.
Throughout the duration of the demonstrations include for necessary operatives to be
available for emergency attendance if required.
63