1.1
GENERAL
The code serves to establish the minimum requirements for fire
safety provisions. It takes into account the function, design,
management, operation, and maintenance of buildings to secure
the life safety of occupants in the event of a fire.
1.1.1
1.1.2
1.1.3
(b)
(c)
1.1.4
1.1.6
1.1.7
1.1.8
1.1.9
1.1.10
1.1.11
1.1.12
1.1.13
1.1.14
1.1.15
1.1.16
1.1.17
For
Laboratories
Handling
1.2
1.2.1
DEFINITIONS
The abbreviations listed in the following table are used in this
Code:Abbreviation
BS
CP
Cl.
NFPA
AS
ISO
SS
PSB
Abbreviation
Definition
British Standard
Code of Practice
Clause
National Fire Protection Association
Australian Standard
International Organisation For
Standardisation
Singapore Standard
PSB Corporation
1.2.2
Approved
1.2.2(A)
Ancillary office
1.2.2(B)
(a)
Ancillary usage
(b)
1.2.3
1.2.4
1.2.5
Area of Building
(a)
(b)
(c)
(a)
(b)
(c)
Area of refuge
Atrium
An atrium within a building is a large open space created by an
opening, or a series of openings, in floor assemblies, thus
connecting two or more storeys. Atrium is covered at the top and
is used for purposes other than those associated with small shafts,
such as for stairs, elevators and various services. The sides of the
atrium may be open to all floors, to some of the floors, or closed to
all or some floors by unrated or rated fire-resistance construction.
1.2.6
Area of building
Atrium
Basement Storey
(a)
Basement storey
(b)
1.2.7
Boundary
1.2.8
Construction provided :
Cavity barrier
(a)
(b)
1.2.9
Ceiling
1.2.10
Circulation space
1.2.11
Code of practice
1.2.11(A)
1.2.12
1.2.13
Compartment wall
& compartment
floor
1.2.14
Concealed space
(cavity)
1.2.15
Corridor
Compartment
1.2.16
(b)
(c)
Cubical extent of
building or
compartment
1.2.17
Dead-end
1.2.18
Direct distance
1.2.19
Door
1.2.20
Electro- magnetic
or electromechanical
device susceptible
to smoke
(a)
(b)
(c)
(d)
1.2.21
Element of Structure
Element of
structure
(a)
(b)
(c)
(d)
An external wall,
(e)
A separating wall,
(f)
(g)
1.2.22
Emergency
generator
1.2.23
Emergency
lighting and
exit lighting
(a)
(b)
1.2.24
Exit
1.2.25
Exit door
1.2.25(A)
Exit access
1.2.25(B)
1.2.26
Exit passageway
Exit staircase
1.2.28
External cladding
1.2.29
(a)
External exit
staircase
(b)
1.2.30
External exit
passageway
1.2.32
Fire resistance
1.2.33
Fire stop
10
1.2.34
Fire-fighting lobby
1.2.35
For
air-conditioning
(a)
Flexible joints
and flexible
connections
(b)
1.2.35(A)
and
mechanical
ventilation
systems:
1.2.35(B)
1.2.36
Habitable floor
1.2.37
The habitable height is the height measured from the lowest level
of fire engine accessway or access road (applicable to buildings
under purpose group II) to the finished floor level of the highest
habitable floor.
Habitable height
1.2.38
Height of building
1.2.39
High hazard
occupancy
(a)
(b)
(c)
(d)
(e)
1.2.40
Loadbearing wall
1.2.41
Masonry
1.2.42
Noncombustible
material
(a)
(b)
(c)
Any material of density less than 300 kg/m3, which when tested
to BS 476: Part 11, does not flame for more than 10 seconds
and the rise in temperature on the centre (specimen)
thermocouple is not more than 35oC and on the furnace
thermocouple is not more than 25oC.
1.2.43
Non-load bearing
wall
1.2.44
Notional boundary
1.2.45
Occupant load
12
(b)
Permitted limit of
unprotected area
1.2.46(A)
Private lifts are passenger lifts which are meant for the exclusive
use of occupants in the building, and are located to open its door
directly into private enclosed spaces. Private lifts shall exclude
vehicle lifts, home lifts and stair lifts.
Private lifts
1.2.47
Protected shaft
1.2.48
Protecting
structure
(a)
(b)
(c)
A roof.
1.2.49
Public building
1.2.50
Purpose group
13
Remarks:
1.2.51
Relevant Authority
1.2.52
Relevant boundary
1.2.53
Rooflight
1.2.54
Room
1.2.55
1.2.56
Separating wall
1.2.57
Smoke
check door
1.2.58
Smoke-stop lobby
1.2.58(A)
Tenancy unit
1.2.59
Travel distance
an exit staircase, or
an exit passageway, or
an open exterior space,
unless otherwise permitted under this Code as in the case of hotel
bedrooms (Cl.2.7.4), residential apartments or maisonettes (Cl.2.4.7)
and exit to Area of Refuge (Cl. 2.2.6(f)).
14
1.2.60
Two-way escape
(Remoteness of
exits)
(a)
Two-way escape
(i)
(ii)
(b)
Reduction in exit
separation
(c)
Exit separation
measured along
exit access corridor
15
(d)
1.2.61
(i)
(ii)
(iii)
(b)
Any part of the external wall which has less than the relevant
fire resistance required in Cl.3.5, and
(c)
One-way travel
Unprotected
area
1.2.62
Vertical
exit
1.2.63
Wall surface
(a)
(b)
(ii)
(iii)
(iv)
fitted furniture.
16
Purpose Group II
Residential.
Schedule 3.1
Schedule 3.2
Schedule 3.3
Schedule 4
Purpose Group IV
Schedule 5
Purpose Group V
Schedule 6
Purpose Group VI
Schedule 7.1
Schedule 7.2
Community Centres.
Schedule 7.3
Schedule 7.4
Schedule 7.5
Public Libraries.
Schedule 7.6
Religious Buildings.
Schedule 7.7
Schedule 7.8
Schedule 7.9
Schedule 7.10
Schedule 8
17
SCHEDULE 2
OTHER RESIDENTIAL
APARTMENTS, MAISONETTES
FUNCTIONAL SPACES
REMARKS
OCCUPANCY LOAD-
SCHEDULE 3.1
PURPOSE GROUP-III
INSTITUTIONAL
BUILDING TYPES -
HEALTH-CARE OCCUPANCY
(HOSPITAL, CLINIC & POLYCLINIC)
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/
Visitors Lounge
Out-patient Waiting Area
OCCUPANCY LOAD
(m2/person)
15.0
OCCUPANCY LOAD
(m2/person)
3.0
3.0
non-simultaneous
1.5
Admin Offices
Doctors Offices
Nursing Station
Staff Lounge
10.0
10.0
10.0
3.0
Consultant/Treatment/
Examination Room
Therapy Centre
Operation Theatre
Surgical Viewing Gallery
Patient Accommodation
5.0
10.0
7.5
3.0
20.0
10.0
10.0
Intensive Care
Room (max 2 beds)
Ward
Laboratories
Pharmacy
20.0
20.0
Kitchen/Housekeeping
Laundry*(1)
Toilet/Locker/ Changing Room
10.0
10.0
non-simultaneous
Storage
Canteen
Restaurant
Shop
30.0
1.5
1.5
5.0
19
OCCUPANCY LOAD-
SCHEDULE 3.2
PURPOSE GROUP-III
INSTITUTIONAL
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/
Visitors Lounge
non-simultaneous
OCCUPANCY LOAD
(m2/person)
3.0
3.0
Admin Office
Staff Office
Library/Reading Room
10.0
10.0
Stack Area
Reading Area
10.0
5.0
Common Room
Multi-purpose Room
1.5
1.5
Student Bedroom
Wardens Accommodation
Sleeping Quarters/ Dormitories
Detention Room
Sick Room
Toilets/Bath/ Changing Rooms
10.0
15.0
3.0
3.0
non-simultaneous
non-simultaneous
1.5
1.5
10.0
Laundry*(1)
Service Area
Storage Area
Dining/Canteen
10.0
10.0
30.0
1.5
Shop
5.0
30.0
20
OCCUPANCY LOAD-
SCHEDULE 3.3
PURPOSE GROUP-III
INSTITUTIONAL
BUILDING TYPES -
SCHOOLS,
COLLEGES,
COMMERCIAL
SCHOOLS,
VOCATIONAL INSTITUTION, POLYTECHNIC, UNIVERSITY
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
non-simultaneous
OCCUPANCY LOAD
(m2/person)
3.0
3.0
Admin Office
Staff Office
Class Room
Computer Classroom
Seminar Room
Lecture Room
Library
10.0
10.0
Commercial School
Others
1.5
1.5
3.0
Stack Area
Reading Area (Sch)
(Others)
1.5
1.5
10.0
5.0
5.0
Sch/Colleges
Others
1.0
1.5
Stage Area
Viewing Gallery
Design Studio
Laboratories
Workshop
Club/Society Room
Sick Room
Storage Area
Kitchen/Service Area
Toilets/Changing Room
Canteen
Mechanical Plant Room
3.0
1.5
5.0
5.0
5.0
1.5
30.0
10.0
1.5
30.0
non-simultaneous
non-simultaneous
21
OCCUPANCY LOAD-
SCHEDULE 4
OFFICE
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
non-simultaneous
Admin Office
Business Centre
Meeting/Seminar Room
Archive/Library
OCCUPANCY LOAD
(m2/person)
3.0
3.0
10.0
10.0
1.5
10.0
5.0
Stack Area
Reading Area
Filing Room/Store
Computer Room
Design Studio
Drafting Office
Trading Floor
Trading Gallery
Banking Hall
Deposit/Strong Room
Machine/Printing Room*(2)
10.0
5.0
5.0
5.0
2.0
1.5
3.0
30.0
10.0
Restaurant
Canteen
Staff Canteen
Shop
Toilets
Storage Area
Mechanical Plant Room
1.5
1.5
1.5
5.0
30.0
30.0
non-simultaneous
22
OCCUPANCY LOAD-
SCHEDULE 5
PURPOSE GROUP V-
SHOPS
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Fixed Corridors
Waiting Area/Visitors Lounge
Atrium Floor/Concourse
Exhibition/Promotion Area
OCCUPANCY LOAD
(m2/person)
3.0
3.0
3.0
1.5
non-simultaneous
non-simultaneous
Shop Floor
Showroom
Supermarket/Bazaar
Department Store
5.0
5.0
5.0
5.0
Restaurant
Canteen
Cafeteria
Fast Food Outlet
1.5
1.5
1.5
1.0
Admin Office
Toilets/Staff Rest Room
10.0
non-simultaneous
Storage
30.0
30.0
23
OCCUPANCY LOAD-
SCHEDULE 6
FACTORY
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
non-simultaneous
Admin Office
Meeting/Seminar Room
Library
OCCUPANCY LOAD
(m2/person)
3.0
3.0
10.0
1.5
10.0
5.0
Stack Area
Reading Area
Workshop
Laboratories
Exhibition
10.0
5.0
1.5
Production Area*(2)
10.0
Packing/Distribution Area
Material/Product
General Storage
10.0
30.0
Multi-purpose Area
Staff Recreation Room
Staff Rest Room
Staff Canteen
Toilets/Changing/ Locker Room
Sick Room
non-simultaneous
1.5
1.5
non-simultaneous
non-simultaneous
non-simultaneous
non-simultaneous
30.0
24
OCCUPANCY LOAD-
SCHEDULE 7.1
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/
Visitors Lounge
Atrium Floor/Concourse
Hotel Bedroom
Service Apartment
Bar/Pub
Discotheque
Night Club
Restaurant
Exhibition/Multi-purpose area
Function/Ball Room
Pre-function Room
Business Centre
Admin Office
Conference Room
Meeting/Seminar Room
Library
Shop
Health Club/Centre/SPA*(3)
Swimming Pool Deck
Swimming Pool
Squash Court
Staff Rest Room
Staff Canteen
Toilets/Changing/ Locker Room
Kitchen/Service Area
Laundry*(1)
OCCUPANCY LOAD
(m2/person)
3.0
3.0
3.0
non-simultaneous
4 to a room
Per unit
15.0
Gross area
Gross area
Gross area
1.0
1.0 (including dine & dance area)
1.5 (including dine & dance area)
1.5
1.5
1.5
10.0
10.0
1.5
1.5
10.0
5.0
non-simultaneous
Stack Area
Reading Area
5.0
5.0
10.0
2 per court
1.5
10.0
10.0
non-simultaneous
non-simultaneous
30.0
25
OCCUPANCY LOAD-
SCHEDULE 7.2
BUILDING TYPES -
COMMUNITY CENTRES
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
Concourse
Admin Office
Multi-purpose Hall
Meeting Room
Library
Health/Fitness Room/SPA*(3)
Games Room
Canteen/Cafeteria
Kitchen
Toilets/Changing Room
Storage Area
OCCUPANCY LOAD
(m2/person)
3.0
3.0
3.0
non-simultaneous
10.0
1.5
1.5
10.0
5.0
Stack Area
Reading Area
5.0
1.5
1.5
10.0
30.0
non-simultaneous
30.0
26
OCCUPANCY LOAD-
SCHEDULE 7.3
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
OCCUPANCY LOAD
(m2/person)
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
Concourse
Admin Office
Archive/Library
Reading Area
non-simultaneous
3.0
3.0
3.0
10.0
10.0
5.0
Stack Area
Reading Area
Exhibition Area
Auditorium/Theatrette
Storage Area
Shop
Restaurant
Canteen/Cafeteria
Kitchen
Staff Rest Room
Toilet/Changing Room
1.5
1.5
30.0
5.0
1.5
1.5
10.0
non-simultaneous
non-simultaneous
30.0
27
OCCUPANCY LOAD-
SCHEDULE 7.4
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Foyer
Corridors
OCCUPANCY LOAD
(m2/person)
3.0
3.0
non-simultaneous
3.0
10.0
10.0
by numbers or
non-simultaneous
1.5
3.0
1.5
3.0
5.0
5.0
30.0
1.5
1.5
10.0
non-simultaneous
30.0
28
OCCUPANCY LOAD-
SCHEDULE 7.5
BUILDING TYPES -
PUBLIC LIBRARIES
FUNCTIONAL SPACES
REMARKS
Reception Area
Foyer
Lobby/Corridors
Waiting Area/Visitors Lounge
Admin Office
Library Area
OCCUPANCY LOAD
(m2/person)
3.0
3.0
3.0
10.0
10.0
5.0
Stack Area
Reading Area
3.0
1.5
1.5
30.0
Cafeteria/Snack Bar
Kitchenette
1.5
10.0
Toilets
Mechanical Plant Room
30.0
non-simultaneous
29
OCCUPANCY LOAD-
SCHEDULE 7.6
BUILDING TYPES -
RELIGIOUS BUILDINGS
FUNCTIONAL SPACES
REMARKS
Reception Area
Foyer
Lobby/Corridors
Waiting Area/Visitors Lounge
OCCUPANCY LOAD
(m2/person)
3.0
3.0
3.0
non-simultaneous
Admin Office
Meeting/Seminar Room
Class Room
10.0
1.5
1.5
Prayer Hall/Gallery
Choir Gallery
1.5
1.5
Crematoria
1.5
Mortuary
30.0
Refreshment Area
Kitchenette
Staff Quarter
1.5
10.0
15.0
General Storage
Toilets/Changing Room
Mechanical Plant Room
30.0
30.0
non-simultaneous
30
OCCUPANCY LOAD-
SCHEDULE 7.7
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Concourse/Foyer
Waiting Area/Visitors Lounge
Admin Office
Meeting/Seminar Room
Multi-Purpose Sports Hall
Gymnasium
Training Area
Grandstand/Seating Area
Squash Court
OCCUPANCY LOAD
(m2/person)
3.0
3.0
3.0
non-simultaneous
10.0
1.5
3.0
3.5
3.0
1.5
2 per court
5.0
2.5
Restaurant
Cafeteria
Fast Food Outlet
Kitchen
1.5
1.5
1.0
10.0
General Storage
Toilet/Changing Room
30.0
non-simultaneous
30.0
31
OCCUPANCY LOAD-
SCHEDULE 7.8
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
non-simultaneous
OCCUPANCY LOAD
(m2/person)
3.0
3.0
Admin Office
Meeting/Seminar Room
10.0
1.5
Bowling Alley
1.0
Amusement Park
Billiards Room
1.0
5.0
Skating Rink
Rink Area
Spectator Area
3.0
1.5
Discotheque
Pub/Bar
Karaoke Lounge
Night Club
Gross area
Gross area
Gross area
Gross area
Health Club/Centre/SPA*(3)
5.0
Restaurant
Cafetaria/Snack Bar
Fast Food Outlet
Kitchen/Service Area
1.5
1.5
1.0
10.0
Toilet/Changing Room
General Storage
Mechanical Plant Room
30.0
30.0
non-simultaneous
32
OCCUPANCY LOAD-
SCHEDULE 7.9
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area
non-simultaneous
OCCUPANCY LOAD
(m2/person)
3.0
3.0
Admin Office
Meeting/Seminar Room
10.0
1.5
Dining Area
Hawker Centres
Fast Food Outlets
Others
1.5
1.0
1.5
Bar/Pub
Lounge
Kitchen/Service Area
Gross area
1.0
2.5
10.0
Storage Area
Toilet/Changing Room
Staff Rest Room
Mechanical Plant Room
30.0
30.0
non-simultaneous
non-simultaneous
33
OCCUPANCY LOAD-
SCHEDULE 7.10
BUILDING TYPES -
BUS TERMINAL,
TERMINAL
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
non-simultaneous
TRAIN
3.0
3.0
3.0
Admin Office
Meeting/Seminar Room
Ticketing Office
Business Centre
10.0
1.5
10.0
10.0
Bus Terminal
Others
1.5
3.0
Restaurant
Cafeteria
Fast Food Outlet
Kitchen/Service Area
1.5
1.5
1.0
10.0
Shop
5.0
AIRPORT,
OCCUPANCY LOAD
(m2/person)
Concourse
Passenger Arrival/
Departure Areas/Foyers
STATION,
30.0
30.0
non-simultaneous
non-simultaneous
34
FERRY
OCCUPANCY LOAD-
SCHEDULE 8
BUILDING TYPES -
FUNCTIONAL SPACES
REMARKS
Reception Area
Lobby/Corridors
Waiting Area/Visitors Lounge
non-simultaneous
OCCUPANCY LOAD
(m2/person)
3.0
3.0
Admin Office
Meeting/Seminar Room
Packaging Area
Goods Storage
General Storage
10.0
1.5
10.0
30.0
30.0
Loading/Unloading Area
4 per Bay
1.5
10.0
30.0
non-simultaneous
non-simultaneous
Note:
a)
b)
For building types not included in the above tables, occupancy load calculation shall be based on
the figures established for buildings within the same purpose group, or as otherwise determined by
the Relevant Authority.
*(1)
Laundry Areas equipped with machine operation, occupancy may be calculated at 15.0sq m per
person.
*(2)
Production Area whether automated or not , shall be calculated on the basis of 10.0m per person
*(3)
35
Diagram
1.2.17
DEAD-END CORRIDORS
c. Example of two common types of dead-end corridors. Both dead-end pockets serve as
traps because travel into them does not lead to an exit; the egress path must be reversed
to reach an exit staircase
36
Diagram
1.2.60(a)(i) to (a)(iv)
Remoteness of exit staircase
Arrangement of exits
Diagram 1.2.60(a)(i)
Diagram 1.2.60(a)(ii)
Diagram 1.2.60(a)(iii)
Diagram 1.2.60(a)(iv)
37
Diagram 1.2.60(a)(v)
Remoteness of exit staircase
Arrangement of exits
38
Diagram 1.2.60(c)
Remoteness of exit staircases
Arrangement of exit staircases
Remoteness of exits is measured along 1-hour rated corridor with hour fire doors.
In place of measuring physical distance between exit stair enclosures, distance for
purposes of determining remoteness is permitted to be measured along a protected
corridor.