Anda di halaman 1dari 12

Systems Unit Testing

Environmental Health & Safety

EHS GENERATION SERVERS / SYSTEM TESTS


CHP PRODCUTION

CHQ QUALITY AND CHS SANDBOX

01-EHS Servers and Systems.docx

Page 1 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety
TABLE OF CONTENTS

1.

TESTING SERVICES ...................................................................................................................................................... 3


1.1.
1.2.
1.3.

2.

SDS MANUAL REPORT SHIPPING

TESTING LABEL PRINTING ........................................................................................................................................ 10


4.1.

5.

SDS CREATION

TESTING REPORT SHIPPING ....................................................................................................................................... 7


3.1.

4.

3
4
4

TESTING REPORT CREATION ..................................................................................................................................... 5


2.1.

3.

WWI SERVICE
GLM (LABEL) SERVICE
EXPERT SERVICE

LABEL PRINTING

10

TESTING EXPERT RULES ........................................................................................................................................... 11


5.1.

EXPERT RULES

01-EHS Servers and Systems.docx

11

Page 2 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety
1. TESTING SERVICES
1.1. WWI SERVICE
Functional Requirement: Used to generate Safety Data Sheets and for report shipping.
Transaction: CGSADM
Detailed Testing Steps:
1. Check SM59 entry EHS_WWI_MSDS

2. Click the test connection icon

3. A succesful test looks like this

01-EHS Servers and Systems.docx

Page 3 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety
Test Status:

1.2. GLM (LABEL) SERVICE


Functional Requirement: Used for printing labels
Detailed Configuration Steps:
1. Check SM59 entry EHS_WWI_MSDS

2. Test Connection

Test Status:

1.3. EXPERT SERVICE


Functional Requirement: Executing Expert rules and populating the EHS property tree with the appropriate data.
Detailed Configuration Steps:
1. Check SM59 entry EHS_EXPERT

01-EHS Servers and Systems.docx

Page 4 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety

2. Connection Test

Test Status:

2. TESTING REPORT CREATION


2.1. SDS CREATION
Functional Requirement: Create a report so that it is saved in the report information system
Transaction: CG02
Detailed Testing Steps:
1. Go to transaction CG02 and find specification 000000019008
2. Create Report

01-EHS Servers and Systems.docx

Page 5 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety

3. Generation Variant EU-GB-SDS


4. Message at the bottom of the screen should show
5. The WWI monitor (CG5Z) will show your username and the status should display completed

6. Look at the report information system

01-EHS Servers and Systems.docx

Page 6 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety

7. It should display a released report as shown.

8. Clicking on the report icon will bring the finished report up for viewing.
Test Status:

3. TESTING REPORT SHIPPING


3.1. SDS MANUAL REPORT SHIPPING
Functional Requirement: Create a report so that it is saved in the report information system
Transaction: CG02
Detailed Testing Steps:
1. Go to transaction CG02 and find specification 000000019008
2. Look at the report information system

01-EHS Servers and Systems.docx

Page 7 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety

3. It should display a released report as shown.

4. Go to the menu item

5. Use material number 4071108


6. Use report recipient 590696
7. Use the Process parameter immediately and communication type INT

01-EHS Servers and Systems.docx

Page 8 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety

8. An order should have been generated at the bottom of the screen


9. Transaction CVD1 should have this order number

10. This is the status it should be. It should also be bundled with a cover sheet.

Test Status:

01-EHS Servers and Systems.docx

Page 9 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety
4. TESTING LABEL PRINTING
4.1. LABEL PRINTING
Functional Requirement: Printing labels requires a Synchronous server connection, which is different than the
normal report generation that uses a Asynchronous connection.
Transaction: ZLABEL
Detailed Testing Steps:
1. Go to transaction ZLABEL and use the material scenario

2. Click on the Label tree icon


3. Information should look like this meaning the material has been set up for label printing

01-EHS Servers and Systems.docx

Page 10 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety
4. Double click on SHIPPING LABEL 3 x 5 (General) and then hit the eyeglasses to activate previewing the label.
The label will display in microsoft word.

Test Status:

5. TESTING EXPERT RULES


5.1. EXPERT RULES
Functional Requirement: Expert rules are a way for us to automate classification and enables consistency of
data througout our system.
Transaction: CG02
Detailed Testing Steps:
1. Go to transaction CG02 and find specification 000000019008
2. Highlight the specification and go to the menu item as shown

3. Choose the expert rule ZEXP_COMP

EHS-Exp: Standard Composition

4. Hit the green check


01-EHS Servers and Systems.docx

Page 11 of 12

Saved on :
12/29/2014
11:59 PM

Systems Unit Testing


Environmental Health & Safety
5. The results should look like this

Test Status:

01-EHS Servers and Systems.docx

Page 12 of 12

Saved on :
12/29/2014
11:59 PM