PROJECT
CHAPTER I
EXECUTIVE SUMMARY
1.
INTRODUCTION
The Bhairon Ghati Hydroelectric Project located in
Uttarkashi district of
Rishikesh
(via Tehri-
SCOPE OF WORKS
The Bhairon Ghati HE project envisages construction of :
El 2630.00 m;
1 no. desilting chamber of length 230 m (L) and size 12.0 m (W)x 17 m
(H) to remove silt particles of size 0.2 mm and above;
1-1
a 5.1 km long and 4.5 m dia head race tunnel terminating in a surge
shaft
an underground
190 m long tail race tunnel 5.0 m diameter D Shape to carry the
power house releases back to the river
3.
HYDROLOGY
The river Bhagirathi drains a catchment area of about 2660 sq. km at the
proposed dam site. The water availability for the project i.e. the dependable
flows both for 90% and 50% dependable year have been assessed, based on
Regional model incorporating glacial cover, snow and forest cover and
incorporating data of 17 Gauge Discharge sites (13 CWC sites and 4 state
Govt. sites) in the region utilising the available data for the period 1975-76 to
2001-2002 for many of the sites. The computed inflow series worked out has
been utilized for Power Potential Studies.
1-2
293.18
51.49
11.13
17.12
The design energy for tariff at 95% availability in a 90% dependable year has
been worked out as 279.45 GWh.
A pondage of 0.853 M cum has been provided in the diversion dam which
would enable the station to operate as peaking station.
The pondage is
equivalent to 231.94 MWh which is sufficient to operate the station for 3.57
hours.
5.
6.
ENVIRONMENTAL ASPECTS
The project site is located in reserve forest area in Bhagirathi river basin. The
submergence area is 13.27 ha, and majority of land falls under the category
of forest land (8.36 ha). About 0.55 ha of land is coming under reservoir
1-3
Based
on
assessment
of
environmental
impacts,
8.
Civil Works
164.94
91.35
Sub Total
256.29
40.53
Total (Generation)
296.82
Transmission Works
7.50
Grand Total
304.32
FINANCIAL ASPECTS
As indicated above, the Bhairon Ghati HE Project, with an estimated cost
(Generation only) of Rs. 296.82 Crores (including IDC of Rs. 40.53 Crores)
and design energy of 279.45 GWh in a 90% dependable year is proposed to
1-4
be completed in a period of 5
years.
CONCLUSIONS
Bhairon Ghati HE Project involves simple civil works and could be completed
in
90% dependable year. The cost per MW installed work out to Rs.3.94 Crores.
The Preliminary Feasibility Report indicates that the scheme merits
consideration for taking up Survey & Investigation and preparation of DPR.
1-5
CHAPTER II
BACKGROUND INFORMATION
2.1
GENERAL
In Nov.2000, Uttaranchal State was carved out of thirteen hill districts of
Northern U.P. The state borders with Nepal and Tibet on the east, Central
Himalayas on the north, Haryana and Himachal Pradesh on the west and
northwest respectively.
Geophysically the state has four Mountain Zones namely Foot hills, Lesser
Himalayas, Greater Himalayas and Trans-Himalayas. The mountains are
covered with perpetual snow and glaciers and has gifted the north India a
perennial river system of the Ganga and its tributaries. The tributaries of
Ganga, namely Alaknanda, Bhagirathi, Yamuna and Sarda originate from
the foothills of snow capped peaks and glaciers in the Central Himalayas and
incise their respective courses through the rugged terrain, splash and surge
the steep
potential for
2-1
State has a geographical area of 53119 sq. km which is 1.62% of the total
area of the country and supports 84.8 lakh population which is 0.83% of
the total population of India.
more than 500 is about 11.4% (1991 Census). The existing majority of
smaller settlements of Uttaranchal pose a serious challenge for economic
infrastructure and lack of services to the far flung places in the hilly terrain
makes Uttaranchal as one of the extremely backward states of India.
It has 76.1% electrified villages as compared to 75.3% of villages of U.P.
The average per capita consumption of electricity is 245.57 kWh whereas
Dehradun and Nainital consume 480.81 and 447.33 kWh respectively
with a minimum consumption of 43.7 kwh in Uttarkashi.
2.2
Requirement
1110
Delhi
Availability
1108
Shortage(-)/
Surplus (+)
(-) 2
%age
0.2
19350
18741
(-)609
3.1
Haryana
18138
17839
(-)299
1.6
Himachal Pradesh
3293
3206
(+) 87
2.6
6635
5899
(-) 736
11.1
Punjab
28780
27577
(-)1203
4.2
2-2
State
Availability
Rajasthan
Requirement
24745
24495
Shortage(-)/
Surplus (+)
(-)250
Uttaranchal-U.P
Northern Region
%age
1.0
48332
43545
(-)4787
9.9
150383
142410
(-)7973
5.3
2.3
Shortage(-)/
Surplus (+)
0
%age
Chandigarh
Peak
Peak Met
Demand
180
180
Delhi
3118
2879
(-)239
7.7
Haryana
3000
2900
(-)100
1.6
Himachal Pradesh
562
562
0.0
1209
999
(-) 210
17.4
Punjab
5420
4936
(-)484
8.9
Rajasthan
3700
3657
(-)43
1.2
Uttaranchal-U.P
7584
6887
(-)607
9.2
Northern Region
24773
23000
(-)1773
7.2
0.0
main resources
potential available along the river drops besides the use of fossil fuel.
Presently the ratio of thermal generation and Hydro-electric generation in
Uttaranchal Power grid, is quite disproportionate. With the diminishing coal
resources and difficult oil position all over the
2-3
existing
installed
generating
capacity
in
the
State is about 1286 MW ( 2003 fig) and the whole is contributed by hydro
generation. There is no thermal power generation in the state . The major
hydro power stations under construction in the state are (i) Maneri Bhali,
Stage-II (304 MW), (ii) Lakhawar Vyasi, Stage-I (300 MW), (iii) Lakhwari
Vyasi, Stage-II (120 MW),
(v)
Vishnuprayag Scheme (400 MW), (vi) Tehri Dam Project, Stage-I (1000 MW),
(vii) Tehri Dam Project, Stage-II (1000 MW),
(400 MW), and (ix) Dhauliganga H.E. Project, Stage-I (280 MW).
With rising hydro power generation and improving efficiencies in distribution
of electricity, Uttaranchal hopes to offer energy at stable prices for ecofriendly industrial development. Though the state is more or less sufficient
in its energy generation to meet its own requirement, there is an urgent need
to develop its huge untapped hydro power potential in an early and efficient
manner, manage efficiently the hydro generation capacity of existing power
stations and to develop and promote new Hydro projects with the purpose
2-4
of harnessing hydropower resources in the state for economic well being and
growth of the people in the whole region.
In order to meet the load demand satisfactorily, it is considered essential to
maintain a minimum gross margin of about 30 per cent over the projected
peak demand while planning for expansion of power supply facilities.
To bridge the gap between the demand for power and the availability of
power, some of the major hydro-electric schemes identified in Ganga Valley
for development are indicated below :
i
Tapovan
Vishnugad viii
(360 MW)
ii
Bowala
Nandprayag ix
(132 MW)
iii
iv
xi
Pancheshwar Dam
Loharinag
Pala
(520 xii
MW)
vi
vii
xiii
Dhauliganga, Stage-II
PRESENT STUDIES
2.5.1 With a view to prioritize the large number of identified schemes to harness
vast untapped hydro resources in the order of their attractiveness for
implementation, Ranking studies were carried out by CEA.
Subsequently,
2-5
2-6
CHAPTER III
THE PROJECT AREA
3.1
GENERAL
The Bhairon Ghati H.E. Project is located on Bhagirathi river immediately after
the confluence of Jadhganga river joining it from the north at Bhairon Ghati
township. The river originates of E1 7010 m from Gangotri glaciers and flow
west wards. It passes through the rugged terrain, incise its course through
steep gradients. The Bhairon Ghati H.E. Project is second H.E. Project on
Bhagirathi after Gangotri H.E. Project for development of hydro power in
cascade. Bhairon Ghati H.E. Project utilise the river bedfall of about 100 m
with the intake located at bed level of E1 2610 m and tail race outlet level river
bed at E1 2510.m.
The Bhairon Ghati H.E. Project is a Run-off-the-River scheme with the
arrangement of dam and gates a small diurnal storage is created.
It is
132.0 m.
3-1
3.2
CLIMATE
The available IMD observatory is at Dehradun which hardly represents the
climate of Uttarkashi District. However at Dehradun peak winter extend from
Dec. to Jan. months where the temperature remains at 20 C and during MayJune months the maximum temperature is around 400 C.
Rainfall during
monsoon period (June to Sept. ) is about 2770 mm. Large climatic variations
are experienced with in the sub basins at higher altitudes in the sub basins of
the Ganga. The project is located on the Bhagirathi basin the climate of
Bhairon Ghati could be considered more synonymous to Badrinath Metstation (IMD) which is in the adjoining Alaknanda basin. Here substantial
snowfall occurs during winter months ( Dec.-April) with average seasonal
snowfall of about 4600 mm. Although some snowfall is experienced in other
months also except during June and July months.
3.3
4% population as
persons per sq. km. as against that of 116 persons per sqkm of the state.
The litracy rate both among total (men and female) and female is lowest in the
district standing at 47.2% and 23.6% as against state average of 59.6 and
3-2
42.9% respectively.
3-3
CHAPTER IV
TOPOGRAPHY AND GEOTECHNICAL ASPECTS
4.1
gradients.
The
major
tributaries
of
Bhagirathi,
Alakananda,
Yamuna, Tons originate from the foot of glaciers and snow capped
peaks.
7010 m at the foot of glaciers and flow westwards, direction before it joins
Alkananda at Devprayag.
Present PFR studies do not envisage topographical surveys and hence
this write up is confined to physiographical aspects only.
4.2
REGIONAL GEOLOGY
The topography of the area around the proposed scheme is located in inner
parts of
Lesser
Himalayas and
extremely rugged. In
outer parts of
Central
Himalayan
is
River
which
originates form
4-1
numerous streams such as Jadhganga, Jalandra Gad and Siam Gad. These
streams appear to be subsequence to joints in granite. The drainage pattern
in Central Crystalline country is rectangular. In the rock of
Group,
Garhwal
and the
Further downstream of
Crystalline
sedimentaries,
possibly
Central
equivalent to Martloi
The tectonic
Central Crystallines
4-2
4.3
and
installed
site is located at an
Markande
for
capacity of 65
encounter problems of snow ice covering the entire river section and
avalanches during the winter months.
At the proposed
550E
diversion
site,
the
river
Bhagirathi
flows from
pegmatite veins is exposed on both the banks of the river upto a height of
nearly 60-70 ms. At this height, both the banks have detached/transported
blocks of rocks with soil and support a forest. farther higher up, both the
banks of the river are covered with forest with occasional exposed rock
along the alignment of the dam. The tourmaline granite is white in colour
with dark coloured laths and specks of tourmaline and is designated as
gangotri granite. It is intrusive in the county rock which are represented
essentially by granite gneiss with subordinate bands of schists, quartzite,
phyllite and amphibolite.
4-3
The diversion site of the proposed HE. Scheme has a geological and
topographical, Setting similar to that of the diversion site of the Gangotri
HE. Scheme, located about 9 Km. farther upstream Consequently, the
proposed diversion site also shows similar geological and topographical
deficiencies as far as siting of a dam at the site is concerned.
These
The
diversion
EL 2610.0 m
and
may
The depth of overburden in the river section at the dam site may be
high and may be of the order of over 10-15 m.
3.
The base width of the gorge at the dam site, limited to approximately
30-40 m is completely occupied by the river
for locating the sedimentation/ de-silting
structure.
Therefore, the
The tourmaline granite is the steep gorge of the river at the diversion
site is highly
jointed
and some of
the
extent of
4-4
5.
The head race tunnel which would conduct the water to the power
house is located on the left bank of the river Bhagirathi. HRT is
aligned is the direction S 800 E N 800 W.
dam site and, for about one-half of its total length would be driven
through the tourmaline granite and remaining one-half of the tunnel
upto the power house site would be driven essentially though the
granite gneiss with subordinate bands of schist, quartzite, phyllite
and amphibolite
of
the
These rocks
power
house for
Scheme
was originally
with
suggested
for an
site
location. The alternative site lies about 750 m upstream of the site
proposed earlier. At the alternative site granite-gneiss are exposed
earlier. At the alternative site granite gneiss are exposed at the
motor road level. However,
4-5
4.4
GEOTECHNICAL APPRAISAL
The proposed Bhairon Ghati Hydroelectric Project envisages to. utilize the
head along Bhagirathi River between the confluence of Jadhganga with
Bhagirathi and Dhorali. The diversion structure of this scheme is proposed to
be located in narrow and deep valley of Bhagirathi just downstream of the
confluence where the powerhouses is proposed to be located. The valley of
intake structure is expected to be narrow one with sub vertical abutments. It
is suggested that the final location of the diversion structure be decided after
of over burden in the river bed and stability of abutments. The site exposes
biotite granite, which is intruded by tourmaline granite. It is medium to coarse
grained and occasionally porphyritic. The 5.1 km long headrace tunnel may
encounter these biotite granites intruded by tourmaline granite, aplite and
pegmatite. The rock is expected to provided fair to good tunneling media
except in the reaches where there are closely
jointed,
sheared or locally
4-6
Narula (1991) that the strain buildup in different sectors of this domain is
taking place at different locales and in Uttarkashi-Kumaon sector, this is
Concentrated around the MCT as evidenced by the clustering of the seismic
events in this subdomain to be around, this structural dislocation. The seismic
status,infact has been a subject of interest for quite some time, though direct
geological evidences of geotectonic activity have not been recorded in the
area. According to Narula (1991), the project area falls in Garhwal Seismic
Block which, is constrained by Alaknanda tectonic flux fault..in the east and
Kautir or Kinnaur Faults in west. This domain contains another tectonic flux
fault which is located in the project area.
MBT & MCT are the two major dislocation features of significance in the
project area located about 20 km to 35 km in the southern direction.
Seismically the project area traverses through highly active Himalayan
seismic belt and falls in seismic zone V of the seismic zoning map of
India [ IS 1893 (Part-I): 2002]. Therefore, a suitable seismic factor would
have to be adopted for designing the structures in the area.
4.6
Refraction Survey
conducted at
presence of rock line at shallow depth near the banks but the rock line
goes below 5-25 meters from the river bed.
Based on velocity model three broad layers can be classified, a thick
alluvium, an intermediate layer and rock with different units of subsurface
layers (Plate-4.1).
4-7
CHAPTER - V
HYDROLOGY
5.1
GENERAL
The Ganga river is one of the holiest rivers in India and many temples and
religious places are situated on its banks right from its origin to its confluence
near Sagar Island with Bay of Bengal. It drains an area of 8.61 lakh sq km
and the basin is one of the most fertile basins of the country.
Bhagirathi and Alaknanda are the two major tributaries of Ganga which
originate from Bhairon Ghati and Kamet glacier in Uttarkashi and Chamoli
districts respectively of Uttranchal state. Bhagirathi originates at an elevation
of 7010 m while Alaknanda rises at an elevation 7800m. Both the Bhagirathi
and Alaknanda rivers join at Deoprayag and thereafter it is known as Ganga.
Jadhganga s the first major tributary of Bhagirathi originating near Tagala at
an elevation 5300m and joins Bhagirathi at Bhairon Ghati. The river has very
steep slopes in upper reaches and most of the area is covered by permanent
snow and glaciers. Due to steep slopes and area covered by snow, there
exists considerable quantity of perennial flow and as such have a large
potential for hydropower development, though irrigation may not be feasible
due to non existence of command area. CEA had identified several hydro
electric sites in the basin.
5 -1
HYDROMEOTEROLOGICAL DATA
No rainfall and discharge data at Bhairon Ghati site is available. However,
observed discharges from 1971 72 at Uttarkashi (CA=4504 sq km) are
available. The site is maintained by CWC. Discharge data for longer periods
are available at 17 G&D sites (13 CWC sites and 4 States Governments) in
the region, which are much downstream of Bhairon Ghati site.
The data
availability is given as under which has been utilised for developing the
Regional Model.
Table -1
Sl.
Name of
No.
Station
1
Tehri
River
Organisation
Period
Bilanganga
CWC
1975-76 to 2001-02
Joshimath
Alakananda
CWC
1975-76 to 2001-02
Tehri
Bhagirathi
CWC
1975-76 to 2001-02
Deoprayag
Ganga
CWC
1975-76 to 2001-02
Maror
Nayar
CWC
1975-76 to 2001-02
Deoprayag
Bhagirathi
CWC
1975-76 to 2001-02
Rudraprayag
Mandakini
CWC
1975-76 to 2001-02
Rishikesh
Ganga
CWC
1975-76 to 2001-02
Rudraprayag
Alakananda
CWC
1975-76 to 2001-02
10
Nandkesri
Pinder
CWC
1994-95 to 2001-02
11
Chandrapuri
Mandakini
CWC
1976-77 to 2001-02
12.
Karnprayag
Pindar
CWC
1976-77 to 2001-02
13
Uttarkashi
Bhagirathi
CWC
1971-72 to 2001-02
14
Raiwala
Ganga
State Govt.
1946-47 to 1983-84
15
Maneri
Bhagirathi
State Govt.
1964-65 to 1984-85
16
Lambagarh
Alakananda
State Govt.
1969-70 to 1990-91
17
Tapovan
Alakananda
State Govt.
1973-74 to 1981-82
5 -2
Long term flood peaks are available at Raiwala on Ganga (1901 to 1992),
Tehri on Bhagirathi (!963 to 1978), Maneri at Bhagirathi (1964 to 84) besides
at G&D sites on Alaknanda, Sarda, Tons and Yamuna rivers.
5.3
The general
5 -3
The linear regional model was developed for Bhagirathi and Alaknanda basin.
After studying the physical parameters responsible for run off for each
catchment upto G&D site, the one parameter, two parameter, three parameter
and four parameter linear models have been developed for each 10 daily
block period. The one parameter model considers the specific yield of G&D
sites Vs catchment area, whereas the remaining models consider the
catchment area, glacier area, forest area, net snow area, mean
catchment rainfall and the specific
yield.
annual
5 -4
Units:m3/sec
Items
June I
June II
June III July I July II July III Aug I Aug II Aug III
90%
75.0
98.7
50%
138.5
183.9
Average
149.9
187.7
Sep I
Sep II
Sep III
Oct I Oct II
Oct III
90%
88.7
69.8
53.8
42.5
28.5
27.9
24.0
20.9
18.0
50%
162.4
125.5
87.1
66.0
47.5
44.0
39.9
32.8
27.5
Average
170.3
131.5
93.1
69.6
52.9
47.4
43.0
34.7
29.4
Dec I
Dec II
Dec III
90%
12.7
12.1
10.3
12.9
12.3
12.5
12.2
11.0
10.3
50%
20.4
19.5
18.8
19.6
19.6
19.1
18.5
17.9
17.4
Average
21.6
20.9
20.4
20.1
19.9
19.7
19.4
18.3
17.8
Mar I
Mar II
Mar III
90%
10.4
10.0
10.7
11.9
10.4
16.9
26.3
31.6
45.5
50%
17.1
17.5
18.9
20.3
25.6
33.0
45.2
60.1
79.6
Average
18.2
19.0
19.8
21.4
26.7
35.2
48.4
65.6
83.5
5.4
5 -5
Return Period
Methodology
100 years
(m3/sec)
5192
500 years
(m3/sec)
-
3588
4560
4397
5125
3432
8495
PMF
m3/sec
8495
(5 G&D sites).
5.5
SEDIMENTATION
Since Bhairon Ghati site HE scheme is identified as run of the river scheme,
the sedimentation studies are not considered necessary as in the case of
storage structures. However, based on the experience gained at variousi
Power Stations in that valley, it is proposed to exclude silt particles of size
0.25 mm and above from the water before it enters the power house. This
aspect will be considered while designing the civil structures.
5 -6
5.6
OBSERVATION OF CWC
The draft report
5 -7
CHAPTER VI
CONCEPTUAL LAYOUT AND PLANNING
6.1
INTRODUCTION
Bhairon Ghati H.E. Project is proposed as Run-off-the River scheme on the
river
underground
LAYOUT STUDIES
6.2.1 The Bhagirathi river rises at EL 7010 m and falls steeply untill Gaumukh at EL
4000 m to Bhairon Ghati, the river bed fall is about 1000 m in 50 km stretch.
Thereafter, it runs in a gentle to steep slopes in various stretches and is joined
by Jadhganga at EL 2625.0 m.
As per CEA assessment studies the hydro-potential of river Bhagirathi is
proposed to be exploited by potential schemes in a cascade development and
6-1
the projects serially planned are Gangotri, Bhairon Ghati, and Harsil Schemes
now proposed for PFR studies.
6.2.2 The entire stretch of river between proposed diversion site of Bhairon Ghati
scheme to power house site was inspected by WAPCOS expert team and it
was observed that both the banks of Bhagirathi are occupied by massive
steep rocky slopes highly jointed and
expected to extend 10-15 m deep. The pondage created at this site selected
shall be within safe levels of the upstream projects.
6.2.3 As per CEA proposal, the diversion site for Bhairon Ghati H.E. scheme as
proposed d/s of the confluence of Jadhganga, the diversion site is kept at the
same location with river bed level EL 2610.0 m.
House site opposite to Sarita Gad as proposed by CEA is not found suitable
due to stability problems.
during there site visit which is about 750 m u/s of the site proposed by CEA
and an underground power house is proposed by WAPCOS instead of
surface power house.
6.3
6.3.1 The aspect of isolating the site for construction activity in the deep river valley
portion was examined for two scenarios i.e. with and without the provision of
diversion tunnel through abutment.
narrow valley it was not found practical to isolate the construction area without
the provision of diversion tunnel.
6-2
6.3.2 A diversion tunnel of 4.5 m diameter circular and 500 m long is proposed
along left bank to divert the discharge of 80 cumecs for the construction of
dam & appurtenant
works.
excess
150 m d/s of the dam axis are proposed. The u/s coffer dam will be 7 m high
with 6 m base width while the d/s coffer dam will be 6 high with base width of
6 m. These structures are proposed of masonry type with colcrete.
6.4
DIVERSION DAM
6.4.1 The type of dam to be adopted i.e Earth dam or concrete dam is governed by
the topographical, geotechnical
downstream slope of 0.8:1 is proposed for the dam section keeping in view
the seismicity of the area (zone V, as per BIS 1893)
6-3
6.4.2 Reservoir
Keeping in view the storage characteristics of the valley upstream, the crest of
spillway is proposed at El 2617.5 m. The crest of power intake is kept 10.5 m
lower then the MDDL of El 2630.0 m. This is to ensure minimum water
cushion requirements above the intake tunnels from air entrainment
considerations. Storage to meet the diurnal peaking requirements has been
provided between MDDL and FRL as it is a Run-off the River type
development. Accordingly, MDDL and FRL are proposed at El 2630.0, and El
2642.0 m respectively which provide live storage of around 0.853 M cum.
6.4.3 Spillway & Energy Dissipation
An ogee spillway with radial gates and breast wall is proposed to pass the
design flood of 8495.0 cumecs corresponding to probable maximum flood.
Three bays, each of clear opening of size 13.0 m x 17.5 m (height) are
proposed to cater design flood discharge. Radial gates will be operated by
means of hydraulic hoists. Provision of stoplog gates with gantry crane is also
made.
Since this project is located in the high altitude area (about El 2650 m above
MSL), and most of the time the reservoir water surface will be under sub-zero
temperature. To generate power for maximum period and for smooth running
of the power plant, deicing arrangement are proposed to be provided.
Energy dissipation is proposed through a trajectory type bucket as tail water
depth fall short of post jump depth requirements during high discharges.
Trajectory bucket with tip angle of 35o would through the jet of water through
the air and into the plunge pool. Protection works in the form of concrete
6-4
Layout
details
of
Dam
and
Spillway
are
shown
in
Drg
6.5.1 One intake structure is proposed on the left bank of the river upstream of
the Diversion structure with its invert at El 2619.5 m i.e. 2.0 m above the
spillway crest level to avoid entry of rolling debris into the water conductor
system during floods. The intake tunnel of 5.0 m dia (D-shaped) is proposed
on the left bank to carry design discharge of 80.0 cumec (including 20%
flushing discharge). A trashrack is proposed at the entry so that debris
/particles exceeding 75 mm do not enter the water conductor system.
6.5.2
cumecs and is provided with a gate on downstream end to isolate for routine
maintenance. The bed of the trough is provided with a longitudinal duct of 2.0
m dia to remove the silt laden water through a silt flushing tunnel to the river
downstream.
6-5
long to meet the surge shaft. The alignment of the tunnel has been optimally
fixed to provide adequate rock cover below the nallah crossings.
6.6.2 The excavated tunnel section is proposed to be provided with suitable support
system depending upon the type of rock strata met. Accordingly, the entire
tunnel reach has been tentatively divided into 4 categories depending upon
the type of rock i.e. Good, Fair, Poor and Very Poor. It is presumed that 20%
of the tunnel reach encounters poor/very poor rock conditions while in
remaining reach Good/Fair rock conditions are met. A 300 mm thick PCC
lining of M20 grade concrete is proposed for the headrace tunnel. Provision
for contact grouting & consolidation grouting has also been made.
The details of the Rock
WAP/PFR/BHAIRON GHATI/1006/R1.
6.7
6.7.1 An 10.0 m dia and 80.0 m high orifice type Surge Shaft is proposed at the end
of headrace tunnel to release the effect of mass oscillations in the tunnel and
to provide immediate storage requirement near the power house in case of
sudden acceptance of load. The bottom elevation of Surge Shaft has been so
fixed as to provide adequate water cushion below the minimum down surge
level. Similarly, it is ensured that maximum upsurge level is contained within
the Surge Shaft.
6-6
POWER HOUSE
The underground power house is proposed as the river banks are steep and
there is paucity of space for surface power house. The underground power
house complex comprises of one cavern of 21.5 m width. The machine hall is
15.5 m wide, it house 2 units of 32.5 MW each along with 20 m long service
bay. The generator floor level is kept at EL 2514.5 Centre line of units is at EL
2509.5 m and invert level of draft tubes kept at EL 2504.5 m. EOT crane of
130/25 tonnes capacity shall be provided at crane beam level at EL 2522.5 m
and travel up to service bay end also. The two main inlet valves, one for each
6-7
unit, is also provided. The transformer bay is 6 m wide inside the main power
house cavern to accommodate transformer and GIS.
A cable carriage is
provided from this cavern to the outdoor switchyard at the roof level. The
draft tubes shall be by a draft tube gate fitted with gantry crane installed in
the transformer cavern. The TRT of 5.0m dia (D-shaped) and 190m long shall
have reverse slope to meet the river bed level. The power house cavern as
well as the transformer bay shall be approached by an access tunnel starting
from the main road.
6.9
6.9.1 General
The proposed 65 MW Bhairon Ghati Hydro-Electric Project would have
underground type power house. The installed capacity would be provided by
2 nos. Vertical Axis Francis turbine driven generating units of 32.5 MW each.
It is proposed to provide Inlet Valve of Butterfly type for each turbine, which
would be accommodated in the powerhouse cavern.
The generation voltage of 11 kV would be stepped up to 220 kV through a
three phase 38 MVA, 11/220 kV ODWF type unit step up transformers for
each unit located in power house cavern. The 11 kV isolated phase bus ducts
would connect the 11 kV generator terminals with 11 kV bushings of step up
transformers. The 220 kV terminal of the transformers would be connected
with 220 kV Gas Insulated Switchgear (GIS) located on the floor above the
transformers in powerhouse cavern.
The layout of generating equipments, unit step up transformers, switchyard
etc. are indicated in the drawings no. WAP/PFR/BHAIRON GHATI/1007(R1)
&1008(R2).
6-8
ii)
iii)
Upstream Levels
FRL
EL 2642.0 M
MDDL
EL 2630.0 M
Tailrace Levels
Maximum
EL 2515.0 M
Minimum
EL 2513.0 M
Average
EL 2514.0 M
Heads
113.90 M
99.90 M
Rated head
108.90 M
6-9
c)
32.5 MW
ii)
Power factor
0.9 lag
iii)
Speed
300 RPM
iv)
Class of Insulation of
stator and rotor winding
Class 'F'
Generation Voltage
11 kV
v)
6-10
EOT Crane
The heaviest equipment which the powerhouse crane is required to handle
during erection and subsequently during maintenance is the generator rotor.
The weight of the generator rotor has been estimated to be about 112 tonnes.
It is proposed to provide one EOT crane of 130/ 25 tonnes capacity.
6.10
ii)
Drainage System
iii)
Dewatering system
iv)
High pressure compressed air equipment for governor and MIV etc.
v)
6-11
vi)
vii)
6.11
viii)
ix)
x)
Illumination system
xi)
Earthing system
xii)
xiii)
xiv)
220 KV SWITCHYARD
It is proposed to provide 220 kV, Gas Insulated Switchgear, having 6 bays; 2
bays for generator incoming, 2 bays for 220 kV transmission lines, 1 bay for
step down transformer and 1 bay for bus-coupler. The double busbar
arrangement has been proposed which would provide flexibility and reliability
in the operation of the plant.
6.12
6-12
CHAPTER - VII
POWER POTENTIAL STUDIES
7.1
GENERAL
The power potential studies have been carried out for Bhairon Ghati Hydel
Scheme. The projected power supply position for 11th Plan also indicated
that there would be shortage of peak power in Uttranchal State as well as
in Northern region. The execution of this project would help in reducing
the gap between supply and demand of power.
This is a Run of river type development with diurnal storage for peaking
purpose and would utilize a rated head of water of 108.9 M.
The
7.2
FIXATION OF FRL/MDDL
7-1
7.3
The
WATER AVAILABILITY
The available data of water flows on 10 daily basis has been analysed in
Chapter No. 5 on hydrology. Water flows determined in 90% dependable
year and in 50% dependable year, have been utilized for computing power
benefits.
7.5
TYPE OF TURBINE
The specific speed of the Turbine for rated head 108.9 m works out to be
174.87 which leads to the choice of Francis Turbine to be used for this
station. The following efficiencies applicable for Francis turbine driven
generating unit have been considered for power potential studies.
-
Efficiency of Turbine
93.5%
Efficiency of Generator
98.0%
Combined efficiency of
91.63%
7-2
7.6
INSTALLED CAPACITY
7-3
RESULTS OF STUDIES
Annual energy generation in 90% dependable year and in 50% dependable
year have been computed for installed capacity of 65 MW (2 x 32.5 MW) and
are indicated in Annexures 7.2 and 7.4 respectively. The results are also
briefly indicated below.
Particulars
90% dependable
year
50% dependable
year
Annual Energy
Generation (Gwh)
293.18
365.54
MW continuous
11.13
18.01
51.49 %
64.2 %
17.12 %
27.71 %
The design energy computation have been carried out and indicated in
Annex-7.5. The design energy of 279.45 GWh would be considered for
financial evaluation.
7-4
The live storage of 231.94 MWh (0.853 Million cubic meters) is available
whereas the storage required for peaking operation works out to 267.12 MWh.
Thus the storage is available for 3.57 hrs. of peaking operation of the station.
7.8
CONCLUSIONS
The power potential studies carried out indicates that installed capacity of 65
MW comprising 2 generating units of 32.5 MW each would be required for this
HEP to derive optimum power benefits. The station would afford generation
of 293.18 Million units in a 90% dependable year.
7.9
7.9.1 At DPR stage, based on the data available of topographic survey, tail race
rating curve should be evolved so that in energy computations the head
utilized for power generation is corrected with the change in trail race level
corresponding to discharge.
considered constant.
7.9.2 The storage at FRL and MDDL should be computed with more accuracy
based on the data of topographic survey.
7-5
CHAPTER VIII
POWER EVACUATION
8.1
proposed Hydel Projects lie between the longitude 78.5o N to 79.5o N namely
Harsil, Bhairon Ghati, Gangotri, Jadhganga, Karmoli Hydro Power Projects.
The next group of Hydro Electric Projects which lie between longitude 79.3o N
to 80o N are Badrinath, Gohana Tal, Rishiganga II, Rishiganga I, Jelum Tamak,
Deodi, Devasari Dam and Malari Jelum. Whereas in the next series the Hydro
Electric Projects which lie between longitude 80o
Bogudiyar, Sirkari Bhyol Bogudiyar, Sirkari Bhytol Rus Bagar, Khasiya Barah,
Khartoli Lumti Talli, Kalika Dantu, Garba Tawaghat, Sobala Jhimrigaon, Sela
Urthing, Chhanger Chal, Bokang Beiling. The power map of Uttranchal as on
1/1/2002 is shown at Annex-8.1.
8.2
8.3
proposed 400/220 kV Chhalmi sub station. Proposed line from Bhairon Ghati
sub-station for evacuation of power is shown at Annexure - 8.3.
8.4
8-2
CHAPTER IX
INITIAL ENVIRONMENTAL EXAMINATION STUDIES
9.1.
INTRODUCTION
The Initial Environmental Examination of Bhairon Ghati hydroelectric project
has following objectives through various phases of development which are
proposed to be covered:
Various
impacts,
which
can
endanger
the
environmental
9-1
9.2
Water Quality
The Bhairon Ghati hydroelectric project site, lies on river Bhagirathi just below
its confluence with river Jadhganga. The catchment area of river Bhagirathi
intercepted at the proposed project site includes the entire catchment of river
Jadhganga as well. As per Revenue records, there are only two revenue
villages in the catchment area of river Jadhganga. These villages are Jadung
and Nelang. The village Jadung has been classified as uninhabited and
village Nelang has only two residents. As per revenue records, there is only
one village, i.e. Gangotri in the catchment of river Bhagirathi intercepted at the
intake site. The present population of village Gangotri is of the order of 160.
Thus, pollution load from domestic sources in the project catchment is
insignificant. Likewise considering the topography and terrain conditions, the
area has no industries as well. Thus, pollution from various sources is virtually
absent in the catchment intercepted at the diversion structure site. The
pristine, relatively undisturbed environment coupled with low temperature
conditions, ensure that the water quality is excellent, with D.O. levels virtually
upto saturation conditions. The TDS levels are well within the permissible
9-2
limit. As a result, the concentration of various cations and anions too are well
within the permissible limits.
b)
Landuse
Various project features were superimposed on the satellite data, and the
landuse pattern of the submergence area was ascertained and the same is
given in Table-9.1.The land use pattern of the submergence area is appended
as Figuirre-9.1 The satellite imagery (IRS 1D, LISS-III + PAN) of the study
area is given as Figure-9.2.
Table-9.1
Landuse pattern of the submergence area
_______________________________________________________________
S.No.
Landuse / Land cover
Area (ha)
_______________________________________________________________
1.
Forest area with dense vegetation
7.01
2.
Forest area with medium vegetation
1.35
3.
Scrub land
0.55
4.
Water bodies
4.10
5.
Rocky outcrop
0.26
______________________________________________________________
Total
13.27
_______________________________________________________________
The submergence area (considering FRL as 2642 m) is 13.27 ha. The major
land cover category in the submergence area is Forest area (8.36 ha) which
includes area with dense vegetation (7.01 ha) and medium vegetation (1.35
ha). The other major landuse category is water bodies (4.10 ha). About 0.55
ha of land in the submergence area is scrub land. As a part of next phase of
Environmental study, it is recommended that detailed studies be conducted to
ascertain the ownership status of these lands, i.e. whether the land belongs
Forest Department or is it a non-forest government land. The scrub land
could still be categorized as forest land, as far as ownership status is
9-3
Vegetation
The proposed project site lies in the western Himalayas. The nature and type
of vegetation occurring in an area depends upon a combination of various
factors including prevailing climatic conditions altitude, topography, slope,
biotic factors, etc.
The proposed project area lies between EL 2,500 m and EL 2,700 m and the
vegetation in the area can be broadly categorised as cool temperate forests.
Amongst the various forest types under temperate forests, Western mixed
coniferous forest is commonly observed in the project area and its
surroundings. Major tree species observed in the area are Morinda (Abies
pindrow) and Rai (Picea smithiana). At many locations,
Deodar (Cedrus
9-4
Within the study area, for a stretch of 2-3 km on either side of river Bhagirathi
dense mixed forest is observed. In different stretches, species such as pine,
deodar are dominant. Beyond a distance of 2-3 km on either side of river
Bhagirathi, barren lands with no major vegetal species are observed.
The major floral species observed in the study area is given in Table-9.2.
Table-9.2
Major floral species observed in the study area
Local Name
Trees
Scientific Name
Spruce
Picea smithiana
Fir/Morinda
Abies pindrow
Pine
Pinus roxburghii
Deodar
Cedrus deodara
Padam
Prunus cornuta
Bhojpatra
Betula utilis
Banj
Quercus leucotriphora
Shrubs
b)
Aatas
Aconitum heterophyllum
Archa
Rheum webbianun
Titphada
Sarccoces saligna
Gugal
Juniperus srumata
Chiraita
Swertia chirayita
Hisar
Rubius niveus
Fauna
The forest in and around the project area especially along the right bank is
quite dense. A part of Gangotri and Patangani Reserve Forest is coming
under reservoir submergence. The population density is quite low in the area,
9-5
as a result of which, human interference are minimal. Thus, project and its
adjacent area have good wildlife. Based on the review of secondary data and
interaction with the Forest Department, major faunal species observed in the
project area and the study area include Musk Deer, Tiger, Jackal, Jungle Cat,
Wild Goat, Monkey, Brown bear, etc. Amongst the reptiles, lizard was the
dominant species. The commonly observed bird species observed in the
project area and its surroundings include vulture, dove, blue rock piegon,
pheasant, etc.
The list of faunal species observed in the study area including project area is
outlined in Table-9.3.
It can be observed, that many of the faunal species belong to Schedule-I &
Schedule II category. As per Wildlife Protection Act (1972), such species are
akin to rare and endangered species and need to be conserved and
preserved. Thus, it is essential to ascertain adverse impacts on such species
due to the proposed project.
Table-9.3
List of faunal species observed in the study area
including project area
Common Name
Zoological Name
Schedule as per
Wildlife
Protection Act
Musk Deer
Moschus moschiferus
Schedule I
Jackal
Canis aureus
Rhesus Monkey
Macaca mulatta
Schedule II
Wild goat
Pseudois nayaur
Schedule I
Brown Bear
Ursus arctos
Schedule I
Tiger
Panthera tigris
Schedule I
Mammals
9-6
Common Name
Zoological Name
Python
Python sp.
Schedule as per
Wildlife
Protection Act
Schedule-I
Wild dog
Cuon alpinus
Avi-fauna
Vulture
Gyps fulvus
Streptopelia decoacto
Streptopelis orientalis
Columba livia
Monal
Lopophorus imnejanus
Pheasant
Catreus wallichii
Reptiles
Lizard
a)
Hemidactyles brooki
Fisheries
The major water body in the project area are rivers Bhagirathi and
Jadhganga. Since these are perennial rivers, it is expected that there could
be quite a few species in these rivers. Based on the review of existing
literature and secondary data, it can be said that fish species such as Black
fish, Brown trout could be present in these rivers. Mahaseer, a migratory fish
species could also be present. Generally in fast flowing mountainous streams,
fish species show definite behaviour, which includes reaction to fast current
and seeking of shelter in the almost stagnant water behind rocks and
boulders. Even good swimmers like Mahaseer seek shelter for most of the
time. Majority of the fishers in such streams spend most of their life facing the
current. This helps them in two ways, viz. to maintain their upright position
and to make respiration easier.
9-7
ST
Literates
Male
Female
Gangotri
Population
No. of
houseMale
Female Total
holds
51
117
6
123
117
Mukhaba
190
593
635
958
130
76
475
116
3.
Dharali
95
271
246
517
65
182
23
Total
336
981
617
1598
203
77
674
143
S.
No.
Village
1.
9-8
9.3
PREDICTION OF IMPACTS
Based on the project details and the baseline environmental status, potential
impacts as a result of the construction and operation of the proposed project
have been identified. As a part of IEE study, impacts on various aspects listed
as below have been assessed:
-
Land environment
Water resources
Water quality
Terrestrial flora
Terrestrial fanna
Aquatic ecology
Noise environment
Socio-economic environment
Construction phase
Quarrying operations
A hydroelectric project requires significant amount of construction material,
which needs to be extracted from various quarry sites in and around the
project area. To the extent possible, existing quarries need to be tapped.
Normally quarrying is done along the hill face, and generally left untreated
after extraction of the required construction material. These sites can become
permanent scar on the hill face and can become potential source of
landslides. This aspect needs to be covered as a part of the EIA study and
suitable measures for stabilization of quarry sites need to be recommended. It
9-9
9-10
Operation Phase
9-11
of tail race discharge. Since there are no users in the intervening stretch,
hence, reduction in flow during lean season is unlikely to lead to any
significant impact. However, reduction in flow is likely to have a minor impact
on riverine ecology as the discharge during lean flow is significantly less, but
intervening nallahs and streams do supplement the minimum flow in the
stretch under study.
9.3.3 Impacts on Water Quality
a)
Construction phase
The project construction is likely to last for a period of 4-5 years apart from
investigation stage. About 2000 workers and 500 technical staff are likely to
work during project construction phase. The construction phase, also leads to
mushrooming of various allied activities to meet the demands of the immigrant
labour population in the project area. Thus, the total increase in labour
population during construction phase is expected to be around 5000-6000.
The total quantum of sewage generated is expected to be of the order of 0.4
mld. The BOD load contributed by domestic sources will be about 270 kg/day.
The sewage generally shall be disposed in nearby streams or channels
through open drains, where ultimately it will find its way into river Bhagirathi.
The inadequate sewage treatment and disposal facilities could lead to
formation of pools of sewage, which can lead to increased incidence of waterborne diseases. Thus, it is recommended to commission adequate sewage
treatment facilities in the labour camps.
Normally, during construction phase, elaborate sewage treatment facilities
including primary and secondary treatment units are not commissioned, as
they are rendered useless once the construction phase is over. At such sites
septic tanks and or other low cost sanitation units are developed. Similar
9-12
Operation phase
9-13
Eutrophication risks
The fertilizer use in the catchment area intercepted at the diversion structure
site is nil and is unlikely to change even during project operation phase.
Since, the present proposal envisages only hydropower generation and does
not entail command area development, problems of eutrophication, which are
primarily caused by enrichment of nutrients in water are not anticipated. Being
a Run-off-the-river scheme, no eutrophication risks are expected.
9.3.4 Impacts on Terrestrial Flora
a)
Construction phase
Increased human interferences
As mentioned earlier, about 2,500 technical staff, workers and other group of
people are likely to congregate in the area during the project construction
phase. The total increase in population is expected to be about 5000-6000.
Workers and other population groups residing in the area may use fuel wood,
if no alternate fuel is provided. On an average, the fuel wood requirements will
be of the order of 2500-2700 m3. Thus, every year, fuel wood equivalent to
about 800-900 trees will be cut, which implies that every year on an average
about 1 ha of dense forest area will be cleared for meeting fuel wood
requirements, if no alternate sources of fuel are provided. It should be made
mandatory for the contractor involved in project construction to provide
alternate source of fuel to the labour population. Alternatively, community
kitchen using LPG or kerosene as a fuel can also be run at various labour
camps.
9-14
b)
Operation Phase
Construction phase
The forest area, in the project area and its surroundings provides habitat to
various faunal species, quite a few which are categorised as Schedule-I and
Schedule-II as per the Wildlife Protection Act (1972), which have to be
protected and conserved. As a part of the EIA study, detailed data collection
from various secondary sources needs to be done to assess the severity of
impacts due to various activities in the construction and operation phases on
Schedule-I & II species & other faunal species as well.
Perusal of various faunal species observed in the project area, indicates that
there are no migratory faunal species observed in the area. River Bhagirathi
in the project area, even in the pre-project phase, acts as a barrier to wildlife
9-15
Operation phase
During project operation phase, accessibility to the area will improve due to
construction of roads, which in turn may increase human interference leading
to marginal adverse impacts on the terrestrial ecosystem. Since, the increase
in human population is not expected to be large, hence significant adverse
impacts on this account are not anticipated.
9.3.6 Impacts on Aquatic Ecology
a)
Construction phase
During construction of a river valley project, huge quantity of muck is
generated at various construction sites, which if not properly disposed,
invariably would flow down the river during heavy precipitation. Such condition
can lead to adverse impacts on the development of aquatic life, which needs
to be avoided.
The increased labour population during construction phase, could lead to
increased pressure on fish fauna, as a result of indiscriminate fishing by them.
Adequate protection measures at sensitive locations, identified on the basis of
fisheries survey in the EIA study need to be implemented.
9-16
b)
Operation phase
Amongst the aquatic animals, it is the fish life which would be most affected.
The migratory fish species, e.g. Brown trout, Black fish and Mahaseer are
likely to be adversely affected due to obstruction to their migratory route
created by the proposed barrage. The dispersal and migration pattern of
various fish species need to be ascertained to assess the degree of severity
of impacts, which needs to be done as a part of EIA study.
9.3.7 Impacts on Noise Environment
Increased noise levels are anticipated only during construction phase due to
operation of various equipment, increased vehicular traffic and blasting etc.
No human settlements are located close to the project site.
However
increased noise level, especially blasting could scare away wildlife from the
area. It has been observed during construction phase of similar projects, that
wildlife migrates from such areas and returns after the cessation of
construction activities. Similar phenomenon is expected in the proposed
project site as well. However, presence of Schedule-I & Schedule II species in
the project area, makes its imperative to conduct detailed noise modelling
studies as a part of EIA study. Based on the increased noise levels, as
estimated through modelling studies, impacts on each faunal species
observed in areas adjacent to the project site needs to be assessed.
9.3.8 Air Pollution
Pollution due to fuel combustion in various equipment
Normally, diesel is used in construction equipment. The major pollutant which
gets emitted as a result of diesel combustion is SO2. The SPM emissions are
9-17
minimal due to low ash content in diesel. Model studies conducted for various
projects with similar level of fuel consumption indicate that the short-term
increase in SO2, even assuming that all the equipment are operating at a
common point, is quite low, i.e. of the order of less than 1g/m3. Hence, no
major impact is anticipated on this account.
Emissions from various crushers
The operation of the crusher during the construction phase is likely to
generate fugitive emissions, which can move even up to 1 km along the
predominant wind direction. During construction phase, one crusher each is
likely to be commissioned at the diversion structure and the power house
sites. During crushing operations, fugitive emissions comprising of the
suspended particulate will be generated. Since, there are no major
settlements close to the diversion structure site, hence, significant adverse
impacts on this account are not anticipated. However, it is recommended that
the labour camp be situated at least 1 km away from the construction sites
and that too on the leeward side of the pre-dominant wind direction in the
area.
9.3.9 Impacts on Socio-Economic Environment
a)
9-18
S.
No.
1.
Parameters
Impact
Land Environment
Construction Soil erosion due to the
phase
extraction of
construction material
from various quarry
sites.
Temporary acquisition
of land for siting of
construction equipment
& material, waste
material, etc.
Management Measures
Proper treatment of
quarry site, and such
sites be located over
non-forest land
9-19
S.
No.
Parameters
Operation
phase
2.
3.
4.
Impact
Acquisition of forest
land in reserve forest
area.
In case downstream
nallahs do not
contribute lean flows
minimum flow will be
released to maintain
the riverine ecology.
Provision of community
toilets and septic tanks
Provision of adequate
sewage treatment
facilities
Acquisition of 8.36 ha
of forest area, located
in reserve forest area.
Provision of community
kitchen by the
contractors engaged in
project construction.
Compensatory
afforestation as per the
Indian Forest
Conservation Act
(1980) and formulation
of Conservation Plan.
Water resources
Operation
phase
Water quality
Construction
phase
Operation
phase
Terrestrial flora
Construction
phase
Operation
phase
Management Measures
Disposal at designated
sites and provision of
suitable management
measures including
bio-engineering
treatment measures
and location of such
sites over non-forest
land.
Compensatory
afforestation &
formulation of
Conservation Plan
9-20
S.
No.
5.
Parameters
Terrestrial fauna
Construction
phase
Operation
phase
6.
Impact
Aquatic Ecology
Construction
phase
Operation
phase
7.
8.
Disturbance to wildlife
due to operation of
various construction
equipment.
Disturbance to wildlife
due to increased
accessibility in the
area.
Marginal decrease in
aquatic productivity due
to increased turbidity
and lesser light
penetration.
Development of
hatchery for artificial
seed production and
stocking of reservoir
and the affected river
stretch
Noise Environment
Construction Increase in noise levels
phase
due to operation of
various construction
equipment.
Air Environment
Construction
phase
Management Measures
Increased surveillance,
in the form of check
posts at major
construction sites and
labour camps.
Specific management
measures are not
required
Provision of release of
minimum flow in case
downstream nallahs do
not contribute to lean
flows.
Construction
equipment to be
provided with noise
control measures.
Cyclones will be
provided in various
crushers.
9-21
S.
No.
9.
Parameters
Socio-economic Environment
Construction Increase in employment
phase
potential.
Operation
phase
9.5
Impact
Increased power
generation
Greater employment
opportunities.
Management Measures
-
9-22
CHAPTER X
INFRASTRUCTURE FACILITIES
10.1
INTRODUCTION
The Bhaironghati hydroelectric project across the river Bhagirathi envisages
construction of a 34 m high dam (above river bed level), a diversion tunnel, a
5.1 km long HRT, an under ground desilting basin, pressure tunnel, an
underground power house with an installed capacity of 65 MW and a tail race
tunnel. The dam is located at a distance of about 97 km from Uttarkashi. The
major infrastructure facilities needed are described in the following
paragraphs.
10.2
COMMUNICATIONS
10.2.1 The nearest rail head available to the project is Rishikesh which is about 267
km from the Barrage site.
From Rishikesh to Bhaironghati via chamba, Dobata, Dunda, Uttarkashi,
Bhatwari, Gangani, Harsil a wide black topped road exists. From Uttarkashi
upto
10-1
adits, and other Power House Complex requirements like road to switch yard,
Power House Colony etc.
Construction roads are also required from barrage / power house site from
quarry sites, and plant and machinery workshops etc.
Considering the existing road facilities, lengths of permanent and temporary
roads that are needed will not be large.
10.2.3 Railways
The nearest railway station is Rishikesh on the broad gauge line. Railway
siding for unloading heavy machineries and equipment is to be provided at
Rishikesh.
10.3
CONSTRUCTION POWER
The power demand for the construction activities is estimated to be about 5
M.W. taking capacity of electric driven equippent and lighting which are to
work within the target time for consideration. The initial requirement in the first
two years could be 2 M.W. and this subsequently has to be increased to 3
M.W.
The power requirement can be met with by procuring the supply from
Uttaranchal authorities. For making the power available at project site
required 33/11 K.V. substation and alongwith new power lines about 3 km to
route from Bhaironghati is proposed.
10-2
TELECOMMUNICATION
To ensure efficient execution at various sites, adequate and reliable
telecommunication net work is necessary. An electronic private Automatic
Exchange with a capacity of about 50 lines is proposed.
A VHF system is also proposed to link project Head Quarters with clients
head-quarters.
Suitable number of mobile phones / walky talkies are also proposed.
10.5
PROJECT COLONIES/BUILDINGS
10.5.1 The main project colony is proposed near Bhaironghati about 3-4 km from
intake site and 10 km from power location. Facilities such as school, post
office, police station, market, primary health centre are
available at
10-3
client.
Areas for fabrication yards for the hydro mechanical equipment, viz the
various gates and hoists, pressure tunnel liners, penstocks etc. will have to be
identified near the work sites.
Two explosive magazines one for the works at dam site and rock quarries and
another for the underground works are to be built.
10.7
10-4
CHAPTER XI
CONSTRUCTION PLANNING & SCHEDULE
11.1
INTRODUCTION
The Bhairon Ghati H.E. Project is located in the higher attitudes of about EL
2610 m in the Himalayas and within the region heavy snow is experienced
during winters. At Badrinath, in Alaknanda sub-basin adjoining Bhagirathi subbasin an IMD observatory is located reveal that for about 5 months from
December to April heavy snow fall takes place. As such it is inferred that the
project area also has a limited working season as regards construction of
surface works are concerned. A period of 24 months has been provided for
preparation of field investigations, subsurface exploration as required for
preparation Detailed Project Report including statutory clearances / approvals.
Thereafter 24 months have been provided for pre-construction activities,
surveys, development of infrastructure facilities, and construction power,
deciding on the developmental funds / agencies for execution, engineering
design, approach roads, tender engineering etc.
Thereafter construction
phase starts only after completion of the initial two phases. A construction
period of 5 years has been considered based on the specific location of the
project in higher attitude and remoteness of the area. The initial 24 months
period for DPR preparation could be optimized in case other potential projects
in the basin are taken up simultaneously.
11.2
CONSTRUCTION METHODOLOGY
Bhairon Ghati H.E. Project is envisage as a Run-off-the-River scheme across
Bhagirathi river. Diurnal gross Storage of about 1.883 Mcum and with live
storage of 0.853 Mcum
11-1
MATERIAL SOURCES
During the reconnaissance visit with a geologist and Engineer it is seen that
sand is available near by of the power house site and further d/s in the river
bed. Coarse aggregate shall have to be crushed from the nearby quary site
selected for the construction purpose.
11.4
CONTRACT PACKAGES
The contracts packages shall be mainly in the following packages :
a)
b)
c)
Power house, pressure shaft, surge shaft, tailrace tunnel with adits and
approaches
d)
e)
11-2
could be contracted earlier so that by the time civil contractors mobilize the
site facilities and some minimum equipment are made available.
11.5
SCHEDULE OF WORK
As envisaged the underground works could progress and may not be
hampered much by the restricted working season but the progress of work
shall be at a lower rate. The surface work shall be limited to about 150 days
in a year with 25 working days in a month and 8 working hours. For the
subsurface works the seasonal effect will be felt on the progress of work due
to low temperatures restricted and reduced supplies as such reduction of
progress in snowy period is considered and about 200 days could be utilized.
Two shift working is considered economical due to shortage of
working
season, but third shift could be planned based on progress of work and
seasonal constraints.
11.6
CONSTRUCTION ACTIVITIES
After the financial terms and the Party/ Agency for investment in the
construction is decided, NIT for fixing the civil contractor can be invited within
6 months on ICB basis.
a)
Diversion of river
As the river gorge is narrow a diversion tunnel on the left bank is proposed
before construction of the dam. The diversion tunnel invert level is kept at
minimum flow level and completed in three months immediately after the
floods recede and before snow fall starts and hampers the surface works,
however, the underground works could progress. The coffer dams could be
constructed during next lean flood period and subsequent floods could be
11-3
allowed to over top the masonry coffer dam. The dam shall be constructed in
phases of overflow and non-overflow sections. Once the dam is fully operative
the diversion tunnel could be plugged. The river bed excavation shall be
handled by 3.0 cum hydraulic excavators and Rear Dumpers (25t).
b)
c)
Power House
The under ground Power house accommodates 2x32.5 MW units.
The
Tunnelling
The finished dia of the tunnel (HRT) is proposed as 4.5 m and 5.1 Km long.
As regards approach to Power House from the highway which is in the left
bank
approach the Power House adit and also approach the Surge Shaft. One Adit
each at Power House, Surge Shaft shall be provided. As both the banks of the
river are under Deodar Forest as such no additional adit is proposed and
approach roads to Surge shaft, Power house and intake structure shall be of
minimum length. There shall be two faces for working on the HRT. Tunnel
excavation shall be based on conventional drilling and blasting and supported
by ribs where essential and supporting the excavated rock face by
shotcreting. A period of 39 months has been kept for tunnel & power house
11-4
construction. The pressure shaft and Surge shaft shall be excavated through
Alimak Raise Climber.
The construction schedule at PFR stage studies is given in the enclosed
Plate 11-1.
11-5
CHAPTER-XII
COST ESTIMATE
12.1
INTRODUCTION
Bhairon Ghati H.E. Project is proposed as Run-off-the River scheme on the
river Bhagirathi to tap its hydropower potential.
underground
ABSTRACT OF COSTS
The Project is estimated to cost Rs. 256.29 crores at June 2003 price level
the break down of cost is given below :
Item
Estimated Cost
( Rs. Crore )
Civil Works
164.94
Electrical Works
91.35
256.29
12-1
The project estimate has been prepared on the basis of Guidelines for
preparation of cost estimates for River Valley projects published by Central
Water Commission,
New Delhi.
enclosed as Annexure 12.1. The above cost does not include the cost of
transmission.
cost of
12-2
S.No.
Items
Provisions of % of
C- Works & J - Power
Plant Civil Works
A. Preliminary
2%
K. Buildings
4%
O. Miscellaneous
5%
P. Maintenance
1% of (C+J+K+R)
R. Communication
Y. Losses on Stock
4%
2.0%
0.25% of C Works,
J - Power Plant - Civil
Works, K - Building &
R - Communication
12-3
CHAPTER XIII
ECONOMIC EVALUATION
13.1
GENERAL
The economic and financial evaluation of the Bhairon Ghati H.E project have
been carried out considering the standard guidelines issued by Central
Electricity Authority and the norms laid down by the Central Electricity
Regulatory Commission (CERC) for Hydro projects.
13.2
PROJECT BENEFITS
13.2.1 The scheme would afford on annual energy generation of 293.18 GWh in a
90% dependable year. For assessing the tariff, design energy generation of
279.45 GWh , calculated with 95% capacity availability in a 90% dependable
year, has been adopted.
capacity benefits.
13.3
CAPITAL COST
The project cost has been estimated at Rs. 256.29 crores without IDC based
on the criteria for Adoption of Rates and Cost for preparation of PFRs of
hydro-electric projects issued by CEA and is as given below:
1.
= Rs. 164.94
Crores
2.
= Rs
Crores
Total
= Rs. 256.29
91.35
Crores
13-1
13.4
MODE OF FINANCING
The project is proposed to be financed with a debt equity ratio of 70:30. An
interest rate of 10% on the loan component has been considered for the
financial analysis of the project. The interest on the working capital is taken
as 9.75%.
13.5
PHASING OF EXPENDITURE
The project is proposed to be completed in 5 years period in all respect with
full benefit available after 5 years.
expenditure based upon the above construction programme for Civil &
Electrical works is given in Annexure 13.1.
13.6
FINANCIAL ANALYSIS
iii)
iv)
v)
vi)
vii)
13-2
viii)
Interest during construction has been worked out based upon the
interest rates as mentioned above.
x)
13.7
Tariff Period
Tariff
(Rs./KWh)
First Year
1.80
Levellised Tariff
1.57
CONCLUSION
The sale rate of energy indicated above shows that the energy generated
from the project is financially viable and economically attractive.
13-3
Annexure 13.2
Debt : Equity 70 : 30
Interest rate @ 10 %
(INR crores)
Year
Project
cost
Equity for
IDC
(6) x 0.30
7
ITERATION - I
Loan for
IDC
(6) x 0.70
8
IDC
10.0%
9
0.00
1.28
6.41
12.81
16.66
0.00
0.38
1.92
3.84
5.00
0.00
0.90
4.49
8.97
11.66
37.16
11.15
26.01
Equity
component
(30%)
Loan
component
(70%)
Cummulative
loan
IDC
10.0%
1
2
3
4
5
25.63
76.89
76.89
51.26
25.63
25.63
51.26
0.00
0.00
0.00
0.00
25.63
76.89
51.26
25.63
0.00
25.63
102.52
153.77
179.40
Total
256.29
76.89
179.40
GRAND TOTAL
TOTAL
Capitalised
IDC
cost
10
11
0.00
0.04
0.31
0.99
2.02
0.00
1.33
6.72
13.80
18.68
25.63
78.21
83.61
65.06
44.31
3.36
40.53
296.82
Annexure -13.1
Phasing of Expenditure
INR crores
Year
Civil cost
E & M cost
Total cost
1
2
3
4
5
16.49
49.48
49.48
32.99
16.49
9.14
27.41
27.41
18.27
9.14
25.63
76.89
76.89
51.26
25.63
Total
164.94
91.35
256.29
Annexure -
13.3
Debt:Equity Ratio
Yr 1
BASIC PARAMETERS
Capacity (MW)
Capital Cost (INR crores)
Capital Cost with IDC .
Equity Portion (%)
Debt Portion (%)
Capital Cost/MW (INR crores)
Interest rate for WC (%)
Tax rate (%)
Interest rate on loan from Financial Institutions (%)
Total annual energy (GWh)
Design energy with 90% dependibility (GWh)
Saleable Energy after aux. (GWh)
consumption & transformation losses
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 2
Yr 3
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 4
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 5
Yr 6
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 7
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
7.0
Yr 8
Yr 9
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 10
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
3.0
Yr 11
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 12
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
% of
total
loan
207.8
Fin. Institutions
Intt.
Rate
(%)
AMOUNT
(INR
crores)
EQUITY
% of
total
equity
% of
project
cost
AMOUNT
(INR
crores)
207.77
Equity component
89.04
296.8
89.04
Fin. Institutions
Total
Period
% of
project
cost
Repayment
Financial Inst.
Repayment Amount/year
Financial Institutions
Moratorium
10
Installment/yr.
0
20.78
1/12
100.00
70.00
100.00
70.00
10.00
207.77
207.77
Equity
Total
100.00
30.00
89.04
100.00
30.00
89.04
Annexure -
13.3
Debt:Equity Ratio
NORMATIVE PARAMETERS
O & M Charges incl. Insurance (%)
O & M Inflation rate (%)
Rate of return on equity (%)
Rate of Depreciation (ES Act) (%)
Rate of Depreciation (IT Act) (%)
Spares for 1 yr -1/5th C.S
Auxiliary consumption (%)
Transformation Losses (%)
SCHEDULE OF LOAN REPAYMENT
AGENCY
FINANCIAL INSTITUTIONS
Outstanding Term loan
Term loan installment
Cum. Loan Repaid
Interest on Term loan
Total Yearly installment
LOAN SERVICING
Outstanding Term loan
Loan Repayment Installment
Sources of Funds for Repayment
- Depreciation (ES Act)
- Advance Depreciation
- Additional sources (ROE )
7.0
3.0
Yr 1
Yr 2
Yr 3
Yr 4
Yr 5
Yr 6
Yr 7
Yr 8
Yr 9
Yr 10
Yr 11
Yr 12
Year
1
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
2
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
3
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
4
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
5
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
6
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
7
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
8
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
9
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
10
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
11
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
12
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
Year
10
11
12
207.77
20.78
20.78
19.74
40.52
186.99
20.78
41.55
17.66
38.44
166.22
20.78
62.33
15.58
36.36
145.44
20.78
83.11
13.51
34.28
124.66
20.78
103.89
11.43
32.20
103.89
20.78
124.66
9.35
30.13
83.11
20.78
145.44
7.27
28.05
62.33
20.78
166.22
5.19
25.97
41.55
20.78
186.99
3.12
23.89
20.78
20.78
207.77
1.04
21.82
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
207.77
20.78
186.99
20.78
166.22
20.78
145.44
20.78
124.66
20.78
103.89
20.78
83.11
20.78
62.33
20.78
41.55
20.78
20.78
20.78
0.00
0.00
0.00
0.00
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
10.39
0.00
10.39
0.00
0.00
0.00
0.00
0.00
0.00
19.74
40.52
17.66
38.44
15.58
36.36
13.51
34.28
11.43
32.20
9.35
30.13
7.27
28.05
5.19
25.97
3.12
23.89
1.04
21.82
0.00
0.00
0.00
0.00
2/12
Annexure -
13.3
Debt:Equity Ratio
Yr 1
Yr 2
Yr 3
Yr 4
Yr 5
Yr 6
Yr 7
Yr 8
7.0
Yr 9
3.0
Yr 10
Yr 11
Yr 12
RATE OF RETURN
Equity amount
Return on Equity
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
O & M EXPENSES
4.45
4.67
4.91
5.15
5.41
5.68
5.97
6.26
6.58
6.91
7.25
7.61
0.37
0.59
0.39
0.59
0.41
0.59
0.43
0.59
0.45
0.59
0.47
0.59
0.50
0.59
0.52
0.59
0.55
0.59
0.58
0.59
0.60
0.59
0.63
0.59
1.73
3.29
2.37
0.74
0.00
0.11
9.21
0.90
1.73
2.94
2.37
0.78
0.00
0.11
8.92
0.87
1.73
2.60
2.37
0.82
0.00
0.10
8.63
0.84
1.73
2.25
2.37
0.86
0.00
0.10
8.34
0.81
1.73
1.90
2.37
0.90
0.00
0.10
8.05
0.79
1.73
1.56
2.37
0.95
0.00
0.09
7.77
0.76
1.73
1.21
2.37
0.99
0.00
0.09
7.49
0.73
1.73
0.87
2.37
1.04
0.00
0.09
7.22
0.70
1.73
0.52
2.37
1.10
0.00
0.08
6.95
0.68
1.73
0.17
2.37
1.15
0.00
0.08
6.68
0.65
1.73
0.00
2.37
1.21
0.29
0.08
6.88
0.67
1.73
0.00
2.37
1.27
1.85
0.10
8.55
0.83
267.13
0.00
10.39
10.39
20.78
0.00
10.39
-10.39
10.39
267.13
256.75
-10.39
10.39
0.00
20.78
0.00
10.39
-20.78
10.39
256.75
246.36
-20.78
10.39
-10.39
20.78
0.00
10.39
-31.17
10.39
246.36
235.97
-31.17
10.39
-20.78
20.78
0.00
10.39
-41.55
10.39
235.97
225.58
-41.55
10.39
-31.17
20.78
0.00
10.39
-51.94
10.39
225.58
215.19
-51.94
10.39
-41.55
20.78
0.00
10.39
-51.94
10.39
215.19
204.80
-51.94
10.39
-41.55
20.78
0.00
10.39
-51.94
10.39
204.80
194.41
-51.94
10.39
-41.55
20.78
0.00
10.39
-51.94
10.39
194.41
184.03
-51.94
10.39
-41.55
20.78
0.00
10.39
-51.94
10.39
184.03
173.64
-51.94
10.39
-41.55
20.78
0.00
10.39
-51.94
10.39
173.64
163.25
-51.94
10.39
-41.55
0.00
0.00
0.00
-41.55
10.39
163.25
152.86
-41.55
10.39
-31.17
0.00
0.00
0.00
-31.17
10.39
152.86
296.82
74.20
74.20
222.61
55.65
55.65
166.96
41.74
41.74
125.22
31.30
31.30
93.91
23.48
23.48
70.44
17.61
17.61
52.83
13.21
13.21
39.62
9.91
9.91
29.72
7.43
0.03
22.29
5.57
0.00
16.71
4.18
0.00
12.54
3.13
0.00
3/12
Annexure -
13.3
Debt:Equity Ratio
Yr 1
TAX LIABILITY (INR crores)
Yearly Profit/loss
Cummulative Profit/loss (+/-)
Tax liability
Yr 2
Yr 3
Yr 4
Yr 5
Yr 6
Yr 7
Yr 8
7.0
Yr 9
3.0
Yr 10
Yr 11
Yr 12
-49.57
-49.57
0.00
-31.02
-80.59
0.00
-17.10
-97.69
0.00
-6.67
-104.36
0.00
1.16
-103.20
0.00
7.03
-96.17
0.00
11.43
-84.75
0.00
14.73
-70.02
0.00
24.60
-45.41
0.00
24.64
-20.78
0.00
24.64
3.86
1.74
24.64
28.49
11.09
30.13
28.05
25.97
23.89
21.82
19.74
17.66
15.58
13.51
11.43
10.39
10.39
19.60
19.79
20.00
20.21
20.44
20.69
20.94
21.22
21.50
21.81
23.91
33.78
49.72
1.80
1.67
47.84
1.73
45.97
1.66
44.11
1.60
42.26
1.53
40.43
1.46
1.33
38.60
1.40
36.80
1.33
35.01
1.27
33.23
1.20
34.30
1.24
1.55
44.17
1.60
12.00 / Year
1
1.80
1.57
2
1.55
3
1.33
4/12
4
1.14
5
0.97
6
0.83
7
0.71
8
0.60
9
0.51
10
0.43
11
0.40
12
0.46
Annexure - 13.3
BHAIRONGHATI HYDEL SCHEME ( Underground Power House )
TARIFF CALCULATIONS WITH PROJECTED COMPLETION COST
Debt:Equity Ratio
Yr 13
BASIC PARAMETERS
Capacity (MW)
Capital Cost (INR crores)
Capital Cost with IDC .
Equity Portion (%)
Debt Portion (%)
Capital Cost/MW (INR crores)
Interest rate for WC (%)
Tax rate (%)
Interest rate on loan from Financial Institutions (%)
Total annual energy (GWh)
Design energy with 90% dependibility (GWh)
Saleable Energy after aux. (GWh)
consumption & transformation losses
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 14
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 15
Yr 16
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
207.8
Fin. Institutions
207.77
Equity component
89.04
296.8
89.04
Period
Repayment
Financial Inst.
Repayment Amount/year
Financial Institutions
Moratorium
10
Installment/yr.
0
20.78
5/12
Yr 17
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 18
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 19
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 20
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
7.0
Yr 21
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 22
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
3.0
Yr 23
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 24
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Annexure - 13.3
BHAIRONGHATI HYDEL SCHEME ( Underground Power House )
TARIFF CALCULATIONS WITH PROJECTED COMPLETION COST
Debt:Equity Ratio
NORMATIVE PARAMETERS
O & M Charges incl. Insurance (%)
O & M Inflation rate (%)
Rate of return on equity (%)
Rate of Depreciation (ES Act) (%)
Rate of Depreciation (IT Act) (%)
Spares for 1 yr -1/5th C.S
Auxiliary consumption (%)
Transformation Losses (%)
SCHEDULE OF LOAN REPAYMENT
AGENCY
FINANCIAL INSTITUTIONS
Outstanding Term loan
Term loan installment
Cum. Loan Repaid
Interest on Term loan
Total Yearly installment
LOAN SERVICING
Outstanding Term loan
Loan Repayment Installment
Sources of Funds for Repayment
- Depreciation (ES Act)
- Advance Depreciation
- Additional sources (ROE )
7.0
3.0
Yr 13
Yr 14
Yr 15
Yr 16
Yr 17
Yr 18
Yr 19
Yr 20
Yr 21
Yr 22
Yr 23
Yr 24
Year
13
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
14
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
15
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
16
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
17
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
18
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
19
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
20
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
21
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
22
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
23
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
24
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
Year
13
14
15
16
17
18
19
20
21
22
23
24
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6/12
Annexure - 13.3
BHAIRONGHATI HYDEL SCHEME ( Underground Power House )
TARIFF CALCULATIONS WITH PROJECTED COMPLETION COST
Debt:Equity Ratio
7.0
3.0
Yr 13
Yr 14
Yr 15
Yr 16
Yr 17
Yr 18
Yr 19
Yr 20
Yr 21
Yr 22
Yr 23
Yr 24
RATE OF RETURN
Equity amount
Return on Equity
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
O & M EXPENSES
8.00
8.40
8.82
9.26
9.72
10.20
10.71
11.25
11.81
12.40
13.02
13.68
0.67
0.59
0.70
0.59
0.73
0.59
0.77
0.59
0.81
0.59
0.85
0.59
0.89
0.59
0.94
0.59
0.98
0.59
1.03
0.59
1.09
0.59
1.14
0.59
1.73
0.00
2.37
1.33
1.85
0.10
8.65
0.84
1.73
0.00
2.37
1.40
1.85
0.11
8.75
0.85
1.73
0.00
2.37
1.47
1.85
0.11
8.86
0.86
1.73
0.00
2.37
1.54
1.85
0.11
8.97
0.87
1.73
0.00
2.37
1.62
1.85
0.11
9.09
0.89
1.73
0.00
2.37
1.70
1.85
0.11
9.21
0.90
1.73
0.00
2.37
1.79
1.85
0.11
9.34
0.91
1.73
0.00
2.37
1.88
1.85
0.11
9.47
0.92
1.73
0.00
2.37
1.97
1.85
0.12
9.62
0.94
1.73
0.00
2.37
2.07
1.85
0.12
9.77
0.95
1.73
0.00
2.37
2.17
1.85
0.12
9.92
0.97
1.73
0.00
2.37
2.28
1.85
0.12
10.09
0.98
142.47
-31.17
10.39
-20.78
0.00
0.00
0.00
-20.78
10.39
142.47
132.08
-20.78
10.39
-10.39
0.00
0.00
0.00
-10.39
10.39
132.08
121.69
-10.39
10.39
0.00
0.00
0.00
0.00
0.00
10.39
121.69
111.31
0.00
10.39
10.39
0.00
0.00
0.00
10.39
10.39
111.31
100.92
10.39
10.39
20.78
0.00
0.00
0.00
20.78
10.39
100.92
90.53
20.78
10.39
31.17
0.00
0.00
0.00
31.17
10.39
90.53
80.14
31.17
10.39
41.55
0.00
0.00
0.00
41.55
10.39
80.14
69.75
41.55
10.39
51.94
0.00
0.00
0.00
51.94
10.39
69.75
59.36
51.94
10.39
62.33
0.00
0.00
0.00
62.33
10.39
59.36
48.97
62.33
10.39
72.72
0.00
0.00
0.00
72.72
10.39
48.97
38.59
72.72
10.39
83.11
0.00
0.00
0.00
83.11
10.39
38.59
28.20
83.11
10.39
93.50
0.00
0.00
0.00
93.50
10.39
28.20
9.40
2.35
0.00
7.05
1.76
0.00
5.29
1.32
0.00
3.97
0.99
0.00
2.97
0.74
0.00
2.23
0.56
0.00
1.67
0.42
0.00
1.26
0.31
0.00
0.94
0.24
0.00
0.71
0.18
0.00
0.53
0.13
0.00
0.40
0.10
0.00
7/12
Annexure - 13.3
BHAIRONGHATI HYDEL SCHEME ( Underground Power House )
TARIFF CALCULATIONS WITH PROJECTED COMPLETION COST
Debt:Equity Ratio
24.64
53.13
11.09
24.64
77.77
11.09
24.64
102.40
11.09
24.64
127.04
11.09
24.64
151.67
11.09
24.64
176.31
11.09
24.64
200.94
11.09
24.64
225.58
11.09
24.64
250.22
11.09
24.64
274.85
11.09
24.64
299.49
11.09
24.64
324.12
11.09
10.39
10.39
10.39
10.39
10.39
10.39
10.39
10.39
10.39
10.39
10.39
10.39
34.17
34.58
35.01
35.46
35.94
36.44
36.96
37.51
38.08
38.69
39.32
39.99
44.56
1.61
44.97
1.63
45.40
1.64
45.85
1.66
1.70
46.33
1.68
46.82
1.70
47.35
1.71
47.90
1.73
48.47
1.76
1.80
49.08
1.78
49.71
1.80
50.38
1.82
13
0.41
14
0.37
15
0.34
16
0.30
8/12
Yr 17
17
0.27
Yr 18
18
0.25
Yr 19
19
0.22
Yr 20
20
0.20
Yr 21
21
0.18
Yr 22
3.0
Yr 14
12.00 / Year
Yr 16
Yr 13
Yr 15
7.0
22
0.16
Yr 23
23
0.15
Yr 24
24
0.13
Annexure - 13.3
7.0
Yr 25
BASIC PARAMETERS
Capacity (MW)
Capital Cost (INR crores)
Capital Cost with IDC .
Equity Portion (%)
Debt Portion (%)
Capital Cost/MW (INR crores)
Interest rate for WC (%)
Tax rate (%)
Interest rate on loan from Financial Institutions (%)
Total annual energy (GWh)
Design energy with 90% dependibility (GWh)
Saleable Energy after aux. (GWh)
consumption & transformation losses
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 26
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 27
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
207.8
Fin. Institutions
207.77
Equity component
89.04
296.8
89.04
Period
Repayment
Financial Inst.
Repayment Amount/year
Financial Institutions
Moratorium
10
Installment/yr.
0
20.78
9/12
Yr 28
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 29
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 30
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 31
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 32
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 33
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
3.0
Yr 34
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Yr 35
65.00
256.29
296.82
30.00
70.00
4.57
9.75
30.00
10.00
293.18
279.45
276.11
Annexure - 13.3
7.0
NORMATIVE PARAMETERS
O & M Charges incl. Insurance (%)
O & M Inflation rate (%)
Rate of return on equity (%)
Rate of Depreciation (ES Act) (%)
Rate of Depreciation (IT Act) (%)
Spares for 1 yr -1/5th C.S
Auxiliary consumption (%)
Transformation Losses (%)
SCHEDULE OF LOAN REPAYMENT
AGENCY
FINANCIAL INSTITUTIONS
Outstanding Term loan
Term loan installment
Cum. Loan Repaid
Interest on Term loan
Total Yearly installment
LOAN SERVICING
Outstanding Term loan
Loan Repayment Installment
Sources of Funds for Repayment
- Depreciation (ES Act)
- Advance Depreciation
- Additional sources (ROE )
3.0
Yr 25
Yr 26
Yr 27
Yr 28
Yr 29
Yr 30
Yr 31
Yr 32
Yr 33
Yr 34
Yr 35
Year
25
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
26
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
27
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
28
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
29
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
30
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
31
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
32
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
33
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
34
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
35
1.50
5.00
16.00
3.50
25.00
0.59
0.70
0.50
Year
25
26
27
28
29
30
31
32
33
34
35
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
207.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10/12
Annexure - 13.3
7.0
3.0
Yr 25
Yr 26
Yr 27
Yr 28
Yr 29
Yr 30
Yr 31
Yr 32
Yr 33
Yr 34
Yr 35
RATE OF RETURN
Equity amount
Return on Equity
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
89.04
14.25
O & M EXPENSES
14.36
15.08
15.83
16.62
17.45
18.33
19.24
20.20
21.21
22.28
23.39
1.20
0.59
1.26
0.59
1.32
0.59
1.39
0.59
1.45
0.59
1.53
0.59
1.60
0.59
1.68
0.59
1.77
0.59
1.86
0.59
1.95
0.59
1.73
0.00
2.37
2.39
1.85
0.12
10.26
1.00
1.24
0.00
2.37
2.51
1.63
0.12
9.72
0.95
0.00
0.00
2.37
2.64
1.07
0.10
8.09
0.79
0.00
0.00
2.37
2.77
1.07
0.10
8.29
0.81
0.00
0.00
2.37
2.91
1.07
0.10
8.50
0.83
0.00
0.00
2.37
3.05
1.07
0.11
8.72
0.85
0.00
0.00
2.37
3.21
1.07
0.11
8.96
0.87
0.00
0.00
2.37
3.37
1.07
0.11
9.20
0.90
0.00
0.00
2.37
3.54
1.07
0.11
9.45
0.92
0.00
0.00
2.37
3.71
1.07
0.12
9.72
0.95
0.00
0.00
2.37
3.90
1.07
0.12
10.00
0.98
17.81
93.50
10.39
103.89
0.00
0.00
0.00
103.89
10.39
17.81
7.42
103.89
7.42
111.31
0.00
0.00
0.00
111.31
7.42
7.42
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.00
111.31
0.00
111.31
0.00
0.00
0.00
111.31
0.00
0.00
0.30
0.07
0.00
0.22
0.06
0.00
0.17
0.04
0.00
0.13
0.03
0.00
0.09
0.02
0.00
0.07
0.02
0.00
0.05
0.01
0.00
0.04
0.01
0.00
0.03
0.01
0.00
0.02
0.01
0.00
0.02
0.00
0.00
11/12
Annexure - 13.3
7.0
Yr 25
TAX LIABILITY (INR crores)
Yearly Profit/loss
Cummulative Profit/loss (+/-)
Tax liability
Yr 26
Yr 27
Yr 28
Yr 29
Yr 30
Yr 31
Yr 32
Yr 33
3.0
Yr 34
Yr 35
24.64
348.76
11.09
21.67
370.43
9.75
14.25
384.67
6.41
14.25
398.92
6.41
14.25
413.17
6.41
14.25
427.41
6.41
14.25
441.66
6.41
14.25
455.91
6.41
14.25
470.16
6.41
14.25
484.40
6.41
14.25
498.65
6.41
10.39
7.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.69
40.02
37.28
38.09
38.94
39.83
40.77
41.76
42.79
43.88
45.02
51.08
1.85
47.44
1.72
1.46
37.28
1.35
38.09
1.38
38.94
1.41
39.83
1.44
40.77
1.48
1.55
41.76
1.51
42.79
1.55
43.88
1.59
45.02
1.63
12.00 / Year
25
0.12
26
0.10
27
0.07
12/12
28
0.06
29
0.06
30
0.05
31
0.05
32
0.05
33
0.04
34
0.04
35
0.03
2
a
3
a
Item
Unit
Oty
Rate
Amount
MT
MT
Set
40
10
1
100000
50,000
6000000
40.00
5.00
60.00
SPILLWAY STRUCTURE
Radial Gates (Size)
Embedded Parts (Including anchorages)
Hydraulic hoist
Bulkhead Gates (Sizes)
Embedded Parts
Gantry Crane
MT
MT
Set
MT
MT
Set
500
170
3
170
60
1
100000
50,000
20000000
60000
30,000
6000000
500.00
85.00
600.00
102.00
18.00
60.00
INTAKE STRUCTURE
Intake Gate (Size) 4 of 4.5 x 4.5
Embedded Parts for Intake Gate
Rope drum hoist (as per capacity)
Bulkhead Gates (Sizes)
Embedded Parts for Bulkhead Gates
Gantry Crane (as per capacity)
MT
MT
Set
MT
MT
Set
40
10
2
20
8
1
100000
50,000
3000000
60,000
50,000
1000000
40.00
5.00
60.00
12.00
4.00
10.00
CLEANNING MACHINE
MT
70
50000
35.00
5
a
b
c
SURGE SHAFT
Gate
Embedded Parts
Hoist
MT
MT
Set
40
10
1
100000
50,000
6000000
40.00
5.00
60.00
Disilting Channel
Gate
Embedded
Hoist/Hydraulic
MT
MT
Set
40
10
2
100000
50000
3000000
40.00
5.00
60.00
1846.00
Say 1846.00
J-1
J-2
J-3
J-4
J-5
J-6
J-7
J-8
J-9
533
1070
3445
455
185
945
133
1846
120
8732
A
B
C
J
K
M
O
P
Q
R
X
Y
229.92
101
2764
8732
459.84
0.5
574.8
114.96
872
574.8
287.4
31.3266
28.74
Say 533.00
Say 1070.00
Say 3445.00
Say 455.00
Say 185.00
Say 945.00
Say 133.00
Say 1846.00
Say 120.00
Works-1
2
3
459.84
2.30
1.01
27.64
87.32
4.60
Say 101.00
5.75
1.15
8.72
5.75
2.87
0.31
0
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
24500
125
30.63
M3
4500
300
13.50
M3
6700
1000
67.00
RM
Underground Excavation
Support System
3.1 Rockbolts
13500
400
54.00
4500
4000
180.00
4.1 M-15
M3
2000
2930
58.6
4.2 M-20
700
3390
23.73
M3
650
4000
26.00
130
27000
35.10
3.2 Shotcreting
Concrete
Reinforeing Steel
488.56
6
2%
9.77
6.2 Instrumentation
1%
4.89
6.3 Dewatering
1%
4.89
5%
24.43
532.52
Say 533.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
48700
1000
487.00
2.1 Rockbolts
RM
8150
400
32.60
2.2 Shotcreting
M3
5550
4000
222.00
M3
5550
4000
222.00
Underground Excavation
Support System
Concrete Lining
963.60
4
4%
38.54
2%
19.27
5%
48.18
Total
1069.60
Say 1070.00
Sl.No
.
Underground Excavation
Support System
2.1 Rockbolts
2.3 Shotcreting
3
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
112010
1000
1120.10
RM
58750
400
235.00
13250
4000
530.00
M3
26450
4000
1058.00
100
27000
27.00
Concrete Lining
Unit
Reinforceing Steel
2970.10
5
8%
237.61
5.2 Instrumentation
1%
29.70
5.3 Dewatering
2%
59.40
5%
148.51
Total
3445.32
Say 3445.00
Item of Work
Underground Excavation
Support System
2.1 Rockbolts
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
9600
1000
96.00
RM
5700
400
22.80
1300
4000
52.00
M3
2550
2930
74.72
MT
240
70000
168.00
2.2 Shotereting
Concrete
413.52
5
3%
12.41
5.2 Instrumentation
1%
4.14
6.3 Dewatering
1%
4.14
5%
20.68
Total
454.87
Say 455.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
Underground Excavation
Support System
3.1 Rockbolts
M3
4000
300
12.00
M3
46500
1000
465.00
RM
4000
400
16.00
900
4.1 M20
M3
1150
3392
39.01
4.2 M15
4100
2930
120.13
3.2 Shotcreting
4
0.00
Concrete
Reinforcing Steel
550
27000
148.50
50
42000
21.00
Stone/Brick Masonry
LS
15.00
836.64
Miscellaneous
5%
41.83
8.2 Instrumentation
1%
8.37
8.3 Dewatering
2%
16.73
5%
41.83
945.40
Say 945.00
Sl.No
.
1
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
500
125
0.63
M3
1500
300
4.50
4000
1000
40.00
RM
2500
400
10.00
M3
560
4000
22.40
M3
1120
4000
44.80
Support system
Concrete Lining
122.33
5
Miscellaneous
5.1 MISC.
3%
3.67
5.2 Dewatering
1%
1.22
5%
6.12
Total
133.33
Say 133.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Geological Investigation
10
11
12
13
history of project.
254.42
Say 254.00
Item of Work
Requirement of land
Total
Unit
ha
Qty
200
Rate
(Rs.)
50,000
Amount (Rs.
in Lakh)
100.00
1.00
101.00
Say 101.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Residential Buildings
Servoces Charges @
Services Charges @
2.2.
Services Charges @
508.84
Say 509.00
Item of Work
3.3 Shotcreting
M3
6750
300
20.25
M3
4000
1200
48.00
3000
1500
45.00
RM
1800
400
7.20
400
4000
16.00
M3
800
4000
32.00
MT
50
2700
1.35
Concrete
4.1 M-20
5
Amount (Rs.
in Lakh)
Support System
3.1 Rockbolts
Rate
(Rs.)
Underground Excavation
Qty
Surface Excavation
Unit
Steel Works
169.80
6
2%
3.40
6.2 Instrumentation
1%
1.70
6.3 Dewatering
1%
1.70
5%
8.49
185.08
Say 185.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
no
no
no
no
no
no
4
12
2
2
4
5
3.75
3.75
8
6.5
5
8
15.00
45.00
16.00
13.00
20.00
40.00
Miscellaneous Equipments
Crane 50 ton
Carane 18 ton
Carane 10 ton
DG sets 500 KVA
Welding set
Tractor Trailor
Weight Bridge-20 ton
Explosive Van 10 ton
Pump 5 HP
Pump 10 HP
Pump 50 HP
no
no
no
no
no
no
no
no
no
no
no
1
1
2
4
4
2
2
2
20
10
10
155
75
45
25
2.25
18
8
6
0.2
0.3
1
310.00
75.00
90.00
100.00
9.00
36.00
16.00
12.00
4.00
3.00
10.00
no
no
no
no
no
no
no
no
no
no
no
no
no
2
2
2
4
2
6
2
2
2
2
2
6
4
1
0.7
0.15
0.75
0.25
0.5
0.15
1.25
8.00
2.00
1.40
0.60
1.50
1.50
10.00
8.00
1.00
1.00
0.30
7.50
15.00
871.80
Say 872.00
Workshop Equipments
Lathe machine
Shaper machine
Bench Drilling machine
Grinder
Drill Steel Grinder
Power hacksw
Hydrulic jack
Engine repair shop
Auto-electrical repair shop
Battery charger
Compressor for tyre inflation
Gas cutting set
Unforeseen item
Total cost of special tools and plants
NOTE : The project has been planned for construction through private agencies. The contractor shall arrange
heavy equipments for works for which no provision has been kept under Q - Special T&P.
C-Works-1
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
500
125
0.63
1000
300
3.00
M3
10500
1000
105.00
3.1 Rockbolts
RM
5800
400
23.20
3.2 Shotcreting
M3
1300
4000
52.00
M3
2600
4000
104.00
100
27000
27.00
Underground Excavation
Support System
Concrete
Reinforcing Steel
314.83
6
Miscellaneous
8%
25.19
6.2 Instrumentation
1%
3.15
6.3 Dewatering
2%
6.30
5%
15.74
365.20
Say 365.00
C-Works-2
Item of Work
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
400
125
0.50
M3
3000
2000
60.00
2000
4000
80.00
400
400
1.60
Concrete
Qty
Surface Excavation
Unit
RM
142.10
4
Miscellaneous
0.5%
0.71
4.2 Dewatering
3%
4.26
5%
7.11
154.18
Say 154.00
C-Works-3
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
20000
300
60.00
2.1 Rockbolts
RM
3700
400
14.80
2.2 Shotcreting
M3
500
4000
20.00
3.1 M 15
M3
9200
2930
269.56
3.2 M 20
23000
3392
780.16
MT
3250
27000
877.50
Support System
Concrete
Reinforcing Steel
2022.02
5
Miscellaneous
3%
60.66
5.2 Instrumentation
1%
20.22
5.3 Dewatering
2%
40.44
5%
101.10
2244.44
Say 2245.00
Item of work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
500
125
0.63
M3
1000
300
3.00
M3
2600
1000
26.00
1900
400
7.60
450
4000
18.00
950
4000
38.00
50
27000
13.50
Underground Excavation
Supports Systems
3.1 Rockbolts
3.2 Shotcreting
Concrete
RM
M3
Reinforcing Steel
106.73
6
Miscellaneous
4%
4.27
Instrumentation
1%
1.07
6.2 Dewatering
2%
2.13
5%
5.34
119.53
Say 120.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
24500
125
30.63
M3
4500
300
13.50
M3
6700
1000
67.00
RM
Underground Excavation
Support System
3.1 Rockbolts
13500
400
54.00
4500
4000
180.00
4.1 M-15
M3
2000
2930
58.6
4.2 M-20
700
3390
23.73
M3
650
4000
26.00
130
27000
35.10
3.2 Shotcreting
Concrete
Reinforeing Steel
488.56
6
2%
9.77
6.2 Instrumentation
1%
4.89
6.3 Dewatering
1%
4.89
5%
24.43
532.52
Say 533.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
48700
1000
487.00
2.1 Rockbolts
RM
8150
400
32.60
2.2 Shotcreting
M3
5550
4000
222.00
M3
5550
4000
222.00
Underground Excavation
Support System
Concrete Lining
963.60
4
4%
38.54
2%
19.27
5%
48.18
Total
1069.60
Say 1070.00
Sl.No
.
Underground Excavation
Support System
2.1 Rockbolts
2.3 Shotcreting
3
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
112010
1000
1120.10
RM
58750
400
235.00
13250
4000
530.00
M3
26450
4000
1058.00
100
27000
27.00
Concrete Lining
Unit
Reinforceing Steel
2970.10
5
8%
237.61
5.2 Instrumentation
1%
29.70
5.3 Dewatering
2%
59.40
5%
148.51
Total
3445.32
Say 3445.00
Item of Work
Underground Excavation
Support System
2.1 Rockbolts
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
9600
1000
96.00
RM
5700
400
22.80
1300
4000
52.00
M3
2550
2930
74.72
MT
240
70000
168.00
2.2 Shotereting
Concrete
413.52
5
3%
12.41
5.2 Instrumentation
1%
4.14
6.3 Dewatering
1%
4.14
5%
20.68
Total
454.87
Say 455.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
Underground Excavation
Support System
3.1 Rockbolts
M3
4000
300
12.00
M3
46500
1000
465.00
RM
4000
400
16.00
900
4.1 M20
M3
1150
3392
39.01
4.2 M15
4100
2930
120.13
3.2 Shotcreting
4
0.00
Concrete
Reinforcing Steel
550
27000
148.50
50
42000
21.00
Stone/Brick Masonry
LS
15.00
836.64
Miscellaneous
5%
41.83
8.2 Instrumentation
1%
8.37
8.3 Dewatering
2%
16.73
5%
41.83
945.40
Say 945.00
Sl.No
.
1
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
500
125
0.63
M3
1500
300
4.50
4000
1000
40.00
RM
2500
400
10.00
M3
560
4000
22.40
M3
1120
4000
44.80
Support system
Concrete Lining
122.33
5
Miscellaneous
5.1 MISC.
3%
3.67
5.2 Dewatering
1%
1.22
5%
6.12
Total
133.33
Say 133.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Geological Investigation
10
11
12
13
history of project.
254.42
Say 254.00
Item of Work
Requirement of land
Total
Unit
ha
Qty
200
Rate
(Rs.)
50,000
Amount (Rs.
in Lakh)
100.00
1.00
101.00
Say 101.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Residential Buildings
Servoces Charges @
Services Charges @
2.2.
Services Charges @
508.84
Say 509.00
Item of Work
3.3 Shotcreting
M3
6750
300
20.25
M3
4000
1200
48.00
3000
1500
45.00
RM
1800
400
7.20
400
4000
16.00
M3
800
4000
32.00
MT
50
2700
1.35
Concrete
4.1 M-20
5
Amount (Rs.
in Lakh)
Support System
3.1 Rockbolts
Rate
(Rs.)
Underground Excavation
Qty
Surface Excavation
Unit
Steel Works
169.80
6
2%
3.40
6.2 Instrumentation
1%
1.70
6.3 Dewatering
1%
1.70
5%
8.49
185.08
Say 185.00
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
no
no
no
no
no
no
4
12
2
2
4
5
3.75
3.75
8
6.5
5
8
15.00
45.00
16.00
13.00
20.00
40.00
Miscellaneous Equipments
Crane 50 ton
Carane 18 ton
Carane 10 ton
DG sets 500 KVA
Welding set
Tractor Trailor
Weight Bridge-20 ton
Explosive Van 10 ton
Pump 5 HP
Pump 10 HP
Pump 50 HP
no
no
no
no
no
no
no
no
no
no
no
1
1
2
4
4
2
2
2
20
10
10
155
75
45
25
2.25
18
8
6
0.2
0.3
1
310.00
75.00
90.00
100.00
9.00
36.00
16.00
12.00
4.00
3.00
10.00
no
no
no
no
no
no
no
no
no
no
no
no
no
2
2
2
4
2
6
2
2
2
2
2
6
4
1
0.7
0.15
0.75
0.25
0.5
0.15
1.25
8.00
2.00
1.40
0.60
1.50
1.50
10.00
8.00
1.00
1.00
0.30
7.50
15.00
871.80
Say 872.00
Workshop Equipments
Lathe machine
Shaper machine
Bench Drilling machine
Grinder
Drill Steel Grinder
Power hacksw
Hydrulic jack
Engine repair shop
Auto-electrical repair shop
Battery charger
Compressor for tyre inflation
Gas cutting set
Unforeseen item
Total cost of special tools and plants
NOTE : The project has been planned for construction through private agencies. The contractor shall arrange
heavy equipments for works for which no provision has been kept under Q - Special T&P.
C-Works-1
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
500
125
0.63
1000
300
3.00
M3
10500
1000
105.00
3.1 Rockbolts
RM
5800
400
23.20
3.2 Shotcreting
M3
1300
4000
52.00
M3
2600
4000
104.00
100
27000
27.00
Underground Excavation
Support System
Concrete
Reinforcing Steel
314.83
6
Miscellaneous
8%
25.19
6.2 Instrumentation
1%
3.15
6.3 Dewatering
2%
6.30
5%
15.74
365.20
Say 365.00
C-Works-2
Item of Work
Rate
(Rs.)
Amount (Rs.
in Lakh)
M3
400
125
0.50
M3
3000
2000
60.00
2000
4000
80.00
400
400
1.60
Concrete
Qty
Surface Excavation
Unit
RM
142.10
4
Miscellaneous
0.5%
0.71
4.2 Dewatering
3%
4.26
5%
7.11
154.18
Say 154.00
C-Works-3
Item of Work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
20000
300
60.00
2.1 Rockbolts
RM
3700
400
14.80
2.2 Shotcreting
M3
500
4000
20.00
3.1 M 15
M3
9200
2930
269.56
3.2 M 20
23000
3392
780.16
MT
3250
27000
877.50
Support System
Concrete
Reinforcing Steel
2022.02
5
Miscellaneous
3%
60.66
5.2 Instrumentation
1%
20.22
5.3 Dewatering
2%
40.44
5%
101.10
2244.44
Say 2245.00
Item of work
Unit
Qty
Rate
(Rs.)
Amount (Rs.
in Lakh)
Surface Excavation
M3
500
125
0.63
M3
1000
300
3.00
M3
2600
1000
26.00
1900
400
7.60
450
4000
18.00
950
4000
38.00
50
27000
13.50
Underground Excavation
Supports Systems
3.1 Rockbolts
3.2 Shotcreting
Concrete
RM
M3
Reinforcing Steel
106.73
6
Miscellaneous
4%
4.27
Instrumentation
1%
1.07
6.2 Dewatering
2%
2.13
5%
5.34
119.53
Say 120.00
Annexure 12.1
BHARO GHATI HYDRO ELECTRIC PROJECT
ABSTRACT OF COST OF WORKS
S.No.
AMOUNT
(Rs.in Crores)
(June 2003)
DESCRIPTION
CIVIL WORKS
DIRECT CHARGES
I - Works
A - Preliminary
B - Land
C - Works
J - Power Plant Civil Works
K - Buildings
M - Plantation
O - Miscellaneous
P - Maintenance
Q - Special Tools & Plants
R - Communication
X - Environment & Ecology
Y - Losses on Stock
(-)
TOTAL OF I - WORKS
2.30
1.01
27.64
87.32
4.60
0.50
5.75
1.15
8.72
5.75
2.87
0.31
147.30
(-)
10.77
1.47
0.00
.013
159.53
1.52
161.05
0.05
1.47
Abstract :
A
B
Civil Works
Electrical works
Total cost
161.05
107.29
268.34
Say 268.00
0.31
0.01308
ANNEXURE-7.1
BHAIRONGHATI HYDEL SCHEME
AREA CAPACITY CURVE
MDDL
FRL
ELEVATION
CAPACITY
(M)
(MCUM)
2630
1.03
2631
1.082
2631.5
1.107
2632
1.133
2632.5
1.159
2633
1.185
2633.5
1.21
2634
1.236
2635
1.288
2635.5
1.313
2636
1.339
2637
1.391
2637.5
1.416
2638
1.442
2639
1.494
2639.5
1.519
2640
1.545
2642
1.883
ANNEX - 7.3
BHAIRONGHATI HYDEL SCHEME
INCREMENTAL ENERGY BENEFITS
( 90% DEPENDABLE YEAR )
1
2
3
4
5
6
7
8
9
10
11
INST.
ANNUAL
ANNUAL L.F LEAN
KWh/ KW
CAP.(MW) ENERGY
(%)
FLOW L.F
GEN (GWh)
(%)
30
186.81
71.09
37.09
6227.14
35
204.20
66.60
31.79
5834.23
40
221.36
63.17
27.82
5533.95
45
237.58
60.27
24.73
5279.58
50
252.22
57.58
22.25
5044.43
55
266.30
55.27
20.23
4841.83
60
279.74
53.22
18.54
4662.35
65
293.18
51.49
17.12
4510.47
70
306.22
49.94
15.90
4374.56
75
318.08
48.41
14.84
4241.06
80
329.12
46.96
13.91
4113.99
d (KWh)/
(KW)
4000
3500
3000
2500
2000
1500
1000
500
0
30
35
40
45
50
55
60
65
70
75
80
3476.78
3432.00
3244.63
2928.00
2815.89
2688.00
2688.00
2607.68
2372.01
2208.00
d (kWh) / d (kW)
S. NO.
85
90
ANNEX - 7.2
BHAIRONGHATI HYDEL SCHEME
POWER POTENTIAL WITH DIFFERENT INSTALLED CAPACITY IN A 90% DEPENDABLE YEAR
FRL
MDDL
TWL
2642 m
2630 m
2514 m
GROSS HEAD
WC LOSSES
NET HEAD
124.00 m
15.1 m
108.90 m
GEN. EFF
TUR. EFF.
98 %
93.5 %
424.26
186.81
11.13
204.20
11.13
221.36
11.13
237.58
11.13
252.22
11.13
266.30
11.13
279.74
11.13
293.18
11.13
306.22
11.13
318.08
11.13
329.12
11.13
Incr. Energy(GWh)
17.38
17.16
16.22
14.64
14.08
13.44
13.44
13.04
11.86
11.04
Incr. Cap.(MW)
3476.78
3432.00
3244.63
2928.00
2815.89
2688.00
2688.00
2607.68
2372.01
2208.00
ANNEX - 7.4
BHAIRONGHATI HYDEL SCHEME
POWER POTENTIAL WITH DIFFERENT INSTALLED CAPACITY IN A 50% DEPENDABLE YEAR
FRL
MDDL
TWL
2642 m
2630 m
2514 m
GROSS HEAD
WC LOSSES
NET HEAD
124.00 m
15.1 m
108.90 m
GEN. EF
TUR. EFF
98 %
93.5 %
729.68
224.54
18.01
248.88
18.01
271.93
18.01
293.32
18.01
312.04
18.01
330.40
18.01
348.48
18.01
365.54
18.01
381.50
18.01
397.46
18.01
412.87
18.01
Incr. Energy(GWh)
24.34
23.05
21.39
18.72
18.36
18.08
17.07
15.96
15.96
15.41
Incr. Cap.(MW)
4867.73
4610.77
4277.96
3743.87
3672.00
3615.91
3413.13
3192.00
3192.00
3082.16
ANNEX - 7.5
BHAIRONGHATI HYDEL SCHEME
CAPACITY AND ENERGY BENEFITS IN
90% DEPENDABLE YEAR
PERIOD
JUN - 1
JUN - 2
JUN - 3
JUL - 1
JUL - 2
JUL - 3
AUG - 1
AUG - 2
AUG - 3
SEP - 1
SEP - 2
SEP - 3
OCT - 1
OCT - 2
OCT - 3
NOV - 1
NOV - 2
NOV - 3
DEC - 1
DEC - 2
DEC - 3
JAN - 1
JAN - 2
JAN - 3
FEB - 1
FEB - 2
FEB - 3
MAR - 1
MAR - 2
MAR - 3
APR - 1
APR - 2
APR - 3
MAY - 1
MAY - 2
MAY - 3
TOTAL
INFLOWS
(Cumecs)
75.00
98.70
126.60
106.50
126.90
173.50
139.30
145.30
121.80
88.70
69.80
53.80
42.50
28.50
27.90
24.00
20.90
18.00
12.70
12.10
10.30
12.90
12.30
12.50
12.20
11.00
10.30
10.40
10.00
10.70
11.90
10.40
16.90
26.30
31.60
45.50
1560.26
(Mcum)
OUTPUT IC =
MWc
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
65.00
52.66
41.60
27.90
27.31
23.49
20.46
17.62
12.43
11.84
10.08
12.63
12.04
12.24
11.94
10.77
10.08
10.18
9.79
10.47
11.65
10.18
16.54
25.74
30.93
44.54
65
GWh
15.60
15.60
15.60
15.60
15.60
17.16
15.60
15.60
17.16
15.60
15.60
12.64
9.98
6.70
7.21
5.64
4.91
4.23
2.98
2.84
2.66
3.03
2.89
3.23
2.87
2.58
1.94
2.44
2.35
2.77
2.80
2.44
3.97
6.18
7.42
11.76
293.18
MW
DESIGN ENERGY
MWc
GWh
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
61.75
14.82
52.66
12.64
41.60
9.98
27.90
6.70
27.31
6.55
23.49
5.64
20.46
4.91
17.62
4.23
12.43
2.98
11.84
2.84
10.08
2.42
12.63
3.03
12.04
2.89
12.24
2.94
11.94
2.87
10.77
2.58
10.08
2.42
10.18
2.44
9.79
2.35
10.47
2.51
11.65
2.80
10.18
2.44
16.54
3.97
25.74
6.18
30.93
7.42
44.54
10.69
279.45