Page No
1 of 6
TECHNO-COMMERCIAL OFFER
Offer- No.- ATEC/QN/14/02
TECHNO-COMMERCIAL OFFER
FOR
DETAILING DESIGN ENGINEERING SERVICES
E-mail.mahendra@atecindia.com
project@atecindia.com
www.atecindia.com
AryaTech
To,
Mr. Ashok R Yadav Manager - International Projects
Nirmal Industrial Controls Pvt. Ltd.
1st Floor, Samriddhi, L.B.S. Marg, Mulund (W),
Mumbai-400080
Subject: Proposal for Detailing Design Engineering Services.
Quotation No.: ATEC/QN/14/02 Rev-R2
Dear Sir,
Please refer our meeting on above subject at your office dated 07.01.2014; I express my sincere
gratitude for the trust shown in our organization.
Please find here our proposal for the support in above said activity.
1.0
2.0
3.0
Input Data:
2.1
REFERENCE DRAWINGS
2.2
Assumptions / Exclusions:
3.1
3.2
3.3
Only soft copies of the design Model shall be provided to you & other Deliverables in
PDF format.
If hard copies are desired, it will be provided at its actual cost.
3.5
KKS format for PID updating. Line numbering, equipment numbering, instrument
numbering, valve numbering etc.
3.6
3.7
3.8
Design pressure & temperature criteria for equipments and pipe lines.
3.9
3.10
3.11
Fuel gas specifications, battery limit conditions (pressure & temperature), flow rate
(gas & liquid) at the inlet of gas receiving, metering & ESD module and at inlet of
process coil.
3.12
Outlet fuel gas specifications, battery limit conditions, flow at the outlet of process
coil
AryaTech
3.13
Main and pilot fuel gas specifications, battery limit conditions (Pressure &
Temperature), flow rate at the inlet of heater
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
Sr.
No.
scope
estimated
qty of
dwg /
doc
Arya
Tech
time in
total
hrs for hrs per
activity activity
Total
hrs
500
Process Engineering
1
2
4
5
6
7
8
Remarks
Review of Tender
SOW and
Specifications
Document Numbering
Procedure
Offer stage PID
Updation in KKS
Format
Line List with Process
Data
Equipment List with
Short Specifications
Tie-in-Point List
PSV relieving capacity
calculation
Checking of
Mechanical Data Sheet
Remarks
Lot
16
16
Review
Lot
18
60
1.50
Lot
16
16
Lot
16
16
12
60
12
Not in Scope
Vetting
Vetting . Vetting of
36
Filter/Separator
AryaTech
(KOD,Condensate
Tank,Filter Separator)
Checking of
Mechanical Data Sheet
(Heater Package )
Skid GA & Isometrics
Review
Validation Heater Coil
Sizing (Fire box &
process coil)
9
10
11
15
16
17
Meeting with
NICPL/Client
12
13
14
excluded.
24
24
Vetting
From process point
30
of view
Lot
30
25
12
24
Lot
16
16
24
24
List of Exclusions:
Any other activity
besides indicated in
break-up above would
be treated as additional
scope of work.
Any additional activties
if required by Client
HSE requirements.
FS vessel will be
designed as per PED
requirements
50 Vetting by
Aryatech.
Vetting by
12 Aryatech. From
process view point.
Deliverables List
As indicated above.
Any additional
documentation will
be at extra.
Extra
NA
3.28
Approved p&id
3.29
3.30
3.31
Approved title box format/ templates (drawing sizes as per client requirement)
3.32
AryaTech
Deliverables documents from aryatech:
4.0
3.33
3.34
Piping isometric :
3.35
3.36
Support details
3.37
MTO
3.38
In isometric
3.39
In excel sheet
3.40
3.41
3.42
Support sketch
3.43
Support MTO
Cost:
SR NO
1
2
3
4
5
6
Discipline
Process
Piping & Mechanical
Project Management
Total Man Hrs
Man Hrs. Rate
Cost in Rs.
Total Project cost (INR)
Note1. Site visit & Clients meeting costing is not considered, will be charge at actual.
Total Price = INR 752250/- (INR Seven Laces fifty two Thousand two Hundred fifty only).
5.0
6.0
4.1
Taxes extra as applicable, the service tax shall be extra and at the rate stipulated by
Government of India.
4.2
Considering Rev. up to R1 and next Rev. Will are charged as per man hrs basis.
Site visits:
5.1
At actual
5.2
Transportation, hotel at actual. Three (3) visits considered. One (1) day /meeting.
5.3
Project schedule:
6.1
7.0
Payment schedule:
7.1
AryaTech
7.2
8.0
Validity:
Our offer is valid for a period of 01Month from the date of this quotation.
Hope you will find it in order and give us a chance to serve your organization.
9.0
Extra Work:
Any changes in input data after start of work if affecting the work done already, will be
treated as extra work and shall be charged separately based on efforts required and mutual
agreement.
M.A. MATELE
(Business Development)
9892470355/9920984503