Pending works to be completed 16 nos HFO isolation MIVs insulation and cladding HFO line filters insulation and clodding HFO short R / C insulation. Boiler Tube Leakage Detection system to be made ready LHS SA duct insulation to be completed hand railing in LHS A&C elevation to be completed. ECO I / L chemical cleaning line to be removed. Steam traps are required in all elevations atomising steam line leakage steam traps
Pending works to be completed 16 nos HFO isolation MIVs insulation and cladding HFO line filters insulation and clodding HFO short R / C insulation. Boiler Tube Leakage Detection system to be made ready LHS SA duct insulation to be completed hand railing in LHS A&C elevation to be completed. ECO I / L chemical cleaning line to be removed. Steam traps are required in all elevations atomising steam line leakage steam traps
Pending works to be completed 16 nos HFO isolation MIVs insulation and cladding HFO line filters insulation and clodding HFO short R / C insulation. Boiler Tube Leakage Detection system to be made ready LHS SA duct insulation to be completed hand railing in LHS A&C elevation to be completed. ECO I / L chemical cleaning line to be removed. Steam traps are required in all elevations atomising steam line leakage steam traps
Description 16 nos HFO isolation MIVs insulation & cladding HFO line filters insulation & cladding HFO short R/C insulation & cladding HFO CV insulation & cladding HFO steam line insulation & cladding HFO steam tracing line pending works to be completed 16m elevation oil station chequed plates paving work to be completed HSD & HFO flow transmitters to be commissioned HSD line eddy current earthing to be done for flanges Boiler Tube Leakage Detection system to be made ready LHS SA duct insulation & cladding to be completed Hand railing in LHS A&C elevation to be completed APH soot blowers permanent supports to be completed Scanner air main header supports to be provided Scanner air lines to burner temporary supports to be removed HFO lines near burner to be insulated A elevation cheqed plates paving & hand railing to be completed A elevation scrap materials to be removed 24 m elevation RHS hand railing to be provided G elevation Coal pipe permanent support to be provided Wind box area insulation & cladding to be completed ECO i/L chemical cleaning line to be removed C elevation RHS SA duct horizontal support not completed E elevation Coal pipe permanent support to be provided C6 HFO leakage to be arrested C layer atomising air SOV fouling C4 HFO leakage to be arrested C 1 burner inst air line leakage Steam traps are required in all elevations atomising steam line Insulation & cladding to be completed in AC & GE water wall area G elevation paltform extension to be provided on both sides G layer scanner air hdr temporary supports to be removed G4 HFO leakage to to be arrested G layer chequed paltes paving , handrailing & platform works to be completed Boiler to De-areator apporoach to be made ready Boiler RHS 28m walkway to 2nd elevation to be made ready 28 m water wall area platform & handrailing work to be completed D layer RHS approach paltform & handrail is required D3 scanner air line temporary supports to be removed Permanent supports to be provided for Inst air line in all 4 corners F layer ( RHS ) platform is required for inst. Pannels BCP dis line PG tapping support not provided @ 38m el Proper & safe approach has to be provided for LHS side APH flue gas I/L dmpr Re-heater spray line permanent supports to be completed All burners coal I/L mov orientation to be changed
BCP dis line permanent supprts to be provided BCP dis CV d/s welding pending Proper & safe approach has to be provided for BCP dis CV Boiler drain lines permanent supports to be provided Boiler drain lines insulation & cladding to be completed All support hangers to be normalised Proper approach to be provided for ECO I/L FT isolation MIV RHS Eco I/L manhole erection to be completed RHS Eco & CRH bellow welding ,insulation & cladding to be completed LHS Eco & CRH bellow welding ,insulation & cladding to be completed First pass RHS 55m handrailing to be completed Proper approach is required for Front & Rear wall blowers CRH safety valve O/L pipe welding to be completed Transition hdr drain line welding to be completed Transition header balance insulation & cladding to be completed RHS CRH safety valve vent pipe to be erected SH spray line temporary supports to be removed Eco O/L & PSH I/L bellow welding , insulation & cladding Eco O/L LHS area insulation & caldding 58 m el LHS platform & handrailing for fire fighting valve 59.8 m el storrage vessle snubber locking to be removed Pass A APH to ESP duct insulation & cladding to be completed Vestuble ww insulation & cladding to be completed Inst air line flange leakage in SH spray cv to be arrested Storage vessle to platen spray line permanent support to be provided SH O/L safety valve vent pipe to be erected MS & HRH snubbers lock nut to be removed Pent house roof insulation bellow the hangers to be completed Cage sling vent MOV to be erected Final RH vent & hydrotest Pressure Gauge to be removed