Boiler Punch Points


Description
16 nos HFO isolation MIVs insulation & cladding
HFO line filters insulation & cladding
HFO short R/C insulation & cladding
HFO CV insulation & cladding
HFO steam line insulation & cladding
HFO steam tracing line pending works to be completed
16m elevation oil station chequed plates paving work to be completed
HSD & HFO flow transmitters to be commissioned
HSD line eddy current earthing to be done for flanges
Boiler Tube Leakage Detection system to be made ready
LHS SA duct insulation & cladding to be completed
Hand railing in LHS A&C elevation to be completed
APH soot blowers permanent supports to be completed
Scanner air main header supports to be provided
Scanner air lines to burner temporary supports to be removed
HFO lines near burner to be insulated
A elevation cheqed plates paving & hand railing to be completed
A elevation scrap materials to be removed
24 m elevation RHS hand railing to be provided
G elevation Coal pipe permanent support to be provided
Wind box area insulation & cladding to be completed
ECO i/L chemical cleaning line to be removed
C elevation RHS SA duct horizontal support not completed
E elevation Coal pipe permanent support to be provided
C6 HFO leakage to be arrested
C layer atomising air SOV fouling
C4 HFO leakage to be arrested
C 1 burner inst air line leakage
Steam traps are required in all elevations atomising steam line
Insulation & cladding to be completed in AC & GE water wall area
G elevation paltform extension to be provided on both sides
G layer scanner air hdr temporary supports to be removed
G4 HFO leakage to to be arrested
G layer chequed paltes paving , handrailing & platform works to be completed
Boiler to De-areator apporoach to be made ready
Boiler RHS 28m walkway to 2nd elevation to be made ready
28 m water wall area platform & handrailing work to be completed
D layer RHS approach paltform & handrail is required
D3 scanner air line temporary supports to be removed
Permanent supports to be provided for Inst air line in all 4 corners
F layer ( RHS ) platform is required for inst. Pannels
BCP dis line PG tapping support not provided @ 38m el
Proper & safe approach has to be provided for LHS side APH flue gas I/L dmpr
Re-heater spray line permanent supports to be completed
All burners coal I/L mov orientation to be changed

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

H elevation Inst air line MIV u/s flange leakage


BCP dis line permanent supprts to be provided
BCP dis CV d/s welding pending
Proper & safe approach has to be provided for BCP dis CV
Boiler drain lines permanent supports to be provided
Boiler drain lines insulation & cladding to be completed
All support hangers to be normalised
Proper approach to be provided for ECO I/L FT isolation MIV
RHS Eco I/L manhole erection to be completed
RHS Eco & CRH bellow welding ,insulation & cladding to be completed
LHS Eco & CRH bellow welding ,insulation & cladding to be completed
First pass RHS 55m handrailing to be completed
Proper approach is required for Front & Rear wall blowers
CRH safety valve O/L pipe welding to be completed
Transition hdr drain line welding to be completed
Transition header balance insulation & cladding to be completed
RHS CRH safety valve vent pipe to be erected
SH spray line temporary supports to be removed
Eco O/L & PSH I/L bellow welding , insulation & cladding
Eco O/L LHS area insulation & caldding
58 m el LHS platform & handrailing for fire fighting valve
59.8 m el storrage vessle snubber locking to be removed
Pass A APH to ESP duct insulation & cladding to be completed
Vestuble ww insulation & cladding to be completed
Inst air line flange leakage in SH spray cv to be arrested
Storage vessle to platen spray line permanent support to be provided
SH O/L safety valve vent pipe to be erected
MS & HRH snubbers lock nut to be removed
Pent house roof insulation bellow the hangers to be completed
Cage sling vent MOV to be erected
Final RH vent & hydrotest Pressure Gauge to be removed