Technical Specifications

Ministry of Housing
Infrastructure works for housing design in the Kingdom
1 to 02,810
Section 02 810
Irrigation systems
PART 1 year
1-1 Description
The goal of this project is to supply, installation, testing and operation of automatic irrigation system,
which includes all
The basic components of the system of irrigation infrastructure project to project work overalls and a
housing area of Ren Ng.
Automatic irrigation system must contain pumps, plates ordinary controller connected to a central
control system
Irrigation and electric wires, valves of electrical control, filter Dsky, machine guns, dotted mechanisms,
Menktat,
Valves end lines and some other basic elements laundering.
1-2 Description tasks:
Must be working on the project closely linked with the specifications required to use materials,
With the operational plans of the irrigation system and with graphics that explain how to install
irrigation materials. It also should include
But not share a year as follows:
A. The contractor must prepare shop drawings that should appear but not share a year each of the
The main lines, laterals, valves, electrical control, and the number of wires passing through
Electrical, control panels, machine guns, dotted mechanisms, drippers, bibliographic a rate valves end
laundering
Lines.
B. The Contractor must provide all the technical information and samples required for materials used in
The project, which should be matching the basic specifications for irrigation materials for this project.
T. The Contractor must be running the irrigation system after the completion of all the work and then
delivers
Project.
W. The Contractor shall after the completion of all the work that delivers the owner number three
copies of
. (As-Built). Schemes that have been modified by the port on the reality of the project
C. The Contractor shall after the completion of all the work that delivers the owner number three copies
of the detailed
Operation and maintenance manual (with translation process into Arabic). This booklet should contain
all
Almncho a special rate of scientific materials that were used in the project. It should also contain a
brochure
List of spare parts, enough for five years, in addition to the basic version of the schemes that have been
Adjusted according to the port on the reality of the project.
H. The owner must and before the receipt of the certificate giving the contractor for the project, that
the ratification of the charts
That have been modified by the port on the reality of the project and the ratification of the operation
and maintenance manual.

1-3 Quality Control: A. Manufacturers: You must be manufacturers of materials, irrigation system, you may have run the
same type of material
Will be supplied to the project and the same conditions for a period of not less than 8 years.
B. Contractor: The Contractor shall secure installation workers to have the experience of not less than
five years in the same
Field work and on the same level of quality.
1-4 rules and standards applicable: .DIN 8061 & similar standard specifications German 19532 -ISO R a. 161
Similar to the specifications of the standard Arabia for pipes. -SASO 14 & b. 15
Base use of polyethylene pipes and pipe cutting polyethylene -BS: CP v. 312
Bordeaux tube specifications and hour pressure size. -BS: W. 1780
Specification polyethylene pressure polyethylene pipes allocated cold water. -BS C. 3505
Blocks allocated to the pressure polyethylene pipes and fittings specifications. -BS H. 4346
Specifications gate valves Corynebacterium manufacturer of iron foundry and valves -BS x. 5150
Dual cylinder.
Specifications spherical copper valves, valves arrest and irreversibility spherical -BS d. 5150
And gate valves and non-return.
Applied specifications of the tubes. -BS LLC. 8010
1-5 submissions: A. -Operative schemes must contractor shall prepare three copies of drawings
And presented to the representative of the owner to take approval before starting operational work.
B. Products- Contractor shall prepare the samples for semen materials used in the project
In addition to all the information and technical Almncho a rate for these materials, which must match
Specifications contained Thales.
C. The Contractor shall after the completion of all the work that delivers the owner number three copies
of the detailed
Operation and maintenance manual (with translation process into Arabic).
D. The Contractor shall after the completion of all the work that delivers the owner number three copies
of
Schemes that have been modified by the port on the reality of the project.
Part 2 outs
2-1 year: 16 bar, (HDPE) a. Must all be used pipes in the main lines of polyethylene
According shop drawings.
10 bar, (HDPE) b. Must all be used in piping laterals of polyethylene
According shop drawings.
16 (HDPE) T. Must all be piped accessories main lines of polyethylene
Bar, according to shop drawings.
16 (HDPE) w. Must all accessories piped laterals Polyethylene be
Bar, according to shop drawings.
Or of the specifications (SASO) c. Polyethylene pipes must be ethylene nonconforming Arabia
Must all links and pieces manufactured in line with the specifications be. (BS British (3505
. Section 1 (British BS (4346
H. You must be flexible pipes intended for use Menktat same sizes contained in the charts
Few (LLDPE) and executive table quantities. It should also be made of polycarbonate material Aniline
. (UV) density. It should also be resistant to damage caused by UV radiation
2 Applied Products: -2

2-2-1. wild grass flats: MP Rotator (9.1 meter radius circle Coverage - A rotary sprinklers Popup (4
Must be spray-type rotor impact viscosity of water and multi-Altea a rate of Msa the rate at different
angles
And rotary.
You must be a machine gun from the conservative type deposition rate equal no more than 0.6 / h in all
Irrigation throughout the arc (Sprinkler Irrigation District) on the same range (radius) can be adjusted so
that the radius
. 25%
Irrigation can be modified arc from 45 to 105 and from 90 to 210 and from 210 to 270 depending on the
Sprinkler
User. As for the gun full circle it must cover 360 and Sprinkler from 45 to 105 should not
You need to install sprinklers in the nearby distance of 1 meter (3 feet).
Sprinklers full circle or adjustable radius can be reduced up to 25% using the nail Ostnls
Steele. Stainless steel or a term damage internal part during the adjustment and calibration Odhu
double Tire pressure relief and
Act before the nozzle spray for keeping the safety and uniformity mainstream.
Sprinklers midwife to change the arc of 90 of the 210 or 210 to 270 must be out of the loop
Stainless steel to be with effect only in the event that the gauze in operation and is an influential state in
the absence of
Irrigation (suspension) and Aldo during a rang of tuning does not affect damaged on any of the term of
the internal part of the gun
You must be a machine gun factory Aorthan of polycarbonate material and integrated resistance to
damage plastic acetylcholine.
, MP Side Strip, MP Left Strip, MP Right Strip, all models of rotary sprinklers either
Can be installed on any machine guns leaping kick that her Reiser MP1000, MP2000 & MP3000
(FIPT X 5/8 / -28 UN) "1 / enactment Gulwoz Jargi and body spray accept mounting serrated 2
For football pitches I-25-ADV (21.6 meter radius circle coverage - b - Popup rotary machine guns (12.2
Tennis and sand and shaking the Rev
Must be Sprinkler type jumper rotor which works on gears in a closed room inside
Sprinkler and body are soften by water that go into the room just once.
31.5 gallons / min under - 21.6 meters Adapted from 3.8 - Sprinkler covers a radius of 12.2
According Alnozl which is mounted PSI 100 - pressure of 04
31.5 c / d) .walnozl double - must be Sprinkler deceased a year with a record 12 nozzle and disposal of
(3.8
The primary and secondary slots Mmeltsqtan together to be the Ozl one must be different colors to
identify the type of
Alnozl and WVGA.
. It should also spray contains a mechanism that enables control of the radius of the circle and spraying
it by screw
Install Alnozl (stainless Stal- stainless steel).
360 degrees) and must be the possibility of setting - must be Sprinkler type stainless change from (40
Easy in all cases before and after installation and before and during the operation, as the adjustment
process are part of the
Top in Sprinkler.
Must be part of the pulsating sprinkler deceased a year or 10 cm length 15 cm (6 ") in accordance with a
great composition. As
Must be done Sprinkler valve irreversibility works even altitude of up to 10 feet (3 meters).

Integral Rubber) should be the body of pulsating sprinkler covered from top rubber cover
That the cover is part of the machine gun. It must be exposed surface to air after installation (Cover
. (FNPT) radius of 5 cm. As should the water inlet from the bottom only 1 "serrated Female
Corrosion resistance (Plastic ABS) must be a body spray and pulsating section of it is made of material
Shocks or that existing Sprinkler part pregnant Alnozl Balstnls coated steel.
It should also be six Su Sprinkler who believes one at a back section of the pulsating sprinkler irrigation
process stops after the
The type of stainless steel-steel.
(Variable Stator) must be equipped with sprinkler adjust the speed of the de rang a Rs Sprinkler
automatic mechanism
Regardless of Alnozl user and the pressure that holds the gun.
In the event that an existing Sprinkler part pregnant Alnozl Balstnls coated steel must have a gun to
ensure five
Years against manufacturing defects.
2-2-2-term part of the special Barre regular trees and palm trees: A rasters high-flow irrigation regular trees and palm trees
You must be a single director, offsetting pressure as the disposal of the dotted remains constant (25 l /
h) under
4 bar. - Pressure of 0.5 slice
Must be dotted with self-washing system continuously through a double mechanism of regulation
include Rberh
The following dimensions: Turbonet and watercourse winding technology works EPDM rubber made of a
material
. 17.0 mm: 1.60 - Length mm: 1.60 Width mm: 25 liters dotted hour: depth
B: a bibliographic rate organization and Alnozlat pressure:
90. must be Albppler of the kind of pressure compensator as the act remains constant under the
pressure of a slice of 20
. (UV) and must be made of plastic materials resistant to corrosion and UV radiation .PSI
Which maintains a constant acted despite (Elastomiric) must Albppler contain membrane of rubber
material
Pressure difference.
Albppler must contain a plastic filter for protection of the blockage, which can result from the presence
of some impurities in
Water.
It also must have a feature that can Albppler spring. (FNPT) serrated Female " must be the entrance
Albppler
. "3 / entrance with 8 (Pop-Up PCN Bubbler) machine gun mounted on a hard spring
1 or 2 gallons / minute according to the specifications and drawings. , 0.5, should be available at the
disposal Albppler 0.25
2-2-3-term portion of private land a melodious rate and soil are covered: A special irrigation drippers a melodious rate and are covered cultivated soil scatter
You must be a single director, offsetting pressure as the disposal of the dotted remains constant (4 l / h
or 8
0.5 bar. - L / h depending on the dotted user) under the pressure of 4 slice
Must be dotted with self-washing system continuously through a double mechanism of regulation
include Rberh
The watercourse winding the following dimensions: EPDM rubber made of a material
35 mm: 1.32 - Length mm: 0.95 - Width mm: dotted 4 liters an hour: depth

35 mm: 1.60 - Length mm: 1.05 - Width mm: dotted 8 liters an hour: depth
4 are covered soil and mattresses melodious rate of -2 -2
A dotted mechanisms that are used above the soil surface Barre melodious a rate and are covered
cultivated soil
Heavy:
You must be mechanisms dotted made from low density polyethylene and stainless UV
And an external diameter of 17 mm or 16 mm. According shop drawings. (UV)
Collage on the wall (Flat drippers) must be rasters existing mechanisms within the dotted flat
Internal me (to be an integral part of who a g) and equal distances. It should also be of the type
compensator
4 bar by regulating mechanism - where the pressure to spend the dotted remains constant under the
pressure of a slice of 0.5
Lying along the dotted and watercourse EPDM double pressure include Rberh made of rubber material
Curvy.
Must be dotted with self-washing system continuously.
You must be my punctuation deceased a year flow 3.5 l / Q as it should be the dimensions of the
waterway dotted
As follows: Turbonet
40 mm: 1.59 - Length mm: 1.15 Width mm: 3.5-liter dotted hour: depth
Must be disposed of fixed dotted nor affected by climate change with a degree insisted Rrh up to 60
degrees Celsius.
Must be dotted with the entrance of a filter works to filter the water inside and prevent any impurities
from entering only that
Can exit.
Very low. (CV) should be dotted with plants change Manufacturers
2-3 valves 2-3-1 ICV 1 electric control valves And stainless open EE (Normally closed CSS naturally) (Globe) must be LED-type spherical
- Epidemiologically by the inner membrane. It also must be capable of LED to work under pressure slice
of 20
300 gallons / minute. - And be led by a year to pass a flow of 0.1 .PSI 220
2 "or 3" and the entrance and exit serrated - 2 "/ 11" LED must be deceased a year in different sizes 1
It also must be deceased LED RC manual control mechanism to act so as to adjust the disposition (FNPT)
Female
Full of the total flow to total closure, regardless of whether the operation is done manually or EE
epidemic and that
By Ra y a manual control and located in the center of the valve cover third-party.
You must be a body and valve cover made of glass-reinforced nylon material to withstand an operating
pressure
It must be met valve cover to not slip on the valve body with different types of keys PSI. Up to 220
And must be kept to a Reggie installation stuck valve cover if they were removed from the valve body.
(Stainless Steel, Bolt Brass Inserts).
Must be the inner membrane of the valve of nylon and subsidized based on an episode are subject to
change so as to strengthen and
Protect the inner membrane of direct water pressure. It should also be LED processors of a membrane
filter g metal
Stainless steel and the mechanism of continuous washing of the filter, which works on the incoming
water filter to the loft above

The membrane so that water enters the refinery only to this room and that this mechanism must
operate continuously as long as
(Filter Sentry). LED is turned on
PSI 20-100) (Pressure Regulator) must be equipped with the possibility of adding LED pressure regulator
The water is out of the LED constant pressure as may be set on the device and regardless (ACCU-SET
.PSI 220 - of the pressure valve located at the entrance and from 35
Must be LED processors of a g solenoid (Slinoad) runs on 24-volt power 60 Hz stream
(Holding continues to work stream of 190 mA (Inrush Current) primary 370 mA
The file must be one capsule is to be offset by dismantling and when the file is decrypted .Current cover)
By a quarter of his role is released water that was Mahgo g in a loft above the membrane valve leading
to
Open the valve and the water flowing through it and when operating or closing the valve manually or EE
epidemic should not go out
Any water out of the valve body so that the valve remains completely from the outside Java.
LED must be guaranteed for five years, and that against manufacturing defects under operating
conditions
Natural according to the specifications and the accompanying drawings.
2-3-2 valves vacuum You must vacuum the same sizes in shop drawings and bills of quantities valves shall be as
Must be of the type motor / automatic, who works on the vacuum automatically at the beginning of
Pipes filled with water during operation.
You must be a size 2 LED "with plastic or copper base. Valve body should be composed of
Plastic resistant to corrosion and shocks.
Must all be moving sections of the LED is composed of 100% corrosion resistant plastic for life insurance
Longer and less possible loss of pressure can be produced from the spill.
Which remains open until EPDM must be a mechanism LED work through a circular movement of a
piece of all
.PSI Pressure up to 10
2-3-3 end automatic washing lines valves You must LED works on a temporary washing and automatic drip lines for sub-compressed water.
Must be authorized by a valve designed to stay open until the high pressure of Bach who shall shake the
equivalent of all
PSI. 3.75 liters. LED also be met for maintenance works on the pressure of 1557
LED must be a component of plastic resistant to corrosion. It also must have the inner membrane of the
valve component
Of silicon material does not contain any metal.
Or 17 mm saddle. " LED is mounted on the irrigation network of LED base that are serrated said
2-3-4 valves quick link
Valves must be a quick link of the kind that works by hollow key from the inside.
You must rotate the key LED works with the same Zawya 90 clockwise and 90 counterclockwise
The time to close the valve.
You must be a valve body composed of solid brass and allow the passage of water at full disposal to
reduce the
Loss of pressure. And be covered with a rubber material pressed a Rra resistant UV and materials
Chemical.
Should the valve body consists of two pieces. It also must contain whispers rust-resistant in order to
secure the closure of

Cover.
2-3-5 valves pylori
You must be gate valves have been designed to withstand pressure of at least 10 bar and a degree h Rrh
water
Up to all 45 C.
Must be equal to the size LED Size nutrition line. The valve is opened by turning the control loop Unlike
Clockwise. It should also notice the presence of shares control loop indicates the direction of the
opening and closing. Have to
The valve body is composed of solid brass and allows the passage of water at full disposal to reduce the
pressure loss
. (Full Bore)
All valves must be less than 3 Mqasa "composed of bronze or copper according to the specifications to
be
"And with the inlet and outlet serrated. As for the valves, which increases Mqasa for 3 (BS British (5154
By linking (BS should be composed of iron foundry by British standards (5150
. (flanged end connections) Flanecat
2-3-6 fuse boxes M 80064F, should be the fuse boxes made of polyethylene high density
In addition to containing materials to resist the problems resulting from exposure to UV. And (HDPE)
You must be lightweight,. (ASTM-D- must be manufactured according to the specifications of America
(1238
Shock-resistant and with a side Zawya is sharp.
Must be the fuse box is connected to the power supply.
1419 and 1320 according to the specifications, 0.910, fuse boxes should be available in sizes 610
Need to install and charts.
2-4 filters systems

2-4-1 battery filters Disekah Qatar


You must be a filtration system is a battery filters Dskyh composed of 2 units Okther 3 "filter of Zawya
According to what is contained on the shop drawings. The battery must be able to filter approximately
310
Gallons per minute of moderate-quality water.
You must be a filtering unit of the type consisting of Aldsky Dskat been a single stack and other made-by
Plastic h a Rra resistant to chemicals. These brake discs characterized as V Gaza from both sides in order
to ensure
Read more surface and thus greater protection of the irrigation system.
The unit must be located within the filtration filter body is made of plastic and stainless Compatible
damage
Shocks to withstand pressure up to 10 bar, where it will be closed by the filter body strap of metal and
mind
(EPDM) TS Lord of TNT any BDM
It should also be possible to assemble and filtration units with each other in a system called Battery
So that the unit can operate on the same washing automatically by the system (Battery Filter) filters
Backwash and regulated by the control panel of electrical works on the principle of water inside the
pressure difference
And the outside of the battery or on the principle of timing

2-5 Control Panel


ACC99D 1 plates automatic control and measuring behaviors rates -5 -2

You must be a control panel (Alcontrolr) of the type stainless to increase the number of stations and has
a large screen display
Can display information in 8 lines and demonstrate the value flow rates for each valve or valves must be
set
To be available the possibility of separate panel of programming that is installed on the wall or the lid of
the box installation of ourse
The possibility of preparing a Alp Rmj or external maintenance without removing the wire as it should be
kept memory. Console
Home (Alcontrolr) start number at least 12 stations, and accept the increase of stations by adding
Modiolr
And that the number of available stations 6. By adding one or more of the number Modiolr can reach
(Modular)
To station number 42 or 99 station decoder system in the control panel plastics to be installed on the
wall or
Control Panel to install the metal of ourse.
Alcontrolr must contain the possibility of running at least 6 valve control at one time and duration of the
run
Each trap of not less than 6 hours with the possibility of preparing uptime in minutes and seconds. Can
be more prepared
10 b of Rmj irrigation that each of them have a separate daily agenda and the possibility of the
introduction of up to 10 dates for each irrigation
A separate program as it should be split irrigation system for irrigation system and the suspension until
absorption for each property
.amkaneh Station startup delay between stations up to 6 hours and an increase of seconds with the
ability to modify the duration
300% and an increase of 1% .amkaneh test - run system stations a year to change a seasonal rate, a rate
of 0
Om the irreversible b Rmj the ability to run several operating variables stations Rh groups. You must
accept the linkage with 4 devices
Sensing and responding to the program each sensor module such as linking a unit of measurement
disposition Eontrulr rights of lung
Behavior in the stations and to respond to any of variable rate as it should be has the potential to
identify the highest and lowest
The disposal of the case when running a number of valves and valve determine who has a problem with
the possibility of adjusting to act
The maximum or minimum behavior of each valve and time to correct the error. It also can be linked to
a unit of measurement
Evapotranspiration to identify the rate of climatic variables and determine the actual required for
irrigation rate (operating) each
Terminal.
As should all be Modiolr inside transparent plastic box with garlands illuminated allow to determine the
status of each
Station (working or not working or damaged) and fitted to protect against electric shock. As it should be
Eontrulr entrance Zakia slice allow communication Eontrulr remote operation and re-programmed or
run any
Valves associated with it. Or add Modelr to controler to conform to run and connect to a central
computer

During one communication system compatible with operating systems Kingdom (underground cables or
telephone or hard
The mobile phone or the use of the waves Redjo Ali waves authorized), and when you connect to your
computer provider
Program Alasta a private trauma management Om a neck irrigation system have contact binary and
allows the preparation of reports.
Kma.ajb be the control panel is guaranteed for five years, and that against manufacturing defects under
conditions
Normal operating according to specification and accompanying drawings.
2-5-2 Sensors and measuring flow rates: The unit of measure flow rate must be compatible with the possibility of recording Alcontrolr provider
rates
The actual act and have a possibility to give instructions automatically in the event of an increase or
decrease the rate of
Conduct during irrigation.
You must be a measuring device disposed of the same diameter of the pipe is installed and connected to
the operator Balcontrlor
Irrigation system cables on the distance from 330 meters shall not exceed.
. (Digital) s be a lung measuring device to act and all recordings of digital type
Decoder specifications:
Must be isolated from the decoder kind against water and electric shocks provider unloading system
and has a wire
Copper works Kerda.
For Dacod a multi-rate stations it must be wire each different from the other for easy station
Installation and maintenance.
Must be available from Alecod a rate Migti at least the following stations:
- Decoders to run one station
- 2 decoder to run station.
- 4 decoder to run station.
- Decoders to run 6 station.
- Decoders to run a sensitive measurement of flow rate
Each decoder must be Mmez colored wires for easy connection between the wire and wire Alcontrolr
Alsolonid
Bamahabs.
Must all be Aldecodrmtuaqh with type Alcontrolr user and certified in accordance with the standard
specifications of
.CE
Ground wire must be created for every 12 decoder or 1000 feet / 330 meters, whichever is the shorter
the length of the wire extends
Of Alcontrolr to stations Almokhtlfah.bdon taking into account the size of the decoder (whether or
multi-station
Stations) for the ground only.
The last decoder in extending the line to be put to him Ground.
It is necessary to apply all the standard Organization standards for electrical connections Tpfa Saudi
standard specifications
The manufacturer of the decoder and Alcontrolr.
2-5-3 sensors and measuring the rates of variable rate air (evaporation rate -nth)

Private (ET) (must be the sensor is able to calculate how much Alboukr- transpiration (local as data
The installer of the region. Estimates according to a variable rate climate in the region by the existing
irrigation system and the specified area.
The system should be able to provide data and information without the payment of any of Chan Rkat or
transmission system
ET and receive or depend on climatic data from other sources to enter the issuance of data worth
Must work with the site Alcontrolr additional feature with automatic irrigation system to limit the value
of evaporation - ET system
I have to be compatible with the unit Alcontrolr site and able to give up to 48 data terminal ((ET)
transpiration
Stopcock).
Ali sensors to measure solar radiation rate, measuring humidity, ET measure must contain a unit of
measurement
0.254 mm) must / "h degree of Rrh air, in addition to the unit rate accurately measure rain starting from
(0.01
All sensors are compatible and complete one device.
An internal unit for programming coefficient rate change with the possibility of wind ET also must
include a measuring device
11.2 km / h) to the speed of a medium welcomed. - With automatic or manual adjustment of (1.6
You must stop the irrigation final automatically in case of rain and irrigation should be prevented in the
case of low ET device
H degrees of Rrh air until freezing.
Appreciate the amount of rain water and will add as a percentage of the Zen X soil to provide irrigation
water automatically. ET device
You must have the ability to turn off irrigation in the case of increasing wind speed for the required
values ET device
For the region.
Each region (valve / station) until 48 ET must have a data base to adjust the value of the measuring
device ET
Area must include the database for each station on the types of plants in addition to the crop coefficient
The data of different soil types, and to define the soil tendencies and the presence of light or a sunny
area.
Must also allows the operator to add or modify the irrigation program in addition to the possibility of
appreciation automatically ET system
And add them to the next irrigation program automatically. ET for the days that have been shut down by
the irrigation and calculate water needs
ET should be allowed to update the data to a variable rate of climate clock and assembling ET rates
system
And operation of the irrigation system according to the daily need.
Should be allowed Basta a trauma ongoing irrigation events possibility of seeing data last irrigation and
Rest of trauma system ET
The total number of operating the irrigation rate per day and the number for the station.
Must contain the potential to activate the feature (to prevent wilting of the plant) to protect the plants
from drought ET system
As a result of changing environmental circumstances

2-6 central control and irrigation pumps system specifications

(Windows- based) must be a central control in irrigation is designed on the basis of a Windows
program
It also must have led a year to cope with the Windows 2000 operating system of Windows XP.
You must be a central control program is a fallen listings with colorful icons coordinator to facilitate the
process
Programming. And to be led by a year to control a single location or multiple locations. Should have led
the program a year on programming
Irrigation days, the duration of running the stations, irrigation start time, and programming division
irrigation for each station to several
And have the ability, (soak) and determine the interval between these Aldo a rate (cycle) sections, each
section called cycle
Also to stop the irrigation process in any of the sites that are controlled through this program. Have to
The control system has led a year to give a hand to run a command and stop all and any site associated
with this site
System. You must be a central control program led a year to run nearly 100 locations through unit
Through computer-to-one. It also must have led to a year (site interface unit) operation of the site
In each of the sites. You must be a program (controller) control, including nearly 100 control panel
Central control led a year to secure a double-way communication between the central computer and
any of the units
Inside (Mhz 470- sites controlled by solid wires, contact telephony or the waves of Redjo (450
Per system and the same time. You must be a central control program led a year to be at work reports
Table or graphics give an idea of the amount of water consumed, uptime and unit price of water
consumption form.
Should have led the program a year to show the results of the above and what is expected of them in
the form of an agenda. Have to
This agenda will be able to equip a reminder private messages a few days in order to facilitate irrigation
management process. It should
That the agenda be able to show any cautionary warning was received from the site in the event of
malfunction of the panel
Control Alo break break sprinkler pipes breakdowns result in an increase Syriacs. You must be a program
Central control led a year to download the agenda of irrigation on any of the control panels in any
location
Sites and through the unit overlap for this site. It is not necessary to have the program
Turned on the computer in order to be the download process. This can be download process by order of
the operator or
Automatically based on the time lag can be determined once per hour to once per day.
You must be a control program led to a year to submit to the operator the possibility of the use of the
units of measurement on the basis of
The standard system or the English system, as it should adopt the same time, history and regional
controls structure
Own computer Alala.ajb be Bernlmj control led a year to adapt and work with the climate sensors on
Different types in addition to increasing the flow sensors. You must be a control program led a year to
adapt and work
With regular irrigation system control panel in one of the sites linked to the central system. This is done
Located in the main control room, and the overlap of each unit (CCC) during CPU Contact
Re-specific regulator. (CI) of the sites and the unity of the Sub-interference (SI) site
You must be a central control program led a year to run a single site by the blades wired (cable)

That you should be at a distance of no more than 2 meters (CCC) through the CPU contact
By (SI) and the control unit site (CCC) Computer Alala.eetm link between the CPU contact
18) is covered with a thin layer of metal. As AWG), consisting of four connectors size (GCBL) wire all
The distance between the unit and contact the central control unit location less than 3000 be Mitr.ajb
UL listed, CE) inside the vehicle resistance to weather tray (SI) units that are overlapping site
And should work on stream 110 or 220 volts. Should be (approved wall mounted cabinet)
Able to run the first panel controller (Controller) and directly by (SI) is the console on the site
18). As it should be the distance AWG) 18) consists of five conductors in size / by wire (5
The first controler less than 2 Mitr.kl controler additional on-site requires (SI) between the console Site
So as to secure the connection to the system through the site and connected to the control unit (CI)
added sub-unit overlap
Through a wired connection or via the Rdio.eetm a wired connection between the unit and the
interference (SI)
The four connectors size (GCBL) by wire (SI) unit overlaps the site (CI Sub)
18) is covered with a thin layer of metal. It also should be the distance between the console Sub be
AWG)
The control unit location less than 3,000 meters. You must console inside the vehicle to be sub-resistant
tray
And should work on stream (UL listed, CE approved wall mounted cabinet)) to weather
110 or 220 Volt.ajb be a central control program led a year to control at nearly 100 locations and
Including nearly 100 controler at each of the sites by contacting telephony in the absence of
Wired connection between the central control system and any of the sites can be dispensed with
communication module
Require a computer (SI) Antrzah.fa this case contact between the program and the unity of the site
control
On (RJ 11 connectors) telephone line with a link (dial-up modem) contains a modem connection
Each. (SI) after a maximum of 2 meters from the computer or the presence of a cell between the
program and the console-site contact
Connected to (modem site interface) site must contain the controller site equipped with modem
(SI) a length of 2 meters and a maximum or a console unusual site RJ symmetric telephone line with a
telephone wire 11
Added by modem Khaloa.aly contractor shall Bage the Rev. cellular site survey before starting the
process of installation and so
To make sure that the need for increased communication and some Alhoaaat.ajb that each unit be able
to control the location of
A Redjo between (UHF) or (GCBL) control, including nearly 99 additional control panel by means of wire
all
(CI) and Ouhdhaltdakhal Sub (SI) and the control unit and the site Bar.s..alatsal between unit overlaps
the site
You must be a duplex, regardless of method of contact. The program should be able to
They turn (SI & CI) Download irrigation agenda on the control panel via the overlap on the site
Send a private condition reports and contact sensors to Antrza.ajb program that is characterized by both
Single symbol that this symbol appears (CI) and the unity of the Sub-interference (SI) and
Haddhaltdakhal site
(CI) and the control unit sub (SI) and clear on the screen. It also must be all of the console featuring Site
Sent, (CCC) ability to diagnose and analyze indicators of rates that are received from the central control
unit
And receive a rate of adverse indicators in order to be returned to the central control unit.

Its ability to accommodate 3 (CI) and the unity of the Sub-interference (SI) must each unit is
characterized by overlapping the site
Different types of sensors in order to determine the operating condition and to give a warning alarm
condition of any defect. And
By (CCC) for the operator can be done to allocate how to deal with the warning sent to the central
control unit
The amortization of certain control or extinguish the site panel entirely.
Part 3. Executive to protect -3
A. When you do move or ship any products should be taken to secure guessing they arrive without any
additional A PL.
All cans must believe in is compiled arrival without any additional A PL should also be borne by the
The factory name clearly. Each pipe must be protected from Tuck, and crushing dissent. All materials
Manufacturer of non-metal must be protected from the sun's rays, according to the recommendations
of the manufacturer.
B. Must secure the full protection of all materials during storage, transport and implementation. Special
care must be
Be given to cut non-metallic pipes and protect it from direct sunlight during storage
Where it is strictly prohibited to use any piece of pipe, or where there is the additional PL.
T. Must secure the full protection of all materials and components of the control system during storage,
transport
And Ativ.o according to manufacturer recommendations.
W. You must fill all the holes in the components of the system before and after installation, so as to
avoid clogging
In the pipes.
C. Must supply all the necessary barriers, insisted the RSS, Esha a rate warning lights as needed, from
For the protection of both the workforce and civilians.
H. Network benefits: You must specify the whereabouts of public goods (power lines, water and
drainage) and that of
In order to avoid any additional PL to a network of existing benefits. Therefore advisable to use a manual
drill in places
There is a list of the benefits of the network.
3-2 efficiency
Planning and Verification:
A. The Contractor shall be based locating pipes and valves, and planning work as accurately as possible
accuracy.
B. The Contractor shall make sure all the horizontal and vertical sizes for the site, before you start
planning.
T. Contractor and after obtaining the approval of the engineer in charge by the owner is responsible for
the re-installation of any
Of existing services mainly. Where the contractor bears the expenses for jaw and recombination.
W. The Contractor shall, and before you start to implement its irrigation system that verifies all layers of
the project and that
To make sure that the start and follow up work.
C. Detailed drawings should all the pieces and connectors on the side roads, funded a rate and a
grandfather rang show.
H. During the implementation process on-site contractor that logs on to any change At a t graphics
Executive.

3-3 is a user
3-4 installation
1 during the implementation process on-site contractor that logs on to any change At a t graphics -4-3
Executive.
2 before you start the installation of piping contractor that the brushes a layer of fine sand under the
pipes -4-3
After the completion of the installation process it must also be covering the pipes with a layer of sand
Soft. Amoad of which must be used in the reclamation process must be free of stones.
3 Use of cement in the site should match with the common standard rules of civil works in -4-3
On site.
4 The contractor shall follow all instructions, notes and details of the recommended installation of the
factory. -4-3
3-4-5 irrigation lines site:
1. Must not be less than the horizontal distance between the special irrigation and sewer lines for a
distance of network lines
3 meters.
2. It should not be less than the distance between the bottom of a confidential irrigation line and the top
of the sewer line about 30 cm.
3. If the irrigation line passing under the sewerage line, you must do encapsulates the sewer line
A layer of cement 3 meter before and after the meeting point or we must use pressure pipes
High avoid work with links and 1 meter by 1 meter after the meeting point.
4. Meet all the conditions of the irrigation line sewer line must be located at least irrigation line 60
Cm above the sewer line.
5. In general In the event of wires EE private irrigation network epidemiological lying with the main line
or
Secondary lines of the irrigation network in the regions of Wales parish or solid For the contractor that
provides coverage
Group (irrigation line + wires) with a layer of fine sand with a warning over this layer bar.
6. Each irrigation lines that will pass under a certain way must be present inside the pipe
Sulaiv). Qatar must be Sulaiv at least 100 mm In the event of) other than the GRP
Irrigation lines largest diameter of 100 mm diameter should be Sulaiv largest 25 mm from the
mushroom
Irrigation line.
7. Wales in the areas of the parish must be based on the contractor to fill the heads of the main line of
sand only.

3-4-6 Extension and installation


1. Should not be placed in the water pipes in trenches or inappropriate for the piping. It should
Avoid water access to the trenches before the completion of the delivery process and dry
adhesives. In
If there is no progress on the work contractor shall fill all the slots Wave quality pipes
And cutting.
2. Each irrigation lines headers that have not been used and will be left for the future in case
the need arises must
Supply valve gate or intoxicate.
3. All except irrigation pipes dotted lines must be informed by a layer of fine sand as contained

Install the product in their own graphics


3-4-7 Plastic pipes
Tips and factory. Regarding (BS 8010 Part must be installed according to British specifications (1
Pipes that arrive via serrated ends must be extended in the trenches are not hamper expansion
process
And contraction.
3-4-8 (a) link: -4 process
1. Must be connected to pipes PVC by manufacturer practical tips. It also must AAA slip all
materials
The lenses of Zidh.
2. Scabs male factory pvc must be used to connect between plastic pipes
And valves as described in the installation of special materials graphics. It also must avoid
screwing the process of Zid
When you do a composition.
3. Must be placed on the main lines where there is a change in the direction of pipes and
diameters. Have to
These pillars consist of cement unarmed and be a minimum size of 300 mm. It should also
The line will be located in the center of these pillars.
4. Must bury all the main irrigation lines and secondary depth of pain broad schemes.
3-4-9 Dam pipes and cleaning process:
1. Dam process: we in this process to avoid the entry of dirt and impurities into the pipes and
filling it all
Openings and left so until needed.
2. The process of cleaning: all pipes and irrigation lines should be cleaned thoroughly before
installing any of the
Sprinklers, Almenkttat or drip lines. We must maintain that all links are visible.
3-4-10 Education and punctuation:
Each own irrigation system products (electric control valves, pressure reducing valves, valves
Gate control panels) must be numbered in a manner consistent with irrigation agenda.
3-4-11 Installation of processing a focused site:
1. Isolation valves and gate valves must be installed according to what is contained in the
installation of special graphics
Materials.
nstallation of processing a focused site:
1. Isolation valves and gate valves must be installed according to what is contained in the
installation of special graphics
Materials.
2. Electric control valves Group: You must ride in their designated places on the charts
Executive. Electric valves range includes gate valve, electric valve with a pressure regulator
And all the necessary pieces and links. Fuse boxes that will be placed inside a group
Control valves must be far from 300 per mm funded a rate.

3. Each cans valves must be installed in places shown on the shop drawings. In match
With special materials to install the graphics.
- When you do a makeup Contractor should be maintained on the surface of the LED in parallel
with the tray
The soil surface level.
- Must be installed in parallel with the road curves, the grandfather of Ryan or some similar
facilities. In the case of
There are several cans should be parallel with each other.
- Installation of all cans own sites valve must be returned with one at a supervising engineer
before starting the process
Installation.
- Fuse box must be installed in the off valve, pipe.
- The figure for the valve should be placed on the edge of the box according to the
specifications listed below:

.
.
.

Near the height of the line 38 mm.

Paint color glossy black.

Numbering should be placed on one side entrance to the enclosure where it should be

heel letters and numbers

Parallel with denied the right caddy.

Should be placed under the valve tray layer of gravel highly between the 20 and 30 cm.
3-4-12 Irrigation control system
1. The contractor must install the painting irrigation control system in place to be approved by
the
Supervising engineer. It should also control wires are clearly connected to the teacher and to
the right place
And appropriate manner, which was agreed upon by the supervising engineer.
2. You must Iike Wen installed to the concrete base by stabilizers have been approved by the
supervising engineer.
Programmable control system for irrigation: The Contractor shall be based programming the
control panel by what is contained in the agenda
Irrigation, which must be enclosed with shop drawings that include the time period and the
operation of each station
3-4-13 electrical works: -

1. The Contractor shall be based supply, installation, testing and operation of all aspects of
Balttaghi focused Alttaghi a focused
Their irrigation control system.
2. Everything related to electrical works belonging to the irrigation control system must be
installed according to the specifications
British.
3. Irrigation system must start from the control system, which must be protected inside a small
box with
Protection from the sun as it should be all the wires in and out of the box out of the be
Below ground level. Enclosure must contain the door desks and closing. The size of the
enclosure must be allowed
Freely deal with the vehicle painting at home.
4. The contractor must rotate every frames a wire rack before delivery that leaves about 150
mm
Extra length of the wire at every link and every point.
5. Significant sign you should be able to clarify the figure. This tag must be plastic
There is the white characters or black numbers and be of the type that enters the link in the
wire.
6. Wiring electrical control valves must be done by a kind of links PVC
Which is used as an underground must do develop a kind of Resin separation....
3-4-14 concrete rules: 1. Ride according to what is shown in the drawings for the installation of materials and in the
places described in the
Shop drawings.
2. Must coordinate with the supervising engineer in order to determine the appropriate places
for these rules.
3. Private channels made of non-metallic materials must be placed in this concrete rules to
enter
To caddy commensurate with the teachings of the supervising engineer.
4. Alp should be placed in a Reggie These rules are commensurate with the places of the holes
in the cans.
3-5 Examine the system (before starting the process of backfilling)
3-5-1 AAA slip air
1. The Contractor shall immediately and before starting hydrostatic examination, that the Ba a
slip of the air inside the mummy
Pipes.
2. Can the contractor that examines the main line is divided. As for sub lines must be completed
Each valve on the end.
3. You must fill out the required pipes checked and one exit to the rest of the exits control
through some
Valves and insulation blankets.
4. Must do to enter the water to the desired section examined under the total pressure
conditions and make sure

Open all exits to make sure the departure of each air intake located inside the pipes and so
begin to close the exits
From lowest to highest.
3-5-2 Initial examination 1. The main line can be divided into sections and each section isolating the end through what is
available from
Isolation valves on the desired section examined for no more than 500 meters.
2. Examination should be done after the completion of the overall operations of the above, and
not before seven days of passage
Pour another concrete pillar.
3. The contractor shall supply all materials and equipment that are needed in a comprehensive
screening process covers,
Valves, hand pump, and hours of pressure size.
4. Must be characterized by hours of pressure that is used the existence of two types of Take
the lungs: Bar and Albi as any.
5. The contractor must fill in the desired section examined the main line is full of water
Drinking and make sure the air out completely from the pipes. After that he must start
The process of upward pressure until we get to a pressure equal to 150% of the operational
design pressure
Of the network, but this pressure must be at least 125% of the operational design pressure of
the network in
The highest point. The time period of the examination should be not less than two hours to be
able to check and verify the
Links. Separate check must be upper division and the pressure equivalent to 150% of the
pressure
AWWA M operational design of the network. All checks must be conducted in conformity with
the - 23
80 for the design and installation of polyethylene pipes vinyl chloride.
6. The contractor shall Bage the Rev. separate examination of the sub-lines of the irrigation
network for each valve on the end. The
For the pressure that will be the examination must be compatible with those reported the
previous item.
7. After the completion of the process of examining laterals for irrigation network, the
contractor to begin the installation process
Operational materials for the irrigation system.
8. After the completion of the screening lines fully and ensure the safety of the installation, the
contractor to proceed
Backfill materials using appropriate process while maintaining all the links and cutting
phenomenon even without bridging
Overall completion of hydrostatic testing.
9. Only you can start using fine sand initial earthmoving to do while supervising engineer
examination and audit
And approval.

10. During the screening process, the contractor that does a Palm minute neck, cutting fittings
and valves to make sure
The absence of any leaks. In case there are no leaks in any section of the network, it must
Contractor
Repair, and then re-fill the grid and tested.
11. Only after receiving final approval from the supervising engineer, the contractor can begin
to complete the reclamation process
And monitoring in order to reach 90% of the maximum dry density.
3-5-3 Final inspection
After the completion of the examination of each section of the main line to a limit on the
contractor that recreates the same steps
Former principal of the line as a whole. Must take into account the class that belong to the
pipes. And special care
Must be given to the disposal of the air valves.
3-5-4 the results of the examination
Information must be recorded for each test or examination that the report include that the
pipeline site
The share, at the time of Egg Rev examination and the name of the engineer who Bage the Rev.
examination. This report should be
Tabular form to submit to the supervising engineer of M irreversible, audit and make sure.
3-6 washing :
A. Year: After the completion of the process of checking the system, the Contractor shall be
based on the process of washing sweeping
To be a speed not less than 1 m / s. If you do not provide a sufficient amount of water for this
purpose For
Contractor that the scanner using appropriately sized so as to get rid of all the impurities within
Pipes. This process must be done separately for each valve. After the completion of this process
can be
The contractor to begin installing drippers, dotted mechanisms and machine guns etc.
B. Operational test: After the completion of the Egg Rev hydrostatic tests, the Contractor to
begin installation
Drippers, sprinklers and dotted mechanisms to verify the effectiveness of the system.
C. The system should be run for a period of 24 hours, but not necessary at once so as to make
sure that
System works required efficiency.