Anda di halaman 1dari 3

ANALISA KESELAMATAN PEKERJAAN

JOB SAFETY ANALYSIS

No. Dokumen/
Document No.

Rev.

TANGGAL
DATE

URAIAN PEKERJAAN
JOB DESCRIPTION
PENGAWAS
SUPERVISOR

:
:

PERSONIL YANG
TERLIBAT
PERSONNEL INVOLVED
PERSYARATAN PERSONIL
PERSONNEL
REQUIREMENTS

No. Dokumen/
Document No.

ANALISA KESELAMATAN PEKERJAAN


JOB SAFETY ANALYSIS

Rev.

Nomo
r
Urut/
Seq
No
1

LANGKAH-LANGKAH KERJA/
JOB STEPS
(Urutan Kejadian/Sequence of
Events)

PERALATAN
PELINDUNG
DIRI/TOOLS/EQUIP
P.P.E.

TINDAKAN OLEH
SIAPA/ACTION
BY WHOM

Complete ppe

All crew

Complete ppe

Mechanic

Miss communication

Check all the level of fluid, make


sure at enough level

Leakage, the cap was not


at the place

Listen carefully and be at the right


place, give the barrier line
around the area of pressure
test
After check,always put again at
the place

Check all the connection hose

Leakage, hose blew up,


struck by hammer.
Hit, falling, drop
object, pinch point
Hit by pressure,
Equipment damage

Make sure the connection union


hose tight of, use whip check
at every connection high
pressure
Make sure the valve must be
closed

Complete ppe

Mechanic

Complete ppe

Mechanic

Check switch motor air pump

Hit by pressure,
Equipment damage

Make sure the air pumpw was


good running

Complete ppe

Mechanic

Start to pumping, look the


pressure gauge, annular
until 2000-3000psi,
Choke manifold until 1500 psi,
automatic stop
Cek all the line if there is a
leakage

Blow off line due to High


Pressure,

Clear the area

Complete ppe

Mechanic

Leakage, hose blew up,


struck by hammer. Hit,
falling, drop object,
pinch point

Always tight off the union


connection, use whip check

Complete ppe

Mechanic

Check four way valve

4
5

PENGENDALIAN BAHAYA/
HAZARD CONTROL
(Tes atau Prosedur/Test or
Procedure)

PJSM, Clear the area of pressure


test

BAHAYA YANG MUNGKIN


TIMBUL/
POTENTIAL HAZARD

No. Dokumen/
Document No.

ANALISA KESELAMATAN PEKERJAAN


JOB SAFETY ANALYSIS

Rev.

Nomo
r
Urut/
Seq
No
8

LANGKAH-LANGKAH KERJA/
JOB STEPS
(Urutan Kejadian/Sequence of
Events)

BAHAYA YANG MUNGKIN


TIMBUL/
POTENTIAL HAZARD

Test finished, check everythink

Leakage, hose blew up,


struck by hammer. Hit,
falling, drop object,
pinch point, Hit by
pressure, Equipment
damage

SIGNED SUPERVISOR
TANDA TANGAN PENGAWAS

Supervisor
________________
Supervisor

PENGENDALIAN BAHAYA/
HAZARD CONTROL
(Tes atau Prosedur/Test or
Procedure)
Placed all the tools at the right
place, check for all the hose,
and bleed of the pressure

HSE
_______________
HSE

PERALATAN
PELINDUNG
DIRI/TOOLS/EQUIP
P.P.E.

TINDAKAN OLEH
SIAPA/ACTION
BY WHOM

Complete ppe

Mechanic

Rig Superintendent
______________
Rig Superintendent

Anda mungkin juga menyukai