System Process Document

Defining and Assigning Shop Floor Statuses

Department
Responsibility/Role
File Name 27599159.doc
Revision
Document Generation Date 14/01/2010 14:03:00
Date Modified 1/14/2010 02:03:00 PM
Last Changed by
Status

Defining and Assigning Shop Floor Statuses


Trigger:

Concept
Shop floor statuses can be used to control shop floor move transactions. You can define as many
shop floor statuses as are required. They are assigned to the intraoperation steps of work in
process routing operations. For example, you may want to create a status of Hold to signify that
shop floor assemblies are on hold for quality situations.

In this topic, you will use the Shop Floor Statuses page to create a new status; and the Assign
Shop Floor Statuses page to assign the value to a discrete job.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 1/14/2010 02:03:00 PM Page 1


System Process Document
Defining and Assigning Shop Floor Statuses

Procedure

Step Action
1. Begin by navigating to the Shop Floor Statuses page.

Click the vertical scrollbar.

Page 2 Last changed on: 1/14/2010 02:03:00 PM


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
2. Click the Shop Floor Statuses link.

Last changed on: 1/14/2010 02:03:00 PM Page 3


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
3. The Shop Floor Statuses page is used to define statuses assigned to intraoperation
steps to control movement in routing operations.

Step Action
4. Click in the Status field.

Page 4 Last changed on: 1/14/2010 02:03:00 PM


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
5. Enter the desired information into the Status field. Enter "Eng-Test".

Last changed on: 1/14/2010 02:03:00 PM Page 5


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
6. Click in the Description field.

Step Action
7. Enter the desired information into the Description field. Enter "Engineering test
for motor assembly".

Page 6 Last changed on: 1/14/2010 02:03:00 PM


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
8. Click the Save button.

Last changed on: 1/14/2010 02:03:00 PM Page 7


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
9. Click the Close Form button.

Step Action
10. Navigate to the Assign Shop Floor Statuses page.

Click the Assign Shop Floor Statuses link.

Page 8 Last changed on: 1/14/2010 02:03:00 PM


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
11. The Assign Shop Floor Statuses page is used to assign statuses to any
intraoperation step. You can assign multiple statuses to a step, but not the same
status to more than one step within the same operation.

Last changed on: 1/14/2010 02:03:00 PM Page 9


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
12. Click in the Job field.

Step Action
13. Enter the desired information into the Job field. Enter "1234".

Page 10 Last changed on: 1/14/2010 02:03:00 PM


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
14. Click the Find button.

Last changed on: 1/14/2010 02:03:00 PM Page 11


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
15. Click in the Operation Sequence field.

Step Action
16. Enter the desired information into the Operation Sequence field. Enter "30".

Page 12 Last changed on: 1/14/2010 02:03:00 PM


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
17. Click in the Step field.

Last changed on: 1/14/2010 02:03:00 PM Page 13


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
18. Enter the desired information into the Step field. Enter "Run".

Step Action
19. Click in the Status field.

Page 14 Last changed on: 1/14/2010 02:03:00 PM


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
20. Enter the desired information into the Status field. Enter "Eng-Test".

Last changed on: 1/14/2010 02:03:00 PM Page 15


System Process Document
Defining and Assigning Shop Floor Statuses

Step Action
21. Click the Save button.

Step Action
22. You have completed the Defining and Assigning Shop Floor Statues procedure.
End of Procedure.