Anda di halaman 1dari 2

HALLIBURTON

JOB SAFETY ANALYSIS

JOB TITLE:

Unload JETTING FLOW


CTU , NITROGEN AND PUMPING
SUPERVISOR:
KASMAN

REGION / COUNTRY / OPERATIONAL


AREA

WELL NO. / LOCATION:


NILAM # 137

DATE:
August 09, 2004
ANALYSIS BY:
PRIA MANOPO
DEPARTMENT /
PSL
PE / CTU

SE Asia / Indonesia / Badak


Required Personal Protective Equipment:
Long Sleeve Coveralls, Hard Hat, Safety Boots, Gloves, Ear Plugs
SEQUENCE OF JOB STEPS
1. Unloading and carrying tools and
equipment

2. Rig up line for Nitrogen and water

APPROVED BY:

POTENTIAL HAZARDS

Dropping tools onto foot

Strained muscle or stress injury


from lifting

Hurt someone hand when


connecting the line and hammering
the connection

Hurt someone because of carrying


to heavy load

Slipping and falling from height

Object falling from height onto


personal

Damage to equipment or injury to


personal

3. Stabbing tubing into injector head

4. Connecting Injector head, BOP and


Riser to wellhead

REVIEWED BY:
BUDYANA

RECOMMENDED ACTION OR
PROCEDURE
Get help to lift heavy equipment or
use crane Wear appropriate PPE
Use correct lifting procedure
Use hand gloves
Make sure the hammer in proper
condition
Keep unauthorised personnel away
Ask for help to carry a heavy load
Wear safety harness when working
up off of the deck
Wear appropriate PPE all the time
Minimise/eliminate the time spent
under any suspended load
Raised and positioned equipment
carefully
Minimise/eliminate the time spent
under any suspended load
Do not pick up equipment with in
excessive wind condition
Lay out hoses carefully
Give mark at hoses that could cause

5. Pressure testing BOP and Stuffing


box

Tripping over hydraulic hoses

Equipment falling from height

Slipping on muddy/oily surface

Danger to personnel due to equipment


failure

Loss of well fluid or personnel injury

Over pressurisation, damage to


equipment and injury to personnel

Return of energised fluids/sand to


surface

Exposure to extreme temperature

6. Pumping Nitrogen and lifting well


fluid with Nitrogen

7. Rig down equipment

Slowly increase the pressure to


required client test pressure. Use
water not well fluid.
The wellhead cap must only
removed by VICO personnel or at
direct supervision.
Install wellhead adapter correctly
Drain test pressure from equipment
by drain valve carefully.

Ensure that all treating lines are


secured. All personnel are removed
from the area when pressure
testing. During Pumping operations
all personnel should stay clear of all
treating lines, and the area of the
rotating swivel on the tubing power
spool.

Never allow contact of unprotected


parts of body with liquid as well as
vapours.
Liquid should not be allowed to
contact carbon steels or plastics as
they will become brittle and fracture

tripping
Ensure that there is no loose or
unsecured objects up on injector
head, wear PPE.
Only one person with clear
knowledge of crane hand signals
Ensure that the safety shoes have
sufficient tread.

Back to item 2.

Back to item 2.

Anda mungkin juga menyukai