JOB TITLE:
DATE:
August 09, 2004
ANALYSIS BY:
PRIA MANOPO
DEPARTMENT /
PSL
PE / CTU
APPROVED BY:
POTENTIAL HAZARDS
REVIEWED BY:
BUDYANA
RECOMMENDED ACTION OR
PROCEDURE
Get help to lift heavy equipment or
use crane Wear appropriate PPE
Use correct lifting procedure
Use hand gloves
Make sure the hammer in proper
condition
Keep unauthorised personnel away
Ask for help to carry a heavy load
Wear safety harness when working
up off of the deck
Wear appropriate PPE all the time
Minimise/eliminate the time spent
under any suspended load
Raised and positioned equipment
carefully
Minimise/eliminate the time spent
under any suspended load
Do not pick up equipment with in
excessive wind condition
Lay out hoses carefully
Give mark at hoses that could cause
tripping
Ensure that there is no loose or
unsecured objects up on injector
head, wear PPE.
Only one person with clear
knowledge of crane hand signals
Ensure that the safety shoes have
sufficient tread.