Unit rate of civil constructions items

1st
2nd
Proposal Proposal

Sl. No

Description of work

Unit

1.0

Preparation of work site including cleaning removing of spoils &


undersiable if any, and perfoming layout for footing, column
and other structures location digitally etc complete.

sft

2.50

Cancelled

cft
cft

8.50
12.50

5.50
Cancelled

cft

3.00

2.50

cft

4.00

3.50

sft

3.00

2.50

sft

1.00

1.00

cft

22.00

12.00

cft

25.50

22.00

cft

Nill

14.00

sft

8.50

7.50

sft

20.00

18.50

sft

16.00

Cancelled

sft

55.00

Cancelled

sft

50.00

Cancelled

kg

4.20

4.00

2.0

3.0

4.0

5.0
6.0
7.0

8.0

8a
9.0
10.0

11.0

12.0
13.0

14.0

Earth in Excavation of foundation trenches and plinth in all


kinds soil upto required depth weadth including cutting and
uprooting of roots of trees if any preparing bed etc complete.
Depth (0' to 8')
Depth (8' to 15')
Earth refilling inside foundation trenches with earth obtain
from the spoil of earth work including proper compaction and
levelling dressing etc complete.
Sand filling in trenches up to required plinth level site
development in 150 mm layers, including levelling, watering
and consolidating each layer upto finished level etc complete.
Brick flat soling in foundation and in floor with 1st class brick
including preparation of bed & filling the interstices with local
sand etc complete.
Laying of polythene sheet in floor below C C , R C C slab etc all
complete in all respect.
Cement concrete (C C) work in foundation, floor and where its
required, mixing laying concrete compaction to materials etc
complete.
Reinforced Cement Concrete work for the following including
supply of mixture machnine, mechanical vibrator, fuel, oil etc
complete.
Reinforced Cement Concrete work for the following excluding
supply of mixture machnine, mechanical vibrator, fuel, oil etc
complete.
Wooden shutter making as per required size, cutting, fixing,
cleaning, oiling etc complete.
Rough shuttering work for base, grade beam, including
deshuttering, rectification of R C C surface etc complete.
(Materials have to be supply by contractor)
Steel shuttering work for any work including deshuttering ,
rectification of R C C surface, etc complete. (Excluding supply of
shutter)
Steel shuttering work for any work including deshuttering ,
rectification of R C C surface, etc complete. (Including supply of
shutter)
Double staging shuttering for any structureincluding
deshuttering rectification of R C C surface etc completed
Re-bar febrication, cutting, bending, placing binding etc
complete ps per drawing and the direction of the Engineer-incharge.

Sl. No

15.0

Description of work
Grade beam, Column etc
Re-bar febrication, cutting, bending, placing binding etc
complete ps per drawing and the direction of the Engineer-incharge.
Floor/Roof Slab, Footing
250mm Brick work excluding scaffolding but soaking & cleaning
of bricks etc complete as per the direction of the Engineer-incharge
125mm Brick work excluding scaffolding but soaking & cleaning
of bricks etc complete as per the direction of the Engineer-incharge
Plaster (Inner side) excluding scaffolding but soaking &
cheaping wall etc complete as per the direction of the Engineerin-charge
Plaster (Outter side) excluding scaffolding but soaking &
cheaping wall etc complete as per the direction of the Engineerin-charge

Unit

1st
2nd
Proposal Proposal

kg

3.20

2.85

cft

12.00

10.00

sft

10.00

8.00

sft

10.00

8.00

sft

12.00

9.00

20.0 Staging work for supporting fo different types of work

sft

6.00

2.00

21.0 Screening of Stone/Brick chips

cft

3.00

Cancelled

22.0 Screening of Sand

cft

2.00

Cancelled

23.0 Making and fixing of spacer block

nos

2.00

1.00

a) Mason

M/Day

550.00

500.00

b) Skilled labour

M/Day

350.00

350.00

c) Unskilled Labour

M/Day

325.00

300.00

16.0

17.0

18.0

19.0

24.0 Day works

Hire Charge of Equipments:


1
2
3
4

Excavator 0.50
= 15,000/ per 8 hours ( Fuel, oil Operator, Carrying all from supplier)
Excavator 0.75
= 17,000/ per 8 hours ( Fuel, oil Operator, Carrying all from supplier)
Pay Loader 9.00 cft = 3,1o,ooo/per Month (Only Operator from supplier)
Mixture Machine (Without Hopper) = 15, 000/ Month (Only machine supply & maintenace)

N0ote: Increase 5% for increasing of each floor height.