Best Practice for Fiber Cabling

Patch cables have the potential to be the weakest link in copper and fiber optic
network infrastructures. It is essential to follow correct procedures in administration
of copper and fiber patch cables to achieve optimum performance and reliability.
Applying best practice at every stage will also minimize costs related to moves, adds
and changes.
The principles of good cable management for fiber patch cables are similar to those
for copper network patch cables. However, there are special considerations with fiber
cabling, and extra care is needed in some areas. Best practice in managing fiber patch
cables can be divided into four parts: planning, preparation, patching, validation.

Planning
Administration activities are initiated with a change request. The change request must
contain all necessary information to begin the planning process.
1. Searching the Records
Once a request form is received, search the records to be sure of the circuit path. The
floor plans provided by the system designer should show backbone/riser cables,
TRs/FDs and lOs. Any changes or additions made since your cabling infrastructure
was installed should also have been documented. If the records are stored in a
database, a different screen can be displayed for each user. This screen should supply
you with the information you need, including the riser and horizontal fiber pairs
serving the particular WAO and the locations of available fiber.
2. Check Design Guidelines and Match Cords
Make sure you know the specifications and design of your fiber cabling. Ensure you
have patch cables matched to the installed cabling, since optical fiber patch cables of
different types (LC, SC, ST etc.) should not be mixed.
3. Efficient Routing
The first step in choosing a cord of the correct length is to determine the best route
between its points of connection. This is usually the shortest route through horizontal
and vertical cable pathways that does not obstruct or interfere with other cords and
connectors on the panel. Avoid running cords through cable pathways that are
already congested.

4. Vertical and Horizontal Sizing


Having established the best route for the cord, find the required length by adding the
horizontal and vertical distances.
5. Minimizing Slack
When selecting a cord to make a cross connection, avoid excessive slack and provide
a neat appearance. Tight cords will pull on connectors and too much slack
complicates cord management, making the panel more difficult to work on.
6. Efficient Management
Ensure you have cords of the right length available and that panels are fitted with
correct cable management accessories. In general, a horizontal patch cable
management guide is needed for every two rack units, depending on the type of
optical patch panel or Lightguide Interconnect Unit (LIU). At the optical patch panel
or LIU, route patch cables equally toward both sides of the vertical cable management
channels to prevent overloading one side.
7. Maintaining Old with New
Take care not to mix up cords of different core diameters. Additionally, cords must be
of the same or higher bandwidth as the behind-the-wall cabling. System performance
regarding distances cannot be guaranteed if lower rated patch cables are used.
Color-coding of connectors for different fiber standards make it easy to avoid
confusion.
8. Core Diameter
Fiber patch cables must use the same core diameter as the trunk cable. A large
attenuation penalty will occur when using a 62.5m patch cable with a 50m trunk
cable fiber or vice versa. Single mode fiber patch cables should use fiber with the
same Mode Field Diameter as the trunk cable fiber.
9. Factory-terminated vs. Field-polished
Factory-terminated cords guarantee fiber patches with optimum performance. Field
polished cords are not covered by warranties and are likely to deliver lower
performance and variable quality.
10. Fiber Safety Precautions and Responsibilities
The lasers that carry information through fiber cables may cause irreparable damage
to the retina. Always avoid looking directly into an energized optical fiber, and never

attach a microscope or other magnifying device to an energized optical fiber. Always


wear appropriate eye protection and ensure that unused ports are covered.
Preparation
To minimize disconnect time, do as much preparation as possible before performing
administration activities.
1. Study Administrative Records
Locate the ports that must be connected or reconnected. Ensure technicians have clear
information on what they need to do, including labeling information for the ports
involved.
2. Cord Inspection
It is essential to ensure cords are of the right type and quality, and that they are clean
and in good condition. Fiber patch cables should be inspected for physical damage
including:

Stress marks from bending on the sheath


Pullout of fibers from the connector
Cracks or scratches on fiber end in connector using a fiber examination microscope

Cleanliness is vital in fiber optic connections so special care is needed with:

Connector ends on patch cables


Connector ends on panels
Connector ends on network equipment

(For detailed information on how to clean ST, SC, LC and MPO connectors, please
view the fiber optic cleaning tutorials in Fiberstore.)
Materials that will be needed include:

Cassettes for connector ends


Lint-free wipes
Cleaning stick for behind the wall (BTW) MPOs

Patching
Once work on a panel is started, it should be completed without delay using best
practice at each stage.

1. Cord Handling
Cord Handling: Kinks, snags, pinches and poor contacts can dramatically reduce the
performance of a fiber patch cable. The following factors are important in avoiding
these problems.
2. Bend Radius
The minimum bend radius for optical fiber patch cables varies with cord diameter. For
1.6 mm and 3.0 mm cords the minimum un-loaded bend radius is 3.5 cm, and for
MPO fiber cable, the minimum bend radius is ten times the cord diameter. Exceeding
the bend radius can result in significant additional loss and adverse impact on channel
performance.
3. Cord Pulling and Stress
Be careful not to use excessive force during the patching process. This can stress
cords and connectors, reducing their performance. If you need to use force in pulling a
cord, something is wrong. Find the problem and fix it before proceeding.
4. Bundling
Bundling and tying cords gives the panel a neat appearance but tight bundling
increases the risk of pinching. Do not tighten ties beyond the point where individual
cords can rotate freely. Use only products manufactured for this purpose, and consider
the use of products that can be re-used without the use of tools such as "hook and
loop" strapping.
5. Routing Cords Through Cable Pathways
If the existing cord is the right length, it may be possible to re-use it. If this is the case,
remove the cord completely and re-run it in through the cable pathways. This is the
only sure way to ensure there are no tangles, kinks or strains in the cord.
6. Steps in Removing and Adding Cords
Removing a patch cable

Locate the existing circuit on both fields of the TR/FD or equipment room (ER)
Unplug the patch cable at one end and cover the connector endface(s) with a dust cap
Cover the open port with a dust cover some adapter ports have spring-loaded covers
that automatically cover the port
Gently lift the cord straight up, taking up slack until its movement is detected
Follow the cord routing, gently removing it along its length from the cable pathways
Find the other end and unplug it

Fully remove the cord

Adding a patch cable

Identify the location of the new circuit


Plug one end of the patch cable into the fiber coupling
Route the patch cable
At the field nearest to the switch and/or computer port field, locate the new connecting
point
Plug the other end of the patch cable into the fiber coupling

Validation
1. Final Visual Inspection and Panel Closure
Patching must be right first time since mistakes can cause costly disruption and
re-work. The time taken to make a final visual check on connections is a good
investment. When patch panels are mounted in enclosures, ensure these are securely
closed and, where necessary, locked, making sure that cord slack is not snagged or
pinched by the doors.
2. Update Documentation
The final step is to update the documentation to the as-built configuration and close
the work order associated with the completed change request.