S.N.

PACKAGE NO. & NAME

UNITS

FIRE FIGHTING SYSTEM


PROVIDED

STATUS

BALANCED JOB & ACTIONS NEEDED

GENERAL OBSERVATIONS

01A - ORE HANDLING


SYSTEM

CONVEYOR GALLERIES, TRANSFER


POINTS, BUILDINGS - J3A, A7, CP1, CP2,
CP3, D2, FLD-1, J0, J1, J2A, J2B, J3, J3B, J4,
J4A, J5, J5A, J5B, J6, J7, J8, J9A, L1, SH-1,
TRACK HOPPERS.

Internal hydrants & Portable fire


extinguishers

Commissioned & Running

1.Test protocols are available. 2. Passive fire


protection facilities - as per contract, cables are
1. Hoses & branch pipes are missing from some
to be coated with fire retardant paints - All
of the hose boxes. 2. Near LCSS2A, Hose box EHvertical runs & 1.0m every 20m of horizontal
42 stands but hydrant valve is missing. 3. Many
run of cables. Many cables has not been coated.
valves are leaking 4. Wheels missing from few
Further, fire sealings have not been done at
valves.
many cable entry/exit points. All cables laid in
cable bridges have not yet been painted.

STOCK YARD & OTHER OPEN AREAS

External hydrants

Commissioned & Running

1. Hoses & branch pipes are missing from some


of the hose boxes. 2. Near LCSS2A, Hose box EH42 stands but hydrant valve is missing. 3. Many
valves are leaking 4. Wheels missing from few
valves.

Commissioned & Running

1. DV identification plates are to be installed. 2.


Approaches to many DV's are blocked due to
bushes.

LCSS 1A, 2A, 3A, 4A, 5A, 6A 7 Wagon Tippler


MVWS in cable cellar
control room

Automatic clean agent system (INERGEN) Commissioned & Running (system is 1. Inhibitors are to be installed. Evacuation alarm
Provided in sespatcher control room &
kept in manual mode)
is missing.
engineer's room.

Internal hydrants near lending of staircases

Commissioned & Running

Portable fire extinguishers

Installed

01B - COAL & COKE


HANDLING SYSTEM

CONVEYOR GALLERIES, TRANSFER


POINTS, BUILDINGS - C3, C4, C5, C6, C7,
Internal hydrants & Portable fire
C8, YJH3, YJH3A, YJH4, YJH4A, YJH5, KP1,
extinguishers
KP2, KP3, CCS, CDU, COKE CRUSHING
STATION

Commissioned & Running

1. Hoses & branch pipes are missing from some


of the hose boxes. 2. All attachments are missing
from water monitor WM-8 installed near coal silo.
3. Many valves are leaking 4. Wheels missing from
few valves.

STOCK YARD & OTHER OPEN AREAS

Commissioned & Running

1. Hoses & branch pipes are missing from some


of the hose boxes. 2. Many valves are leaking 3.
Wheels missing from few valves.

MVWS in cable cellars

Commissioned & Running

1. DV identification plates are to be installed. 2.


Approaches to many DV's are blocked due to
bushes. 3. In cable cellar of LCSS-2B, one of the
spray distribution pipes is too close to the trays.
Proper impingement of water will not take place
& therefore it is to be corrected.

Automatic clean agent system (Inergen) rovided in despatcher control room &
engineer's room.

Commissioned & Running (system is 1. 1. Inhibitors are to be installed. Evacuation


kept in manual mode)
alarm is missing.

Internal hydrants near lending of staircases

Commissioned & Running

Portable fire extinguishers

Installed

LCSS 1B, 2B, 3B, 4B, 5B, 6B WAGON


TIPPLER CONTROL ROOM

01C - BASE MIX


PREPARATION PLANT

External hydrants

1.Test protocols are available. 2. Passive fire


protection facilities - as per contract, cables are
to be coated with fire retardant paints - All
vertical runs & 1.0m every 20m of horizontal
run of cables. Many cables has not been coated.
Further, fire sealings have not been done at
many cable entry/exit points. All cables laid in
cable bridges have not yet been painted.

1.Test protocols are available. 2. Passive fire


protection facilities - as per contract, cables are
to be coated with fire retardant paints - All
vertical runs & 1.0m every 20m of horizontal
run of cables. Many cables has not been coated.
Further, fire sealings have not been done at
many cable entry/exit points. All cables laid in
cable bridges have not yet been painted.

CONVEYOR GALLERIES, TRANSFER


POINTS, BUILDINGS - CB1, JNT1, CB3,
D1, KCB, D3, J14A, FB, J13, TT6, TT7, H1,
TH

Internal hydrants & Portable fire


extinguishers

Commissioned & Running

1. Hoses & branch pipes are missing from some


of the hose boxes. 2. Many valves are leaking 3.
Wheels missing from few valves.

STOCK YARD & OTHER OPEN AREAS

External hydrants & water monitors in


stockyards (alternatively).

Commissioned & Running

1. Hoses & branch pipes are missing from some


of the hose boxes. 2. Many valves are leaking 3.
Wheels missing from few valves.

LCSS 1C, 2C, 3C

MVWS in cable cellars

Commissioned & Running

1. DV identification plates are to be installed. 2.


Approaches to many DV's are blocked due to
bushes.

Automatic clean agent system (Inergen) provided in despatcher control room &
engineer's room.

Commissioned & Running (system is 1. Inhibitors are to be installed. Evacuation alarm


kept in manual mode)
is missing.

Portable fire extinguishers

Installed

CONTROL ROOM

Clean Agent (INERGEN) & Portable fire


extinguishers

Installed, commissioned & in service NIL

Commissioning activities has been conducted


but protocols have not been signed. Protocols
for fire extinguishers have been signed. The
refilling date of extinguishers have been expired.

PLANEL ROOM

Portable fire extinguishers & detectors

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

OFFICE

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

02 - COKE OVEN BATTERY

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

STAIRCASE IN CONTROL BUILDING

Internal hydrants & Portable fire


extinguishers

Installed, commissioned & in service

CANTEEN

Portable fire extinguishers

Installed, commissioned & in service NIL

SUBSTATION: 11TS1

Internal hydrants & Portable fire


extinguishers

Protocols for fire extinguishers have been


MVWS required in cable cellar, sealing of ducts &
signed. Testing protocols for hydrants has also
Installed, commissioned & in service fire retardant paints are balanced, fire retardant
been signed. The refilling date of extinguishers
paint is balanced with the contractor.
have been expired.

SUBSTATION: 11TS2

Portable fire extinguishers

Installed, commissioned & in service

INTER BLOCK BENCH

Portable fire extinguishers

Installed, commissioned & in service NIL

END BENCH

Portable fire extinguishers

Installed, commissioned & in service NIL

COKE TOWER

Portable fire extinguishers

Installed, commissioned & in service NIL

BATTERY PROPER

NIL

Installed, commissioned & in service

CABLE GALLERY

MVWS

Fire barrier & sealants at every entry into


substation/rooms. Fire retardant is balanced with
the contractor. All cable length is to be painted for Protocols for fire extinguishers have been
Installed, commissioned & in service
1.0m length for every 20m run of cables. Entry
signed.
vertical lengths is to be painted with fire retardant
paints.

CABLE GALLERY (FWPH TO LBDS-2)

NIL

Installed, commissioned & in service MVWS erection is in progress

FWPH

Portable fire extinguishers

Installed, commissioned & in service Fire barrier & sealants at evry entry into PH

DUST FREE COKE PUSHING

Portable fire extinguishers

Installed, commissioned & in service NIL

Sealing of ducts & fire retardant paints are


balanced.

External hydrants are required along the road 9


blow cable gallery.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.
Protocols for fire extinguishers have been
signed. The refilling date of extinguishers have
been expired.
Protocols for fire extinguishers have been
signed. The refilling date of extinguishers have
been expired.
Protocols for fire extinguishers have been
signed. The refilling date of extinguishers have
been expired.
Protocols for fire extinguishers have been
signed.

NIL
Protocols for fire extinguishers have been
signed. The refilling date of extinguishers have
been expired.
Protocols for fire extinguishers have been
signed. The refilling date of extinguishers have
been expired.

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

OPEN AREA

External Hydrants

Installed, commissioned & in service

CABLE CELLAR

Portable fire extinguishers

Fire barriers & sealants at every entry into


Protocols for fire extinguishers have been
Installed, commissioned & in service substations/rooms. Fire retardant is balanced with signed. The refilling date of extinguishers have
the contractors.
been expired.

CDCP STAIRCASES

Internal hydrants & Portable fire


extinguishers

Installed, commissioned & in service

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired. Testing protocols for hydrants
have also been signed.

AUXILIARY BUILDING

Internal hydrants & Portable fire


extinguishers

Installed, commissioned & in service

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired. Testing protocols for hydrants
have also been signed.

CIRCULATING WATER PUMP HOUSE

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

CHAMBER AREA

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

BOILER ANALYSER ROOM

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

COKE CAR GARRAGE

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

03B - COKE DRY COOLING


PLANT

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired. Testing protocols for hydrants
have also been signed.

DUST CLEANING STATION

Internal hydrants & Portable fire


extinguishers

Installed, commissioned & in service

CONTROL ROOM

Clean Agent (INERGEN) & Portable fire


extinguishers

Installed, commissioned & in service NIL

CABLE GALLERY

NIL

NIL

PANEL ROOM

Portable fire extinguishers & Detectors

Installed, commissioned & in service NIL

OPEN AREA

External hydrants

Installed, commissioned & in service

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Testing protocols for hydrants has also been


signed.

ELECTRICAL BUILDING-A

Internal hydrants in staircases & Portable


fire extinguishers

Installed, commissioned & in service

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired. Testing protocols for hydrants
have also been signed.

ELECTRICAL BUILDING-B

Internal hydrants in staircases & Portable


fire extinguishers

Installed, commissioned & in service

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired. Testing protocols for hydrants
have also been signed.

MVWS & all cable length is to be painted for


1.0m length for every 20m run of cable. Vertical
cables are to be painted with fire retardant paint
for entire length.

Commissioning activities has been conducted


but protocols has not been signed.Protocols for
fire extinguishers have been signed. The refilling
date of extinguishers have been expired.

NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

05 - BY PRODUCT PLANT

ELECTRICAL BUILDING-C

Internal hydrants in staircases & Portable


fire extinguishers

Installed, commissioned & in service

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired. Testing protocols for hydrants
have also been signed.

ELECTRICAL BUILDING-D

Internal hydrants in staircases & Portable


fire extinguishers

Installed, commissioned & in service

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired. Testing protocols for hydrants
have also been signed.

PUMP HOUSE

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

NAPHTHALENE PLANT

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

SOLAR OIL TANK

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

SCRUBER AREA

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

GAS EXHAUST BUILDING

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

PANEL ROOM

Portable fire extinguishers

Installed, commissioned & in service NIL

Protocols for fire extinguishers have been


signed. The refilling date of extinguishers have
been expired.

Commissioning activities has been conducted


but protocols has not been signed.Protocols for
fire extinguishers have been signed.

CONTROL ROOM

Clean Agent (INERGEN) & Portable fire


extinguishers

Installed, commissioned & in service NIL

OPEN AREA

External hydrants

Installed, commissioned & in service

CABLE CELLAR IN ELECTRICAL


BUILDING - A

MVWS & Portable fire extinguishers

Deffective installation, fire barrier & sealants at


Protocols for fire extinguishers have been
Installed, commissioned & in service every entry points. Fire retardant paint is balanced signed. The refilling date of extinguishers have
with the contractor.
been expired.

CABLE CELLAR IN ELECTRICAL


BUILDING - B

MVWS & Portable fire extinguishers

Deffective installation, fire barrier & sealants at


Protocols for fire extinguishers have been
Installed, commissioned & in service every entry points. Fire retardant paint is balanced signed. The refilling date of extinguishers have
with the contractor.
been expired.

CABLE GALLERY

NIL

NIL

CABLE CELLAR IN ELECTRICAL


BUILDING - C

MVWS & Portable fire extinguishers

Deffective installation, fire barrier & sealants at


Protocols for fire extinguishers have been
Installed, commissioned & in service every entry points. Fire retardant paint is balanced signed. The refilling date of extinguishers have
with the contractor.
been expired.

CABLE CELLAR IN ELECTRICAL


BUILDING - D

MVWS & Portable fire extinguishers

Deffective installation, fire barrier & sealants at


Protocols for fire extinguishers have been
Installed, commissioned & in service every entry points. Fire retardant paint is balanced signed. The refilling date of extinguishers have
with the contractor.
been expired.

06 - SINTER PLANT
MIXING & NODULIZING UNITS 1&2
PH WITH COOLING TOWER
WELFARE BUILDING
JUNCTION HOUSE -A, B, C, D, E, F, G
CRUSHER HOUSE
SCREEN HOUSE
ADMINISTRATIVE BUILDING

Internal hydrants & portable fire


extinguishers
Internal hydrants & portable fire
extinguishers
Internal hydrants & portable fire
extinguishers
Internal hydrants & portable fire
extinguishers
Internal hydrants & portable fire
extinguishers
Internal hydrants & portable fire
extinguishers
Internal hydrants & portable fire
extinguishers

Installed
Installed
Installed
Installed
Installed
Installed
Installed

Hoses & branch pipes are missing from some of


the hose boxes. Hose cabinet is of MS material.

All horizontal cable length is to be painted for


1.0m length for every 20m run of cables. Vertical
cables are to be painted for entire length.

Testing protocols for hydrants have also been


signed.

NIL

SINTER MACHINE BUILDING 1&2

Internal hydrants & portable fire


extinguishers

Installed (One at each floor)

OTHER OPEN AREAS, INCLUDING


ROADS

External hydrants

Installed, commissioned & in service

MVWS & portable fire extinguishers

1. DV identification plates are to be installed at


which DV installed. 2. Outlet pipes from DV at
each DV installation are to be properly anchored
Erection almost complete. System has & grouted. 3. Portion of cable trays at entry to
not been commissioned yet.
tunnels are unprotected. 4. At some places spray
distribution pipes are too close to trays & it will
impact spray pattern. 5. Accessories /trims at each
DV are to be properly fixed & tested.

MVWS & portable fire extinguishers

1. DV identification plates are to be installed at


which DV installed. 2. Outlet pipes from DV at
each DV installation are to be properly anchored
Erection almost complete. System has & grouted. 3. Portion of cable trays at entry to
not been commissioned yet.
tunnels are unprotected. 4. At some places spray
distribution pipes are too close to trays & it will
impact spray pattern. 5. Accessories /trims at each
DV are to be properly fixed & tested.

MVWS & portable fire extinguishers

1. DV identification plates are to be installed at


which DV installed. 2. Outlet pipes from DV at
each DV installation are to be properly anchored
Erection almost complete. System has & grouted. 3. Portion of cable trays at entry to
not been commissioned yet.
tunnels are unprotected. 4. At some places spray
distribution pipes are too close to trays & it will
impact spray pattern. 5. Accessories /trims at each
DV are to be properly fixed & tested.

HVWS & portable fire extinguishers

1. DV identification plates are to be installed at


which DV installed. 2. Outlet pipes from DV at
each DV installation are to be properly anchored
Installation is not complete. Fixing of
& grouted. 3. Portion of cable trays at entry to
QBDs are to be done. System has not
tunnels are unprotected. 4. At some places spray
been commissioned.
distribution pipes are too close to trays & it will
impact spray pattern. 5. Accessories /trims at each
DV are to be properly fixed & tested.

CABLE TUNNELS

CABLE VAULTS AT LEVEL 5.0M

CABLE BASEMENT AT LEVEL -4.0M


(ECR)

TRANSFORMER 11MVA

CONTROL ROOMS, ENGINEERS


CLEAN AGENT (INERGEN)
STATION & VFD ROOMS (LEVEL 18.5M)

FIRE WATER PUMP HOUSE

1. Hoses & branch pipes are missing from some


of the hose boxes 2. Many valves are leaking

System has been commissioned &


1. Inhibitors are to be installed. 2. Evacuation
running (At present system is kept in
alarm is missing.
manualmode)
One hydrant pump is running continuously
though as per system design should run only
when hydrants are operated. It means there is
leakage in the line that is not being replineshed by
jockey pumps. Level switchs are not working.

07 - BLAST FURNACE
COMPLEX

HYDRAULIC ROOM FOR CAST HOUSE,


TRANSFER HOUSE, GCP, STOVES,
STOCK HOUSE & BLT

CABLE CELLARS IN ESP, GCP, SHS, PH,


MAIN CONTROL BUILDING, DHS
SUBSTATIONS.

AUTOMATIC CARBON DIOXIDE


FLOODING SYSTEM & PORTABLE
FIRE EXTINGUISHERS

MVWS & PORTABLE FIRE


EXTINGUISHERS

SYSTEM COMMISSIONED &


RUNNING (AT PRESENT
SYSTEM IS KEPT IN MANUAL
MODE)

1. THE GAP BETWEEN THE PIPE & DUCT


IN THE WALL IS TO BE SEALED
PROPERLY TO AVOID LOSS OF GAS
DURING FIRE.

SYSTEM COMMISSIONED &


RUNNING

1. AT SOME PLACES, PATTERN OF


INSTALLATION OF NOZZLES HAS TO BE
CHANGED TO ENSURE PROPER
COVERAGE OF ALL TRAYS. 2. SOME
STRETCHES OF CABLE TRAYS ARE LEFT
UNPROTECTED. 3. IN CABLE CELLAR OF
SHS SUB-STATION, ONE OF THE SPRAY
DISTRIBUTION PIPES IS TOO CLOSE TO
THE TRAYS. PROPER IMPINGEMENT OF
WATER WILL NOT TAKE PLACE &
THEREFORE IT IS TO BE CORRECTED. 4.
FIRE RETARDANT PAINT IS TO BE
APPLIED AT EVERY 20M INTERVAL ON
CABLE FOR 1.0M LENGTH. 5. THE DUCTS
ON WHICH PANELS HAVE BEEN
MOUNTED ARE TO BE SEALED
PROPERLY WITH FIRE SEALANT/FIRE
BARRIERS.

1.TESTING PROTOCOLS ARE


AVAILABLE. 2. PASSIVE FIRE
PROTECTION FACILITIES - AS PER
CONTRACT, CABLES ARE TO BE
COATED WITH FIRE RETARDANT
COATING WITH FIRE RETARDANT
PAINTS. - ALL VERTICAL RUNS & 1.0M
OF HORIZONTAL RUNS OF CABLES. 2.
MANY CABLES HAS NOT BEEN COATED.
3. FURTHER, FIRE SEALINGS HAVE NOT
BEEN DONE AT MANY CABLE
EBTRY/EXIT POINTS.

PARTLY COMMISSIONED &


COMMISSIONED PORTION IS
RUNNING

1. AT SOME PLACES, PATTERN OF


INSTALLATION OF NOZZLES HAS TO BE
CHANGED TO ENSURE PROPER
COVERAGE OF ALL TRAYS. 2. SOME
STRETCHES OF CABLE TRAYS ARE LEFT
UNPROTECTED. 3. IN CABLE CELLAR OF
SHS SUB-STATION, ONE OF THE SPRAY
DISTRIBUTION PIPES IS TOO CLOSE TO
THE TRAYS. PROPER IMPINGEMENT OF
WATER WILL NOT TAKE PLACE &
THEREFORE IT IS TO BE CORRECTED. 4.
FIRE RETARDANT PAINT IS TO BE
APPLIED AT EVERY 20M INTERVAL ON
CABLE FOR 1.0M LENGTH.

CABLE TUNNELS

MVWS

BLAST FURNACE PROPER

1. FEW MORE PORTABLE FIRE


EXTINGUISHERS ARE REQUIRED. 2. THE
HOSES & ACCESSORIES ARE NOT IN THE
INTERNAL HYDRANTS & PORTABLE INSTALLED, COMMISSIONED &
HOSE CABINET. 3. THE HOSE CABINE IS
FIRE EXTINGUISHERS
IN SERVICE
OF MS MATERIAL. 3. THE REFILLING
DATE OF EXTINGUISHERS HAS BEEN
EXPIRED.

MAIN CONTROL ROOM

CLEAN AGENT (INERGEN) &


PORTABLE FIRE EXTINGUISHERS

INSTALLED, COMMISSIONED &


NIL
IN SERVICE

GCP PH

PORTABLE FIRE EXTINGUISHERS

INSTALLED, COMMISSIONED &


IN SERVICE

NIL

STAIRCASE IN MAIN CONTROL


BUILDING, BLAST FURNACE TO
TOPPEST PLATFORM, ECRs

INTERNAL HYDRANTS, & PORTABLE INSTALLED, COMMISSIONED &


FIRE EXTINGUISHERS
IN SERVICE

NIL

ECR BUILDING - Basement - Cable Cellar

MVWS, internl hydrants & Portable Fire


Extinguishers

Installed, deployed, tested,


commissioned & in service

ECR BUILDING - Ground Floor - AWR

Portable Fire Extinguishers

Deployed & Commissioned

ECR BUILDING - Ground Floor Transformer-1

External Hydrants, Portable Fire


Extinguishers

Deployed & Commissioned

Hose boxes are of MS material, Hoses ae not


availabel in hose cabinets

ECR BUILDING - Ground Floor Transformer-2

External Hydrants, Portable Fire


Extinguishers

Deployed & Commissioned

Hose boxes are of MS material, Hoses ae not


availabel in hose cabinets

THE REFILLING DATE OF PORTABLE


FIRE EXTINGUISHERS HAS BEEN
EXPIRED.
THE REFILLING DATE OF PORTABLE
FIRE EXTINGUISHERS HAS BEEN
EXPIRED.
THE REFILLING DATE OF PORTABLE
FIRE EXTINGUISHERS HAS BEEN
EXPIRED.

08 - COAL DUST
PREPARATION &
INJECTION
Hose boxes are of MS material

ECR BUILDING - Ground Floor - Panel


Room

Portable Fire Extinguishers

Deployed & Commissioned

ECR BUILDING - Ground Floor - Pantry

Portable Fire Extinguishers

Deployed & Commissioned

ECR BUILDING - First Floor - Cable Cellar

MVWS, internl hydrants & Portable Fire


Extinguishers

Installed, deployed, tested,


commissioned & in service

Hose boxes are of MS material

ECR BUILDING - Second Floor - Drive room Portable fire extinguishers

Deployed & Commissioned

ECR BUILDING - Second Floor Automation Room

Automatic Clean Agent & Portable fire


extinguishers

Installed, tested, commissioned & in


service

ECR BUILDING - Second Floor - Control


Room

Automatic Clean Agent & Portable fire


extinguishers

Installed, tested, commissioned & in


service

ECR BUILDING - Other Areas

Portable fire extinguishers

Deployed & Commissioned

ECR BUILDING - Staircase 1

Internal hydrants

Installed, tested, commissioned & in


service

ECR BUILDING - Staircase 2

Internal hydrants

Installed, tested, commissioned & in


service

Hose boxes are of MS material

CPIU - Ground Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CPIU - First Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CPIU - Second Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CPIU - Third Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CPIU - Fourth Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CPIU - Fifth Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

10

CPIU - Sixth Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CPIU - Seventh Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CPIU - Eighth Floor

Internal hydrants & Portable fire


extinguishers

Deployed, Installed, tested,


commissioned & in service

Hose boxes are of MS material

CDI - Outside Area

External Hydrants

Installed, tested, commissioned & in


service

Hose boxes are of MS material. Hoses are not


available in cabinets

Store

Portable fire extinguishers

No deployment of portable fire


extinguishers has been observed

Office

Internal hydrants & Portable fire


extinguishers

No deployment of portable fire


extinguishers has been observed

Canteen

Internal hydrants & Portable fire


extinguishers

Internal hydrant has been installed,


tested, comissioned & No
deployment of portable fire
extinguishers has been observed

09 - PIG CASTING MACHINE

10 - HOT METAL HANDLING


SYSTEM

Hose reels & accessories are to be placed in the


cabinet

No deployment of portable fire


extinguishers has been observed

Electrical Room

11

installation of hose cabinet.

Control Room

Portable fire extinguishers

No deployment of portable fire


extinguishers has been observed

Control Room

Portable fire extinguishers

No deployment of portable fire


extinguishers has been observed

Winch Room

Portable fire extinguishers

No deployment of portable fire


extinguishers has been observed

Pump House

Portable fire extinguishers

No deployment of portable fire


extinguishers has been observed

Pig Storage Yard

External hydrants & Portable fire


extinguishers

No deployment of portable fire


extinguishers has been observed

installation of hose cabinet,.

Hose reels & accessories are to be placed in the


cabinet

Open Area

External Hydrants

Installed, tested, commissioned

installation of hose cabinet,.

Hose reels & accessories are to be placed in the


cabinet

HEATING & DRYING AREA - CONTROL internal hydrants & Portable fire
ROOM
Extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

HEATING & DRYING AREA - MCC


ROOM

internal hydrants & Portable fire


Extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

HEATING & DRYING AREA PROPER CV ANALYSER ROOM

internal hydrants & Portable fire


Extinguishers

Hydrants has been installed &


commissioned. Extinguishers
deployed.

HEATING & DRYING AREA PROPER

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP PROPER

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP - COOLING AREA

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP - REFRACTORY


STORE

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP - STORE

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP - PANEL ROOM

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP - REPAIR SHOP

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP - OFFICE

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

LADLE REPAIR SHOP ADMINISTRATION BLOCK

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

COOLING AREA

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

DEBRICKING AREA

Internal hydrants, external hydrants &


portable fire extinguishers

Hydrants has been installed &


commissioned.

Portable fire extinguishers are to be deployed

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

Hose cabinet is of FRP material. Hose reels &


accessories are to be placed in the cabinet

12

11A - HOT METAL


DESULPHURIZATION

13

11B - BOF SHOP

14

11C - SECONDARY REFINING


UNITS

DISPENSER BUILDING - LEVEL +5.30M

Portable Fire Extinguishers

Deployed

DISPENSER BUILDING - LEVEL +9.22M

Portable Fire Extinguishers

Deployed

DISPENSER BUILDING - LEVEL +12.10M Portable Fire Extinguishers

Deployed

DISPENSER BUILDING - LEVEL +14.70M Portable Fire Extinguishers

Deployed

CONTROL BUILDING - LEVEL +0.4M

Portable Fire Extinguishers

Deployed

CONTROL BUILDING - LEVEL +4.75M

Portable Fire Extinguishers

Deployed

CONTROL BUILDING - LEVEL +7.55M

Portable Fire Extinguishers

Deployed

CONTROL BUILDING - LEVEL +11M

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done.

CONTROL BUILDING - LEVEL +12M

Portable Fire Extinguishers

Deployed

SILO BUILDING - LEVEL +0.00M

Portable Fire Extinguishers

Deployed

SILO BUILDING - LEVEL +2.80M

Portable Fire Extinguishers

Deployed

SILO BUILDING - LEVEL +5.80M

Portable Fire Extinguishers

Deployed

SILO BUILDING - LEVEL +7.70M

Portable Fire Extinguishers

Deployed

SILO BUILDING - LEVEL +13.25M

Portable Fire Extinguishers

Deployed

SILO BUILDING - LEVEL +17.85M

Portable Fire Extinguishers

Deployed

LHF#1 - CAPACITOR ROOM

Portable Fire Extinguishers

Totally balanced job

Electrification of HF actuator & other electric


workis balanced

Totally balanced job

LHF#1 - HT ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - HYDRAULIC ROOM

Carbon Dioxide Flooding System, Portable


fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - LCSS TRANSFORMER ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - PLC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - MCC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - VENTILATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - AHU ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - VENTILATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - VENTILATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - LCSS ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - CONTROL ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Totally balanced job

LHF#1 - TRANSFORMER ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#1 - LEVEL II ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

LHF#2 - CAPACITOR ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - HT ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - HYDRAULIC ROOM

Carbon Dioxide Flooding System, Portable


fire Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

LHF#2 - LCSS TRANSFORMER ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

Electrification of HF actuator & other electric


workis balanced

Electrification of HF actuator & other electric


workis balanced

LHF#2 - PLC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - MCC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - VENTILATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - AHU ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - VENTILATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - VENTILATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - LCSS ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - CONTROL ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

LHF#2 - TRANSFORMER ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

LHF#2 - LEVEL II ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

RH - LCSS ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - LCSS ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - CONDENSATION PH

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - COMMON PH

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - MCC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - PLC ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced

RH - CONTROL ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced

Electrification of HF actuator & other electric


workis balanced

Electrification of HF actuator & other electric


workis balanced

15

RH - LEVEL II ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

RH - LCSS ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - AHU ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - CABLE ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - HYDRAULIC ROOM

Carbon Dioxide Flooding System, Portable


fire Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

RH - PERSONAL ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - LCSS TRANSFORMER ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

RH - ANALYZER ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

HM - PLC ROOM

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

SH - CONTROL ROOM

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

SH - PANEL ROOM

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

BOF LEVEL II PROGRAMMER ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced

BOF LEVEL I SERVER ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced

Electrification of HF actuator & other electric


workis balanced

Electrification of HF actuator & other electric


workis balanced. Cylinder bankis to be enclosed
in a house to allow authorised entry.

11-06A BALANCE FIRE


PROTECTION FACILITIES
FOR BOF SHOP

BOF MAIN CONTROL ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced

BOF - PLC ROOM

Clean Agent System & Portable Fire


Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced

SDS - CONTROL/PLC/MCC ROOM

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

GCP - ID FAN VVF PANEL ROOM

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

OLR - CONTROL ROOM, BOF-1

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

OLR - CONTROL ROOM, BOF-2

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

OLR - CONTROL ROOM, BOF-3

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

GRP MAIN CONTROL/PLC ROOM

Clean Agent System & Portable Fire


Extinguishers

Totally balanced job

Totally balanced job

The work has not been started yet. False ceiling


is almost done at site.

HYDRAULIC ROOM - BOF#1

Carbon Dioxide Flooding System, Portable


fire Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced. Cylinder bankis to be enclosed
in a house to allow authorised entry.

HYDRAULIC ROOM - BOF#2

Carbon Dioxide Flooding System, Portable


fire Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced. Cylinder bankis to be enclosed
in a house to allow authorised entry.

HYDRAULIC ROOM - BOF#3

Carbon Dioxide Flooding System, Portable


fire Extinguishers

System(Mechanical) installation has


been done. Deployment of portable
fire extinguishers is balanced.

Deployment of portable fire extinguishers are


balanced

Electrification of HF actuator & other electric


workis balanced. Cylinder bankis to be enclosed
in a house to allow authorised entry.

HMHS(HM) - SWITCHGEAR
ROOM/MCC/VVF

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

HMHS (HM) - PLC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

SCRAP HANDLING (SH) - CONTROL


ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

SCRAP HANDLING (SH) - PANEL ROOM Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - MAIN


SWITCHGEAR ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - PLC ROOM Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - LEVEL II


PROGRAMMER ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - LEVEL II


SERVER ROOM ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING INSTRUMENT MAINTANENCE ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING ELECTRICAL MAINTANENCE ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - MAIN


CONTROL ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - CHILLAR


ROOM-1

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - CHILLAR


ROOM-2

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - CHILLAR


ROOM-3

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING VENTILATION ROOM-1

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING VENTILATION ROOM-2

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING DOCUMENTATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING - CABLE


VAULT (+7.5M)

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING CONFERENCE ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING COMMUNICATION ROOM 1

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF CONTROL BUILDING COMMUNICATION ROOM 2

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


POWER DISTRIBUTION ROOM

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


ISOLATION ROOM

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


TRANSFORMER 1 LCSS 1

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


TRANSFORMER 2 LCSS 1

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


TRANSFORMER 1 LCSS 2

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


TRANSFORMER 2 LCSS 2

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


TRANSFORMER 1 LCSS 3

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


TRANSFORMER 2 LCSS 3

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


FUTURE POWER DISTRIBUTION ROOM

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


CABLE VAULT (+7.5M)

Totally balanced job

Totally balanced job

BOF POWER DISTRIBUTION BUILDING Portable Fire Extinguishers


CABLE VAULT (+3.8M)

Totally balanced job

Totally balanced job

BOF - COMMUNICATION LOCAL ROOM Portable Fire Extinguishers


GCP PUMP HOUSE

Totally balanced job

Totally balanced job

BOF - COMMUNICATION LOCAL ROOM Portable Fire Extinguishers


GCP PUMP HOUSE (FAN COOLER)

Totally balanced job

Totally balanced job

BOF - COMMUNICATION LOCAL ROOM Portable Fire Extinguishers


GCP PUMP HOUSE (RO ROOM)

Totally balanced job

Totally balanced job

BOF - COMMUNICATION LOCAL ROOM Portable Fire Extinguishers


GCP (WET ANALYZER ROOM)

Totally balanced job

Totally balanced job

BOF - COMMUNICATION LOCAL ROOM Portable Fire Extinguishers


MHS COMMON FLUX HANDLING

Totally balanced job

Totally balanced job

BOF - COMMUNICATION LOCAL ROOM MHS COMMON FERRO ALLOY


Portable Fire Extinguishers
CHARGING

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - LANCE


ELECTRIC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - GAS VALVE


STATION - BOTTOM STIRRING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - LADDLE


STIRRING ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - LANCE


COOLING WATER PUMP HOUSE

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - SLAG


DETECTION SYSTEM ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - GCP


HYDRAULIC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - GCP DRY GAS


ANALYSER

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - GCP WET GAS


ANALYSER

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - MHS - FLUX


HANDLING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 LOCAL ROOM - MHS - FERRO


ALLOY CHARGING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - GAS VALVE


STATION - BOTTOM STIRRING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - LADDLE


STIRRING ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - LANCE


COOLING WATER PUMP HOUSE

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - SLAG


DETECTION SYSTEM ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - GCP HYDRAULIC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - GCP HYDRAULIC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - GCP - DRY GAS


HANDLING ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - GCP - WET GAS


Portable Fire Extinguishers
HANDLING ROOM

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - MHS - FLUX


HANDLING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 LOCAL ROOM - MHS - FERRO


ALLOY CHARGING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - LANCE


ELECTRIC ROOM - 2&3

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - GAS VALVE


STATION - BOTTOM STIRRING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - LADDLE


STIRRING ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - LANCE


COOLING WATER PUMP HOUSE

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - SLAG


DETECTION SYSTEM ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - GCP HYDRAULIC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - GCP - DRY GAS


HANDLING ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - GCP - WET GAS


Portable Fire Extinguishers
HANDLING ROOM

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - MHS - FLUX


HANDLING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 LOCAL ROOM - MHS - FERRO


ALLOY CHARGING

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 - RISING STATION - OLR - MCC


ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 - RISING STATION - OLR CONTROL ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 1 - RISING STATION - OLR MEDIA ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 - RISING STATION - OLR - MCC


ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 - RISING STATION - OLR CONTROL ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 2 - RISING STATION - OLR MEDIA ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 - RISING STATION - OLR - MCC


ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 - RISING STATION - OLR CONTROL ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF - 3 - RISING STATION - OLR MEDIA ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - TRAFO#1 LCSS#4

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - TRAFO#2 LCSS#4

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - TRAFO#1 LCSS#5

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - TRAFO#2 LCSS#5

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - POWER DISTRIBUTION
ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - CABLE VAULT

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - MCC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - CHILLAR ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - VENT ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

PRIMARY GAS COOLING & CLEANING


PLANT - GCP - FIRE FIGHTING
EQUIPMENT

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GCP - ID FAN CONTROL BUILDING VVF PANEL ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GCP - ID FAN CONTROL BUILDING SWITCHGEAR ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GCP - ID FAN CONTROL BUILDING CABLE VAULT

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GCP - ID FAN CONTROL BUILDING CHILLAR ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GCP - ID FAN CONTROL BUILDING VENT ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


Portable Fire Extinguishers
(SDS) - TRAFO#1 LCSS#6

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


Portable Fire Extinguishers
(SDS) - TRAFO#2 LCSS#6

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


Portable Fire Extinguishers
(SDS) - POWER DISTRIBUTION ROOM

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


Portable Fire Extinguishers
(SDS) - CONTROL/PLC/MCC

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


Portable Fire Extinguishers
(SDS) - CHILLER ROOM

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


Portable Fire Extinguishers
(SDS) - CABLE VAULT

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


Portable Fire Extinguishers
(SDS) - VENTILATION ROOM

Totally balanced job

Totally balanced job

SECONDARY GAS DEDUSTING SYSTEM


(SDS) - FIREFIGHTING EQUIPMENT
Portable Fire Extinguishers
ROOM

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) SWITCHGEAR ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) - MAIN


CONTROL/PLC ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) - MCC


ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) - CABLE


VAULT

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) VENTILATION ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) CHILLAR ROOM

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) - LOCAL


ROOM - WET ESP TRAFO# LINE 1

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) - LOCAL


ROOM - WET ESP TRAFO# LINE 2

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

GAS RECOVERY PLANT (GRP) - LOCAL


ROOM - WET ESP TRAFO# LINE 3

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF SHOP PROPER

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

16

11-06B PASSIVE FIRE


PROTECTION FOR BOF
SHOP

17

11-12 FERRO ALLOY


STORAGE & HANDLING &
SLAG HANDLING

18

11-14 WATER SUPPLY SYSTEM


FOR BOF & CCP

WATER SUPPLY BOF & CCP

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

CABLE TUNNELS - ENTRY & EXIT

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

BOF GAS HOLDER

Portable Fire Extinguishers

Totally balanced job

Totally balanced job

SHOP PROPER

Internal hydrants & Portable fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned.

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +9.5M

Internal hydrants & Portable fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned.

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +13.2M

Internal hydrants & Portable fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned.

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +16M

Internal hydrants & Portable fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned.

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +26.5M

Internal hydrants & Portable fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned.

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +20.8M

Internal hydrants & Portable fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned.

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +26.5M

Internal hydrants & Portable fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned.

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +29M

Internal hydrants & Portable fire


Extinguishers

Nil

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +43.9M

Internal hydrants & Portable fire


Extinguishers

Nil

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +47.97M

Internal hydrants & Portable fire


Extinguishers

Nil

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +52M

Internal hydrants & Portable fire


Extinguishers

Nil

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

Working Platform, +55M

Internal hydrants & Portable fire


Extinguishers

Nil

Portable fire Extinguishers are to be deployed

Hose cabinets are of MS material. Hose reels &


accessories are to be place inside cabinet

GRP - CABLE VAULT

MVWS & Portable fire Extinguishers

Piping has been completed.

Instasllation of nozzles is balance. DV assembly is


DV house is balance
in progress. Portable fire extinguishers has not
been deployed

RH - CABLE VAULT

Portable fire Extinguishers

Nil

Portable fire Extinguishers are to be deployed

MVWS required

SH - CABLE VAULT

Portable fire Extinguishers

Nil

Portable fire Extinguishers are to be deployed

MVWS required

MCB - CABLE VAULT

MVWS & Portable fire Extinguishers

Piping has been completed.

Portable fire Extinguishers are to be deployed

Nozzles has not been installed correctly.

GCP - CABLE VAULT

MVWS & Portable fire Extinguishers

Piping has been completed.

Instasllation of nozzles is balance. DV assembly is


DV house is balance
in progress. Portable fire extinguishers has not
been deployed

SDS - CABLE VAULT

MVWS & Portable fire Extinguishers

Piping has been completed.

Instasllation of nozzles is balance. DV assembly is


DV house is balance
in progress. Portable fire extinguishers has not
been deployed

19

CABLE TUNNEL

MVWS & Portable fire Extinguishers

Piping has been completed except


zone-19, 18.

Instasllation of nozzles is balance. DV assembly is


DV house is balance
in progress. Portable fire extinguishers has not
been deployed

LCSS-1, 2, 3, 7

MVWS, Internal hydrants & Portable fire


Extinguishers

Piping has been completed.

Portable fire Extinguishers are to be deployed

Nozzles has not been installed correctly.

CABLE TUNNEL TO LBDS-4

MVWS, Internal hydrants & Portable fire


Extinguishers

Piping has been completed.

Portable fire Extinguishers are to be deployed

Nozzles has not been installed correctly.

CABLE TUNNEL TO GCP PH

MVWS, Internal hydrants & Portable fire


Extinguishers

Piping has been completed.

Portable fire Extinguishers are to be deployed

Nozzles has not been installed correctly.

Medium Velocity Water Spray System

1. At some places nozzle fixing has to


be corrected. In some stretches of
cable tunnel, the nozzles have been
mounted directly of over the top tray
and in rest of the length of trays the
nozzles has been positioned such that
the complete coverage of all tray is
not possible.

The nozzles are to be installed as per drawing to


ensure coverage of all the trays. 2. Deluge valve
trim arrangement & electrics work including
integration with fire detection and alarming
system (FDA) are yet to be done. 3. Deluge valve
housing arrangement along with its electrics has
not been done. 4. System testing and
commissioning

SUB-STATION, ELECTRICAL ROOM IN


MCC FOR CCM-1&2,

Medium Velocity Water Spray System

1. At few locations in side room, the


ventilation duct is obstructing the
spray pattern of nozzles. The pipe is
to be re-arranged to ensure coverage
of all trays. 2. A few nozzles have
not yet been installed . 3. The deluge
valve installation is not complete and
the work is in progress.

The nozzles are to be installed as per drawing to


ensure coverage of all the trays. 2. Deluge valve
trim arrangement & electrics work including
integration with fire detection and alarming
system (FDA) are yet to be done. 3. Deluge valve
housing arrangement along with its electrics has
not been done. 4. System testing and
commissioning

Sub-station for CCM-3

Medium Velocity Water Spray System

Entire work is balance

12A - CONTINUOUS CASTING


PLANT

Cable tunnel

Medium Velocity Water Spray System

(a) The piping arrangement has not


been completed for cable spreader.
The work is in progress. (b) The
nozzles have not been installed but
the sockets for nozzles fixing have
been installed at places. (c) The
deluge valve installation is not
complete.

PLC ROOM, CONTROL ROOM, TCM


CONTROL ROOM, DISCHARGE AREA
CONTROL ROOM FOR CCM-1&2,
CONTROL ROOM FOR BBL:

Automatic Clean Agent gas (Inergen)

(a) The spray pipe network


installation inside room has been
done but nozzles have not been
mounted for room proper. (b) The
nozzles have been installed in false
ceiling along with the detector. (d)
The installation of hoses, connection
with manifold and accessories have
not been completed. (g) The
installation of fire detectors has been
done in the rooms. (h) The
AC/ventilation tripping arrangement
before system actuation, integration
with the FDA, FDA monitor module
are balance.

PLC ROOM, CONTROL ROOM,


DISCHARGE AREA CONTROL ROOM
FOR BBL:

Automatic Clean Agent gas (Inergen)

The work has not been started yet.

HYDRAULIC ROOM FOR CCM-1&2:

Automatic Carbon dioxide system

(a) The spray pipe network


installation inside room has been
done but nozzles has not been
mounted. (b) The cylinder bank
enclosure is balance (f) The
installation of hoses, connection with
manifold and accessories has not
been completed. (d) The AC/
ventilation tripping arrangement
before system actuation, integration
with the FDA, FDA monitor module
installation has not been completed.

HYDRAULIC ROOM FOR BBL:

Automatic Carbon dioxide system

The work has not started yet.

ELECTRICAL ROOM IN MCC FOR BBL

20

13A - LIME & DOLOMITE


CALCINATION PLANT

MCC BUILDING

Internal hydrants & portable fire


extinguishers

Internal hydrants at central staircases are required.


Installed, commissioning & in service Hoses & accessories are not available in hose
cabinet. Hose cabinets are of MS material.

CABLE CELLAR

MVWS & portable fire


extinguishersPORTABLE FIRE
EXTINGUISHERS

More fire extinguishers are required. Fire barriers


& sealants at every entry points. Fire retardant
Installed, commissioning & in service paint is balanced with the contractor. All cable
length is to be painted for 1.0m length for every
20m run of cables.

CONTROL ROOM

Clean Agent (INERGEN) & portable fire


extinguishers

Installed, commissioning & in service

PANEL ROOM

portable fire extinguishers & etectors

Installed, commissioning & in service More fire extinguishers are required

GAS BOOSTER STATION

portable fire extinguishers

Installed, commissioning & in service

BLOWER HOUSE

portable fire extinguishers

Installed, commissioning & in service NIL

DELIVERY BIN BUILDING

Internal hydrants

Portable fire extinguishers are balanced. Hoses &


Installed, commissioning & in service accessories are not available in hose cabinet. Hose
cabinet is of MS material.

RAW MATERIAL STORAGE BUNKER

Internal hydrants

Portable fire extinguishers are balanced. Hoses &


Installed, commissioning & in service accessories are not available in hose cabinet. Hose
cabinet is of MS material.

SCREENING HOUSE

NIL

Portable fire extinguishers are balanced. Intrnal


Installed, commissioning & in service hydrants at staircases & working platforms are
required to be installed.

NIL

Fire barriers & sealants at every entry points. Fire


retardant paint is balanced with the contractor.

21

13A-02 FIRE FIGHTING &


HYDRANT SYSTEM FOR
INTERFACING AREAS OF
LDCP WITH BY PRODUCT
PLANT & BOF SHOP

22

14 - UNIVERSAL SECTION
MILL

All cable length is to be painted for 1.0m length


for every 20m run of cables.

CABLE GALLERY

NIL

NIL

KILN PROPER

External hydrants

Portable fire extinguishers are balanced. Hoses &


Installed, commissioning & in service accessories are not available in hose cabinet. Hose
cabinet is of MS material.

KILN STAIR CASES

Internal hydrants

Portable fire extinguishers are balanced. Hoses &


Installed, commissioning & in service accessories are not available in hose cabinet. Hose
cabinet is of MS material.

CABLE TUNNEL (CT-1 TO CT-4)

MVWS

Installed

ECR-1, Cable Cellar

MVWS & Portable Fire Extinguishers,


Passive fire protection

installation is in progress. Portable


fire extinguishers has been deployed

ECR-1 TRANSFORMER

HVWS, Portable fire Extinguishers

installation completed. Portable fire


extinguishers has been deployed

ECR-2, Cable Cellar

MVWS & Portable Fire Extinguishers,


Passive fire protection

Installation is pending. Portable fire


extinguishers has been deployed

Passive fire protection is balanced

ECR-3, Cable cellar

MVWS & Portable Fire Extinguishers,


Passive fire protection

installation completed. Portable fire


extinguishers has been deployed

Passive fire protection is balanced

ECR-4, Cable cellar

MVWS & Portable Fire Extinguishers,


Passive fire protection

installation is in progress. Portable


fire extinguishers has been deployed

Passive fire protection is balanced

TRANSFORMER (CT4)

HVWS, Portable fire Extinguishers

installation completed. Portable fire


extinguishers has been deployed

SHOP PROPER

Internal hydrant, Portable fire Extinguishers Hydrants have been installed.

Passive fire protection is balanced

Portable fire extinguishers are to be deployed at


their locations.

Hose reels & accessories are to be placed in the


cabinet

23

ECR-WTP

Automatic Clean Agent

Piping has been completed, nozzles


installation is alos complete.

ECR-TENDEM

Automatic Clean Agent

Piping has been completed, nozzles


installation is alos complete.

Oil Cellar 1

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Electrification of electric actuator

Oil Cellar 2

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Electrification of electric actuator

Oil Cellar 3

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Electrification of electric actuator

Oil Cellar 4

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Carbon Dioxide Flooding System &


Portable Fire Extinguishers

Electrification of electric actuator

WTP ECR - Control Room

Clean Agent System & Portable Fire


Extinguishers

Clean Agent System & Portable Fire


Extinguishers

Electrification of electric actuator

Tendem ECR

Clean Agent System & Portable Fire


Extinguishers

Clean Agent System & Portable Fire


Extinguishers

Electrification of electric actuator

15 - REHEATING FURNACE
COOLING TOWER
PUMP HOUSE
REHEATING FURNACE - WRM
REHEATING FURNACE - BM
REHEATING FURNACE - USM

Internal Hydrants & Portable Fire


Extinguishers
Internal Hydrants & Portable Fire
Extinguishers
Internal Hydrants & Portable Fire
Extinguishers
Internal Hydrants & Portable Fire
Extinguishers
Internal Hydrants & Portable Fire
Extinguishers

ECRs - RH - WRM - BASEMENT

Portable Fire Extinguishers

ECRs - RH - WRM - GF - MCC/PDB

Portable Fire Extinguishers

ECRs - RH - WRM - FF - LEVEL II &


ENGINEERS STATION

Clean Agent System & Portable Fire


Extinguishers

ECRs - RH - WRM - FF - AHU

Portable Fire Extinguishers

ECRs - RH - WRM - FF- BATTERY

Portable Fire Extinguishers

ECRs - RH - WRM - FF - CPLC

Portable Fire Extinguishers

ECRs - RH - WRM - CA

Portable Fire Extinguishers

ECRs - RH - WRM - VENTILATION


ROOM

Portable Fire Extinguishers

Deployment of portable extinguishers is pending


Deployment of portable extinguishers is pending
Deployment of portable extinguishers is pending
Deployment of portable extinguishers is pending
Installed, In Service

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Clean Agent System is balanced job. Deployment


of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

ECRs - RH - WRM - Hydraulic Room

Carbondioxide Flooding SystemPortable


Fire Extinguishers

ECRs - RH - WRM - CONTROL PULPIT

Portable Fire Extinguishers

ECRs - RH - WRM - TRAFO#1

Portable Fire Extinguishers

ECRs - RH - WRM - TRAFO#2

Portable Fire Extinguishers

ECRs - RH - BM - TRAFO#1

Portable Fire Extinguishers

ECRs - RH - BM - TRAFO#2

Portable Fire Extinguishers

ECRs - RH - BM - BASEMENT

Portable Fire Extinguishers

ECRs - RH - BM - GF - MCC/PDB

Portable Fire Extinguishers

ECRs - RH - BM - FF - LEVEL II &


ENGINEERS STATION

Clean Agent System & Portable Fire


Extinguishers

ECRs - RH - BM - GF - AHU

Portable Fire Extinguishers

ECRs - RH - BM - GF- BATTERY

Portable Fire Extinguishers

ECRs - RH - BM - GF - CPLC

Portable Fire Extinguishers

ECRs - RH - BM - GF - CA

Portable Fire Extinguishers

ECRs - RH - BM - GF - VENTILATION
ROOM

Portable Fire Extinguishers

ECRs - RH - BM - GF - CONTROL PULPIT Portable Fire Extinguishers


ECRs - RH - BM - Hydraulic Room

Carbondioxide Flooding SystemPortable


Fire Extinguishers

ECRs - RH - USM - BASEMENT

Portable Fire Extinguishers

ECRs - RH - USM - GF - MCC/PDB

Portable Fire Extinguishers

ECRs - RH - USM - FF - LEVEL II &


ENGINEERS STATION

Clean Agent System & Portable Fire


Extinguishers

ECRs - RH - USM - FF - AHU

Portable Fire Extinguishers

ECRs - RH - USM - FF- BATTERY

Portable Fire Extinguishers

ECRs - RH - USM - FF - CPLC

Portable Fire Extinguishers

ECRs - RH - USM - FF - CA

Portable Fire Extinguishers

ECRs - RH - USM - FF - VENTILATION


ROOM
ECRs - RH - USM - GF - CONTROL
PULPIT

Portable Fire Extinguishers


Portable Fire Extinguishers

ECRs - RH - USM - Hydraulic Room

Carbondioxide Flooding SystemPortable


Fire Extinguishers

ECRs - RH - USM - TRAFO#1

Portable Fire Extinguishers

ECRs - RH - USM - TRAFO#2

Portable Fire Extinguishers

Installation of gas system is in


progress

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Installation is balanced

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil
Installation of gas system is in
progress

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Installation is balanced

Deployment of portable extinguishers is pending

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil
Installation of gas system is in
progress

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Deployment of portable extinguishers is pending

PUMP HOUSE - GF - MCC

Portable Fire Extinguishers

PUMP HOUSE - GF - TRAFO#1

Portable Fire Extinguishers

PUMP HOUSE - GF - TRAFO#2

Portable Fire Extinguishers

PUMP HOUSE - GF - TRAFO#3

Portable Fire Extinguishers

PUMP HOUSE - GF - BATTERY

Portable Fire Extinguishers

PUMP HOUSE - GF - RIO

Portable Fire Extinguishers

PUMP HOUSE - CA

Portable Fire Extinguishers

PUMP HOUSE - FF - AHU

Portable Fire Extinguishers

PUMP HOUSE - FF - VENTILATION

Portable Fire Extinguishers

PUMP HOUSE - LEVEL II & ENGINEERS Clean Agent System & Portable Fire
STATION
Extinguishers
24

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Nil

Deployment of portable extinguishers is pending

Installation is balanced

Deployment of portable extinguishers is pending

16 - WIRE ROD MILL & BAR


MILL
Shop Proper
Cable Tunnels

25

Nil

Internal Hydrants & Portable fire


Extinguishers
Nozzles installation hasve been corrected.
Portable fire extinguishers

Installed & commissioned

Hoses & accessories are not available in hose


cabinet.

Hose cabinets are of MS material

Installed

Nil

Out of six sump pumps, 2 have been installed.

Hydraulic cellars

Carbondioxide Flooding SystemPortable


Fire Extinguishers

Extinguishers have been deployed.


Out of five blocks, 2 have been
Gas system is balanced
installed with gas system. Remaining
installation is in progress

Control Rooms

Clean Agent System & Portable Fire


Extinguishers

Installation has been completed

Nil

Cable Vault

MVWS & Portable Fire Extinguishers

Installed

Nil

Operator Room
Electrical Room
Mechanical Room

Portable Fire Extinguishers


Portable Fire Extinguishers
Portable Fire Extinguishers

Installed
Installed
Installed

CONTROL BUILDING - DCS CABINET


ROOM (GF)

Clean Agent System (Inergen), Portable Fire


Only Portable Fire Extinguishers
Extinguishers
have been deployed

Clean Agent System (Inergen)

CONTROL BUILDING - OPERATION


STATION (FF)

Clean Agent System (Inergen), Portable Fire


Only Portable Fire Extinguishers
Extinguishers
have been deployed

Clean Agent System (Inergen)

CONTROL BUILDING - ENGINEERING


STATION (FF)

Clean Agent System (Inergen), Portable Fire Only Portable Fire Extinguishers
Extinguishers
have been deployed

Clean Agent System (Inergen)

CONTROL BUILDING - ANALYZER


ROOM (FF)

Clean Agent System (Inergen), Portable Fire


Only Portable Fire Extinguishers
Extinguishers
have been deployed
Clean Agent System (Inergen)
Portable Fire Extinguishers, External
Portable Fire Extinguishers, External
Hydrants
Hydrants
Nil
MVWS, Portable fire Extinguishers
MVWS
Portable Fire Extinguishers

17 - OXYGEN PLANT

HT TRANSFORMER
CABLE VAULT

Nozzles in main ECR has not been installed


correctly. Passive fire protection is balanced.
The Ceiling ducts beneath panels are to be
sealed with fire barriers.

CYLINDER FILLING STATION


LUB STORAGE ROOM

Nil
Nil

Nil
Nil

Nil

Nil

Nil

Nil

COMPRESSED AIR, MOLECULAR SIEVE External Hydrants, Internal hydrants &


ADSORBER, HEAT EXCHANGER
Portable Fire Extinguishers

Nil

Nil

HT SUBSTATION
COOLING TOWER
ARGON COLD CONVT
ARGON COL BOX

External Hydrants
External Hydrants
External Hydrants, Water Monitor
External Hydrants, Water Monitor

Nil
Nil
Nil
Nil

Nil
Nil
Nil
Nil

LOX TANK

External hydrants & Portable fire


extinguishers, Water Monitor

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Totally balanced job

Totally balanced job

Totally balanced job

Totally balanced job

OFFICE BUILDING
PRESSURE REDUCING STATION

LIN TANK
OXYGEN BUFFER VESSEL

External Hydrants
External Hydrants
Internal hydrants & Portable Fire
Extinguishers
External Hydrants

External hydrants & Portable fire


extinguishers, Water Monitor
External Hydrants, Portable Fire
Extinguishers

MCC ROOM
26

18 - TOP PRESSURE
RECOVERY PLANT

Shop Proper

Clean Agent System & Portable Fire


Extinguishers
Totally balanced job

TRANSFORMER 12MVA (1 Nos.)

Portable fire Extinguishers, HVWS

HVWS has been installed, tested,


commissioned.

Portable fire extinguishers have to be deployed.

TRANSFORMER 31.5MVA (3 Nos.)

Portable fire Extinguishers, HVWS

Portable Fire Extinguishers (CO24.5Kg, DCP-5Kg) for 1 nos.


transformer at STG side has been
deployed, HVWS installation has
been completed.

Portable fire extinguishers have not been


deployed.

TRANSFORMER 20MVA (1 Nos.)

Portable fire Extinguishers, HVWS

HVWS has been installed, tested,


commissioned.

Portable fire extinguishers have not been


deployed.

TRANSFORMER 25MVA (3 Nos.)

Portable fire Extinguishers, HVWS

HVWS has been installed, tested,


commissioned.

Portable fire extinguishers have not been


deployed.

TRANSFORMER 5MVA (1 Nos.)

Portable fire Extinguishers

DCP-5Kg (1 NOS.)

They are to be deployed in pairs of DCP & CO2

TRANSFORMER 2MVA (8 Nos.)

Portable fire Extinguishers

DCP-(Total 1 NOS.)

They are to be deployed in pairs of DCP & CO3

STG BUILDING (+9.0M) PLATFORM

Portable fire Extinguishers

CO2-4.5Kg (4Nos.), CO2-6.5Kg


(4Nos.), DCP-5Kg (1Nos.)

More portable fire extinguishers are required

STG BUILDING - ENGINEERS ROOM

Portable fire Extinguishers

Extinguishers have not been


deployed

They are to be deployed in pairs of DCP & CO3

Control Room

27

19 - POWER & BLOWING


STATION

STG BUILDING - CONTROL ROOM

Portable fire Extinguishers

DCP-1Nos. & CO2-1Nos.

More portable fire extinguishers are required

STG BUILDING - PANEL ROOM

Portable fire Extinguishers

Extinguishers have not been


deployed

They are to be deployed in pairs of DCP & CO3

STG BUILDING - CABLE CELLAR (0.00M) Portable fire Extinguishers, MVWS

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 1 (+5.3M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 1 (+9.8M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 1 (+15.3M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 2 (+4.3M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 3 (+0.7M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 4 (+5.3M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 4 (+9.8M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 4 (+15.3M)

Internal Hydrants

Installed, commissioned, & In Service

STG BUILDING - STAIRCASE 5 (+0.7M)

Internal Hydrants

STG BUILDING - STAIRCASE 5 (+9.8M)

Sufficient quantities has not been deployed

DV house has not been provided with door &


lock arrangement system. By pass line has been
provided. DV=7

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet, Hose cabinet


is of MS material,

Hoses & accessories are not available in hose


cabinet.
Hoses & accessories are not available in hose
cabinet.
Hoses & accessories are not available in hose
cabinet.
Hoses & accessories are not available in hose
cabinet.
Hoses & accessories are not available in hose
cabinet.
Hoses & accessories are not available in hose
cabinet.
Hoses & accessories are not available in hose
cabinet.

Hoses are not available in cabinet, Hose cabinet


is of MS material,
Hoses are not available in cabinet, Hose cabinet
is of MS material,
Hoses are not available in cabinet, Hose cabinet
is of MS material,
Hoses are not available in cabinet, Hose cabinet
is of MS material,
Hoses are not available in cabinet, Hose cabinet
is of MS material,
Hoses are not available in cabinet, Hose cabinet
is of MS material,
Hoses are not available in cabinet, Hose cabinet
is of MS material,

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material, Landing Valve is leaking

Internal Hydrants

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material, Landing Valve is leaking

STG BUILDING (OUTSIDE)

External Hydrants & water monitors

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material, Hydrants Valve is leaking

SWITCHGEAR BUILDING (OUTER)

External Hydrants & water monitors

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material, Hydrants Valve is leaking

SWITCHGEAR BUILDING - CABLE


CELLAR (+8.25M)

Portable fire Extinguishers, MVWS

DCP-10Kg (1Nos.), DCP5Kg(3Nos.), CO2-4.5Kg(2Nos.).


Installed, commissioned, & In Service

NIL

DV house has not been provided with door &


lock arrangement system. By pass line has been
provided. DV=4

SWITCHGEAR BUILDING - STAIRCASE 1


Internal Hydrants
(+9.225M)

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material.

SWITCHGEAR BUILDING - STAIRCASE 1


Internal Hydrants
(+13.389M)

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material.

SWITCHGEAR BUILDING - STAIRCASE 2


Internal Hydrants
(+9.225M)

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material.

28

20 -MW DW WATER SYSTEM

SWITCHGEAR BUILDING - STAIRCASE 2


Internal Hydrants
(+13.389M)

Installed, commissioned, & In Service

Hoses & accessories are not available in hose


cabinet.

Hoses are not available in cabinet. Hose cabinet


is of MS material.

SWITCHGEAR BUILDING - PANEL


ROOM

Portable fire Extinguishers

CO2-4.5Kg (1Nos.), CO2-6.5Kg


(1Nos.), DCP-5Kg (1Nos.)Deployed
& Commissioned

SWITCHGEAR BUILDING - OPERATOR


ROOM

Portable fire Extinguishers

Deployed & Commissioned

BOILER -1 - STAIRCASE-1 (+8.5M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER -1 - STAIRCASE-1 (+13.2M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER -1 - STAIRCASE-2 (+8.5M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER -1 - STAIRCASE-2 (+13.2M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-1 - OUT SIDE

External Hydrants & Water Monitors

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

BOILER-2 - SATAIRCASE-1 (+8.5M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-2 - SATAIRCASE-1 (+13.2M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-2 - SATAIRCASE-2 (+8.5M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-2 - SATAIRCASE-2 (+13.2M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-2 - OUT SIDE

External Hydrants & Water Monitors

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

BOILER-3 - SATAIRCASE-1 (+8.5M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-3 - SATAIRCASE-1 (+13.2M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-3 - SATAIRCASE-2 (+8.5M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-3 - SATAIRCASE-2 (+13.2M)

Internal Hydrants

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.

Portable Fire Extinguishers are required

BOILER-3 - OUT SIDE

External Hydrants & Water Monitors

DM PLANT

EXTERNAL HYDRANTS

LDO PLANT

EXTERNAL HYDRANTS

Installed, commissioned, & In Service HOses & accessories are not available in hose
cabinet.
HOses & accessories are not available in hose
Installed, commissioned, & In Service
cabinet.
HOses & accessories are not available in hose
Installed, commissioned, & In Service
cabinet.

More portable fire extinguishers are required

HOses & accessories are not available in hose


cabinet.

More portable fire extinguishers are required

Nil

Installation of internal hydrants & deployment of


portable fire extinguishers

Nil

Installation of internal hydrants & deployment of


Fire Retardant paint /sealant is to be applied
portable fire extinguishers

Nil

Installation of internal hydrants & deployment of


Fire Retardant paint /sealant is to be applied
portable fire extinguishers

MW & DW Electrical Building - Control Room Portable Fire Extinguishers

Nil

Deployment of portable fire extinguishers is


balanced with the contractor

MW & DW Electrical Building - Panel Room

Portable Fire Extinguishers

Nil

Deployment of portable fire extinguishers is


balanced with the contractor

Fire Retardant paint /sealant is to be applied

RW Electrical Building - Panel Room

Portable Fire Extinguishers

Nil

Deployment of portable fire extinguishers is


balanced with the contractor

Fire Retardant paint /sealant is to be applied

RW Electrical Building - Control Room

Portable Fire Extinguishers

Nil

Deployment of portable fire extinguishers is


balanced with the contractor

Chemical House

Internal Hydrants & Portable Fire


Extinguishers

Internal hydrants has been installed,


tested & commissiomned

Transformer#1
Transformer#2

Portable Fire Extinguishers


Portable Fire Extinguishers

Deployed & Commissioned


Deployed & Commissioned

TRANSFORMER - 80/100MVA (4Nos.)

HVWS

MW Pump Room

DW Pump Room

RW Pump Room

29

Internal Hydrants & Portable Fire


Extinguishers

Internal Hydrants & Portable Fire


Extinguishers

Internal Hydrants & Portable Fire


Extinguishers

Deployment of portable fire extinguishers is


balanced with the contractor
-

21 - MAIN RECEIVING
STATION

CABLE VAULT

CABLE GALLERY

CABLE TUNNEL
SWITCH YARD
STAIRCASE-1, 2, 3

CONTROL ROOM

SCADA ROOM

Installed, commissioned, & In Service


MVWS, Portable Fire Extinguishers, Passive Installed, commissioned, & In
Service, Extinguishers have been
Fire Protection
deployed
MVWS, Portable Fire Extinguishers, Passive Installed, commissioned, & In
Service, Extinguishers have been
Fire Protection
deployed
MVWS, Portable Fire Extinguishers, Passive Installed, commissioned, & In
Service, Extinguishers have been
Fire Protection
deployed
External Hydrants, Water Monitor

Installed, commissioned, & In Service


Installed, commissioned, & In
Internal Hydrants, Portable Fire
Service, Extinguishers have been
Extinguishers
deployed
Clean Agent System (Inergen), Portable Fire Installed, commissioned, & In
Service, Extinguishers have been
Extinguishers
deployed
Clean Agent System (Inergen), Portable Fire Installed, commissioned, & In
Service, Extinguishers have been
Extinguishers
deployed

Nil
Fire barriers are to be fixed at ceiling ducts below
panels
Fire barriers are to be fixed at ceiling ducts below
panels
Nil
Nil

Hoses are not available in cabinet. Hose cabinet


is of MS material.

Nil

Hose cabinet is of MS material.

Nil

Nil

Clean Agent System (Inergen), Portable Fire Installed, commissioned, & In


Service, Extinguishers have been
Extinguishers
deployed
Installed, commissioned, & In
Service, Extinguishers have been
MAIN CONTROL BUILDING (OUTSIDE) External Hydrants
deployed
METERING & PROTECTION ROOM

30

Nil

Nil

Hoses are not available in cabinet. Hose cabinet


is of MS material.

1. Nozzels have not been fixed


correctly. Proper impingement of
water on each tray is not possibel. 2.
System is not charged with water. 3.
Approached to many DVs are
blocked due to bushes.

DV identification plates are to be installed. 2.


Approaches to many DVs are blocked due to
bushers. 3. Nozzles are tobe correctly installed. 4.
Additional supports are to be provided for pipe
inside DV house. Testing & commissioning of the
system are to be done both manual & auto mode.

1. Test protocols are available. 2. Passive fire


protection facilities: as per contract, cables are to
be coated with fire retardant paints - all vertical
runs & 1.0m every 20m of horizontal runs of
cables. Many cables have not been coated.
Further, fire sealing have not been done at many
cable entry/exit points. A few fire doors are
balance.

HVWS for transformer

Installatin is complete

DV identification plates are to be installed. 2.


Approaches to many DVs are blocked due to
bushers. 3. Nozzles are tobe correctly installed. 4.
Additional supports are to be provided for pipe
inside DV house. Testing & commissioning of the
system are to be done both manual & auto mode.

Portable fire Extinguishers

Installatin is complete

Hydrant System

Installatin is complete

22 - LBDS, SCADA & CABLE


TUNNELS

LBDS 1 TO LBDS 10

MVWS for basement

1. HOSES & ACCESSORIES HAVE NOT


BEEN KEPT IN HOSE BOXES. 2. SOME
VALVES ARE LEAKING. 3. WHEELS ARE
MISSING FROM FEW VALVES.

31

1. HYDRAULIC TESTING OF PIPES IS TO


BE DONE. 2. TESTING & COMMISSIONING
OF THE SYSTEM ARE TO BE DONE IN
BOTH MANUAL & AUTO MODE. 3. AT
MANY PLACES , THERE IS NO SPACE IN
THE DV HOUSE FOR OPERATION OF
VALVES & MAINTANENCE ACTIVITIES.
THE SITUATION IS TO BE IMPROVED.

CABLE TUNNELS

MVWS

Erection is complete

LCSS A, B, & C

Portable fire Extinguishers

Installatin is complete

Hydrant System

Installatin is complete

UPS ROOM

Detection and Portable Fire Extinguishers

Installed & Commissioned


(Detection)

CONTROL ROOM

Clean Agent System (Inergen), Portable Fire


Portable Fire Extinguishers to be provided. Hook
Installed & Commissioned (Inergen)
Extinguishers
for mounting of extinguishers has been provided

AHU ROOM

Detection and Portable Fire Extinguishers

Installed & Commissioned


(Detection)

Portable Fire Extinguishers to be provided. Hook


for mounting of extinguishers has been provided

CAPACITOR BANK ROOM

Detection and Portable Fire Extinguishers

Installed & Commissioned


(Detection)

Portable Fire Extinguishers to be provided. Hook


for mounting of extinguishers has been provided

23A - CENTRALIZED
COMPRESSED AIR STATION

Portable Fire Extinguishers to be provided. Hook


for mounting of extinguishers has been provided

Portable Fire Extinguishers to be provided. Hook


for mounting of extinguishers has been provided

TRANSFORMER - 1.25MVA (2Nos.)

Portable Fire Extinguishers to be provided. Hook


for mounting of extinguishers has been provided

TRANSFORMER - 16/20MVA

HVWS, Portable fire Extinguishers

Installed & commissioned

PANEL ROOM

Detection and Portable Fire Extinguishers

Installed & Commissioned


(Detection). Extinguishers deployed

PANEL + BATTERY ROOM

Detection

Installed & Commissioned


(Detection)

Portable Fire Extinguishers to be provided. Hook


for mounting of extinguishers has been provided

STORE

Detection

Installed & Commissioned


(Detection)

Portable Fire Extinguishers to be provided. Hook


for mounting of extinguishers has been provided

MAIN SHED AREA

PROTECTION FROM OUTSIDE


32

NIL

External Hydrants

NIL

Hoses are not available in cabinet. Hose cabinet


is of MS material.

Installed & Commissioned

27 - BOD PLANT

33

28A - LDO STORAGE &


HANDLING SYSTEM

34

38D-R1 - CENTRAL
WORKSHOP

MCC BUILDING

Portable fire extinguishers & passive fire


protection

Totally balanced job

Totally balanced job

SHOP PROPER (INSIDE) - 14 Nos.

Internal hydrants

Not installed yet

Not installed yet

SHOP PROPER (OUTSIDE) - 8 Nos.

External hydrants

Not installed yet

Not installed yet

PDB ROOM

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

GENERAL STORE

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

METROLOGY ROOM

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

TOOL CRB ROOM

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

PLANNING ROOM

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

DISCUSSION CONFERENCE ROOM

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

EXECUTIVE OFFICE 1

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

EXECUTIVE OFFICE 2

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

35

60 - AMBIENT AIR
MONITORING SYSTEM

36

64A - CENTRAL FIRE


STATION

37

84 - GAS BOOSTING STATION

38

87 AR1 - MISCELLANEOUS
BUILDINGS

STAFF OFFICE ROOM

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

WAITING LOUNGE ROOM

Portable fire extinguishers

Portable fire extinguishers are to be


deployed

Portable fire extinguishers are to be deployed

MAIN BUILDING - GROUND FLOOR

Portable fire extinguishers

To be deployed

To be deployed

MAIN BUILDING - FIRST FLOOR

Portable fire extinguishers, Internal hydrants

Portable fire extinguishers are to be


Portable fire extinguishers are to be deployed,
deployed, internal hydrants are to be
internal hydrants are to be installedINTERNAL
installedINTERNAL HYDRANTS
HYDRANTS ARE TO BE INSTALLED
ARE TO BE INSTALLED

MAIN BUILDING - SECOND FLOOR

Portable fire extinguishers, Internal hydrants

Portable fire extinguishers are to be


Portable fire extinguishers are to be deployed,
deployed, internal hydrants are to be
internal hydrants are to be installedINTERNAL
installedINTERNAL HYDRANTS
HYDRANTS ARE TO BE INSTALLED
ARE TO BE INSTALLED

DRILL TOWER

Portable fire extinguishers

To be deployed

To be deployed

OPEN AREA

External hydrants

To be erected

To be deployed

FIRE WATER PIPING NETWORK

External & internal hydrants

To be erected

To be erected