EMPLOYMENT HISTORY
Jan 2013 May 2013
Alcatel-Lucent, Saudi Arabia
PAT Coordinator

Responsible for PAT scheduling & Responsible to update the daily Tracker.
Working on ( NPTS , NFTS , Gate )
Trouble shouting with G TAC, Back office, ROL teams to follow site status.
Responsible for update in NPTS (Network Project Tracking System) for dismantle
project
Coordination with subcontractors related site confirmation.
Arrange the PAT document toward the regions as per PAT schedule.
Responsible to check the site relevant documents e.g.; SSR, SVR, SCO, SAF,
VSWR, CGI File.
Responsible to collect the signed Documents from Subcontractors and migrate for
invoicing /certification.
Generating reports to view progress and passing on the same to the concerned PM
Plan
and
schedule project timelines
&
Provide
direction
and support to project team

July 2012 Jan 2013


STC, Saudi Arabia
Assistant Project Manager

Directly responsible for the general management of the entire Network


Dismantling
Trouble shouting with RF, TX and AUC teams to follow site status.
Coordination with subcontractors Related site confirmation & Rerouting site
Responsible to check the site relevant documents e.g.; SCO, SAF, TD file.
Generating reports to view progress and passing on the same to the concerned PM
Working on (NPTS , NFTS , Gate , Trends , JISOW)

The information contained herein is confidential and proprietary to SNS. In accepting receipt of this document, the recipient hereby
agrees that this information will only be used for sole purposes of evaluating and preparing the service requested.

Jan 2012 July 2012


Advanced ERA
Project Supervisor

Site Surveys, Network Path Survey, Microwave Installation (MPR), implementing


Commission reliable microwave network (MPR)
Managing the (Survey, installation, Commission, Integration, NMS, PAT)
activities for ALU Equipment (MPR)
Supervise all installation & Integration Activities for NMS (MPR, BTS 9100). Tk
Project.
Supervise all installation & Integration Activities for NMS (I Paso). Mine Project.
Responsible about status of site such as on Air.
Arrange the PAT document toward the regions.
Provide direction and support to project team.

June 2011 Jan 2012


MOBINIL, Egypt
Team Leader and Technical Support Engineer

Microwave Transmission Engineer for Survey, Installation & Commissioning &


Integration and testing IP & VLANS (MX Paso Link V4, Paso NEO, and RTN
microwave).
Responsible about status of site such as on Air & update the daily Tracker
Coordination with subcontractors related site confirmation.
Arrange the PAT document toward the regions as per PAT schedule.

Feb 2010 June 2011


NEC, Egypt
Project Supervisor

Huawei -Etisalat Expansion Project, BTS &Sector expansion, Integration (3012 II


- 3012- 3012AE 3900) outdoor - indoor.
Huawei -Etisalat Microwave Project, Installation, Commissioning (RTN MW).
Huawei - Etisalat TK Project, Acceptance & Quality (QA & QC).
Coordination with subcontractors related site confirmation.
Arrange the PAT document toward the regions as per PAT schedule.
Responsible to update the daily Tracker.
Responsible to check the site relevant documents eg ; PO, SCO, SAF, VSWR,
File.
Responsible to collect the signed Documents from Subcontractors and migrate for
invoicing /certification.

The information contained herein is confidential and proprietary to SNS. In accepting receipt of this document, the recipient hereby
agrees that this information will only be used for sole purposes of evaluating and preparing the service requested.

Generating reports to view progress and passing on the same to the concerned PM
Plan and schedule project timelines.
Provide direction and support to project team.
Rings project, Survey, Installation, Commissioning & Acceptance (PASO NEOs).
For Mobinil SDH
Survey, Installation, Commissioning &Acceptance (PASO, NEOs). For PDH
Rings project

Aug 2008 Feb 2010


NEC, Egypt
Site ENgineer

Survey, Installation, commissioning, Integration for Paso+, Paso, PDH, SDH and
NMS
Huawei -Etisalat Microwave Project, Installation, Commissioning (RTN MW).
Huawei Etisalat TK Project, Acceptance & Quality (QA & QC).

TRAINING

Training in NEC system integration & construction


Training in Cairo training centre (CTC) of NEC at smart village which includes
Course in (ICDL) the National Studies Centre
Course in (GSM).
Training in ASCOM CO. for Computer Network system.
Course in (Borland C) in Noble COMPU-Science Centre.
Course in (Hardware Maintenance).
Cisco Certified Network Associate (CCNA). (Course).

EDUCATION
Bachelor of Science in Computer & Communications Engineering
REFERENCES
Will be furnished upon request

The information contained herein is confidential and proprietary to SNS. In accepting receipt of this document, the recipient hereby
agrees that this information will only be used for sole purposes of evaluating and preparing the service requested.

Anda mungkin juga menyukai