1.
General :
This report outlines the basis of design, estimated requirements, Proposed system,
other requirements and estimated cost.
2.
Area to be Airconditioned :
Ground and First of each left and right wing to be airconditioned.
3.
Basis of Design :
3.1
Summer
Monsoon
Winter
7.2O CDB;
5.0O CWB
3.2
Inside conditions
Summer
&
Monsoon
23.8O C +/- 1O C
RH not exceeding 65%
3.3
Light
Shop
Other area
:
:
6.0 w/sqft.
2.0 w/sqft.
3.4
Occupancy
60 sqft./person
3.5
Fresh air
3.6
Roof insulation
4.
Estimated Requirement :
-:2:-
Right Wing
1.
Ground Floor
Mezzanine Floor
Shops
4511
34.96
36.37
Corridor
1538
6.05
6.46
-----------------------------------------------------------------------------------------------------------------Subtotal
6,049
41.01
42.83
-----------------------------------------------------------------------------------------------------------------Total
13,440
87.38
93.86
-----------------------------------------------------------------------------------------------------------------B-
Left Wing
3.
Ground Floor
Shopping Hall
4.
6779
44.75
48.42
Mezzanine Floor
Shopping Hall
6122
47.09
49.37
-----------------------------------------------------------------------------------------------------------------Subtotal
12,901
91.84
97.79
-----------------------------------------------------------------------------------------------------------------Grand Total
26,341
179.22
191.65
Sqft.
TR
TR
------------------------------------------------------------------------------------------------------------------
-:3:-
=
=
=
94 TR
98 TR
--------192 TR
---------
230 TR
5.
System Design :
5.1
It is proposed to install central chilled water system to aircondition the entire shopping
area of left and right wing.
5.2
5.3
The main plant will be installed in the Service area in open space.
5.4
Main plant will supply chilled water to various areas on each floor using M.S. `C class
insulated chilled water piping.
5.5
All show room will have FCU according to requirements. Big Bazzar & other area will
also be feeded by AHUs.
5. 6
G.I. sheet steel ducting will be used to supply conditioned air to various area supply and
return air grill/diffuser will be of extruded Aluminium duly powder coated.
5.7
The system will be complete with electrical panel board with cabling and earthing.
6.
Power Requirements :
Complete system of airconditioning will require 400 kw of 3 Ph, 415 volts, 50 Hz A.C.
supply and 3 Ph/1 Ph supply will be needed for AHU.
7.
Water Requirements :
As the system is aircooled, water is not required.
-:4:-
8.
Estimated Cost :
Shopping Complex
8.1
Chilling unit
60 TR each (Recip.)
4 Nos.
Rs.
50,00,000
8.2
6 Nos.
Rs.
2,00,000
8.3
Lot.
Rs.
16,00,000
8.4
AHUs /FCU
Lot.
Rs.
25,00,000
8.5
Lot.
Rs.
15,00,000
8.6
L.S.
Rs.
Total
(ABID HUSAIN)
800/19092005
4,00,000
---- ----------Rs. 1,12,00,000
---------------